Engage Coupler. Engage Coupler Chase



Similar documents
Model Number Electrical Compatibility Module Connector Type. M LL-S22 60 cell PV module MC-4 Type 2 Locking

Enphase Engage Cable and Accessories

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

Enphase Microinverter Model M215

Enphase M250 Microinverter

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

Installation Guide Content for P250xV-240 microinverters

Enphase M215 Microinverter

AC Module Installation Guide Content

TECHNICAL BRIEF. Commercial PV in Australia and New Zealand Using the Enphase Microinverter System

1 GENERAL 4 2 DEFINITIONS 4 3 STANDARDS FOR INSTALLATION 4 4 LICENSING Extra Low Voltage (ELV) Low Voltage (LV) 5

How To Plan Out An Array Of Solar Panels

sunmax Residential Solar Solution sunmax Hardware sunmax Software

Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

AC Module Installation Guide Content

Masterseal Plus TM. ingress protected wiring devices. technical hotline +44 (0) IP66. Improved catch.

How To Mount An Ecosa Series Solar Panel

Power Distribution Systems for the Dell PowerEdge M1000e Modular Server Enclosure - Selection and Installation

Los Angeles Fire Department Requirement No. 96 SOLAR PHOTOVOLTAIC SYSTEM

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting

Designing Multi-Tenant and Multi-Home Developments with Enphase Microinverters

Expedited Permit Process for PV Systems AC Module

LIEBERT VNSA Installation Sheet

City of San Diego Residential Photovoltaic Systems Inspection Guidelines

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

Solar Panel Installations

Washer, Electrical Equipment Bond WEEB

Solar Kit. Complete solution to optimize your photovoltaic system

Doe Residence kw DC Roof Mounted Photovoltaic System

Solar Power Solutions

Installation Guide Solar Connect-11

Request for Proposals for Photovoltaic System Installation

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

RAY-MAX Integrated Solar Power Strip

HP 16/18-Port Cable Management Kit Installation Guide

SMART SOLAR SOLUTIONS FOR ROOFTOP ENERGY IN NORTH AMERICA

Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada

Auxiliary equipment for communication with the EuroProt protective devices

Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10

GENERAL INSTALLATION MANUAL FOR EGING PV MODULES

INSTALLATION OF A BAY WINDOW

RESIDENTIAL PHOTOVOLTAIC SUBMITTAL REQUIREMENTS

Safety and Installation Instructions for AC Modules

AC Unison Installation Guide

Roy Allen, Technical Training, 17FEB2015 ABB Solar Days Residential Products, Design & Application Rapid Shutdown. ABB Feb 27, 2014 Slide 1

Assembly Instructions for the InteliTrack 3000 Rail Tracking System

RMM2 Heat-Tracing Remote Monitoring Module for the Raychem NGC Control System Installation Instructions

Installation Guide of Sunrise Solartech PV Modules. Term Contents. Purpose of this guide. General. Safety precaution for installing a solar

Installation Instructions

ES-A Series Photovoltaic Panels

Mounting instructions

Solar Power System Installation Manual

Checklist Testing and inspection without interconnection

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure

5800 Temperature Sensor Cable Assembly

Solar Water Heating and Photovoltaic Electrical Systems Installed on One or Two Family Dwellings

March 14, Installation of Bay, Bow and Garden Windows

Solar Cell Optimization: Cutting Costs and Driving Performance

Cabinets 101: Configuring A Network Or Server Cabinet

42U/45U 28" Wide Rack Installation & Service Guide

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

Photovoltaic System Overcurrent Protection

Installation instructions, accessories - Handsfree for cellular phone, system B, entry level

SOLAR ELECTRIC MODULE ES-124 & ES-62T Owners Manual and Installation Guide

Installation Instructions

RayClic Connection System Installation Instructions

CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute

Ocean Engineering Technical Data Sheet Stuffing Tubes

Electrical safety of grid-connected solar installations in Western Australia December 2011

Builder Specifications for Solar Ready Homes

Scepter PVC Molded Junction Boxes

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

TECHNICAL SPECIFICATIONS

UBBINK SOLAR IN-ROOF SYSTEM

ACDC12 Solar Air Conditioner Heat Pump

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D

POWER LOCK KIT GENERAL INSTALLATION -J04427 REV Kit Number. Models. Additional Parts Required. Kit Contents

PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

YINGLI SOLAR PV MODULES Installation and User Manual

Energy Communication Unit (ECU)

WIND ALARM. Wind Speed Alarm. Wind Speed. Set Point 2. Set Point 1 NEW BEDFORD, MA USA

Energy Communication Unit (ECU)

8 Ways Power Optimizers are Better by Design

KNX Interface. User Manual PM00A00IRI

Focus of the Guidebook

Solar Solutions and Large PV Power Plants. Oscar Araujo Business Development Director - Americas

PITCHED ROOF STRUCTURES

Understanding the Fire Hazards of Photovoltaic Systems

Installation and Operations Manual. Siemens Microinverter Model SMIINV215R60XX

IRFTS SHADOW SOLAR SOLAR SHADE HOUSE STRUCTURE - ENERGY PRODUCTION AND SUN PROTECTION

1 Table of Contents SolarEdge Site Design Tool

HP 36-Port InfiniBand Switch Cable Management Kit Installation Guide

Disclaimers. Important Notice. Emission Compliance. Disclaimers

Transcription:

TECHNICAL BRIEF Wire Management in an Enphase System The Enphase Microinverter System installs much more quickly than other PV (photovoltaic) system technologies. This is partly due to the plug-and-play nature of the Enphase Microinverters and the ease of managing the Engage Cable. A significant advantage of the Enphase system is that the system wiring is all AC. There is generally a lot less conduit and wiring in an Enphase installation. Also, an Enphase system has only one wire run, and that wire run is direct from the array to the main service panel. This means that an Enphase system has lower installation costs because it requires fewer conduits, less wiring, fewer wire pulls, no DC wire runs, and lower labor costs. In all PV systems, wire management is critical to the long-term reliability of the system. While an Enphase system is not impacted by the arc fault and ground fault issues so frequent with string inverter systems, the need for proper wire management still exists. This document discusses some of the best practices for proper wire management in an Enphase system and some of the products you can use to reduce installation costs and labor time on the roof. Managing Installations with Multiple Sub-Arrays Junction Box Engage Coupler Chase Engage Coupler When Enphase Microinverters are installed on multiple sub-arrays or on multiple roof faces, you can choose from several approaches: Install a roof-mounted junction box at each sub-array where the Engage Cable is connected to the field wiring. Run TC-ER field cable between the arrays in open-ended chases to protect the cable and to provide additional UV protection. Install the cable along support cables or along rails, and transition from Engage Cable to TC-ER field cable through a junction box or an Engage Coupler (Enphase order: ET-SPLK). 1 2015 Enphase Energy Inc. All rights reserved. February 2015

For more information on the Enphase Engage Coupler, refer to the Engage Coupler technical brief and datasheet at: https://enphase.com/products/engage-coupler/ AC Wire Management at the Junction Box Wire management practices at the junction box are critical to the long-term reliability of any PV system. You can locate the junction box either underneath the modules or adjacent to the array. Installers often install the roof-mounted junction box on the side of a rail. 2 2015 Enphase Energy Inc. All rights reserved. February 2015

Follow these recommendations to prevent moisture from accumulating in the junction box. At the same time, you will significantly improve system reliability while helping to ensure that the wiring connections last for the life of the system. Make sure that cables enter the junction box from the side or from the bottom, never from uphill. Install cables with a drip loop. Secure the cable so that water drains away from the cable entry. Use properly sized strain reliefs and cord grips. Note that: - The outside diameter of the single-phase Engage Cable is 0.42 (10.75mm) - The outside diameter of the three-phase Engage Cable is 0.46 (11.75mm) Properly tighten the strain reliefs to prevent cable movement. Install the junction box to meet the manufacturer s recommended mounting and orientation requirements. Use NEMA 4 enclosures. (NEMA 3 enclosures have a limited mounting orientation range and may not accommodate typical rooftop installations.) Consider drilling a small drain hole in the bottom, lowermost corner of the junction box, so that moisture or condensate can drain out of the junction box. Frame Mount and Cable Connector You can use the Enphase Frame Mount and Connector Clip to attach the Enphase Microinverters directly to module frames. This may be the ideal solution for rail-less racking solutions, whether residential or commercial. When using the Enphase Frame Mount product, you can support the cabling off the roof and connect to the module frames using the Connector Clip. DC Wire Management Products Installers use a number of methods to support the DC module leads off the roof. Many simply loop the cable and then plug it into the microinverters, leaving the cable to rest on top of the microinverter and racking. Some clip the DC module lead to the module frame, using a clip rated for PV Cable. Clip examples follow: Nine Fasteners Burndy / Wiley Electronics Heyco Products DCS-1307 PV Cable clip ACME ACC-PV PV Cable Clip SunRunner PV Cable Clip 3 2015 Enphase Energy Inc. All rights reserved. February 2015

AC Wire Management Products Manufacturer Model Rail or Module Frame Parallel or Perpendicular Enphase Energy ET-CLIP Rail When cable runs parallel to rail Image Nine Fasteners NFI-1414 Module Frame When cable runs parallel to module frame Nine Fasteners NFI-1461 Module Frame When cable runs parallel to module frame Nine Fasteners NFI-1462 Module Frame When cable runs perpendicular to module frame Burndy/Wiley ACC-F2-90 Module Frame When cable runs parallel or perpendicular to module frame Burndy/Wiley UNIRAP Rail When cable runs parallel to rail or mounting system Heyco SunRunner 2 Series Rail or Module Frame When cable runs parallel to rail or module frame Heyco SunBundler Rail When cable runs parallel to rail or mounting system The Enphase Engage 240V, single-phase cable has an outside diameter of 10.75mm (0.425 ) The Enphase Engage 208V, three-phase cable has an outside diameter of 11.75mm (0.463 ) 4 2015 Enphase Energy Inc. All rights reserved. February 2015

Supporting the Engage Cable In a roof mount installation, you will often install the Engage Cable before installing the modules. In these cases, support the Engage Cable at each connector and attach the cable to the module frame when spanning from row to row. You must support the cable off the roof. Install the Engage Cable terminators (Enphase order: ET-TERM) at the ends of all cable sections. Install the terminators properly to prevent conductor faults and to prevent water from entering the cabling. Install watertight seals (Enphase order: ET-SEAL) on all unused connectors on the Engage Cable to prevent water ingress into the cable, damage to the system, and potential fault conditions. Using these seals helps to eliminate avoidable service calls. When running the cable between arrays, support the cable with clips on the module frames or by securing it to a grounding conductor (if used). 5 2015 Enphase Energy Inc. All rights reserved. February 2015

Supporting the DC Module Leads Prepare the modules by using clips on the leads to prevent the leads from resting on the roof. It is best to prepare the modules on the ground, prior to the module installation. Install the wire clips and DC module leads to allow for easy connection to the microinverter while also supporting the conductors off of the roof. Once the modules are prepared, install them on the racking. Secure any loose wires or cables to the module frames with properly sized wire clips. When the installation is complete, support all conductors off of the roof. Proper wire management is one of the most critical steps to ensuring a long lasting and reliable PV installation. Use the instructions provided here to ensure a trouble-free installation and to help reduce the number of service calls to the site. If needed, contact Enphase Customer Support at support@enphaseenergy.com. 6 2015 Enphase Energy Inc. All rights reserved. February 2015