Assembly Instructions for the InteliTrack 3000 Rail Tracking System

Size: px
Start display at page:

Download "Assembly Instructions for the InteliTrack 3000 Rail Tracking System"

Transcription

1 Assembly Instructions for the InteliTrack 3000 Rail Tracking System InteliTrack is a trademark of Sedona Solar Technology. Sedona Solar Technology 16 April

2 1. Before you begin WARNING Safety equipment needed: Hard hat Safety goggles Ear plugs Work gloves Tools and other equipment needed: Torque wrench SAE socket set The frame array has moving parts that can cause injury if handled improperly during assembly and operation. Use appropriate safety equipment including gloves, hard hats, and eye protection, and keep hands clear of areas where unsecured components may move. Follow the directions in this manual for safe, proper setup of the tracking system. SAE open-end wrench set Pliers lineman s, needle-nose, and channel-lock Figure 1: Safety equipment Laser level or string line 4 ratchet straps 8 foot length, minimum working load 500 pounds Rubber mallet Socket adapters and extensions Tape measure at least 25 feet Impact driver or cordless drill* * Optional but highly recommended. List of parts: See Bill Of Materials included with individual packages. Sedona Solar Technology 16 April

3 2. Posts 2.1 Posts are customer-supplied parts. 2.2 The minimum length of 48 inches includes 6 inches of clearance. Adjust length accordingly if more clearance is needed for snow, grass, etc. Length increase must meet local codes and wind loads. 2.3 Posts can be pounded posts, helical piles, ground screws, or set in concrete, depending on soil conditions and local codes, and must be engineered. 2.4 Engineering can be done locally or by Tower Engineering Professionals ( which provides this service to Sedona Solar Technology customers. 2.5 Recommended post material: 4-inch diameter schedule 40 galvanized steel pipe. 2.6 Post spacing see Figure 2. Number of frames Spacing west-to-east Configuration W W-E W-C-E W-C-C-E W-C-C-C-E W-C-C-C-C-E 2.7 Install the ground posts in a secure foundation. 2.8 The posts must be installed to within ± 1 inch in all directions. Figure 2: Post spacing Sedona Solar Technology 16 April

4 3. Overview of assembled tracking system 3.1 Axes of motion Assembly Instructions InteliTrack 3000 System The system is configured to move in two axes to track the sun. The motion around the elevation axis (Figure 3) tilts the array toward the north in winter (in the northern hemisphere) and more nearly horizontal in the summer. Figure 3: Elevation axis Sedona Solar Technology 16 April

5 The motion of the radial axis moves the panels to track the sun from east to west through the day. Figure 4: Array at summer position Figure 5: Array at winter position Sedona Solar Technology 16 April

6 3.2 Array configuration Up to six frames can be joined together to make a single array or rail. Each array will have one West frame (Figure 6), one East frame (Figure 7), and up to four Center frames (Figure 8). Note the differences in the corners where each rail meets a crossbeam. Figure 6: West frame Figure 7: East frame Figure 8: Center frame Sedona Solar Technology 16 April

7 3.3 Actuator placement Elevation actuators are placed as shown in Figure 9. Figure 9: Actuator placement Sedona Solar Technology 16 April

8 The radial actuator is placed near the center of the array, as shown in Figure Controller placement Figure 10: Radial actuator placement The controller is mounted on the west-most post in the array. 4. Frame assembly 4.1 Post clamp installation Locate all post clamps one for each frame plus one at the end of each array Mount one post clamp to each post in the array, with two ½ u-bolts to each post in the array, tightening all nuts evenly to finger-tight locate the highest post clamp in the array Set the laser level elevation to the center of the holes on the top of each post clamp. (See Figure 11.) Adjust the height of all the other post clamps to match that of the highest clamp, using the laser level Torque all the u-bolts. Note: When the post clamps are properly aligned, it will be possible to look through all the mounting holes. Sedona Solar Technology 16 April

9 Figure 11: Post clamp locations 4.2 Saddle bracket installation see Figures 12 and Locate the saddle brackets one for every post clamp Verify that all the bushings are fully pressed into the saddle brackets Install a saddle bracket over each post clamp with a clevis pin. Figure 12: Saddle bracket installation Figure 13: Saddle bracket installation Sedona Solar Technology 16 April

10 4.3 Crossbeam installation Figures 14 and Locate a crossbeam Install the crossbeam on the furthest saddle bracket to the west, using four bolts Install crossbeams on each remaining saddle bracket. Figure 14: Crossbeam installation Figure 15: Crossbeam installation Sedona Solar Technology 16 April

11 4.3.4 Locate four rail end angle brackets and four crossbeam end angle brackets Install four crossbeam angle brackets onto the crossbeams in the locations shown in Figure 16, with the orientation shown. 4.4 Rail installation Locate one top rail and one bottom rail. Figure 16: Crossbeam angle bracket installation Install grommets in all 1 holes in both rails Install the rail end brackets onto the rails as shown in Figures 17 and 18. Note: Rail end brackets will have different spacing for the crossbeams at both ends of the frames. Rails mating to end crossbeams install as shown in Figure 17. Rails mating to middle crossbeams install as shown in Figure Using two ratchet straps, secure the southern end of each crossbeam to the mounting posts to prevent crossbeams from moving during installation of the bottom frame rail Mount the bottom rail to the crossbeam using bolts as shown in Figures 19 and 20. Make sure the grommets face inside the frame Flip the frame so that the installed rail is now on the high side, and secure the frame with ratchet straps Install the top rail in the same way Using a tape measure and a square, check to make sure that the frame is square to within Sedona Solar Technology 16 April

12 Figure 17: Rail end bracket- end crossbeam Sedona Solar Technology 16 April

13 Figure 18: Rail end bracking - center crossbeam Sedona Solar Technology 16 April

14 Figure 19: Mounting the lower rail to the end crossbeam Figure 20: Mounting the lower rail to the middle crossbeam Sedona Solar Technology 16 April

15 4.5 Installation of middle frames Assembly Instructions InteliTrack 3000 System Locate one crossbeam for each saddle bracket, two middle rails per frame, four rail end angle brackets per frame, and four crossbeam end anble brackets per frame Install the crossbeams on all saddle brackets as shown in Figure 21. Figure 21: Crossbeam installation Install two crossbeam angle brackets on each crossbeam as shown in Figure Install two rail end angle brackets on each rail spacing holes as shown in Figure Use two ratchet straps to secure the West frame to the post clamps, with the bottom rail down Use the remaining two ratchet straps to secure the next two crossbeams in the array to their posts with their south ends down Install bottom rails, using two bolts at each end of each rail Move ratchet straps down the array as needed to secure the next crossbeam before installing the next rail When all the middle frame bottom rails are installed, flip the frame and use the ratchet straps to secure the array for top rail installation Install all top rails using two bolts at each end of each rail. Sedona Solar Technology 16 April

16 Figure 22: Rail end angle bracket installed 4.6 Installation of elevation actuators Sedona Solar Technology 16 April

17 4.6.1 Locate the elevation actuator bracket assemblies two per array Locate two post actuator bracket assemblies two per array Locate two actuators Position the actuators according to Figure Install post actuator bracket assemblies as shown in Figure Install the elevation actuator bracket assemblies as shown in Figure Install actuators on each post actuator bracket as shown in Figures 25 and Repeat for all other elevation actuators in the system. Figure 23: Post actuator bracket Sedona Solar Technology 16 April

18 Figure 24: Elevation actuator bracket assembly Sedona Solar Technology 16 April

19 Figure 25: Actuator installation Figure 26: Actuator installation on crossbeam Sedona Solar Technology 16 April

20 4.7 Installation of lever arms Locate lever arms four per frame Install lever arms into the frames as shown in Figures 27 and Check for free movement of each lever arm. Figure 27: Lever arm installation Sedona Solar Technology 16 April

21 Figure 28 Lever arm installation Sedona Solar Technology 16 April

22 4.8 Carrier arm installation Locate the carrier arms one for each frame Locate the carrier arm coupler kits one for each junction between carrier arms Locate the radial actuator carrier arm bracket assembly Locate radial actuator frame bracket assembly Locate actuators one for each array Install each carrier arm using clevis pins from lever arm, as shown in Figure 29. Figure 29: Carrier arm installation Sedona Solar Technology 16 April

23 4.8.7 Join the carrier arms using couplers as shown in Figure 30. Figure 30: Carrier arm coupler Install radial actuator carrier arm brackets as shown in Figures 31 and 32. Figure 31: Radial actuator carrier arm bracket installation Sedona Solar Technology 16 April

24 Figure 32: Assembled radial actuator carrier arm bracket Sedona Solar Technology 16 April

25 4.8.9 Install radial actuator frame bracket as shown in Figure 33. Figure 33: Radial actuator frame bracket Install the actuator as shown in Figure 34. Install the shaft end of the actuator to the carrier with clevis pin. Figure 34: Actuator installation on frame Note: You may apply 12 to 24 volts dc to the actuator to extend it to hold the lever arms in a level position. Sedona Solar Technology 16 April

26 4.9 Panel support bar installation Locate panel support bars two per lever arm Locate hat brackets two per lever arm Locate hat bracket fasteners four per lever arm Install panel support bars as shown in Figure 35. Figure 35: Panel support bar installation Mock up solar panel (if available) to determine correct positioning for panel support bars to center panel on lever arm Use laser level to guide positioning of all successive panel support bars Properly torque all panel support bars Frame checks Check all frames and verify that they are square Disconnect radial actuator at the carrier arm and ove carrier arm through its entire range of motion, checking for binding and collisions Check all fasteners for proper torque Install solar panels Install solar panels onto panel support bars, making sure that panels are oriented so that leads can feed into the wiring holes in the bottom rails of the frame Torque all fasteners to panel manufacturer s specifications. Sedona Solar Technology 16 April

27 4.12 Wire arrays according to NEC and local building codes Install controller Install control unit on the post furthest to the west using the controller mount kit Wire controller referencing documentation provided Follow setup procedure in controller documentation. 5. Final checks 5.1 Check frames Check that all fasteners are properly torqued Check that all wires have adequate lengths to allow for system movement Check that frames are not twisted Verify all grounding connections Verify all controller and actuator connections. 5.2 Check system function Check array range of motion to the north, using the controller in manual mode Check array range of motion to the south, using the controller in manual mode Check array range of motion to the east, using the controller in manual mode Check array range of motion to the west, using the controller in manual mode Check that the controller moves the panels to full south and centers them between east and west when in CLEAN mode Check that the controller moves the panels to be flat when in STORM mode Check that the controller points the panels at the sun when in TRACK mode by placing at least a six inch long rod, such as PVC pipe, on the panel and checking the shadow. Sedona Solar Technology 16 April

28 Sedona Solar Technology 16 April

29 2225 North Gemini Drive Flagstaff AZ Sedona Solar Technology 16 April

DYNA RIDER FOOTBOARD KIT

DYNA RIDER FOOTBOARD KIT -J0 REV. 0-0-0 DYNA RIDER FOOTBOARD KIT GENERAL Kit Number 000 Models For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com (English

More information

Solar Power Systems Models: PVS220W-24 and PVS220W-48 Installation Manual

Solar Power Systems Models: PVS220W-24 and PVS220W-48 Installation Manual Solar Power Systems Models: PVS220W-24 and PVS220W-48 Installation Manual 255379 Rev. D0 1015 Printed in U.S.A. Copyright 2015 Federal Signal Corporation Limited Warranty The Alerting and Notification

More information

POWER LOCK KIT GENERAL INSTALLATION -J04427 REV. 2007-12-04. Kit Number. Models. Additional Parts Required. Kit Contents

POWER LOCK KIT GENERAL INSTALLATION -J04427 REV. 2007-12-04. Kit Number. Models. Additional Parts Required. Kit Contents -J0 REV. 00--0 POWER LOCK KIT GENERAL Kit Number -0, 0-0 Models For model fitment information, please see the P&A Retail Catalog or the Parts and Accessories section of www.harleydavidson.com (English

More information

Post Mount Light Installation*

Post Mount Light Installation* Post Mount Light Installation* *For the general installation of most Post Mount Spotlights, many vehicles may need slight modifications to these instructions. You will need the following tools: High torque

More information

6 inch A-Arm Lift Kit WARNING: 16-018/16-019. installation instructions. will fit CLUB CAR DS. included:

6 inch A-Arm Lift Kit WARNING: 16-018/16-019. installation instructions. will fit CLUB CAR DS. included: Revised May 205 6-08/6-09 6 inch A-Arm Lift Kit will fit CLUB CAR DS installation instructions included: Rear Lift Blocks Main Suspension Assembly Spindles A-Arms Rear Shock Mounting Plates U-Bolts WARNING:

More information

WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR.

WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR. Model: Document Number: 64058111 Kit Number: 64058112 Revision: 02 Description: Release Date: 04/08 Introduction This kit allows a PS90 scale to be integrated into a standard gravity conveyor. The kit

More information

Step 1. Item 6. Item 1

Step 1. Item 6. Item 1 Voltage Regulators QD3/T350 Motor Replacement Kit Kit Number 57A63675100B Service Information S225-50-35 Contents General..................................... 1 Parts Supplied...............................

More information

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 (See Supplemental Instructions for trailers with heavy duty round footplates and/or Power Leveling Systems) PHONE SUPPORT

More information

Rating when used as a weight carrying hitch without spring bars:

Rating when used as a weight carrying hitch without spring bars: BOLT-TOGETHER WEIGHT DISTRIBUTING HITCH SYSTEM Rating when used as a weight distributing hitch with spring bars: Part Number 48051 4805 48053 48054 Max Tongue Weight 550 Ibs. 750 Ibs. 1000 Ibs. 1400 lbs.

More information

SELF-STEERING AXLE TABLE OF CONTENTS

SELF-STEERING AXLE TABLE OF CONTENTS SELF-STEERING AXLE TABLE OF CONTENTS Section 1 - Introduction Section 2 - Pre-Installation Check List Section 3 - Ride Height Adjustments Section 4 - Suspension Mount Section 5 - Axle Mount Section 6 -

More information

Mounting Tripod Kit Installation Manual

Mounting Tripod Kit Installation Manual Mounting Tripod Kit Installation Manual For use with Davis s wireless and cabled Vantage Pro2 weather stations, the Mounting Tripod simplifies installation. The tripod supports the Integrated Sensor Suite

More information

XL PREMIUM OIL COOLER KIT

XL PREMIUM OIL COOLER KIT -J05 REV. 0-0-0 XL PREMIUM OIL COOLER KIT GENERAL Kit Number 0008 Models For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com (English

More information

EZ-48-3AB-125-35 Weather Station Mounting Tripod and Mast

EZ-48-3AB-125-35 Weather Station Mounting Tripod and Mast EZ-48-3AB-125-35 Weather Station Mounting Tripod and Mast EZ-125-35M 35 Mast Extension (Optional) EZ-125-SK Stake Kit (Optional) EZ-46-3 Tar Pad Kit (Optional) EZ-GWA Guy Wire Kit (Optional) Ambient Weather

More information

TABLE OF CONTENTS. I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2

TABLE OF CONTENTS. I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2 BAL Accu-Slide System I. Table of Contents TABLE OF CONTENTS I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2 II. GETTING STARTED... 5 - Section 2.01: Tools You Will Need... 5 - Section

More information

AZEK Rail Install Guide

AZEK Rail Install Guide TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with CableRail by Feeney... 1 Installing CableRail by Feeney for AZEK Rail... 7 Installing AZEK Rail Stairs with CableRail

More information

Installation Instructions For Slider Casement Air Conditioners

Installation Instructions For Slider Casement Air Conditioners Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT

More information

Auto-belay Cable Replacement Process

Auto-belay Cable Replacement Process Auto-belay Cable Replacement Process Version 2.00 WARNING: The air pressure in the auto-belay system is what causes the cable to be retracted when releasing the cable or climbing the wall with the cable

More information

INSTALLATION INSTRUCTIONS. 6108 Air Spring Kit 2011+ Ford F250 Single Wheel 4WD 2011+ Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

INSTALLATION INSTRUCTIONS. 6108 Air Spring Kit 2011+ Ford F250 Single Wheel 4WD 2011+ Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113) INSTALLATION INSTRUCTIONS 6108 Air Spring Kit 2011+ Ford F250 Single Wheel 4WD 2011+ Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113) Thank you for purchasing a quality Hellwig Product. PLEASE

More information

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING*************** Bill of Materials: RAC0012 Green Wing Aerodynamic Skirt Kit Item Part Number Description Quantity 1 RMC0218 Gen 2 Trailer Skirt Roadside 1 2 RMC0219 Gen 2 Trailer Skirt Curbside 1 3 RMC0041 Trailer Skirt

More information

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports 972-429-1963

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports 972-429-1963 LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports 972-429-1963 Thank you for purchasing LG Motorsports products for your Gen 5 Camaro. Parts Inventory:

More information

Contractors Guide Central Inverter System Installation

Contractors Guide Central Inverter System Installation Contractors Guide Central Inverter System Installation Step By Step Procedures 2,200 Watt/VA 6 Step Installation 1. Mount Bottom Cabinet 2. Mount Top Cabinet 3. Install Batteries 4. Install Conduit 5.

More information

2.4M SERIES 1241 ANTENNA

2.4M SERIES 1241 ANTENNA 4096-859 Revision A August 7, 2012 2.4M SERIES 1241 ANTENNA GENERAL DYNAMICS SATCOM Technologies 1500 Prodelin Drive Newton NC 28658USA Phone 828-464-4141 www.gdsatcom.com Prodelin Corporation Page 1 8/17/2012

More information

These Installation Instructions are valid for antennas in the following version:

These Installation Instructions are valid for antennas in the following version: Installation Instructions 4 ft CompactLine Antennas (with E-Mount 250 km/h) SB, SBX NMT 560-05(e) These Installation Instructions are valid for antennas in the following version: Reflector Ø 1.2 m (4 ft)

More information

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks Securitron Magnalock Corp. www.securitron.com ASSA ABLOY, the global leader Tel 800.624.5625 techsupport@securitron.com in door opening solutions INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate

More information

ECM-D70T / ECM-D70T1.5

ECM-D70T / ECM-D70T1.5 Elliptical Ceiling Dual Mount for 37 to 50 Flat Panels INSTALLATION INSTRUCTIONS CREATING POSITIVE CUSTOMER EXPERIENCES 9531-041-001-01 Contents ECM-D70T / ECM-D70T1.5 Installation Tools... 3 Parts List...

More information

SLACK PERFORMANCE KARTS

SLACK PERFORMANCE KARTS SLACK PERFORMANCE KARTS SET UP GUIDE Thank you for purchasing a 2013 Slack Axiom Chassis. Performance Mfg. strives to provide you with the very best chassis and components on the market today. Your satisfaction

More information

Solar Power System Installation Manual

Solar Power System Installation Manual Solar Power System Installation Manual Power-Save Energy Co. 3940-7 Broad St. #200 San Luis Obispo, CA 93401 866 297 7192 FOR INSTALLATION PERSONNEL Please read this manual carefully before installing

More information

GPS AutoSteer System Installation Manual

GPS AutoSteer System Installation Manual GPS AutoSteer System Installation Manual Supported Vehicles John Deere Sprayers 4720 4630 4730 4830 AutoTrac Ready PN: 602-0227-01-A LEGAL DISCLAIMER Note: Read and follow ALL instructions in this manual

More information

Owners & Installation Manual for the Sheridan, Mountainair, Pine Valley and Old Forge Ceiling Fan Family

Owners & Installation Manual for the Sheridan, Mountainair, Pine Valley and Old Forge Ceiling Fan Family Owners & Installation Manual for the Sheridan, Mountainair, Pine Valley and Old Forge Ceiling Fan Family Part of the Kiva Lighting Family Custom Lighting and Fans Since 1992 1312 12th St NW Albuquerque,

More information

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation Solar Pool Heating System Installation Manual Read the complete manual before beginning the installation 1. Sizing the System Visit www.techno-solis.com to size the system using the sizing calculator.

More information

Rebuild Instructions for 70001 and 70010 Transmission

Rebuild Instructions for 70001 and 70010 Transmission Rebuild Instructions for 70001 and 70010 Transmission Brinn, Incorporated 1615 Tech Drive Bay City, MI 48706 Telephone 989.686.8920 Fax 989.686.6520 www.brinninc.com Notice Read all instructions before

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

GreenWay Solar LED Path and Trail Lighting System. Installation and Owner s Manual

GreenWay Solar LED Path and Trail Lighting System. Installation and Owner s Manual GreenWay Solar LED Path and Trail Lighting System Installation and Owner s Manual Important Notes and Warnings This installation and instruction manual provides installation, operation, and maintenance

More information

2011-14 F250 6 RADIUS ARM KIT

2011-14 F250 6 RADIUS ARM KIT 92154000 Thank you for choosing Rough Country for your suspension needs. 2011-14 F250 6 RADIUS ARM KIT Rough Country recommends a certified technician installs this system. In addition to these instructions,

More information

Customer Service 800.780.8889 or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

Customer Service 800.780.8889 or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips reflect your style TM Customer Service 800.780.8889 or visit us online at smithnoble.com Wood Shutters Step by Step Installation Troubleshooting Tips Easy Care Instructions STEP 1 Your New Shutter Thank

More information

Owner s Manual Read and keep this manual. Patents World Wide

Owner s Manual Read and keep this manual. Patents World Wide Owner s Manual Read and keep this manual. Patents World Wide S & S Industries, Inc., Sarasota, FL, USA www.trail-gator.com Copyright 2008 All Rights Reserved The following manual is provided to assist

More information

Wind Direction Smart Sensor (S-WDA-M003)

Wind Direction Smart Sensor (S-WDA-M003) (S-WDA-M003) The Wind Direction smart sensor is designed to work with HOBO Stations. The smart sensor has a plug-in modular connector that allows it to be added easily to a HOBO Station. All sensor parameters

More information

Arecont Vision H.264 Color or Day/Night SurroundVideo Series Installation Manual

Arecont Vision H.264 Color or Day/Night SurroundVideo Series Installation Manual 0 P a g e H.264 Color or Day/Night SurroundVideo Installation Manual Inside the box: A. Arecont Vision SurroundVideo camera B. Mounting template C. RJ45 female to female coupler D. Hex key E. Security

More information

EZ-Steer Assisted Steering System

EZ-Steer Assisted Steering System EZ-Steer Assisted Steering System Installation Instructions Platform Kit P/N 53059-54 Case IH CVX 1135 CVX 1145 CVX 1155 CVX 1170 CVX 1190 CVX 1195 CVX 135 CVX 145 CVX 155 CVX 175 CVX 195 New Holland TVT

More information

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford Pump Skid Fabrication for Magnetic Coupling Rick Soltis Chief Mechanic City of Bedford Contents Magnetic Couplings What They Are, How They Work, Where They re Used Fabrication and Manufacturing of Pump

More information

RadianceRail Installation Guide

RadianceRail Installation Guide RadianceRail Installation Guide Installing RadianceRail with CableRail by Feeney... 2 Installing CableRail by Feeney for RadianceRail... 7 Installing RadianceRail Stairs with CableRail by Feeney... 10

More information

R O A D M A S T E R, I N C.

R O A D M A S T E R, I N C. R O A D M A S T E R, I N C. ROADMASTER, Inc. 6110 NE 127th Ave. Vancouver, WA 98682 6 13 11 MOUNTING BRACKET KIT Cable Tab 14 12 7 15 9 Cable Tab 360-896-0407 fax 360-735-9300 www.roadmasterinc.com ITEM

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Turbo Tube Slide INSTALLATION INSTRUCTIONS C A U T I O N Do not climb on the outside of the slide This slide is designed for home use only, not for Public Playgrounds PlayCore, Inc. 2004 Copyrighted Material.

More information

INSTRUCTION. Industrial Sewing Machines. No. 010012. First published : June 1997 Second edition : March 2001

INSTRUCTION. Industrial Sewing Machines. No. 010012. First published : June 1997 Second edition : March 2001 INSTRUCTION Industrial Sewing Machines First published : June 1997 Second edition : March 2001 No. 010012 INTRODUCTION Thank you for your purchasing Kansai Special's DLR Series. Read and study this instruction

More information

OPERATING INSTRUCTIONS AND PARTS LIST FOR U075075 U100058 UNDERGROUND HOSE REELS

OPERATING INSTRUCTIONS AND PARTS LIST FOR U075075 U100058 UNDERGROUND HOSE REELS OPERATING INSTRUCTIONS AND PARTS LIST FOR U075075 U0005 FORM NO.: 3-00 REV: RAIN BIRD CORPORATION ONE REELCRAFT CENTER COLUMBIA CITY, IN 675 (00) -33 / (60) - FAX: (60) -605 U0005 MODEL NUMBER SIGNIFICANCE

More information

How To Launch A Rocket From A Formica

How To Launch A Rocket From A Formica Building the Basic Bottle Rocket Launch Pad Materials: -Formica double-sink countertop cutout. This can be easily and cheaply obtained from a local company that manufactures and/or installs countertops.

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

Installation Instructions

Installation Instructions READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:

More information

Table of Contents WARNING SYMBOLS AND DEFINITIONS

Table of Contents WARNING SYMBOLS AND DEFINITIONS Table of Contents SAFETY INSTALLATION OPERATION MAINTENANCE Safety... 2 Specifications... 4 Installation... 5 Operation... 8 WARNING SYMBOLS AND DEFINITIONS Maintenance... 9 Parts List and Assembly Diagram...

More information

Installation Instructions:

Installation Instructions: Portable Guardrail System Model Numbers: 7900060, 7900061, 7900062, 7900063 Installation Instructions: Portable Guardrail System This instruction is intended to meet the Manufacturer s Instructions requirement

More information

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab GOOSENECK MOUNTING KIT Equipment Required: Fastener Kit: F Wrenches: 3/4, 7/8, 15/16 Drill Bits: 1/4 Other Tools: Drill WARNING: Under no circumstances do we recommend exceeding the towing vehicle manufacturers

More information

INSTALLATION INSTRUCTIONS. 6111 Air Spring Kit 2011+ Ford F250/F-350 Single Wheel 2WD 2011+ Ford F350 Dually 2WD IMPORTANT NOTES

INSTALLATION INSTRUCTIONS. 6111 Air Spring Kit 2011+ Ford F250/F-350 Single Wheel 2WD 2011+ Ford F350 Dually 2WD IMPORTANT NOTES INSTALLATION INSTRUCTIONS 6111 Air Spring Kit 2011+ Ford F250/F-350 Single Wheel 2WD 2011+ Ford F350 Dually 2WD Thank you for purchasing a quality Hellwig Product. PLEASE READ THIS INSTRUCTION SHEET COMPLETELY

More information

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks TITAN pt. no.: 03 0000 0120 Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS G e n e r a t i o n V Extended

More information

Service Manual Supplement

Service Manual Supplement Volvo Trucks North America, Inc. Greensboro, NC USA This Service Bulletin is a supplement to Service Manual, Group, Anti-lock Brake System (ABS), Bendix, VNL, VNM publication number PV /. Service Manual

More information

Seismic Installation for Attic Storage System

Seismic Installation for Attic Storage System Your Performance Partner Seismic Installation for Storage System CONTENTS SSafety Precautions................................. 2 Required Tools..................................... 2 Parts and Fastener

More information

TRANS-05, Torque Tube Removal, Rebuilding, and Installation

TRANS-05, Torque Tube Removal, Rebuilding, and Installation TRANS-05, Torque Tube Removal, Rebuilding, and Installation Tools Metric Wrench Set Metric Socket Set Jack Stands (6 minimum) Floor Jack 8mm Cheesehead socket (also referred to as 12 point internal socket

More information

Chapter 10 - Scaffolding Systems

Chapter 10 - Scaffolding Systems Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5

More information

16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1

16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1 16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1 BD Adjustable Track Bar w/bracket Dodge 2500-3500 4WD Models 1994-2002 Dodge 1500 4WD Model 1994-2001 P/N# 1032011-F

More information

Roll-Up Door Maintenance Guide

Roll-Up Door Maintenance Guide R Roll-Up Door Maintenance Guide Cable Replacement on Two Spring Type Balancer Page 1 Panel Replacement - Removable Roller Cover Type Bottom Panel Page 1 Panel Replacement - Removable Roller Cover Type

More information

Slide the new steering column shaft through the steering column from the driver compartment.

Slide the new steering column shaft through the steering column from the driver compartment. Slide the new steering column shaft through the steering column from the driver compartment. Push the column shaft through the steering column until the machined end is out past the column lower bushing.

More information

INSTALL/REMOVAL INSTRUCTIONS: WINDOW LIFT MOTOR

INSTALL/REMOVAL INSTRUCTIONS: WINDOW LIFT MOTOR REMOVAL/INSTALL OF WINDOW LIFT MOTOR (742-273) Ford Expedition 1997 2002, Lincoln Navigator 1998 2002, Ford F-150 Super Crew Cab 2001 General Tech Tips: Use painter s tape rather than duct tape to secure

More information

F-Series Camera Mounting Accessories

F-Series Camera Mounting Accessories F-Series Camera Mounting Accessories Document Number: 427-0462-00-12 Version: 100 Issue Date: September 2010 2010. All rights reserved worldwide. FLIR Commercial Systems, Inc. 70 Castilian Drive Goleta,

More information

2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure

2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure 2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure Derek Guenther 1/28/2015 Rev. Purpose The purpose of this document is to describe the procedure necessary to replace one of the ball nuts

More information

SERVICE MANUAL. Corpus 3G. Seat system for electric wheelchair

SERVICE MANUAL. Corpus 3G. Seat system for electric wheelchair SERVICE MANUAL US Corpus 3G Seat system for electric wheelchair How to contact Permobil Head Office of the Permobil group Produced and published by Permobil AB, Sweden Version 4, 2014-07 Item No.: 205260-US-0

More information

MGB Chrome Bumper Conversion

MGB Chrome Bumper Conversion MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different

More information

DiscPlus DX195 and DX225 Air Disc Brakes

DiscPlus DX195 and DX225 Air Disc Brakes Revised 11-04 Technical Bulletin Revised 1 Technical 11-04 Bulletin DiscPlus DX195 and DX225 Air Disc Brakes Inspection, Installation and Diagnostics Air Disc Brake Inspection Intervals and Procedures

More information

Express5800/120Ed. Rack Mount Kit Installation Procedures PN: 455-01607-001

Express5800/120Ed. Rack Mount Kit Installation Procedures PN: 455-01607-001 Express5800/120Ed Rack Mount Kit Installation Procedures PN: 455-01607-001 Proprietary Notice and Liability Disclaimer The information disclosed in this document, including all designs and related materials,

More information

»Product» Safety Warning

»Product» Safety Warning C1200 Installation Instructions 2007-2016 Chevy/GM 1500 2/4wd 2" Strut Spacer Lift Read and understand all instructions and warnings prior to installation of product and operation of vehicle. Zone Offroad

More information

Home Signal Distribution Kit for Satellite TV Plus SIRIUS

Home Signal Distribution Kit for Satellite TV Plus SIRIUS SR-101C SIRIUS/DBS Signal Combiner System SR-2261 Combiner-Outdoor Made in China DBS IN SIRIUS IN SR-101C SIRIUS/DBS Signal Combiner System SR-2251 Splitter-Indoor Made in China DC IN DBS OUT SIRIUS OUT

More information

Installation Instructions Hustler 6-BTV Trap Vertical

Installation Instructions Hustler 6-BTV Trap Vertical Installation Instructions Hustler 6-BTV Trap Vertical ASSEMBLY 1. Check the package contents against the parts list on page 2. 2. WARNING. Installation of this product near power lines is dangerous. For

More information

HYDRAULIC LIFT TABLE CART 2200-LB.

HYDRAULIC LIFT TABLE CART 2200-LB. HYDRAULIC LIFT TABLE CART 2200-LB. OWNER S MANUAL WARNING: Read carefully and understand all MACHINE ADJUSTMENT AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other

More information

IF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL

IF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL IF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL Check out our Affordable Selection of DIY Pole Barn kit sizes and prices below. We offer a complete DIY pole barn kit plus independent experienced

More information

Part Name/Description Part Number Quantity. Power Cable 4000950-5 1

Part Name/Description Part Number Quantity. Power Cable 4000950-5 1 Note: Indented items indicate parts included in an assembly listed above Part Name/Description Part Number Quantity Power Cable 4000950-5 1 Raven Harness Adapter Kit 4100525 1 Installation Instructions

More information

30 minutes in class, 2 hours to make the first time

30 minutes in class, 2 hours to make the first time Asking questions and defining problems Developing and using models Planning and carrying out investigations 30 minutes in class, 2 hours to make the first time 3 12 x 24 x ¾ inch plywood boards 1 x 12

More information

Drive shaft, servicing

Drive shaft, servicing Volkswagen Passat B6 - Drive shaft, servicing Стр. 1 из 41 40-7 Drive shaft, servicing Drive shafts, overview I - Assembly overview: Drive axle with CV joint VL100 40-7, Drive axle with CV joint VL100,

More information

1993 SUSPENSION Volkswagen Front. EuroVan

1993 SUSPENSION Volkswagen Front. EuroVan Article Text ARTICLE BEGINNING 1993 SUSPENSION Volkswagen Front EuroVan DESCRIPTION FWD independent suspension is an double-wishbone type with torsion bars mounted on upper control arm. Wheel is supported

More information

COOPER S PULLEY UPGRADE KIT INSTALLATION INSTRUCTIONS PART NUMBER NME5011

COOPER S PULLEY UPGRADE KIT INSTALLATION INSTRUCTIONS PART NUMBER NME5011 COOPER S PULLEY UPGRADE KIT INSTALLATION INSTRUCTIONS PART NUMBER NME5011 Below are instructions for the Mini Mania Pulley Upgrade Kit, Part Number NME5011. Please take all necessary precautions for working

More information

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V TITAN pt. no.: 02 0000 0143 Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS G e n e r a t i o n V Extended

More information

Dock Hardware & Accessory Products Catalog

Dock Hardware & Accessory Products Catalog Dock Hardware & Accessory Products Catalog Product Page # Product Page # Angle Brackets/Clips 8 Back Up Plate 5 Backing Plate/Hurricane Stop 10 Carriage Bolt Sets 4 Chain Retainer 10 Connector Pin Set

More information

RZ Guardrail System Installation Manual

RZ Guardrail System Installation Manual TM RZ Guardrail System Installation Manual RZ Guardrail System Compliance is based on OSHA standards: (Standards - 29 CFR) 1910.23 (e) and (Standards - 29 CFR) 1926.502 (b) Failure to read, understand

More information

Bulletin 840 Float Switch and Operator Assembly Instructions

Bulletin 840 Float Switch and Operator Assembly Instructions Bulletin 840 Switch and nstructions ATTETO: Disconnect all power before wiring float switch and motor. Secure cover before reconnecting power. Test float switch operator assembly manually before leaving

More information

92-00 Civic/ 94-01 Integra/ 93-97 Del Sol/ 92-95 CRX Rear Kit Part No. 75540

92-00 Civic/ 94-01 Integra/ 93-97 Del Sol/ 92-95 CRX Rear Kit Part No. 75540 92-00 Civic/ 94-01 Integra/ 93-97 Del Sol/ 92-95 CRX Rear Kit Part No. 75540 www.airliftperformance.com MN-514 (06409) NPR 4762 Please read these instructions completely before proceeding with installation

More information

LIFT-505. BMF Lift Kit. Yamaha Drive Gas or Electric. Installation Instructions

LIFT-505. BMF Lift Kit. Yamaha Drive Gas or Electric. Installation Instructions LIFT-505 BMF Lift Kit Yamaha Drive Gas or Electric Installation Instructions Contents of LIFT-505 Yamaha Drive BMF Lift Kit: a (1 ea.) BMF A-Arm Assembly b (1 ea.) Driver Side Shock Tower c (1 ea.) Passenger

More information

GPS AutoSteer System Installation Manual

GPS AutoSteer System Installation Manual GPS AutoSteer System Installation Manual Supported Vehicles John Deere Combines 9650 STS 9660 STS 9550 CTS 9400 Walker 9600 Walker 9750 STS 9760 STS 9650 CTS 9410 Walker 9610 Walker 9560 STS 9860 STS 9660

More information

AA Solar and Sun Power Plus

AA Solar and Sun Power Plus AA Solar and Sun Power Plus www.aasolar.co.nz www.sunpowerplus.co.nz -1- Contents Chapter Title Page 1 General information 3 2 Safety and Installer Responsibilities 4 3 Technical Specifications 5 4 Tools

More information

POLEMOUNT FIELD FIX ASSEMBLY INSTRUCTIONS

POLEMOUNT FIELD FIX ASSEMBLY INSTRUCTIONS POLEMOUNT FIELD FIX ASSEMBLY INSTRUCTIONS Polemount Field Fix Support If you have any questions or incur any problems installing or using the new Polemount, please use Miovision s Support System by emailing

More information

DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT

DeZURIK 3-20 BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT Instruction D10386 August 2013 Instructions These instructions provide installation, operation and maintenance information for BAW Butterfly Valves.

More information

Small Flat Panel Lift Arm FSA-1004 and KSA-1004

Small Flat Panel Lift Arm FSA-1004 and KSA-1004 I N S T A L L A T I O N I N S T R U C T I O N S Small Flat Panel Lift Arm FSA-1004 and KSA-1004 The Lift Arm is an accessory that can be used with a broad range of Small Flat Panel Displays. The allows

More information

AstroSystems Digital Setting Circles for Zhumell, GSO, Apertura and Astro-Tech

AstroSystems Digital Setting Circles for Zhumell, GSO, Apertura and Astro-Tech AstroSystems Digital Setting Circles for Zhumell, GSO, Apertura and Astro-Tech Components 1 Sky Commander Digital Setting Circle Computer 2 Encoders 10,000 step 1 Sky Commander Digital Setting Circle Manual

More information

TITAN Fuel Tanks. Extended Capacity Replacement Tank for Diesel Chevrolet / GMC Trucks

TITAN Fuel Tanks. Extended Capacity Replacement Tank for Diesel Chevrolet / GMC Trucks Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS G e n e r a t i o n V Extended Capacity Replacement Tank

More information

SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List

SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List For MG, WG, WGL, and Grinder Pumps for Effluent & Sewage CAUTION! Read these safety warnings first before

More information

AZEK Rail Install Guide

AZEK Rail Install Guide TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with Glass Infill... 2 Installing AZEk Rail Stairs with Glass Infill... 9 Notes...14 Please read all instructions completely

More information

9,000lb capacity 4 Post Lift Installation Manual

9,000lb capacity 4 Post Lift Installation Manual 9,000lb capacity 4 Post Lift Installation Manual Parts Checklist 1 Main side track with 9/16 hole on cylinder end complete with cylinder, hose and connector 1 Offside track 2 Cross Rails pre-assembled

More information

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE Cable Processor Module overview WARNING! When tipping the Cable Processor Module back, (after removing the toggle arm pin), use extreme caution not to drop

More information

POWERS Controls No. 4 Pneumatic Damper Actuator

POWERS Controls No. 4 Pneumatic Damper Actuator POWERS Controls No. 4 Pneumatic Damper Actuator Technical Instructions Document No. 155-032P25 AP 331-2 Actuator Assembly 331-2929 Typical Actuator Assembly 331-2904 Typical Actuator Assembly 331-3000

More information

READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS PRIOR TO INSTALLATION OF SYSTEM AND OPERATION OF VEHICLE.

READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS PRIOR TO INSTALLATION OF SYSTEM AND OPERATION OF VEHICLE. 491 W. Garfield Ave., Coldwater, MI 49036 Phone: 517-279-2135 Web/live chat: www.bds-suspension.com E-mail: tech-bds@sporttruckusainc.com Product: GM Leaf Spring READ AND UNDERSTAND ALL INSTRUCTIONS AND

More information

Front axle components, overview

Front axle components, overview just a test. Front axle components, overview 40-1 General Information Load bearing components and parts of the suspension must not be welded or straightened. Vehicles without drive axle must not be moved,

More information

SureSite Magnetic Liquid Level Indicator

SureSite Magnetic Liquid Level Indicator SureSite Magnetic Liquid Level Indicator Instruction Bulletin No. 177664-1 (Rev. E) Section 1: Weldments Thank you for purchasing the GEMS SureSite Magnetic Level Indicator. Please read this document prior

More information

For 100 Amp Automatic Transfer Switch/Load Center Models: 10 Circuit, 12 Circuit and 16 Circuit. Installed with 7, 10, 13 and 16kW Generators.

For 100 Amp Automatic Transfer Switch/Load Center Models: 10 Circuit, 12 Circuit and 16 Circuit. Installed with 7, 10, 13 and 16kW Generators. INSTALLATION GUIDE For s Residential Power Systems For 100 Amp Automatic Transfer Switch/Load Center Models: 10 Circuit, 12 Circuit and 16 Circuit. Installed with 7, 10, 13 and 16kW Generators. This Automatic

More information