1 1. Standards BOS Item / System I ii iii TECHNICAL SPECIFICATIONS Applicable BIS /Equivalent IEC Standards / Applicable MNRE Specifications Standard Description Standard Number Crystalline Silicon Terrestrial PV modules poly/ mono Solar PV module safety qualification requirements PV modules to be used in a highly corrosive atmosphere (Coastal area etc,) must qualify Salt Mist corrosion Testing IEC 61215/ IS14286 IEC (P1 P2) IEC 61701/ IS SOLAR PV MODULES Type Origin Crystalline silicon Poly or Mono Manufactured in India Module Efficiency >= 15.2% Fill factor >= 70% Power warranty 25 years limited warranty on power output & 5 years product warranty Performance Warranty Should not be less than 90% of designed nominal power at the end of 10 years and 80% of designed nominal power at the end of 25 years. Module frame Anodized aluminum. Non-corrosive and electrolytically compatible mounting structure Mounting structure Metallic mounting structure. Hot dip Galvanized with 70 microns thickness Module minimum rated power RF Identification tag for each solar module RF Identification tag data The nominal power of a single PV module shall be >=240Wp. Must be able to withstand environmental conditions and last the life of the solar module and shall be kept inside the module laminate. a) Name of the manufacturer of PV Module b) Name of the Manufacturer of Solar cells c) Month and year of the manufacture (separately for solar cells and module) d) Country of origin (separately for solar cells and module) e) I-V curve for the module f) Wp, Im, Vm and FF for the module g) Unique Serial No and Model No of the module h) Date and year of obtaining IEC PV module qualification certificate i) Name of the test lab issuing IEC certificate j) Other relevant information on traceability of solar cells and module as per ISO 9000 standard Power output rating To be given for standard test conditions (STC). I- V curve of the sample module should be submitted.
2 3. SOLAR PV MODULE MOUNTING STRUCTURE The PV modules shall be mounted on fixed metallic structures of adequate strength and appropriate design, which can withstand the load of the modules and high wind velocities up to 150 km per hour. a. The module mounting structure will be designed in such a way that it will occupy minimum space without forfeiting the output from SPV panels & shall be designed to allow easy replacement of any module. b. Bidder may design foundation (RCC and PCC) and structure considering the wind loads and structural load bearing capacity of the building. The System integrator must ensure proper water proofing in case of any modifications to the roof. c. Detailed specifications for the mounting structure are given below: Wind velocity withstanding capacity 150 km / hour Structure material Bolts, nuts, fasteners, panel mounting clamps Mounting arrangement for flat roofs Installation Minimum distance between roof edge and mounting structure (Horizontal Clearance) Minimum clearance between lowest part of panel and mounting structure (Vertical Clearance) Access for panel cleaning and maintenance Panel tilt angle Spares Warranty Structural materials shall be corrosion resistant and electrolytically compatible with the materials used in the module frame, its fasteners, nuts and bolts. Hot dip galvanised steel with galvanisation thickness of min 70 micron or aluminium alloy. Stainless steel SS304 With Removable concrete ballast made of Pre-fabricated PCC(1:2:4), M15 The structures shall be designed for simple mechanical on-site installation >= 0.60 m Shall not be less than 100mm All solar panels must be accessible from the top for cleaning and from the bottom for access to the junction box North south orientation with a fixed tilt angle depending on location (south facing) Required numbers of spare structures must be provided. The structure must have a free replacement warranty for 10 years.
3 The prospective Installer shall specify installation details of the solar PV modules and the support structures with lay-out drawings and array connection diagrams. The work shall be carried out as per the designs approved by concerned tender inviting authority. 4. ARRAY JUNCTION BOX ( ) The array junction boxes are free of dust, vermin, and waterproof and made of Thermo Plastic. The terminals will be connected to copper bus-bar arrangement of proper sizes. The array junction boxes will have suitable cable entry points fitted with cable glands of appropriate sizes for both incoming and outgoing cables. Technical Specification Junction Boxes Material Thermoplastic Hardware SS 304 Protection Dust, Vermin & Water proof Cable Gland Thermoplastic IP 65 enclosures with transparent covers with Surge Protection Device (SPD) class-i/ii, DC Fuse with holder and string disconnector. Surge Protection Device (SPD): Internal surge protection shall consist of three MOV/GDT (glass discharge tube) type arrestors connected from +ve and ve terminals to earth (via Y arrangement) for higher withstand of the continuous PV-DC voltage during earth fault condition. SPD shall have safe disconnection and short circuit interruption arrangements through integrated DC inbuilt bypass fuse (parallel) which should get tripped during failure mode of MOV, extinguishing DC arc safely in order to protect the installation against fire hazards. a. A surge protection device in each sub-array line shall be provided to prevent the high current transients from entering into the DC bus. Busbar must be made from tinned plated copper. b. It must be with DC disconnect switch and DC fuses positive side shall have a voltage rating of 1000V DC, current rating as required. 5. DC Distribution Box ( )(optional) A DC distribution box shall be mounted close to the solar grid inverter. The DC distribution box shall be of the thermo plastic IP65 DIN rail mounting type and shall comprise the following components and cable terminations:
4 Incoming 2 core (Positive and negative DC) cables from the DC Combiner Box; DC circuit breaker, 2 pole (the cable from the DC Combiner Box will be connected to this circuit breaker on the incoming side); DC surge protection device (SPD), class 2 as per IEC ; Outgoing 2 core cable(positive and negative DC) to the solar grid inverter. As an alternative to the DC circuit breaker a DC isolator may be used inside the DC Distribution Box or in a separate external thermoplastic IP 65 enclosure adjacent to the DC Distribution Box. If a DC isolator is used instead of a DC circuit breaker, a DC fuse shall be installed inside the DC Distribution Box to protect the DC cable that runs from the DC Distribution Box to the Solar Grid Inverter. DC and AC CABLES: For the DC cabling, XLPE insulated and PVC sheathed, UV stabilized single core flexible copper cables shall be used. Multi-core cables shall not be used. For the AC cabling, PVC or XLPE insulated and PVC sheathed single or multicore flexible copper cables shall be used. Outdoor AC cables shall have a UVstabilised outer sheath. The total voltage drop on the cable segments from the solar PV modules to the solar grid inverter shall not exceed 2.0%. The total voltage drop on the cable segments from the solar grid inverter to the building distribution board shall not exceed 2.0% The DC cables from the SPV module array shall run through a UVstabilised PVC conduit pipe of adequate diameter with a minimum wall thickness of 1.5mm. Cables and wires used for the interconnection of solar PV modules shall be provided with solar PV connectors and couplers. All cables and conduit pipes shall be clamped to the rooftop/ walls/parapet with thermo-plastic clamps at intervals not exceeding 50 cm. The minimum DC cable size shall be 4.0 mm2 copper. The minimum AC cable size shall be 4.0 mm2 copper. In three phase systems, the size of the neutral wire size shall be equal to the size of the phase wires. Cables and conduits that have to pass through walls or ceilings shall be taken through a PVC pipe sleeve.
5 Cable conductors shall be terminated with tinned copper end-ferrules to prevent fraying and breaking of individual wire strands. The termination of the DC and AC cables at the Solar Grid Inverter shall be done as per instructions of the manufacturer, which in most cases will include the use of special connectors. Only copper cables of appropriate size and of reputed-make shall have to be used. However aluminum cables can be used on A.C side. a) All connections should be properly terminated, soldered and/or sealed from outdoor and indoor elements. Relevant codes and operating manuals must be followed. Extensive wiring and terminations (connection points) for all PV components is needed along with electrical connection to lighting loads. b) All the Cu/Al. PVC or XLPE insulated Armored. Sheathed cables required for the plant will be provided by the manufacturer. c) Only terminal cable joints shall be accepted. No cable joint to join two cable ends shall be accepted. All cable/wires shall be marked with good quality letter and number ferrules of proper sizes so that the cables can be identified easily. All Cables shall confirm relevant IS/ IEC standards All cables shall be supplied in the single largest length to restricting the straight through joints to the minimum number. AC Distribution Box An AC distribution box shall be mounted close to the solar grid inverter. The AC distribution box shall be of wall / rail mounting type and shall comprise of following components : Incoming 3 core cable from the solar grid inverter AC circuit breaker, 2 pole / 4 pole AC surge protection device (SPD), class 2 as per IEC Outgoing cable to the building electrical distribution board. A manual disconnect switch beside automatic disconnection to grid would have to be provided at utility end to isolate the grid connection by the utility personal to carry out any maintenance. This switch shall be locked by the utility personal.
6 6. GRID INVERTER AND BI-DIRECTIONAL METER - Only BESCOM empanelled shall be used 7. Standards for other components Cables i General Test and Measuring Method PVC insulated cables for working voltage upto and including 1100 V and UV resistant for outdoor installation for A.C. cables. (It is suggested to use D.C. rated, UV resistant Photovoltaic cable having plug and play capability cables) IEC / IS 694 IEC / IS 1554 (part I & II) Earthing i Grounding IS 3043: 1986 Switches/ Circuit Breakers/ Connectors Junction Boxes/ Enclosures for Charge Controllers/ Luminaries Balance of system materials: 8. Data logger: i i General Requirements Connectors -safety A.C. /D.C. General Requirements IEC Part I,II, III / IS Part I,II, III / EN IP 65 (for outdoor)/ IP 21 (for indoor) As per IEC 529 The communication local to the Solar Energy Generator shall follow Industry Standard like RS232 or RS485 or RJ45 LAN Communication between the Solar Energy Generator and the Application running on the Server shall be based on GSM/GPRS. Battery backup for data logger system is mandatory The data to be logged and made available as follows:- o Instantaneous DC Voltage o Instantaneous DC Current o Instantaneous AC Voltage o Instantaneous AC Current o Conversion Efficiency o Voltage graph showing Volts in Y-axis and Time-of-Day on X-axis. Similarly Current graph o Total AC Power generated per day, per week and per month showing Power Generation Profile graphs o Peak Power generated o Monthly Power generation charts showing the total power generated in each month.
7 a) PV array energy production: Digital Energy Meters to log the actual value of AC/ DC Voltage, Current & Energy generated by the PV system shall have to be provided. b) Solar Irradiance: An integrating Pyranometer (Class II or better) shall be provided, with the sensor mounted in the plane of the array. Readout shall be integrated with data logging, system. c) Wind Speed: An integrated wind speed measurement unit shall be provided. d) Temperature: Temperature probes for recording the Solar panel temperature and ambient temperature shall be provided. A data logging system for plant control and monitoring shall be provided. 9. EARTHING PROTECTION 1. Earthing protection: A minimum of two separate dedicated and interconnected earth electrodes must be used for the earthing of the solar PV system support structure with a total earth resistance not exceeding 5 ohms. (i) Equipment earth (DC) and (ii) System earth (AC) Both equipment earth (DC) and system earth (AC) shall be checked for proper earthing. Equipment earth (DC): All the non-current carrying metal parts such as PV modules, DCDB are bonded together and connected to earth to prevent shocks to the manpower and protection of the equipment. System earth (AC): All the non-current carrying metal parts such as ACDB, Lightening Arresters are bonded together and integrated to existing earth. Earthing shall be done in accordance IS , provided that earthing conductors shall have a minimum size of 6.0 mm2 copper wire or 10 mm2 aluminium wire or 3mm2 X 70 mm2 hot dip galvanized iron flat. Unprotect aluminium or copper-clad aluminium conductors shall not be used for final underground connections to earth electrodes. The earth electrodes shall have a pre-cast concrete enclosure with a removal lid for inspection and maintenance. The entire earthing system shall comprise non-corrosive components.
8 10. Caution Signs In addition to the standard caution and danger boards or labels as per Indian Electricity Rules, the AC distribution box near the solar grid inverter and the building distribution board to which the AC output of the solar PV system is connected shall be provided with a noncorrosive caution label with the following text: WARNING DUAL POWER SOURCE SECOND SOURCE IS SOLAR SYSTEM The size of the caution label shall be 105mm (width) x 20mm (height) with white letters on a red background. 11. METERING SCHEME: The bi-directional (import kwh and export kwh) meter shall be fixed at the point of grid connectivity (the Solar Service Connection Meter ) for the purpose of net-metering as per below diagram The existing meter shall be rewired to record total solar generation. Both bi-directional and solar generation side meter shall be in same vicinity. The bi-directional meter shall comply with the requirements of CEA Regulations on Installation and Operation of Meters. Meter must also display on demand, instantaneous, AC system voltages and currents, frequency, reactive power with sign. For 1-5kW : Single phase Bi-directional whole current meter class I 5-17kW : Three phase Bi-directional whole current meter class I 17to 50kW : Three phase 3 X 5 A, CT operated, 0.5s class, Bi-directional meter Above 50kW i.e For all HT installations 0.2S class meter, 0.2 class CT s of suitable ratio and 0.2 class PT s 11kV / 3 /110V / 3 Note: For HT installations, if the existing meter cubicle is having 2 element system of 2 CTs, 2 PTs and metering with three wire system, it shall be replaced by 3 element system of 3 CTs, 3 PTs and metering with four wire system.
9 12. Connection to Building Electrical System The AC output of the solar grid inverter shall be connected to the building s electrical system after the BESCOM service connection meter at the consumer busbar by providing suitable capacity manual disconnector. The solar grid inverter output shall be connected to a dedicated module in the Main Distribution Board (MDB) of the building. It shall not be connected to a nearby load or socket point of the building. The connection to the electrical system of the building shall be done as shown in below diagram. Note: Any system up gradation in the infrastructure required to connect to grid shall be carried out by the consumer.
10 Single Line Diagram of Rooftop Facility DC surge protection device Solar PV array DC Fuse DC combiner box DC disconnect Switch DC distribution box DC to AC Grid tied Inverter Manua l discon nect Uni-directional meter Solar Meter Distribution Network BESCOM Grid Bi-directional Meter Net Meter Consumer Distribution Panel AC disconnect Switch AC surge Protection device To consumer Loads AC distribution box
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tamil Nadu Version: April 2014
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tamil Nadu Version: April 2014 Scope and Purpose These Guidelines for grid-connected small scale (rooftop) solar PV systems have
What are the basic electrical safety issues and remedies in solar photovoltaic installations?
What are the basic electrical safety issues and remedies in solar photovoltaic installations? Presented by: Behzad Eghtesady City of Los Angeles Department of Building and Safety Topics Covered Photovoltaic
SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings
*** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not
INFORMATION DOCUMENT
INFORMATION DOCUMENT For Design, manufacture, supply, installation and commissioning of different capacity Roof top Solar PV Power projects under Net Metering policy in the state of Punjab. PUNJAB ENERGY
Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points
Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points Features SELV Compliant No Detection Passive Injector Gigabit Compatible Full Protection
12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting
12 SOLAR PHOTOVOLTAIC POWER by John Ware IT IS PLANNED for BS 7671:2008 to include a new Section 712 providing additional requirements for safety applicable to solar photovoltaic (pv) power supply systems.
Solar Panel Installations
Solar Panel Installations Page 1 of 6 SINGLE-FAMILY RESIDENTIAL CHECKLIST City of Hayward Development Services Department Revised: 7-09-15 PERMIT REQUIREMENTS Permits are required for all solar panel installations.
How To Plan Out An Array Of Solar Panels
CITY OF DOWNEY COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 11111 Brookshire Avenue Downey, CA 90241 562.904.7142 (www.downeyca.org) B SECTION 01/01/2011 EFFECTIVE DATE PHOTOVOLTAIC 032 FORM NUMBER 2013
33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application
33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application Features Compliant with the IEEE802.3at Standard -40 to +60 C Temperature Range Diagnostic LEDs Full Protection
Format - 17 GUIDELINES FOR ON-GRID SOLAR RTPV PROGRAMME (ON NET- METERING BASIS) FOR BESCOM OFFICERS
Format - 17 GUIDELINES FOR ON-GRID SOLAR RTPV PROGRAMME (ON NET- METERING BASIS) FOR BESCOM OFFICERS 1. Introduction: Solar energy is a clean, pollution free and renewable source of energy. Karnataka being
32/1/2013-14/PVSE(Part-II) Ministry of New and Renewable Energy SPV Off Grid Division
Annexure-A 32/1/2013-14/PVSE(Part-II) Ministry of New and Renewable Energy SPV Off Grid Division Scheme: Installation of 10,000 nos. of solar photovoltaic water pumping systems for irrigation purpose implemented
SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE
SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE for solar energy management LEATEC Delivering Solutions for Energy Management SOLAR ENERGY DATA CENTER BUILDING 4 to8 String Monitoring with 0.% Accuracy
Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.
SOLAR ALTERATIONS REQUIREMENTS August 2015 These requirements address typical alterations to solar installations; they cannot address every scenario. In Victoria, an alteration to a solar installation
Pressure monitoring equipment for oil-sf 6. bushings, type GOEK
Pressure monitoring equipment for oil-sf 6 bushings, type GOEK Installation and maintenance guide 5693 827-6 en, Rev. 3, 2002-01-30 This document must not be copied without our written permission, and
FAQs-Main switchboard design criteria
FAQs-Main switchboard design criteria Q: What is the Australian standard for main switchboards? Current Australian standard is AS/NZS 3439.1: 2002 originating from IEC 60439. The new series of standard
Doe Residence - 5.64 kw DC Roof Mounted Photovoltaic System
EQUIPMENT SUMMARY 20 LG 300W solar panels 1 SMA SE6000AUS Inverter Everest Solar Systems Cross Rail Racking System QuickMount PV Quick Hook Curved Tile Mount QMCTH SHEET INDEX T01 COVER PV01 SITE MAP &
ADM1TE 5/30A DIN rail single phase two wire energy meter
ADMTE 5/30A DIN rail single phase two wire energy meter. Safety instruction.2 Foreword.3 Performance criteria.4 Specifications.5 Basic errors.6 Description.7 Dimensions.8 Installation.9 Operating.0 Troubleshooting.
Solar Kit. Complete solution to optimize your photovoltaic system
Solar Kit Complete solution to optimize your photovoltaic system April 2012 Mounting and selection quick guide On Grid Solar Kit rooftop installation INSTALLATION WITH OVERLAID SUB-STRUCTURE (A.1, A.2)
Renewable Energy Test Station (RETS) TEST PROCEDURES FOR SOLAR TUKI
Renewable Energy Test Station (RETS) TEST PROCEDURES FOR SOLAR TUKI March 2007 A. Test Procedures for Solar Tuki Lamp S. No. Test Parameters Technical Requirements Instruments Required Test Methods A.
3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance
SPECIFICATION FOR LOW VOLTAGE SWITCHBOARD SEN I N D E X Description 10 STANDARD TECHNICAL REQUIREMENTS 11 Standards 12 General Operating Conditions 13 General Description Of Switchboard 131 Structure 132
LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems
LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems A. General This Net Metering Standard for Customer-Owned Grid Connected Electric Generating Systems sets forth the
Installation Guide of Sunrise Solartech PV Modules. Term 2013. Contents. Purpose of this guide. General. Safety precaution for installing a solar
Installation Guide of Sunrise Solartech PV Modules Term 2013 Contents Purpose of this guide General Safety precaution for installing a solar Photovoltaic system Product Identification Mechanical Installation
DRM75A 230V 20/100A DIN rail single phase two wire energy meter
DRM75A 230V 20/100A DIN rail single phase two wire energy meter 1.1 Safety instruction 1.2 Foreword 1.3 Performance criteria 1.4 Specifications 1.5 Basic errors 1.6 Description 1.7 Dimensions 1.8 Installation
Safety and Installation Instructions for AC Modules
Safety and Installation Instructions for AC Modules United States and Canada Contents of this manual are subject to change without notice. For the latest guide please refer to www.sunpower.com/pvinstallguideacmodule
Checklist Testing and inspection without interconnection
Shams Dubai Checklist Testing and inspection without interconnection Version.0 AUGUST 205 TABLE OF CONTENTS Scope...5. PV PLANT AND INSPECTION DATA... 6 2 TESTING EQUIPMENT...7 3 DOCUMENTS... 8 3. Reference
MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4
CE - BF - C - en - REV.00 2012.4 APPLICATION CE-BF Switchbords up to 40.5 kv are designed for use in public and industrial distribution system up to 40,5KV for the operation and protection of lines, transformers,
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code June 2015 Revision 1.5 Shalhevet Bar-Asher; SolarEdge Technologies, Inc. Bill Brooks, PE; Brooks Engineering LLC
Energy Depot GmbH PRODUCT AND APPLICATION GUIDE. Total Monitoring Solution for PV. Delivering Solutions for Energy Management
Energy Depot GmbH Delivering Solutions for Energy Management PRODUCT AND APPLICATION GUIDE Total Monitoring Solution for PV SOLAR LOGGER & ANALYSIS DC STRING MONITORING Residential Comprehensive Solar
INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1
City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included
1 GENERAL 4 2 DEFINITIONS 4 3 STANDARDS FOR INSTALLATION 4 4 LICENSING 5. 4.1 Extra Low Voltage (ELV) 5 4.2 Low Voltage (LV) 5
TABLE OF CONTENTS 1 GENERAL 4 2 DEFINITIONS 4 3 STANDARDS FOR INSTALLATION 4 4 LICENSING 5 4.1 Extra Low Voltage (ELV) 5 4.2 Low Voltage (LV) 5 5 DOCUMENTATION 6 6 RESPONSIBILITIES OF ACCREDITED PERSON
Linear Luminaire with LED Series EXLUX 6402/2
> Latest LED technology with a high luminous efficacy and a long service life > As pendant light fitting or side entry lamp > Central locking > All-pole disconnection by means of an N/C switch when the
READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!
READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY! The main power to any existing system must be disconnected prior to the
AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5
AMFA-27 AMFA-29 Operator s Manual & Installation Instructions Rev. 2.5 Date: 17 July, 2010 Permanently-connected, utility Interactive, single-phase, inverters Model AMFA-27 WIND TURBINE INVERTER (240 VAC
Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission SOLAR PHOTOVOLTAIC WATER PUMPING SYSTEMS (2015-16)
Ministry of New and Renewable Energy Jawaharlal Nehru National Solar Mission SOLAR PHOTOVOLTAIC WATER PUMPING SYSTEMS (2015-16) I. INTRODUCTION A Solar Photovoltaic (SPV) Water Pumping System consists
Section III Schedule of Requirements TECHNICAL SPECIFICATIONS OF THE REQUIRED SYSTEMS
PART III TECHNICAL SPECIFICATIONS OF THE REQUIRED SYSTEMS I. GENERAL The objective of this specification is to describe a system which uses solar energy to produce electricity. For each site (lot) one
SHARP SOLAR Frequently Asked Questions for PV Integrators Revised 05/04/2010
SHARP SOLAR Frequently Asked Questions for PV Integrators Revised 05/04/2010 How do I determine the PTC rating of a module? PTC refers to PVUSA Test Conditions, which were developed to test and compare
YINGLI SOLAR PV MODULES Installation and User Manual
YINGLI SOLAR PV MODULES Installation and User Manual Revision Date December 24, 2011 Applicable for IEC certified products This manual applies to photovoltaic modules ( PV modules, also commonly known
Unified requirements for systems with voltages above 1 kv up to 15 kv
(1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to
Linear Luminaire for Fluorescent Lamps Series EXLUX 6001
> As wall, ceiling and pendant light fitting or side entry lamp > Version with 2 lamps: 18 W, 36 W and 58 W > Central locking > All-pole disconnection by means of an N/C switch when the lamp is opened
Solar Photovoltaic (PV) Systems
ARTICLE 690 Solar Photovoltaic (PV) Systems INTRODUCTION TO ARTICLE 690 SOLAR PHOTOVOLTAIC (PV) SYSTEMS You ve seen, or maybe own, photocell-powered devices such as night lights, car coolers, and toys.
Installation Guide Content for P250xV-240 microinverters
A C M o d u l e Installation Guide Content for P250xV-240 microinverters May 15, 2012 2011-2012 SolarBridge Technologies, Inc. All Rights Reserved. No part of this publication may be reused in any manner
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying
Request for Proposals for Photovoltaic System Installation
Request for Proposals for Photovoltaic System Installation Presented by: Prepared by: Location: Contact: Date: Capitol Hill Housing Foundation Bonneville Environmental Foundation, Renewable Energy Group
Installation Guide Solar Connect-11
Installation Guide Solar Connect-11 Version 1.1 Contents Important Product Information 3 System Registration Form 4 Solar Connect-11 Overview 5 Internet & Power Connections 6 Single Phase CT Connections
PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS
Butte County Department of Development Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 Main Phone (530)538-7601 Permit Center Phone (530)538-6861 Fax (530)538-7785 FORM NO DBP-71 PERMIT
Low voltage Direct Current Network. Compact NSX DC PV. Circuit breakers and switch disconnectors for solar application.
Low voltage Direct Current Network Compact NSX DC PV Circuit breakers and switch disconnectors for solar application Catalogue 2012 Compact NSX DC PV A complete DC offer for solar application from 80
Solar Power Solutions
Solar Power Solutions Wire and Cable Photovoltaic Connectors Combiner Boxes Fuses Grounding Power Connectors Physical Support Products Cable Ties Supply Chain Solutions Products. Technology. Services.
Model Number Electrical Compatibility Module Connector Type. M250-60-2LL-S22 60 cell PV module MC-4 Type 2 Locking
TECHNICAL BRIEF M250 Microinverter System Installation Planning The M250 Microinverter The Enphase M250 Microinverter is a powerful and efficient grid-tied microinverter. It is compatible with most 60-cell
RAY-MAX Integrated Solar Power Strip
RAY-MAX Integrated Solar Power Strip 600008, 600009, 600010, 600208, 600209, 600210 Owner s Manual NEXTRONEX, INC. Revision Date: 10/27/14 Contents 1. Safety Instructions... 3 2. General Equipment Warnings...
City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov
City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov PHOTOVOLTAIC PERMITTING GUIDELINES The information provided in this document is general and is intended only as a
METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D
12 - ELECTRIC SERVICE HANDBOOK SECTION D METER REQUIREMENTS This chapter gives you information on Central Lincoln s metering requirements. It's divided into three sections: General requirements This section
IRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw
4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and
Product and functional description
Product and functional description The KNX / DALI gateway N 141/02 is a 4 MU wide, DINrail mounted KNX device with one DALI interface to which up to 64 DALI actuators (e.g. DALI ballasts) can be connected
AC Module Installation Guide Content
AC Module Installation Guide Content for ET-P660250AC May 9, 2012 2011-2012 ET Solar Group All Rights Reserved. No part of this publication may be reused in any manner nor in any form or format without
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to
TIG INVERTER INSTRUCTION MANUAL
TIG INVERTER INSTRUCTION MANUAL Contents Warning General Description Block Diagram Main Parameters Circuit Diagram Installation and Operation Caution Maintenance Spare Parts List Troubleshooting 3 4 4
DSD 70 Dual Channel Hall Effect Speed Sensor for Railway Applications, compliant with EN 50155
DSD 70 Dual Channel Hall Effect Speed Sensor for Railway Applications, compliant with EN 50155 Technical information Version: 07.14 General Function The speed sensors family DSD.70 are suitable for generating
GENERAL INSTALLATION MANUAL FOR EGING PV MODULES
GENERAL INSTALLATION MANUAL FOR EGING PV MODULES PLEASE READ THIS MANUAL CAREFULLY BEFORE INSTALLING OR USING THE MODULES. PLEASE PASS ALONG THE ATTACHED USER MANUAL TO YOUR CUSTOMER. 1. INTRODUCTION This
Enphase Microinverter Model M215
INSTALLATION AND OPERATION MANUAL Enphase Microinverter Model M215 (M215-60-230) 141-00017, Rev 02c Corporate Headquarters Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954
MOUNTING AND OPERATING INSTRUCTIONS
MOUNTING AND OPERATING INSTRUCTIONS CF 51/55 1. Delivery CF 51/55-1 calculator with battery (optionally with mains power supply) - 1 wall mounting bracket - package with material for sealing, screws, wall
SURGE PROTECTIVE DEVICES
SURGE PROTECTIVE DEVICES 1. INTRODUCTION In order to ensure safety of people, protection of equipment and, to a certain extent, continuity of supply, insulation co-ordination aims at reducing the likelihood
SOLAR ELECTRIC MODULE ES-124 & ES-62T Owners Manual and Installation Guide
SOLAR ELECTRIC MODULE ES-124 & ES-62T Owners Manual and Installation Guide circuit. Reverse connection will damage the module and may result in fire. CAUTIONS Solar electric modules produce DC electricity
Trade of Electrician. Three-phase Distribution Boards And Socket Circuits
Trade of Electrician Standards Based Apprenticeship Three-phase Distribution Boards And Socket Circuits Phase 2 Module No. 2.3 Unit No. 2.3.2 COURSE NOTES Created by Charlie Walsh - Athlone TC Revision
ADDENDUM #1(BID PACKAGE # 3)
H2Engineering, Inc. 114 East Fifth Avenue Tallahassee, FL 32303 Phone 850.224.7922 Fax 850.224.5876 ADDENDUM #1(BID PACKAGE # 3) To: Jeff Williams From: Peter Lindstrom Co: Leon County Date: October 04,
TruPower-Portable-500W. Solar Starter kit
TruPower-Portable-500W Solar Starter kit This Solar starter kit is an easy to use solar power supply system that is the complete solution for all your solar power needs. It is a solar generator that converts
YSmart Technology Co.,Ltd
YSmart Technology Co.,Ltd GWV Series Grid Tie Microinverter User Manual The copyright of this user manual belong to YSmart TechnologyCompany Limited. Without the written permission of the copyright holder,
4 IX D N E P P A Installation methods Current-carrying capacity and voltage drop for cables Reference method IET Wiring Matters
8 Appendix 4 of BS 7671 by Mark Coles Appendix 4, Current-carrying capacity and voltage drop for cables and flexible cords, has seen significant changes with the publishing of BS 7671:2008. This article
County of Riverside Building and Safety Department
County of Riverside Building and Safety Department Mike Lara Director Photovoltaic Permitting Guidelines The information provided in this document is general and is intended only as a guide. Each project
Our brand POWER DYNAMIC PASSION COMMITMENT CREATIVITY. A strong brand for strong products: 8PU Premium. MV Energy
Our brand A strong brand for strong products: The ENERGOLINE brand represents our product portfolio of INDUSTRIAL SWITCHGEAR SYSTEMS. Our products are characterized by a high degree of safety, flexibility
LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE
LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE 380/415/690 Volt AC 50/65/80/100 ka 1. Product Guide Low Voltage Motor Control Centre CONTSTRUCTION Continuous "poured in place" gasket
CHAPTER 5 PHOTOVOLTAIC SYSTEM DESIGN
CHAPTER 5 PHOTOVOLTAIC SYSTEM DESIGN 5.1 Introduction So far in the development of this research, the focus has been to estimate the available insolation at a particular location on the earth s surface
METAL-CLAD AND METAL-ENCLOSED SWITCHGEAR 3.6KV~40.5KV. tgood.com. Energy. Fast.
METAL-CLAD AND METAL-ENCLOSED SWITCHGEAR 3.6KV~40.5KV tgood.com Energy. Fast. TGOOD produces over 5000 switchgear units annually for projects around the globe PRODUCT OVERVIEW Integral substation component
RISH EM 3490 DS Dual Source Energy Meter RISH EM 3490 DS. Application : Product Features:
Application : RISH Master 3490 DS measures important electrical parameters of Utility (in normal mode) & Generators (in Power back up) in three phase and single phase Network & replaces the multiple analog
Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide
Instruction Bulletin EAV85226 08/2014 Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide Retain for future use. Product Description Kit Contents The Wiser Panel Meter is for use in energy management
Hyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
/ Our accessories complement all PV systems, simplify installation and ensure that the system meets the required safety standards.
56 / Accessories for inverters Accessories for inverters / Our accessories complement all PV systems, simplify installation and ensure that the system meets the required safety standards. FRONIUS STRING
PHOTOVOLTAIC (PV) solar panels. Specification. Electricity - CE & ISO 9000 certified. 83W panel. 180W panel Maximum power:
PHOTOVOLTAIC (PV) solar panels Electricity - CE & ISO 9000 certified Photovoltaic solar panels convert sunlight into useful electricity. ZEDfabric supplies high quality mono-crystalline silicon cell PV
Photovoltaic System Overcurrent Protection
Photovoltaic System Overcurrent Protection Photovoltaic System Overcurrent Protection Introduction Solar Photovoltaic (PV) systems have, over the last fifty years, evolved into a mature, sustainable and
Application Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers
9229 Waterford Centre Dr. Bldg C, Suite 110 Austin, Tx 78758 Application Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers Current Version: 13 AC Modules are a new product
ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU
ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU George CURCANU, Constantin ILINCA, Ilie SBORA ICMET Craiova, Romania, Calea Bucuresti 144, phone:
Technical Data. Dimensions
0102 Model Number Features 15 mm quasi flush Usable up to SIL2 acc. to IEC 61508 Accessories BF 30 Mounting flange, 30 mm V1-G-N-2M-PUR Female cordset, M12, 2-pin, NAMUR, PUR cable V1-W-N-2M-PUR Female
We're with you... solar. Call 1800 332 332 today FOR THE LIFE OF THE SYSTEM YEAR WARRANTY * YEAR OLD BACKED BY CSR BRADFORD CSR A AUSTRALIAN COMPANY
We're with you... FOR THE LIFE OF THE SYSTEM 25 YEAR WARRANTY * Electricity prices are predicted to continue to rise in the future. If you're serious about installing energy in your home, look no further
EMC Engineering Guidelines For Automation Systems PS 4 PS 416 04/97 AWB 27-1287-GB
EMC Engineering Guidelines For Automation Systems PS 4 PS 416 1st edition 04/97 Moeller GmbH, Bonn Author: Werner Albrecht Editors: Klaus Krüger, Thomas Kracht Translator: Chris Baker, Terence Osborn Contents
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
e 2 ALPHA Medium Voltage Switchgear Data Sheet K-1.1.2 EN
e 2 ALPHA Medium Voltage Switchgear Data Sheet K-1.1.2 EN We create ideas with power! ELEKTROMETAL ENERGETYKA SA is a new Polish company providing solutions for electrical power engineering. Our services
BB800 Off-Grid Solar System
BB800 Off-Grid Solar System KEY PRODUCT FEATURES Control Box & Charge Controller 1000W of Solar Panels 4x200Ah of SLA Batteries in series 2KW Inverter Output Power Solar Panel & Battery Mounting Our entry
Electrical Grounding. Appendix C
Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment
CHAPTER 4: TECHNICAL CHARACTERISTICS OF SOLAR FARM
CHAPTER 4: TECHNICAL CHARACTERISTICS OF SOLAR FARM 4.1 PRINCIPLE OF ELECTRICITY PRODUCTION FROM SOLAR IRRADIANCE Solar irradiance from the sun can provide an invaluable source of energy. Solar energy is
A. 5MWp SPV Plant at Khimsar, Rajasthan. B. 5MWp SPV Plant Installed Technologies. D. 5MWp SPV Plant Challenges. E. 5MWp SPV Plant - Performance
An overview & Performance Analysis of 5 MWp Solar PV Plant at Khimsar, Rj Rajasthan Reliance Industries Limited June 2, 2011 July 2010 Contents A. 5MWp SPV Plant at Khimsar, Rajasthan B. 5MWp SPV Plant
User Manual DONGGUAN SHENGYANG INDUSTRIAL CO., LTD. SY WMVC Smart Grid Tie Microinverter. Dongguan Shengyang Industrial Co., Ltd.
DONGGUAN SHENGYANG INDUSTRIAL CO., LTD SY WMVC Smart Grid Tie Microinverter User Manual Dongguan Shengyang Industrial Co., Ltd. ADD: No. 1 Shangxin Road, New Village, Xin An Community, Chang An Town, Dongguan
Renewable energy. Inverters - Socomec G-1. Load break switches (Isolators) - Socomec G-2. Fuses - df G-3. Fuse bases.
G Product page Inverters - Socomec G-1 Load break switches (Isolators) - Socomec G-2 Fuses - df G-3 Fuse bases Surge protection - df G-3 - Wohner G-5 - CPT G-4 - Dehn G-5 Connectors - Wieland G-6 Cable
Comparative study for cables and busbars
Comparative study for cables and busbars Preliminary considerations To compare the prices of two categories of product as different as traditional cables and busbars, it is necessary to make some preliminary
Solar Energy Systems. Matt Aldeman Senior Energy Analyst Center for Renewable Energy Illinois State University
Solar Energy Solar Energy Systems Matt Aldeman Senior Energy Analyst Center for Renewable Energy Illinois State University 1 SOLAR ENERGY OVERVIEW 1) Types of Solar Power Plants 2) Describing the Solar
Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time
Trial Exams C Standards and Regulations Examination No: GH-08-C- This test is intended to gauge your knowledge of essential information contained within AS/CA S009:2013. To qualify for an allpication to
Stand Alone PV System Sizing Worksheet (example)
Stand Alone PV System Sizing Worksheet (example) Application: Stand alone camp system 7 miles off grid Location: Baton Rouge, La Latitude: 31.53 N A. Loads A1 Inverter efficiency 85 A2 Battery Bus voltage
Wind Generator. NEMO400 Instruction Manual. Suzhou Shoot Power Equipment Co., Ltd. Serial number:
Suzhou Shoot Power Equipment Co., Ltd NEMO400 Instruction Manual Wind Generator Serial number: Please read and understand this manual completely before operating the machine. 1. Introduction: This manual
POINT OBSTRUCTION LIGHTS SOL LED SOLAR POWERED RED OBSTRUCTION SYSTEM
Compliances: ETL Listed to UL 1598 ETL Listed to CSA C22.2 No.250.0-04 Canada FAA Approved L-810 & L-864 by Advisory Circular 150/5345-43G Verified to ICAO Annex 14 Registered ISO 9001: 2008 Point Lighting
AJ s Technical Tips: Designing a Small Solar PV System Part IV; Selecting Wires for the System
AJ s Technical Tips: Designing a Small Solar PV System Part IV; Selecting Wires for the System A little while back Simon Nyukuri of Kitale wrote to ask me about sizing wires and cables for solar PV systems.