Coastal Highway Route E39 Project



Similar documents
Coastal Highway Route E39 Project Overview

CROSSING THE OSLOFJORD - AN EARLY STRATEGIC ANALYSIS - Technical challenges and consideration of Feasible solutions

Bjørnafjorden floating bridge, Norge

3 Tappan Zee Bridge Rehabilitation Options

Brandangersundet Bridge A slender and light network arch

Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund

5 ALTERNATIVE SOLUTIONS AND EVALUATION

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

Sub-sea tunnels and lake taps in Norway - a short overview

Process towards the final NTP

Söderströmtunnel: immersion in downtown Stockholm, Sweden

Response to questionnaire for: Assessment of strategic plans and policy measures on Investment and Maintenance in Transport Infrastructure.

Høyanger Upper Secondary School

Escape the Limblessage

Highway Bergen - Haugesund

Safe & Sound Bridge Terminology

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013


NORWAY S NUMBER ONE PORT OF CALL BERGEN THE GATEWAY TO THE FJORDS OF NORWAY

Hydrogen as strategy in Climate Action Plan for Hordaland

SECOND PENANG BRIDGE PROJECT

NORWAY High Speed Railway Phase III Initial Option Testing. Atkins: Warwick Lowe

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

IH-635 MANAGED LANES PROJECT, SEG. 3.2

BRIDGES ARE relatively expensive but often are

3.1 Historical Considerations

Report to INFRASTRUCTURE SERVICES Committee for noting

Strusshamn. Bergen. Leirvik. Fredrikstad. Skudeneshavn. Kragerø. Kristiansand CRUISE IN COMPANY / JULY Fredrikstad TO Bergen

2010 Open Norwegian Champions in Melges 24 Practical information

A new 4-lane Mjoesbridge built in timber? In Norwegian : Mjøsbru

PORTS OF. sh i p to no r way

REHABILITATION PACKAGE 1-a

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

Alternatives Evaluation Overview

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

The Norwegian High Speed Rail Assessment Project

Offshore Structures. Offshore Drilling Equipment

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

The Mersey Gateway Project

US 51 Ohio River Bridge Engineering and Environmental Study

Optimum proportions for the design of suspension bridge

RAFTSUNDET BRIDGE IN LOFOTEN, NORWAY. A CANTILEVERED BRIDGE WITH A LIGHTWEIGHT CONCRETE MAIN SPAN OF 298m

Light Rail Transit in Phoenix

THE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS

CONCEPTUAL REHABILITATION ALTERNATIVE

The Follo Line Project

Member Nation Report 2010 from Denmark.

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV

Market Efficient Public Transport? An analysis of developments in Oslo, Bergen, Trondheim, Kristiansand, and Tromsø

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL

HONG KONG ZHUHAI MACAO LINK

Virginia Approach Spans

PORT OF ODENSE & LINDØ INDUSTRIAL PARK STRONG LOGISTICS FACILITY IN NORTHERN EUROPE

How To Increase Vehicle Height Of A Tunnel In Daugherd Port

Truss. are both simple and A Matsuo Example continuous trusses. The

Jurisdictional Scan of Traffic Management during Incidents on Bridges

The Gotthard Base Tunnel

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Roadway Cost Per Centerline Mile Revised June 2014

Maliakos Kleidi Project Construction & Challenges faced. Presentation to ELAC 2014

Bridge Facts. Can you name the longest bridge in the world? The Akashi-Kaikyo Bridge

Rural Road Safety Policy in Korea: Lesson Learned

Impact of Larger Vessel Size on Port Infrastructure Costs

Elevated Roads for Sri Lanka

Is a modal shift to Short Sea Shipping within reach for fresh fish? A feasibility study. Oostende, 20 February 2014

Roadway Congestion 139, , ,700 NA 4,300 4,900. Table 7-2 Transportation Criteria - Roadway Congestion (2035)

FROM VIKINGS TO AN OIL NATION

London Array. Operations and Maintenance

Offshore Renewable Energy Services and solutions

WATERVIEW CONNECTION PROJECT. Ground Settlement WATERVIEW CONNECTION TEAM

NORWEGIAN COASTAL ADMINISTRATION RATES OF FEE 2016

Study for a suspension bridge with a main span of 3700 m.

Marketing day Bybanen in Bergen building stage 3

Toll ring around Oslo: How car owners help paying for improved mobility, and better environment too

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

The size of labour markets and productivity

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Presentation to Community Task Force July 9, 2007

Terms, conditions and prices Trondheim Port Authority Valid from 1 January 2012

2015 ODOT Bridge Design Conference May 12, DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

HV Submarine Cable Systems Design, Testing and Installation

Benefits of Navigational Port Studies

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

Gröna Tåget [grœ:na 'tɔ:gɛt] to make train travel more attractive

Single Project Professional Indemnity Insurance Proposal Form. Note: This is a proposal form for a claims made policy

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Why build the Silvertown Tunnel?

Dulles Corridor Metrorail Project

APPENDIX H DESIGN CRITERIA FOR NCHRP PROJECT NEW BRIDGE DESIGNS

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings

Norconsult AS Trekanten, Vestre Rosten 81, NO-7075 Tiller Memo no.: 1 Tel: Fax:

Road Tolling in Norway a brief introduction

SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP

Fjord Line AS a company running on LNG. Presentation, Thursday March 5th 2015

Press Kit Jette Well PL 027D, PL 169C og PL 504 REV. : 01 DATE : PAGE : 2 of 6

CITY OF TRAIL MEMORANDUM

Government of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL

Entreprenørdagen 14. mars 2011

Transcription:

Coastal Highway Route E39 Project Teknologidagene 22th September 2015 Trondheim Kjartan J Hove/ Jørn Arve Hasselø/ Harald I. Johnsen Norwegian Public Roads Administration

Coastal Highway Route E39 E39 Kristiansand - Trondheim 1100 km 7 Ferry links Remaining on E39 Tunnels (sub sea) Fjord Crossings (bridges) 22.09.2015

Coastal Highway Route E39 Kristiansand Stavanger Harestad X Rogfast Kristiansand Ålgård Planning corridors (roads and brigdes) Nye veier AS Ålgård Stavanger Planning (smaller part around Sandnes under constrution) Design Stavanger Harestad X Rogfast Building Planning

Coastal Highway Route E39 Fjord Crossings Characteristics (Width, Depth) Halsafjorden, 2 km, 5-600 m Romsdalsfjorden, 15,5 km Subsea tunnel 350 MBSL + 1,6 km bridge, 5-600 m Sulafjorden, 3,8 km, 500 m Vartdalsfjorden, 2,1 km, 600 m Nordfjorden, 1,4 km, 500 m Sognefjorden, 3,7 km, 1250 m Bjørnafjorden, 5 km, 5-600 m Langenuen, 1,3 km, 500 m Boknafjorden, Rogfast Subsea Tunnels 27 km, 390 MBSL

Coastal Highway Route E39 Boknafjorden, The Rogfast Project Boknafjorden, Rogfast Subsea Tunnels 27 km 390 MBSL

Coastal Highway Route E39 The Tunnel Alignment (Rogfast, Boknafjorden) Twin tunnel with cross-sections of T10,5 Design speed 100 km/h Maximum gradient will be 5% Maximum depth is 392 mbsl Total length about 27 km Total cost approx NOK 12,2 billion Financing Toll money NOK 9,5 billion State share NOK 2,7 billion Under design Tender 2018/2019, building 2019/2020

E39 Rogfast- Bergen Bjørnafjorden Road (approx 65 60 km) Bridges Tunnels (incl subsea) Langenuen Under planning Building 2020

Coastal Highway Route E39 E39 Rogfast Bergen Rogfast Stord Planning (roads and subsea tunnel(?)) Approx 65 km Stord Os Brigdes (Langenuen and Bjørnafjord) Approx 60 km Os Bergen Start constrution 2015

Coastal Highway Route E39 E39, Fixed link across the Bjørnafjord width: 5000 m, depth: 550 m Floating bridge in combination with suspension bridge

Coastal Highway Route E39 Feasibility study, The Sognefjord how to cross Beautiful, but difficult to cross with a fixed link Width: approx. 3.7 km Depth: 1300 m, sudden deep waters approx. 1500 m to rock Navigation channel required for large cruise ships

Bergen, west Coastal Highway Route E39 Sotrasambandet PPP, brigde and road, smaller tunnels Planning

Coastal Highway Route E39 E39, Sognefjorden- Grodås Planning Ongoing and upcoming tender, road and tunnel Bridges after 2020

Coastal Highway Route E39 Region Center Harald Inge Johnsen, Project manager E39 Romsdalsfjorden Jørn Arve Hasselø, Project manager E39 Vartdalsfjorden E39 Sulafjorden E39 Halsafjorden

Volda-Ålesund Via Hareidlandet Feasibility study on two fjord crossings Sulafjorden Vartdalsfjorden Tunnel Volda-Furene Tunnel safety Vegsund-Breivika

Ålesund-Molde 45-50 min reduction in travel time Known technology Worlds fourth longest suspension bridge 15,5 km subseatunnel High socioeconomic benefit

Molde-Bergsøya New hospital for Nordmøre and Romsdal at Hjelset Increased labour and settlement market Årø-Hjelset Bjerkeset-Astad

Bergsøya-Klett Feasibility study on Halsafjorden Road development Betna-Stormyra: Narrow road Harangen-Thamshamn: New E39, access to regional port Thamshamn-Klett: Tunnel safety

E39 Romsdalsfjorden Harald Inge Johnsen, project manager 22.09.2015

E39 Romsdalsfjorden Region midt, near Molde 22.09.2015

E39 Ålesund-Molde Kjerringsundet E39 Romsdalsfjorden 22.09.2015

E39 Romsdalsfjorden Zoning plan finished in 2016 Technologically feasible today Total cost: 16 billion NOK +/-25% (2015) 22.09.2015

E39 Romsdalsfjorden 15,5km subsea road tunnel with twin tubes and four lanes. Max 5 % incline 1960 m long suspension bridge with 1625m span. Four lanes and bicycle and pedestrian path. 22.09.2015

E39 Romsdalsfjorden Core drilling Core drilling along the entire route of the tunnel from April 2015 to mid 2016. Holes with lengths between 1500 and 2200 m. Drill cores extracted for examination 22.09.2015

E39 Romsdalsfjorden Suspension bridge Suspension bridge with 1625 m span is technologically feasible today (Storebæltbrua in Denmark has 1624 m span) High clearance beneath bridge 65m HAT 22.09.2015

E39 Romsdalsfjorden Wind measurements Wind measured continuously since the end of 2013 Preliminary results show moderate winds some great gust Wind tunnel in Denmark to test stability ok results 22.09.2015

E39 Romsdalsfjorden Implementation of the project will be clarified in the next National Transport Plan (2018-2029). So far considered construction period of 5-6 years. Type of contracts discussed not decided 22.09.2015

Coastal Highway Route E39 Project E39 Kristiansand-Trondheim Sulafjorden Width: 3200 5000 meters Depth: 420 meters. 22.09.2015

Coastal Highway Route E39 Project Ship traffic analyses Sulafjorden 22.09.2015 Ship traffic in the fjords Time periode from January 2014 -> January 2015

E39 Sulafjorden Metocean Swell RP 100 Maximum Hs [m] for all directions and all peak periods Wind waves RP 100 Maximum Hs [m] for all directions and all peak periods 29

22.09.2015 E39 Sulafjorden Alternative routes across the fjord

E39 Sulafjorden Suspension bridge span 2800m 31

E39 Sulafjorden Floating Suspension bridge l= 4000m Ellipse floater with moonpool 32

E39 Sulafjorden Suspension bridge on GBS - Span 2x2000m The deck is composed of two closed steel box girders connected with cross beams every 20m and steel transvers bulkheads every 4m along the bridge. 22.09.2015

E39 Sulafjorden Suspension bridge on GBS, Span 2 x 2000m 22.09.2015

Coastal Highway Route E39 Project Halsafjorden Width: 2000 meters Depth: 490 meters Bridge site 25.11.2013

E39 Halsafjord Supension bridge 2050m main span 265m towers in concrete Sidespans in concrete

Suspension bridge - Halsafjord Aerodynamic properties 07.10.2014 Wind tunnel testing is currently being performed Various configurations of split box-girders are now tested

22.09.2015 E39 Halsafjorden 2 x span l= 1000 m, Floating TLP-pontoon

Coastal Highway Route E39 Project Region center Project development model A. Feasibility study Technical and operational feasibility evaluation of different designs B. Concept study Design rules Design basis Technology qualification program C. Preengineering Concept evaluation of the bridge design documentation Directorate of Public Roads/National Rules for design of bridges N400 22.09.2015

Coastal Highway Route E39 Project Region center Project plan A. Feasibility study E39 Sulafjorden: 2014-2015 E39 Halsafjorden: 2013-2015 B. Concept study E39 Sulafjorden: 2016-2018 E39 Halsafjorden: 2016-2017 C. Preengineering Concept evaluation: Sulafjorden: 2019-2020 Halsafjorden: 2018-2019 22.09.2015