Escape the Limblessage

Size: px
Start display at page:

Download "Escape the Limblessage"

Transcription

1 Click Click to edit to Master edit Master text styles text styles Riverside County - Orange County Second level Third level Fourth level Fifth level 1 1

2 MIS Corridor Demand 2 2

3 County Line Crossings % of Total Trips by Subarea 3 3

4 Distribution of Traffic to South Orange County

5 Future Corridor Demand 5 5

6 6 6

7 2030 ADT Volumes- Base Case 7 7

8 2030 ADT Volumes- Corridors A & B 8 8

9 2030 ADT Volumes- Corridors A & B versus Base Case 9 9

10 Approved Recommendations (11/18/05) Prioritize SR-91 improvements particularly east of SR-241 Work with F/E TCA to develop plan for coordination of capacity improvements on toll roads Continue to evaluate costs/impacts of Corridor A within SR-91 Second R/W level (between SR-71 and I-15) Continue to Third study technical feasibility of Corridor B level Eliminate Fourth Strategic level Alternative 1b from further consideration Eliminate widening of Corridor D from further consideration Evaluate operational improvements on Ortega Highway Continue to coordinate with Cal-Nevada Super Speed Train Commission on potential Maglev alignments 10 10

11 Corridor A Cross-Section within SR-91 R/W 11 11

12 Corridor A Cross-Section within SR-91 R/W 12 12

13 Project Phasing and Durations 13 13

14 SR-91 Implementation Plan Coordinate SR-91 ultimate widening with existing Caltrans, Third OCTA, level and RCTC studies Evaluate Requirements Fourth level of Corridor A within 91» Fifth Revise SR-91 Implementation level Plan to be consistent with the MIS recommendations Prioritize improvements to maximize throughput Funding from Measure A and OCTA resources and future state and federal funds 14 14

15 SR-91 Implementation Plan Projects 15 15

16 Corridor A Implementation Plan Evaluate Second Corridor level A alignment (SR-71 to I-15) within SR-91 Third R/W level Consideration of staged approach (east and west of SR-71) Develop multi-county funding plan Decisions at completion of PE and prior to environmental clearance 16 16

17 Corridor B Implementation Plan Initiate geotechnical investigations Initiate technical studies on basis of geotechnical information Fourth Alignments refinement, level cost, and technical analysis Investigate partnerships for shared benefits and funding MWD Other Agencies Decisions at completion of Feasibility Studies/PE and prior to environmental clearance 17 17

18 Ortega Highway Operational Improvements Second Estimated cost level $180 million Develop funding plan in partnership with Caltrans Coordinate with Caltrans for project initiation Coordinate with Orange County project Decision prior to environmental clearance 18 18

19 Ortega Highway Potential Operational Click to edit Improvements Master title style Standard lane and shoulder widths Guardrail improvements Second level Turnouts Passing lanes on sustained grades Dedicated turn lanes Slope cuts for visibility around curves 19 19

20 Click Identify to edit funding Master sources text styles Begin environmental process Next Steps Update SR-91 Implementation Plan Prioritize projects Corridor A preliminary engineering Corridor B technical feasibility studies Ortega Highway Scoping Study with Caltrans 20 20

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU Purpose of Tonight s Meeting Informational Open House to discuss two City projects: Fairchild Street Subway Phase I Engineering: Immediate need to replace subway Bowman Avenue Feasibility Study Future

More information

PRIORITIZATION PROCESSES

PRIORITIZATION PROCESSES PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take

More information

California Self-Help Counties and Transportation Funding

California Self-Help Counties and Transportation Funding California Self-Help Counties and Transportation Funding 2015 IBTTA Washington Briefing Tuesday, March 31, 2015 Michael Blomquist Toll Program Director Riverside County Transportation Commission Traditional

More information

An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP

An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP Today s s Discussion The Basics HOV Lanes Pricing Darren Henderson, AICP PB, Houston, TX Active Traffic Management The Latest Projects

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,

More information

Spot Safety Project Evaluation

Spot Safety Project Evaluation Spot Safety Project Evaluation Project Log # 200610094 Spot Safety Project # 04-01-219 Spot Safety Project Evaluation of the Traffic Signal and Left Turn Lane Installation at SR 1010 and SR 1526 in Johnston

More information

Ten Easy Steps to Intersections in AutoCAD Civil 3D

Ten Easy Steps to Intersections in AutoCAD Civil 3D in AutoCAD Civil 3D Robert Gadbaw Team Blue22 Ltd. CV110-2L This class takes students step by step through creating an intersection using Civil 3D 2009. Students will learn about alignments, profiles,

More information

NCDOT MAPPING GUIDELINES FOR PLANNING AND DESIGN ACTIVITIES MAPPING PRODUCTS FOR ROADWAY DESIGN AND PDEA STEPS FOR REQUESTING MAPPING PRODUCTS

NCDOT MAPPING GUIDELINES FOR PLANNING AND DESIGN ACTIVITIES MAPPING PRODUCTS FOR ROADWAY DESIGN AND PDEA STEPS FOR REQUESTING MAPPING PRODUCTS NCDOT MAPPING GUIDELINES FOR PLANNING AND DESIGN ACTIVITIES MAPPING PRODUCTS FOR ROADWAY DESIGN AND PDEA STEPS FOR REQUESTING MAPPING PRODUCTS DESIGN TYPE DEFINITIONS YEARLY MAPPING NEEDS REQUEST DESCRIPTION

More information

Truck Lane Restriction Expansion

Truck Lane Restriction Expansion Truck Lane Restriction Expansion Dallas City Council Transportation and Environment Committee August 25, 2009 North Central Texas Council of Governments Transportation Department 1 Truck Lane Restrictions

More information

Based on the AASHTO: PREPARED FOR

Based on the AASHTO: PREPARED FOR Based on the AASHTO: Ne va da PREPARED FOR Pr oj P R ec t O C Sa E S fety S September 2015 Introduction The Nevada Department of Transportation (NDOT) has as its first department goal to optimize safety

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Contents Introduction... 3 Introduction to Corridor Targets... 3 Surface Targets... 4 Width and Offset Targets... 5 Elevation or Slope Targets...

More information

SR-18 Corridor Improvements in Wood County

SR-18 Corridor Improvements in Wood County Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park

More information

HRTAC Regional Financial Planning. October 29, 2015

HRTAC Regional Financial Planning. October 29, 2015 HRTAC Regional Financial Planning October 29, 2015 PFM s Transportation Experience For 29 years PFM has been ranked the leading financial advisor, including investment and commercial banks, to transportation

More information

CHAPTER 27 New Public Road Connections. Table of Contents

CHAPTER 27 New Public Road Connections. Table of Contents Chapter 27 New Public Road Connections Table of Contents CHAPTER 27 New Public Road Connections Table of Contents CHAPTER 27 New Public Road Connections... 27-3 ARTICLE 1 - General... 27-3 Responsibility...

More information

100 Design Controls and Exceptions

100 Design Controls and Exceptions Table of Contents 100 Introduction... 1 101 Functional Classification... 1 101.1 General... 1 101.2 Urban & Rural... 1 101.3 Classification Used In ODOT Design Criteria... 1 102 Traffic Data... 2 102.1

More information

Transportation Infrastructure Asset Management

Transportation Infrastructure Asset Management 2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE hlongfellow@parametrix.com (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory

More information

I-66 Pavement Rehabilitation

I-66 Pavement Rehabilitation I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal

More information

Section 6 Traffic Analysis

Section 6 Traffic Analysis Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

MPO Staff Report MPO Technical Advisory Committee: March 13, 2013 MPO Executive Board: March 20, 2013

MPO Staff Report MPO Technical Advisory Committee: March 13, 2013 MPO Executive Board: March 20, 2013 MPO Staff Report MPO Technical Advisory Committee: March 13, 2013 MPO Executive Board: March 20, 2013 RECOMMENDED ACTION: Matter of MnDOT Kennedy Bridge Study and NDDOT Sorlie Bridge Phase I Report Matter

More information

Roadway Congestion 139,600 135,300 134,700 NA 4,300 4,900. Table 7-2 Transportation Criteria - Roadway Congestion (2035)

Roadway Congestion 139,600 135,300 134,700 NA 4,300 4,900. Table 7-2 Transportation Criteria - Roadway Congestion (2035) 7 Transportation Criteria 7.1 Introduction A goal of this project is to improve mobility in the corridor. To that end, all the major Project alternatives identified at this point in the study include significant

More information

2012 Supplemental Project Compare: House Proposal (2/16/12) vs. Senate Proposal (2/21/12)

2012 Supplemental Project Compare: House Proposal (2/16/12) vs. Senate Proposal (2/21/12) Highway Management & Facilities Program (D) Northwest Region Traffic Management Center Improvements 2012 Senate Chair Proposed Budget 1,575 12,700 725 0 0 0 15,000 Difference 1,575 12,700 725 0 0 0 15,000

More information

Highway Safety Evaluation. What Is Out There

Highway Safety Evaluation. What Is Out There Highway Safety Evaluation What Is Out There Workshop Series Wed. Nov. 6 Wed. Nov. 13 Wed. Nov. 20 Wed. Dec 4 Wed. Dec. 11 Wed. Dec. 18 Wed. Jan. 8 Wed. Jan. 15 Wed. Jan. 22 Wed. Jan. 29 Highway Safety

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

INDOT 2000-2025 Long Range Plan

INDOT 2000-2025 Long Range Plan Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process

More information

Transportation Management Plan Template

Transportation Management Plan Template DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

Tolling: Critical Steps to Deploying Your Project Implementing the I-77 Managed Lanes

Tolling: Critical Steps to Deploying Your Project Implementing the I-77 Managed Lanes Tolling: Critical Steps to Deploying Your Project Implementing the I-77 Managed Lanes Traffic is Good / Congestion is Bad Peak-Period Congestion on National Highway System Year 2007 Year 2040 Charlotte

More information

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. The Rehabilitation Alternative Huey P. Long Bridge Case Study Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. March 22, 2010 Replacement vs. Rehabilitation Project Background Introduction

More information

(1) General Regulations for Oversize/Overweight Permits. (A) In the design and fabrication of all vehicles, machinery, equipment, structures,

(1) General Regulations for Oversize/Overweight Permits. (A) In the design and fabrication of all vehicles, machinery, equipment, structures, (1) General Regulations for Oversize/Overweight Permits. (A) In the design and fabrication of all vehicles, machinery, equipment, structures, buildings, or other units or components, careful consideration

More information

Hh Highway Performance Monitoring System

Hh Highway Performance Monitoring System Hh Highway Performance Monitoring System About the Highway Performance Monitoring System The HPMS is a national level highway information system that includes data on the extent, condition, performance,

More information

Soapstone Connector Feasibility Study

Soapstone Connector Feasibility Study Technical Report Soapstone Connector Feasibility Study Prepared by ATCS, plc., 2553 Dulles View Drive, Herndon, VA 20171, (703) 430-7500 www.atcsplc.com In association with: Michael Baker Corporation,

More information

Meeting Eleven March 12, 2015 Lake County Central Permit Facility

Meeting Eleven March 12, 2015 Lake County Central Permit Facility Finance Committee Meeting Eleven March 12, 2015 Lake County Central Permit Facility Today s Agenda Recap Meeting #10, January 20, 2015 Discussion of comments and revisions to the draft report Questions

More information

Assessing Paved Trails for Compliance with Standards and Best Practices

Assessing Paved Trails for Compliance with Standards and Best Practices Assessing Paved Trails for Compliance with Standards and Best Practices Session Presenters: Kristin Maravilla, Planner/Designer Masters in Landscape Architecture (UC Berkeley) Masters in City and Regional

More information

Rockfall in Ohio An Update of the Rockfall Database Population. Eric Kistner Stantec August 1, 2012 Geohazards Conference

Rockfall in Ohio An Update of the Rockfall Database Population. Eric Kistner Stantec August 1, 2012 Geohazards Conference Rockfall in Ohio An Update of the Rockfall Database Population Eric Kistner Stantec August 1, 2012 Geohazards Conference Presentation Outline Rockfall in Ohio An Update of the Rockfall Database Population

More information

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s. Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library

More information

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37

More information

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING TEC has performed many GPS/GIS inventory projects and studies for the Ohio Department of Transportation (ODOT), Counties, and municipalities.

More information

CHAPTER 20 Project Development Cost Estimates Table of Contents

CHAPTER 20 Project Development Cost Estimates Table of Contents Chapter 20 Project Development Cost Estimates Table of Contents CHAPTER 20 Project Development Cost Estimates Table of Contents CHAPTER 20 Project Development Cost Estimates... 20-3 SECTION 1 Project Cost

More information

GEOMETRIC DESIGN CIVL 3161

GEOMETRIC DESIGN CIVL 3161 GEOMETRIC DESIGN CIVL 3161 Reading Assignment: p. 45-72 (4 th ed.) p.45-75 (previous ed.) in Mannering textbook. Geometric design of highway facilities deals with the proportion of physical elements of

More information

Coastal Highway Route E39 Project

Coastal Highway Route E39 Project Coastal Highway Route E39 Project Teknologidagene 22th September 2015 Trondheim Kjartan J Hove/ Jørn Arve Hasselø/ Harald I. Johnsen Norwegian Public Roads Administration Coastal Highway Route E39 E39

More information

Intelligent Transportation Systems (ITS)

Intelligent Transportation Systems (ITS) Orange County Intelligent Transportation Systems (ITS) Strategic Deployment Plan 2013 UPDATE FINAL REPORT Prepared for Prepared by Orange County Intelligent Transportation Systems (ITS) Strategic Deployment

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

Developing and Implementing Mobility Management in Oregon. W.D. Baldwin OBDP/HDR TCM 2008 Orlando, Florida

Developing and Implementing Mobility Management in Oregon. W.D. Baldwin OBDP/HDR TCM 2008 Orlando, Florida Developing and Implementing Mobility Management in Oregon W.D. Baldwin OBDP/HDR TCM 2008 Orlando, Florida Outline Program Background How this Applies to All Work Zones Technologies and Strategies Used

More information

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Planning Level Cost Estimation Tool. User s Manual

Planning Level Cost Estimation Tool. User s Manual Planning Level Cost Estimation Tool User s Manual Atlanta Regional Commission Submitted By: User s Manual Table of Contents 1. INTRODUCTION... 1 2. OBJECTIVE... 1 3. FRAMEWORK OF THE TOOL... 2 4. HOW TO

More information

Dallas-Fort Worth Area Major Transportation Projects

Dallas-Fort Worth Area Major Transportation Projects Dallas-Fort Worth Area Major Transportation Projects Presented by: Jeffrey C. Neal Program Manager Transportation North Central Texas Council of Governments (NCTCOG) August 14, 2014 Texas Society of Professional

More information

Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22)

Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) 2. For Bicycle and Pedestrian Projects: Clearly indicate the location, length, width, surface materials, and any

More information

Table of Contents 39.03.18 - RULES GOVERNING OVERLEGAL PERMITS FOR RELOCATION OF BUILDINGS OR HOUSES

Table of Contents 39.03.18 - RULES GOVERNING OVERLEGAL PERMITS FOR RELOCATION OF BUILDINGS OR HOUSES Table of Contents 39.03.18 - RULES GOVERNING OVERLEGAL PERMITS FOR RELOCATION OF BUILDINGS OR HOUSES 000.LEGAL AUTHORITY.... 2 001.TITLE AND SCOPE... 2 002. -- 009. (RESERVED).... 2 010.DEFINITIONS....

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

CONCEPTUAL REHABILITATION ALTERNATIVE

CONCEPTUAL REHABILITATION ALTERNATIVE Appendix D While federal law requires preservation/rehabilitation of historic bridges be considered, there is no standard procedure to determine when rehabilitation is appropriate and when replacement

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE

More information

CHAPTER 3: ALTERNATIVES

CHAPTER 3: ALTERNATIVES CHAPTER 3: ALTERNATIVES Substantive changes to Chapter 3 since the publication of the SDEIS Section 3.1.1.3 Provides footnote to explain ongoing cost reductions for the Modified Selected Alternative that

More information

CHAPTER 6 Project Cost, Scope, and Schedule Changes Table of Contents

CHAPTER 6 Project Cost, Scope, and Schedule Changes Table of Contents Chapter 6 Project Cost, Scope, and Schedule Changes Table of Contents CHAPTER 6 Project Cost, Scope, and Schedule Changes Table of Contents CHAPTER 6 Project Cost, Scope, and Schedule Changes... 6-3 ARTICLE

More information

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

How To Improve Safety

How To Improve Safety Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,

More information

FISCAL YEAR 2014 SOLICITATION FOR PROPOSALS FOR FEDERAL JOB ACCESS AND REVERSE COMMUTE AND NEW FREEDOM PROGRAM FUNDS EVALUATION CRITERIA

FISCAL YEAR 2014 SOLICITATION FOR PROPOSALS FOR FEDERAL JOB ACCESS AND REVERSE COMMUTE AND NEW FREEDOM PROGRAM FUNDS EVALUATION CRITERIA FISCAL YEAR 2014 SOLICITATION FOR PROPOSALS FOR FEDERAL JOB ACCESS AND REVERSE COMMUTE AND NEW FREEDOM PROGRAM FUNDS EVALUATION CRITERIA Los Angeles County Metropolitan Transportation Authority (LACMTA)

More information

Technical Memorandum PERFORMANCE MEASURES. Prepared by:

Technical Memorandum PERFORMANCE MEASURES. Prepared by: Technical Memorandum PERFORMANCE MEASURES Prepared by: March 2014 TABLE OF CONTENTS Executive Summary... 1 1. Introduction... 2 1.1 Performance Measures and the Public Sector... 2 1.2 National Focus: MAP

More information

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety:

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety: Hamilton-Finn Suite 310 Tel. (403) 207-6000 Road Safety 3016 5th Avenue N.E. Fax. (403) 273-3440 Consultants Ltd. Calgary, Alberta dawatt.dawatt.com www.hamiltonfinn.ca January 19, 2005 Mr. Don Szarko,

More information

ITS Georgia Presentation Mike Holt, PE, PTOE World Fiber Technologies January 28, 2011

ITS Georgia Presentation Mike Holt, PE, PTOE World Fiber Technologies January 28, 2011 ITS Georgia Presentation Mike Holt, PE, PTOE World Fiber Technologies January 28, 2011 Presentation Overview Project Background HOT Lane Description Tolling Operations Construction Challenges Progress

More information

Stephen Gaj. Martin Kidner State Planning Engineer Wyoming DOT

Stephen Gaj. Martin Kidner State Planning Engineer Wyoming DOT Stephen Gaj Leader, Asset Management Team, FHWA Martin Kidner State Planning Engineer Wyoming DOT What is asset management? Asset management is a strategic and systematic process of operating, maintaining,

More information

ACTT - Fitting the New Definition of Construction Management. Rick Smith Director, Project Control and Reporting

ACTT - Fitting the New Definition of Construction Management. Rick Smith Director, Project Control and Reporting ACTT - Fitting the New Definition of Construction Management Rick Smith Director, Project Control and Reporting New Definition of CM The totality of activities that address the management and technology

More information

Wilmington to Newark Commuter Rail Improvement Project

Wilmington to Newark Commuter Rail Improvement Project Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion

More information

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois

More information

How To Teach A College Course On The History Of Transportation In Utah

How To Teach A College Course On The History Of Transportation In Utah UDOT University College of Systems Planning and Programming Academic Business Plan Vision UDOT College of Planning and Programming will be the place for advancing careers and developing an appreciation

More information

GOVERNMENT COLLEGE UNIVERSITY FAISALABAD BACHELORS DEGREE PROGRAM IN CIVIL ENGINEERING TECHNOLOGY SCHEME OF STUDIES SEMESTER-1 Sr# Course Code Subject

GOVERNMENT COLLEGE UNIVERSITY FAISALABAD BACHELORS DEGREE PROGRAM IN CIVIL ENGINEERING TECHNOLOGY SCHEME OF STUDIES SEMESTER-1 Sr# Course Code Subject GOVERNMENT COLLEGE UNIVERSITY FAISALABAD BACHELORS DEGREE PROGRAM IN CIVIL ENGINEERING TECHNOLOGY SCHEME OF STUDIES SEMESTER-1 Sr# Course Code Subject Credit Hours Contact Hours Theory Practical Theory

More information

14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:

14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise: 14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay

Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Peter Hsu, P.E. FDOT District Seven Safety Office Presentation Overview FDOT Traffic Safety Focus Areas

More information

Superseded. The average time for a normal repair after a crash is approximately 1.5 to 2 hours for a 3- person crew.

Superseded. The average time for a normal repair after a crash is approximately 1.5 to 2 hours for a 3- person crew. To: Subject: Purpose: All HQ Directors: Operations, Planning and Major Projects All Regional Directors All Regional Managers, Engineering All Regional Traffic Engineers All District Managers Transportation

More information

I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT

I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT MANDATORY PRE-BID SIGN IN CDOT Carrie DeJiacomo, Program Engineer John Hall, Resident Engineer Telecia McCline, Project Manager Tammy Maurer, Assistant Project Manager David Evans/Hartwig Design Consultant

More information

FDOT Roadway Design and 3D Modeling

FDOT Roadway Design and 3D Modeling State of Florida Department of Transportation FDOT Roadway Design and 3D Modeling CE-11-0138, CE-11-0139, and CE-11-0140 User Training Manual October 30, 2014 ENGINEERING / CADD SYSTEMS OFFICE TALLAHASSEE,

More information

EXHIBIT "A" INSURANCE REQUIREMENTS FOR RIGHT OF ENTRY AGREEMENTS

EXHIBIT A INSURANCE REQUIREMENTS FOR RIGHT OF ENTRY AGREEMENTS EXHIBIT "A" INSURANCE REQUIREMENTS FOR RIGHT OF ENTRY AGREEMENTS Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to Property,

More information

Railyard Alternatives and I-280 Boulevard Feasibility Study. Planning Commission February 6, 2014

Railyard Alternatives and I-280 Boulevard Feasibility Study. Planning Commission February 6, 2014 Railyard Alternatives and I-280 Boulevard Feasibility Study Planning Commission February 6, 2014 Problem Statement Major pieces of new infrastructure are planned including: Downtown Rail Extension (DTX)

More information

Strategic Regional Transit Plan

Strategic Regional Transit Plan Strategic Regional Transit Plan December 2008 Chapter 6: Run Time nalysis (Chapter 6 originally prepared October 2007) RUN TIME NLYSIS TLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 SCREEN TWO LTERNTIVES...

More information

Virginia Department of Transportation Rural Rustic Road Program Manual

Virginia Department of Transportation Rural Rustic Road Program Manual Virginia Department of Transportation Rural Rustic Road Program Manual Prepared by Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 Jennifer

More information

I. EVENTS CALENDAR... 2 II. INTRODUCTION... 2 III. INQUIRIES... 4 IV. SUBMISSIONS... 4 V. GENERAL INFORMATION... 5

I. EVENTS CALENDAR... 2 II. INTRODUCTION... 2 III. INQUIRIES... 4 IV. SUBMISSIONS... 4 V. GENERAL INFORMATION... 5 REQUEST FOR TECHNICAL PROPOSALS to provide ENVIRONMENTAL AND ENGINEERING SERVICES to prepare a PROJECT STUDY REPORT-PROJECT DEVELOPMENT SUPPORT (PSR-PDS) on the ETHANAC ROAD/STATE ROUTE 74/NICHOLS ROAD

More information

MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE EXPRESSWAY AUTHORITY (MDX)

MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE EXPRESSWAY AUTHORITY (MDX) XA10016 10016 SR 112 Toll System Conversion LeJeune Road I-95 4.1 Toll System Conversion 4,811 1,723 Activity - - DSB MDX 3,088 0 0 0 0 XA10017 10017 SR 836 Toll System Conversion NW 137th Avenue I-95

More information

Bristol District Park & Ride Investment Strategy

Bristol District Park & Ride Investment Strategy Bristol US 19 at Russell Road Major Corridors Served: US 19 Jurisdiction: Washington County Improvement Type: Expansion Recommendation ID: BRI-3 Technical Score (Ranking): 8.825(1 st ) - P&R lot expansion

More information

SF Bay Area Transportation Management Systems: An Innovative DOT and MPO Partnership

SF Bay Area Transportation Management Systems: An Innovative DOT and MPO Partnership SF Bay Area Transportation Management Systems: An Innovative DOT and MPO Partnership Radiah Victor Principal, Operations Metropolitan Transportation Commission Oakland, California ITS CA Annual Meeting

More information

What is a Horizontal Curve?

What is a Horizontal Curve? Paul Deutsch What is a Horizontal Curve? Provides a transition between two tangent lengths of roadway. PI PC PT PC (Point of Curvature at beginning of curve) PI (Point of Intersection of tangents) PT (Point

More information

Bentley Power Rail Track SELECTseries 2. Richard W. Bradshaw - Development Date

Bentley Power Rail Track SELECTseries 2. Richard W. Bradshaw - Development Date Bentley Power Rail Track SELECTseries 2 Richard W. Bradshaw - Development Date Geometry Enhancements Horizontal and vertical alignment enhancements for rail design 2 Geometry Projects & Multi-user Access

More information

TRINITY COUNTY. Board Item Request Form 2015-03-17. Phone 623-1365 ext 3425

TRINITY COUNTY. Board Item Request Form 2015-03-17. Phone 623-1365 ext 3425 County Contract No. Department Transportation TRINITY COUNTY 2.01 Board Item Request Form 2015-03-17 Contact Richard Tippett Phone 623-1365 ext 3425 Requested Agenda Location 10:00 AM Public Hearings Requested

More information

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program Capacity Deficiency Project Application Jackson MPO Surface Transportation Program The following information must be completed for all Capacity Deficiency proposed Jackson MPO STP projects. MPO staff will

More information

SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY

SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY Draft 7/2/08 The SAFETEA-LU Technical Corrections Bill (HR 1195) was enacted on June 6, 2008 (P.L. 110-244). The Bill can be found at: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=110_cong_bills&docid=f:h1195enr.txt.pdf

More information

CABLE MEDIAN BARRIER

CABLE MEDIAN BARRIER A Focus Technology of the American Association of State Highway and Transportation Officials (AASHTO) Technology Implementation Group (TIG) CABLE MEDIAN BARRIER Why Median Barriers 23,139 Road Departure

More information

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality

More information

City of Santa Ana. FY 2014/2015 Capital Improvement Program. Broadway/Anahurst to 1 st Improvements. First Street Bridge Replacement

City of Santa Ana. FY 2014/2015 Capital Improvement Program. Broadway/Anahurst to 1 st Improvements. First Street Bridge Replacement Broadway/Anahurst to 1 st Improvements First Street Bridge Replacement MacArthur Rehabilitation/Bristol to Flower Fisher Park Butterfly Garden Improvements 1 Finance, PRCSA, CDA and PWA Data Gathering

More information

Appendix 4 Eastside Corridor Express Toll Lanes Financial Feasibility Analysis

Appendix 4 Eastside Corridor Express Toll Lanes Financial Feasibility Analysis Appendix 4 Eastside Corridor Express Toll Lanes Financial Feasibility Analysis Introduction As part of the January 2010 Eastside Corridor Tolling Study, WSDOT prepared an analysis to determine how much

More information

I-95 Corridor Coalition

I-95 Corridor Coalition Quick Clearance and Move It Best Practices Executive Summary June 2005 The I-95 Corridor Coalition is a partnership of service providers working together to improve transportation along the Atlantic Coast

More information

District Three Design newsletter

District Three Design newsletter Florida Department of Transportation newsletter Inside this issue: Editor s Desk Highway Safety Manual Implementation Design Spotlight Plans Processing, Specifications & LAP Supplemental Agreement Report

More information

MBTA Green Line Positive Train Control Project

MBTA Green Line Positive Train Control Project PRESENTATION MBTA Green Line Positive Train Control Project Presented to: MBTA Board of Directors December 2012 Agenda Project Goal Why Green Line PTC/Evaluation Criteria? Key Findings Maintaining Green

More information

RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing

RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing (21.6 percent) and transportation (14.9 percent) are the two largest expense categories for the typical Austin family;

More information

A GIS Enabled Cost Estimation Tool for Road Upgrade and Maintenance to assist Road Asset Management System

A GIS Enabled Cost Estimation Tool for Road Upgrade and Maintenance to assist Road Asset Management System 1239 A GIS Enabled Cost Estimation Tool for Road Upgrade and Maintenance to assist Road Asset Management System Kabindra K. SHRESTHA 1, S.M.ASCE, M.S. CSIT, Pramen P. SHRESTHA 2, M.ASCE, Ph.D., P.E. 1

More information