UNIT PRICE LIST January 2009

Description Quantity Cost Total Cost

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

A. Structures Quantity Item Price $3,500 EA

Figure 3 Pipe Cracking

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

Chapter 22. Lump Sum Project Guidelines

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

Roadway Cost Per Centerline Mile Revised June 2014

FY08 SEWER POINT REPAIRS BID TABULATION

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

EXHIBIT A Accessible Truck Routes Map

The unit costs are based on the trend line of the 3 low bids for the average quantity.

Jackson Gulch Outlet Canal Rehabilitation Project


Riverside County Transportation Department Summary of Bids

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FDOT Specifications List

MIAMI BLUFFS COMMUNITY ASSOCIATION LINE ITEM BUDGET (9058)

RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4

Surface Transportation Program (STP)

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

SECTION 13 REPLACEMENT AND CLEANUP SCOPE OF WORK

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

Item No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description

Planning Level Cost Estimation Tool. User s Manual

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Update on Previous Related Transportation Enhancement Grants

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

PROPERTY EVALUATION AND RESERVE FUND STUDY

MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA

Exhibit A Scope of Work

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

SECTION SELECTIVE DEMOLITION

CID STREET INFRASTRUCTURE ASSESSMENT

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.:

ADVERTISEMENT FOR BIDDERS

Developing Critical Path Method Scheduling (CPM)

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016

UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY

Bond Release Process for New Subdivision Developments in Fairfax County

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

How To Build A Road In A Townhouse

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33, Mile: Population: 80,200 Median HH Income: $34,900

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

CD i -STREETS- Detail #

Summary Form. Partner Information. Project Information. Primary Contact Name: David Cosgrove Phone:

City of Shelbyville Site Inspection Checklist

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

Preliminary Plan Application and Checklist

Data Center Due Diligence List

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

STORMWATER MANAGEMENT CHECKLIST

TREE # 3 CRITICAL ROOT ZONE = 4,536 SF AREA IMPACTED = 50 SF % IMPACTED = 1 % ' BL VALVE IN BOX POP-UP EMITTER 74.7 CLEAN OUT BACKWATER

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

Storm Drain Inlet Protection - IP

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Waterleaf ARB Application

The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Transcription:

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30,000 50 $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25,000 36.0 $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6,000 32 $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 7.5 $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 3.8 $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100,000 3.8 $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50,000 7.5 -$375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 13 $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Bridge @ Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

( This Page Blank.)

Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38,000 50 $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4,000 12 $48,000 Per standards - center and skip Signage - all MI $4,000 7.5 $30,000 Avg. 20 signs per mile @ $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3,000 7.5 $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30,000 36.0 $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $600 15 $9,000 emergency solar phone Gravity wall LF $350 800 $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7,500 32 $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150,000 0.5 $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100,000 7.5 $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100,000 7.5 $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50,000 0.5 -$25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22,000 16 $352,000 7 roadway intersections Signage & Striping LS $4,000 13 $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1,500 13 $19,500 intersection lighting all Approach curb and ramps EA $3,000 26 $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Bridge @ Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Bridge @ Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton