ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F



Similar documents
Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Hyperlinks are Inactive

Power Plant Electrical Distribution Systems

TABLE OF CONTENT

101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION. Cutler-Hammer

ENERGY NETWORKS ASSOCIATION. Electricity Industry EMF Measurement Protocol for High Field Areas

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13

PG&E Transmission Interconnection Handbook. Section L3: SUBSTATION DESIGN FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Unified requirements for systems with voltages above 1 kv up to 15 kv

Siemens STEP 2000 Course Basics of Electrical Products

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

C.I.8.2 Offsite Power System. C.I Description

Online Transformer Insulation Monitoring System BushingGard Product Focus. Maximizing Transformer Uptime and Reliability

This section applies to the design and installation of transformers.

Secondary Unit Substations

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

Medium Voltage Electrical Distribution

Technical Requirements. For Generating Facilities Interconnecting. To The Distribution System. Salt River Project

ECE 586b Course Project Report. Auto-Reclosing

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse

Practical Transformers: Operation, Maintenance and Testing

SCADA Controlled Multi-Step Automatic Controlled Capacitor Banks & Filter Banks

SUPPLEMENT TO SPECIFICATIONS FOR ELECTRICAL INSTALLATIONS

When power interruptions happen.

CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION

TABLE OF CONTENT

Work in Substations - General

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions

Electrical Grounding. Appendix C

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS

Product brochure Multi Functional Switchgear PASS M kv Flexible and compact switchgear solutions for windfarms

Short Circuit Current Calculations

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

Sample - No Commercial Use

SECTION ELECTRICAL ACCEPTANCE TESTS

HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE

Switchgear and Metal-Enclosed Bus

Primary and Secondary Electrical Distribution Systems

SF 6 Gas Insulated Switchgear Type SDF for 170 kv

Paralleling Switchgear

January 23, Minimum Design Standards Task Force

PowerCommand Paralleling System Digital MasterControl

Power products and systems. Intelligent solutions for power distribution Zone concept

Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V V V (at 50 Hz)

An Overview of Wind Plant Design Standards and Common Nomenclature and Available Resources to the Power Engineer

IRRIGATION PUMPING Table of Contents - Section 900

Atlanta Chapter IEEE Industry Applications Society

Application of Four-Pole Circuit Breakers within Data Centers

NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers

Electric Power Distribution

SWITCHGEAR. EGP Switchgear

Bypass transfer switch mechanisms

Customer Substation Manual 08/05/02

Power Quality Standards for Electric Service

Metrolinx Electrification Project. Electrification Performance Specification EPS SCADA System Final Version. Metrolinx

Colorado Springs Utilities Interconnection Guidelines For Transmission to Transmission Interconnections Version 1 12/04/2007

Inverter / Charger Installation General Operations and AC and DC Connections

Design of electrical power system for a 1000MW nuclear power generating station

ELECTRICAL SAFETY. The standard unit for measuring electrical current.

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT NETWORK SYSTEMS SECTION

CONSULTATION PAPER FOR PROPOSED MODIFICATIONS TO THE TRANSMISSION CODE

ARC FLASH CALCULATIONS & LABELING REQUIREMENTS

Litigation Services & Information

6. The estimated costs here do not include any applicable ITCC tax

SECTION HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY STANDARDS

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

County of Riverside Building and Safety Department

NATIONAL CERTIFICATE (VOCATIONAL)

BU Control Technologies, Decathlon TM Product Overview. ABB in the Data Center Overview

The electrical energy produced at the gen

IESO Supply Deliverability Guidelines

Arc Flash Energy Mitigation Techniques

TERMS AND CONDITIONS

Earthing Guidance Notes

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

HIGH VOLTAGE CALCULATIONS / EVALUATIONS. West Virginia Office of Miners Health, Safety & Training

Fusible Disconnect Switch

HM-W536 Install Guide

SECTION SYSTEMS INTEGRATION TESTING

TABLE OF CONTENT

Top Commercial / Residential Electrical Requirements *

Diesel Engine Driven Generators Page 1 of 6

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

SCADA Systems Automate Electrical Distribution

Project Name: Nortrax Section Project No: SURGE PROTECTION DEVICES Page 1

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

Current Limiting Protector For Systems rated kV and continuous currents through 5000A.

Arc Flash Avoidance and its Application to Overhead Traveling Cranes

FIXED CHARGE: This is a cost that goes towards making the service available, including

Transcription:

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1 F.3.1 Switchyard...F-1 F.3.2 Transformers...F-2 Tables Table F1 Table F2 Table F3 Table F4 Design and Construction LORS Electric and Magnetic Field LORS Hazardous Shock LORS Communications Interference LORS F-i

TABLE OF CONTENTS F-ii

F-1 Appendix F Electrical Engineering Design Criteria F.1 INTRODUCTION This appendix summarizes the codes, standards, criteria, and practices that will be generally used in the design and construction of electrical engineering systems for the Bullard Energy Center (BEC). More specific project information will be developed prior to construction of the project to support detailed design, engineering, material procurement, and construction specifications as required by the California Energy Commission (CEC). F.2 CODES AND STANDARDS The design of the electrical systems, subsystem, and components will be in accordance with the laws and regulations of the federal government, State of California, County of Fresno, and City of Fresno local agencies and industry standards. The most current issue or revision of rules, regulations, codes, ordinances, and standards at the time of the filing of this Application for Certification (AFC) will apply, unless otherwise noted. If there are conflicts between the cited documents, the more conservative requirement shall apply. The following codes and standards are applicable to the electrical aspects of the power facility: American National Standards Institute (ANSI) American Society for Testing and Material (ASTM) Anti-Friction Bearing Manufacturers Association (AFBMA) Insulated Cable Engineers Association (ICEA) Institute of Electrical and Electronics Engineers (IEEE) Illuminating Engineering Society (IES) California Electrical Code (CEC) National Electrical Manufacturers Association (NEMA) National Electrical Safety Code (NESC) National Fire Protection Association (NFPA) Underwriters Laboratories, Inc. (UL) F.3 SWITCHYARD AND TRANSFORMERS F.3.1 Switchyard The facility switchyard will be located on the western portion of the site. It will be interconnected to the Pacific Gas and Electric (PG&E) transmission grid through a newly constructed Bullard switching station located on-site. The facility s 230 kilovolt (kv) outdoor switchyard will connect directly to the PG&E Bullard switching station with overhead bare aerial cables. The switchyard will be of the air-insulated aluminum bus type and will consist of high voltage SF6-insulated dead-tank circuit breakers arranged in a radial configuration. Connections to the nodes will be provided for each generator and for interconnecting to the utility grid. Each

Appendix F Electrical Engineering Design Criteria circuit breaker will be equipped with a no load break, air-insulated, disconnect switch on each side. Air-insulated aluminum strain bus will be used as the primary bus construction and interconnection material within the switchyard. The strain buses will be attached to strain insulators on structural steel H-frame supports. Current and voltage transformers will be located at points within the switchyard to provide for metering and relaying. Control, protection, and monitoring panel or devices for the switchyard will be located in the electrical building and generation control module. Monitoring and alarms will be available to the programmable logic controller (PLC) operator workstations in the control room. The 125 volt direct current (Vdc) battery system will provide control and protection voltage to circuit breakers. The switchyard design will meet the requirements of the NESC-ANSI C2. A grounding grid will be provided to control step and touch potentials in accordance with IEEE Standard 80, Safety in Alternating Current (AC) Substation Grounding. All equipment, structures, and fencing will be connected to the grounding grid of buried bare copper conductors and ground rods, as required. The substation ground grid will be tied to the plant ground grid. Lightning protection will be provided by shield wires and/or lightning masts for any overhead lines. The lightning protection system will be designed in accordance with IEEE 998 guidelines. All electrical faults shall be detected, isolated, and cleared in a safe and coordinated manner as soon as practical to ensure the safety of Equipment, Personnel, and the Public. Protective relaying will meet IEEE requirements and will be coordinated with PG&E s requirements. The protection will be designed to maintain integrity when isolating a faulted node. Each circuit breaker will be provided with independent breaker failure relay protection scheme. Breaker failure protection will be accomplished by protective and timing relays for each breaker. Each 230 kv circuit breaker will have 2 redundant trip coils. Interface with PG&E s supervisory control and data acquisition (SCADA) system will be provided. Interface will be at the interface terminal box and remote terminal unit (RTU). Communication between the facility switchyard and the control building to which it is connected will be included. F.3.2 Transformers Each generator will be connected to the 230 kv switchyard through a separate 230 13.8 kv, generator step-up transformer (GSU). The GSU will be designed in accordance with ANSI standards C57.12.00, C57.12.90, and C57.116. The transformers will be two-winding, deltawye, Oil Non Forced Air Non Forced (ONAN)/Oil Non Forced Air Forced (ONFA)/ONFA cooling, and 65 degrees Celsius ( C) rises. The neutral point of the high voltage (HV) wyeconnected winding will be solidly grounded. Each GSU will have metal oxide surge arrestors adjacent to the HV bushing terminals. The GSUs will have manual de-energized ( no-load ) tap changers located in the HV windings. Each generator will be connected to each GSU through low-side generator breakers to allow taps for unit auxiliary transformers. The unit auxiliary transformers step the 13.8 kv down to 4,160V and connect to 4,160V switchgear via a non-segregated phase bus duct by way of main circuit F-2

Appendix F Electrical Engineering Design Criteria breakers to supply the facility 4,160V loads. A normally open tiebreaker between the two 4,160V switchgear will allow a single unit auxiliary transformer to supply the entire facility load. The unit auxiliary transformer 4,160V winding neutrals will be connected to ground grid through low-impedance grounding resistors to limit system ground fault current. TABLE F1 DESIGN AND CONSTRUCTION LORS LORS Applicability Compliance Go-128, CPUC, Rules for Underground Electric Line Construction Title 8 CCR, Section 2700 et seq. High Voltage Electrical Safety Orders GO-52, CPUC, Construction and Operation of Power and Communication Lines CPUC rule covers required clearances, grounding techniques, maintenance, and inspection requirements. Establishes essential requirements and minimum standards for installation, operation, and maintenance of electrical installation and equipment to provide practical safety and freedom from danger. Applies to the design of facilities to provide or mitigate inductive interference. 3.6.2: 3.5.4 3.9.3: 3.4.11.2 3.6 3.9.3 3.6. 3.9.3 3.4.5 TABLE F2 ELECTRIC AND MAGNETIC FIELD LORS LORS Applicability Compliance Decision 93-11-013, CPUC CPUC position on EMF reduction. 3.6.4.3 GO-131-D, CPUC, Rules for Planning and Construction of Electric Generation, Line, and Substation Facilities in California ANSI/IEEE 544-1994, Standard Procedures for Measurement of Power Frequency Electric and Magnetic Fields from AC Power Lines CPUC construction application requirements, including requirements related to EMF reduction. Standard Procedure for measuring EMF from an electric line that is in service. 3.6 3.4.5 3.6.4.3 F-3

Appendix F Electrical Engineering Design Criteria TABLE F3 HAZARDOUS SHOCK LORS LORS Applicability Compliance 8 CCR 2700 et seq. High Voltage Electrical Safety Orders ANSI/IEEE 80, IEEE Guide for Safety in AC Substation Grounding NESC, ANSI C2, Section 9, Article 92, Paragraph E; Article 93, Paragraph C Establishes essential requirements and minimum standards for installation, operation, and maintenance of electrical equipment to provide practical safety and freedom from danger. Presents guidelines for assuring safety through proper grounding of AC outdoor substations. Covers grounding methods for electrical supply and communications facilities. 3.6.4.3 3.6.5.3 3.6.2 3.6.2 3.6.2: TABLE F4 COMMUNICATIONS INTERFERENCE LORS LORS Applicability Compliance 47 CFR 15.25, Operating Requirements, Incidental Radiation GO-52, CPUC CEC staff, Radio Interference and Television Interference (RI-TVI) Criteria (Kern River Cogeneration) Project 82- AFC-2, Final Decision, Compliance Plan 13-7 Prohibits operations of any device emitting incidental radiation that causes interference to communications; the regulation also requires mitigation for any device that causes interference. Covers all aspects of the construction, operation, and maintenance of power and communication lines, and specifically applies to the prevention or mitigation of inductive interference. Prescribes the CEC s RI-TVI mitigation requirements, developed and adopted by the CEC in past citing cases. 3.6.4.3: 3.6.5: 3.6. 3.9.3 3.4.5 3.6.4.3 F-4