SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)



Similar documents
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

SPACE TYPE: AUDITORIUM

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

REFLEC TIONS I & II AT CIRCLEPORT

SHELL & CORE: OFFICE BUILDING

17,280 square feet Overview:

MRI RF SHIELDING DESIGN

SHELL & CORE: UTILITY BUILDING

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

Building Condition Assessment Report

Nominal Life Expectancy for Building Components

Print Shop/Mail Room

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

LEASE BETWEEN RALEIGH PORTFOLIO JH RETAIL, LLC AND CITY OF DURHAM FOR SPACE IN THE BUILDING AT 2945 S. MIAMI BOULEVARD; DURHAM, NC EXHIBIT A

Fire Alarm System Plans Review Checklist Property location Date of Review

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

TIA 569 Standards Update Pathways & Spaces. Ignacio Diaz, RCDD April 25, 2012

Water Leak 1: Intrusion Policy

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Core & Shell Construction. Rules and Regulations

A1.5 Classroom Standards

Doc Ref: baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

This directive establishes Department of Homeland Security (DHS) policy regarding the physical protection of facilities and real property.

Point Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth

Schedule of Maintenance Fees

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

SECTION MORTUARY REFRIGERATORS

Your Basement Remodeling Specialist LLC

PUBLIC RESTROOMS, DESIGN INTENT

Summit Series Single Section and Double Section Homes

Project Close Out Summary

2. What building projects are exempted? (permit not required)

Element D Services Heating, Ventilating, and Air Conditioning

Mechanical, Plumbing, and Fire Protection Conditions

Current as of 11/10/08 1 of 1

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

Aurora Mall. Aurora (Denver), Colorado

Building Condition Assessment Report

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

GENERAL WIRING RULES FOR HOUSES

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

GENERAL ELECTRICAL REQUIREMENTS

Glossary of HVAC Terms

FIRE-FIGHTING DESIGN BRIEF REPORT

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

Page 1 of 6 COMPLIANCE CHECKLIST. > Long Term Care Facility - Nursing Unit

Mike and Jen Sample 111 Main St. Tabb, VA SPECIFICATION LIST

50 St Mary Axe London EC3

Replacement Costs and Cleaning & Service Charges for Northwood

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

Building Code Clarifications - 7. Fire Resistance

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

LogisticsCentre IV Distribution Center

COMMODITIZING THE DATA CENTER MARKET

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

The Telecommunications Closet and Building Services

Tate s Wire & Cable Solution

Welcome To Mallard Park

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

IMPROVEMENT COST ESTIMATE powered by HomeFixers

Building Permit Application

Your Company Name. Your Company Address Your City, State, Zip Your Phone Number Your Address. Project Information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

DCSS (ACB) Data Center Fire Suppression Procedures

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

CONDUIT MAYFAIR READY FOR OCCUPATION SPRING 2014 GLINSMANWELLER.CO.UK A DEVELOPMENT BY LONDON PROPERTY PARTNERSHIP LTD

Middleborough Police Electronic Security Narrative

Presenters Brett Weiss, Gabe Martinez, Brian Kroeger.

LogisticsCentre IV Distribution Center

Electrical Wiring Technical Bulletin

Standards. 5 ANSI/TIA/EIA-569-A (CSA T530)

Turnkey Projects, Conversions, Restorations & Property Management. Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

800 Communications Circuits

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE

** PROPRIETARY ** SAMPLE COUNTY DATA CENTER PROJECT BUDGET ** PROPRIETARY **

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE

ANNEX C - DESIGN BRIEF

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained).

TURN-KEY LAB SPACE AVAILABLE

Building Telecommunications Infrastructure Requirements

MURCH ELEMENTARY SCHOOL

Harmon Court 1128 Harmon Place Minneapolis, Minnesota

N O W A V A I L A B L E

VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC TEL: (202) INITIAL PROJECT COST ANALYSIS

SECTION ZONED (DC LOOP) FIREALARM SYSTEM

H-Stud Area Separation Wall System

Transcription:

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following table. This information has been generally organized under Uniformat headings. Items marked with a have a space-related cost impact on the building shell and core. Shell Exterior Enclosure Windows All exterior windows to computer spaces, including tape room, teleprocessor room, mainframe room, DASD farms, server farms and test rooms to be glass block Interior Construction Partitions Suite Perimeter and Public Corridor Printer Room Mechanical Room Doors ½ GWB on metal studs at 16 OC Raised floor-to-ceiling grid Structural slab-to-slab Two layers ½ GWB both sides on metal studs at 16 OC Acoustical insulation 45 STC Floor-to- slab One layer ½ GWB both sides on metal studs at 16 OC with underfloor plenum divider Acoustical insulation 40 STC Structural slab-to-slab 5 / 8 GWB on metal studs at 24 OC Hardware to be latch sets with levers ADP (Mainframe) 17-1

Suite Entrance Solid core 1¾ hardwood veneer double doors in 6-0 (w) by 7-0 (h) Frame and threshold sound gasketing Hardware to be locksets with levers Key locks Automatic closers Printer Room Frame sound gasketing Hardware to be locksets with levers Key locks Brushed stainless steel kick plate room side Mechanical Room Hardware to be latch sets with levers Brushed stainless steel kick plate room side Signage Suite Entrance Room Signage System Room identification signage to be raised plastic letters mounted beside the door with Braille stainless steel ADAAG compliant module Signage for life safety and public convenience (toilets) within the functional areas of the tenant will be included in the unit costs and will be modular vinyl lettering on plastic laminate signage frame system with ADAAG compliant tactile Braille vinyl signage modules Signage requirements within the tenant demised space related to their function will be provided by tenant Window Treatment Glass block areas do not require window treatment Horizontal 1 louver blinds at offices Anti-static painted aluminum louvers Concealed valance free head Floor 18 raised floor throughout suite All non-core areas and core electrical, telephone and computer LAN closets Exclude core areas of public lobby, public toilets, mechanical fan rooms, janitor closets and storage rooms Low pressure high induction diffuser Concrete filled metal pans at 24 modules Pedestal and stringer support, with intermediate support UL rated conduit 17-2 ADP (Mainframe)

Interior Finishes Walls Low VOC semi-gloss paint with vinyl base Floors Offices, Break Rooms Ceiling Anti-static plastic laminate (on raised floor as part of building shell and core provisions) Carpet tile (on raised floor) 32 oz per square yard level loop Yarn dyed color with pattern Fourth generation nylon yarn Bonded construction with cushioned back Suspended 24 by 24 acoustical tile ceiling par t of the building shell and core provisions ADP (Mainframe) 17-3

HVAC Dedicated HVAC Units Suite to have redundant mechanical systems with service provided 24 hours per day; the system will provide humidity control Computer areas will use the cold aisle concept (W. Pitt Turner IV, Edward C. Koplin, Changing Cooling Requirements Leave Many Data Centers At Risk, Computer Site Engineering Inc, www.upsite.com, CSE 540.1) Dedicated HVAC equipment has been sized on the basis of approximately 1 ton of refrigeration per 125 gross SF of usable floor area; a total of six (6) 25 ton units are assumed to allow for 50% redundancy in units Dedicated cooling towers shall be two-cell type with each cell having 100% required heat rejection capacity Provide two condenser water pumps (one stand-by) Separate zones for each space Air Supply Exhaust Air Thermostat Controls Fire Protection Fire Suppression Fire and Smoke Detection Fire Alarms Sound baffles at all acoustically rated partitions Copier rooms, printer rooms and service units provide direct 100% exhaust Provide separate controls for each room Provide setback thermostat even in areas of 24 hr operation with override by building shell and core BAS Sprinkler system is part of the building shell and core provisions; assume that the Tenant Improvement for this space type requires relocation of 10% sprinkler heads Fire and smoke dampers to be provided in rated walls One smoke and heat detection device in each occupiable space One fire alarm pull station by each egress point for each suite Audible and visible (strobe) alarm in each occupiable space 17-4 ADP (Mainframe)

Electrical Criteria UPS and Emergency Power Electrical Outlets Raised Floor Areas Lighting Telephone and Communication Outlets Computer Equipment 50 Watts per SF provided as part of building shell and core provisions Emergency power and uninterruptible power be provided to meet all electrical requirements of the entire ADP facility for 30 minutes Raised floor wireway distribution with modular cable, distribution boxes and conduit every 12-0 Raised floor in equipment rooms to have 50 Watts/SF general power supply See Equipment section below for information on the requirements of individual pieces of equipment Flush floor receptacles with four duplex receptacles for every 100 SF for office areas Wall mounted duplex outlets every 50-0 OC lighting provided as part of the building standard shell and core provisions with a minimum of one 24 (w) by 48 (l) recessed parabolic fluorescent fixture with two T-8 lamps and electronic ballasts per room and additional fixtures per every 80 SF (or T-5 equivalent) Independent switch control for each suite with 3 way switches at each entrance and for each enclosed space, including offices, work rooms, file rooms, closets Conduit and pathways for services from the core to the tenant demised space provided as part of the building shell and core provisions; conduit and boxes within the tenant suite are part of the Tenant Improvement unit costs Conduit and outlet boxes provided as part of the Tenant Improvement unit costs; telephone systems and Data LAN systems provided by tenant Conduit and telephone outlet boxes for flush floor receptacles with one telephone line for every 400 SF provided as part of the Tenant Improvement unit costs; equipment and wiring provided by tenant Conduit and outlet boxes for flush floor receptacles with one LAN connection for every 400 SF provided as part of the Tenant Improvement unit costs; equipment and wiring provided by tenant Conduit and outlet boxes for one ceiling mounted PA speaker per room plus one for every additional 1,000 SF provided as part of the Tenant Improvement unit costs; equipment and wiring provided by tenant Conduit and outlet boxes for fiber optic main horizontal and vertical backbone system (optics by tenant) provided as part of the Tenant Improvement unit costs; equipment and wiring provided by tenant Conduit and outlet boxes for T-1 communication lines for web servers provided as part of Tenant Improvement unit costs; equipment and wiring provided by tenant ADP (Mainframe) 17-5