TURN-KEY LAB SPACE AVAILABLE
|
|
|
- Herbert Allison
- 10 years ago
- Views:
Transcription
1 TURN-KEY LAB SPACE AVAILABLE 910 CLOPPER ROAD LOCATION... Tech Park Clopper Road BUILDING ,650 rentable square feet TURN-KEY LAB/OFFICE SPACE AVAILABLE Second Floor 9,800 SF 14,644 SF (can subdivide) BASE RENTAL RATE... $28.50 per square foot, triple net (Turn-Key) TENANT S IMPROVEMENTS... Landlord will construct lab space on a Turn-key basis in accordance with lab specifications enclosed, including shared laboratory services PARKING... Abundant Free surface parking at ratio of 3.25 spaces per 1,000 square feet leased AMENITIES Existing laboratory services & equipment Excellent I-270 Access Consolidated Stills & Sterilizers, Autoclave with dry, wet, and quick sterilization cycles Newly Renovated Lobby and Common Areas Clustered among life science companies Neu-Ion* Reverse Osmosis/Deionization water purification system generating USP quality Compressed air Central vacuum Natural gas Closely located to large retail amenity base Extensive Window Line affords high ratio of private windowed offices & maximum natural light for open areas & labs Virtual Tour enclosed
2 Lab Specifications: Architectural: VCT flooring throughout laboratory areas, IT closet, copy/fax, and break room Upgraded VCT flooring throughout the common hallways; 6 wide public corridors Carpet throughout reception and office areas Acoustical ceiling tile in the office and common corridor Mylar coated (cleanable) acoustical ceiling tile in laboratory areas Epoxy top metal casework in the laboratory areas One sink per laboratory area with RO/DI drop at point(s) of use 9 clear finished ceilings, fully sprinklered Double wide painted metal laboratory doors hard acrylic bumper and corner guards in common corridors and interior lab space Shared locker storage available for office/lab supplies HVAC: Shared 60-ton recirculating direct expansion cooling unit with gas-fired furnace supplying the office spaces Individual 25-ton recirculating direct expansion cooling unit with gas-fired furnace supplying each laboratory space Ventilation: Manifold system of two fume hood exhaust ducts with an individual exhaust fan for each laboratory area Shared Services: Consolidated Stills & Sterilizers, Autoclave with dry, wet, and quick sterilization cycles Girton Glassware* Washer, full size, upright unit Neu-Ion* Reverse Osmosis/Deionization water purification system generating USP quality Emergency Power: Caterpillar or Onan/Cummins diesel fuel emergency generator with approximate hour run time; Generator will provide emergency power to dedicated laboratory and server outlets, and exhaust ventilation systems Laboratory Services: Reverse Osmosis/Deionization purified water loop serving the glassware washer, and points of use at each laboratory sink Compressed air to two points of use in each laboratory and a point of use in each chemical fume hood Central vacuum to two points of use in each laboratory and a point of use in each chemical fume hood Natural gas to two points of use in each laboratory * Typical equipment manufacturer, replacement manufacturer may be substituted at landlord s discretion
3 2nd Floor Plan 9,800 SF 14,644 SF
4 Laboratory Plan 9,800 SF Shared Laboratory Services Suite C 7,002 SF Suite B 7,642, SF
5 Conceptual Small Lab Office Office 225 S.F. Common Corridor Reception LAB #1 475 S.F. Typical LAB #2 LAB #3 LAB #4 Reception Reception OFC OFC OFC LAB #5 LAB #6 Copy. Copy Copy Closet SUITE C-1 2,878 S.F. SUITE C-2 2,382 S.F. SUITE C-3 2,382 S.F.
6 AERIAL
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This
Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL
Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL 6800-6880 N. Broadway, Denver CO 80221 Lease rates & terms 6870 AVAILABLE 6860 6850 3.1 Acre Build-To-Suit Site 8 High-quality buildings
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
MSBA Guidelines for Science Labs
Massachusetts School Building Authority Steven Grossman Chairman, State Treasurer Katherine Craven Executive Director MSBA Guidelines for Science Labs May 26, 2010 www.massschoolbuildings.org Introduction:
Laboratory Design & Construction Guidelines
Laboratory Design & Construction Guidelines Department of Environmental Health & Safety EHS-M-35 Page 1 Issue Date: 03/01/10 General Health and Safety The USC Environmental Health and Safety Department
Harmon Court 1128 Harmon Place Minneapolis, Minnesota
Harmon Court 1128 Harmon Place Minneapolis, Minnesota Building Specifications Location 1128 Harmon Place Minneapolis, Minnesota 55403 Building Size 31,350 rentable square feet 3 office floors Year Built
the research park at torrey pines
the research park at torrey pines 1083 Road to the Cure, San Diego 67,998 s.f. Class A Laboratory & Office Project propertyhighlights 1083 Road to the Cure is suited to provide best in class laboratory
Element D Services Heating, Ventilating, and Air Conditioning
Load Calculation Criteria PART 1 - GENERAL 1.01 OVERVIEW A. This section includes requirements for calculating HVAC cooling and heating loads. B. Load calculations must be performed in accordance with
Iron Hill Corporate Center Newark, DE
Iron Hill Corporate Center Newark, DE Delaware s Premier Suburban Office Park Contact: John Kaczowka (302) 661-6709 or Brian Hopkins (302) 661-6712 Total Project Size 463,085 RSF Red Wing Built in 1988
1450 Infinite Drive. Unique Space Opportunity In Northwest Denver! 1450 Infinite Drive Louisville, Colorado 80027
1450 Infinite Drive Offi ce, Clean Electronics Lab and Clean Room Manufacturing Environment Intensive Infrastructure & Growth Capabilities! The space use in the building includes offi ce, lab space, clean
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
REX JACOBSMA 877.739.2526 [email protected]. P.O. BOX 1833 Paso Robles, California 93447 P: 805.239.3090 F: 805.239.9088 www.corvallisofficespace.
For Lease RESEARCH WAY TECHNOLOGY CENTER ABOUT THE PROPERTY LOCATION 4575 S. W. Research Way STRUCTURE & SIZE High-Tech Flex-Space for Offices, R&D, Assembly and Laboratory 103,200 SF on 9.16 Acres AVAILABLE
Building Description Project Description Estimated Cost Notes Total Deferred
Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field
Applies to: All Employees within the Facilities Management Department (FMD)
Building Area Measurement Guidelines Applies to: All Employees within the Facilities Management Department (FMD) GUIDELINES: Issued: December 17, 2013 Author: FMD Physical Planning Team PURPOSE: To establish
OFFICE SPACE SUBLEASE 1105 Berkshire Boulevard / The TRAVELERS BUILDING Wyomissing, PA 19610. Rare Wyomissing Sublease 4,926 SF AVAILABLE NOW
SPACE SUBLEASE 1105 Berkshire Boulevard / The TRAVELERS BUILDING Rare Wyomissing Sublease 4,926 SF AVAILABLE NOW Full Service Lease, all-in for only $16.50 / SF! Glass on three sides, huge conference room
Nominal Life Expectancy for Building Components
Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes
BEAR CREEK CORPORATE CENTER BEAR CREEK CORPORATE CENTER NEW LEASING OPPORTUNITY
NEW LEASING OPPORTUNITY 98,246 SF CLASS A OFFICE BUILDING 17425 NORTHEAST UNION HILL ROAD, REDMOND, WA 98052 AVAILABILITIES BUILDING B AVAILABILITIES FLOOR SQUARE FOOT RATE DATE AVAILABLE 1st Floor 46,541
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
R432. Health, Health Systems Improvement, Licensing. R432-5. Nursing Facility Construction. R432-5-1. Legal Authority. R432-5-2. Purpose.
R432. Health, Health Systems Improvement, Licensing. R432-5. Nursing Facility Construction. R432-5-1. Legal Authority. This rule is promulgated pursuant to Title 26, Chapter 21. R432-5-2. Purpose. The
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings CPE Candidate No. 0714108 December 2014 1 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings Table
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA
Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project
Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project The Watergate Community is currently in the process with the fire suppression and interior renovations
Saint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
17,280 square feet Overview:
CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The
Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,
4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.
Calculating Commercial Real Estate Rent. An E-book Prepared By:
Calculating Commercial Real Estate Rent An E-book Prepared By: For more information please contact us at 630.444.0444 O Donnell Commercial Real Estate, Inc. provides product and tenant representation of
KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the
Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks
Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same
Mechanical Systems Proposal revised
Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option
Aurora Mall. Aurora (Denver), Colorado
is the largest superregional mall in the city of Aurora, and it s only getting bigger and better. The mall is currently undergoing a significant interior and exterior renovation, scheduled for completion
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
5703 South Sossaman Road Aviation Center
5703 South Sossaman Road Aviation Center has an available Class A aviation center with a 10,000 s.f. hangar. This facility includes 10,000 s.f. of space for offices, avionics repair, or other uses. It
BUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792
COOK PHYSICAL SCIENCE BUILDING RENOVATIONS. Engineering & Architectural Services CONCEPT DESIGN MAY 11, 2012. BVH Project No.
COOK PHYSICAL SCIENCE BUILDING RENOVATIONS Civil Structural Mechanical Electrical Technology Engineering & Architectural Services CONCEPT DESIGN Commissioning 50 Griffin Road South Bloomfield, CT 06002
3901 Calverton Boulevard Beltsville, Maryland
3901 Calverton Boulevard Beltsville, Maryland GHP Office Realty One West Red Oak Lane White Plains, New York 10604 Phone: 914.642.9300 Fax: 914.642.9301 ghpoffice.com 3901 CALVERTON BOULEVARD, BELTSVILLE,
BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES
Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations MECHANICAL SYSTEMS DESIGN STANDARDS Appendix A RECOMMENDED HVAC SYSTEMS BY TYPE OF SPACE Matt Higgins Valentin Lucero
STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION. Now offered for a limited period of time, free solar with each home!
STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION Now offered for a limited period of time, free solar with each home! ENERGY EFFICIENT ITEMS BUILD IN YOUR HOME 50 Gal Energy Star Hot Water Heaters with
Professional Property Management TREC 4507
Professional Property Management TREC 4507 ANSWER KEY FOR FINAL EXAMINATION (With rational followed by chapter and page references) Example: (1:3 means the answer can be found in Chapter 1 on Page 3).
Proudly Presenting. 5083 Twinflower Crescent
Proudly Presenting 5083 Twinflower Crescent Brand new contemporary style home in the "Ponds", a great family neighbourhood in the Upper Mission. Modern décor both interior and exterior. Open design with
1301 Fannin. Houston Data Center & Office Facility
1301 Fannin & Office Facility 1301 FANNIN Building Features Building Location Building Typical Floor plans Systems Infrastructure Amenities BUILDING FEATURES YEAR BUILT/RENOVATED: 1984/2009 TOTAL LEASE
Building Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
MARQUETTE UNIVERSITY: McCabe Hall
MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
Construction Indoor Air Quality Management Plans for LEED. Matt Gregg, PE, LEED AP
Construction Indoor Air Quality Management Plans for LEED Matt Gregg, PE, LEED AP Agenda What is a Construction IAQ Management Plan? What are the LEED Requirements? What is the Mechanical Contractor s
COMMODITIZING THE DATA CENTER MARKET
COMMODITIZING THE DATA CENTER MARKET Site Summary The building at 1360 Kifer Road has approximately 94,500 SF of server and support space and is currently divided into two independent data center areas.
Table of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9
Table of Contents I Introduction 2 II Definitions & Area Calculation 2 III Room Numbering 7 IV Appendix A 9 I. Introduction A. Purposes The purposes of this document are to: B. Benefits 1. Clarify and
ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015
ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18,
property introduction
THE PINNACLE IN DOWNTOWN SARASOTA OFFICE SPACE property introduction Built in 1970 as part of the Ellis Group of banks, downtown Sarasota s Ellis Building has always had a healthy and stable mix of business
MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS
CHAPTER 93 MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS Note: Chapter 93 is entirely Seattle amendments to the International Fire Code and is not underlined. Point of Information The requirements of this
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
Property Features. Rate SF $28/SF/annum, FSG Parking.. 1/1,000 at prevailing building rates
John C. Anthony Senior Managing Director Lic. # 01226464 [email protected] Direct 213.534.3245 Office 213.481.1800 Fax 213.481.0758 Chris Steck Director Lic. # 01841338 [email protected] Direct
Oil Spill Clean-up by Homeowner in Ohio *
Oil Spill Clean-up by Homeowner in Ohio * HALLWAY WITH OIL TANK AND ENCLOSURE (NOVEMBER 2005) This picture is taken before we purchased the property. The house is built on a slab foundation. There was
MODERATE INCOME HOUSING UNIT PROGRAM PRICE & RENT SUMMARY FOR LOW INCOME ALTERNATIVE January 1 through June 30, 2016*
MODERATE INCOME HOUSING UNIT PROGRAM PRICE & RENT SUMMARY FOR LOW INCOME ALTERNATIVE January 1 through June 30, 2016* For-Sale Pricing Unit Type Base House Price Maximum Rents Maximum Unit Size Rent One
DRAFT Document valid at the date shown on the page header. DETE Facilities Design Standards and Guidelines. General Index. Planning Guidelines
DETE Facilities Design Standards and Guidelines General Index P D S R Planning Guidelines Design Guidelines Standards Reference Documents DRAFT Document valid at the date shown on the page header. * Documents
City of Elk River BASEMENT Office Use Only
City of Elk River BASEMENT Office Use Only Fire and Building Safety Division (FABS) Building Permit Application Notes Scan Permit Total Date Permit # PID # $ Site Address Suite/Unit Structure Type Single
Holz Choices & Specifications
March 21, 2011 0. SALES AND DESIGN 1. UTILITIES AND PERMITS Holz Choices & Specifications 2. EXCAVATION AND LOT PREPARATION Job Beginning date of Monday May 2 nd, 2011 ALTERNATE: Garage walls as drawn
Walkthrough Inspection Checklist
Walkthrough Inspection Checklist This checklist is to aid during an IAQ Walkthrough of the school. The checklist includes considerations both inside and outside the school building: Instructions: 1. Read
BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207
BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist
1.2 Refrigerant Equipment. General
Part 1 General 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying heating, ventilation and air conditioning (HVAC) work. These standards are not intended to restrict or
SAFETY SELF-INSPECTION PROGRAM
Palm Beach State College Florida s First Public Community College SAFETY SELF-INSPECTION PROGRAM PALM BEACH STATE COLLEGE SAFETY SELF-INSPECTION PROGRAM 1. INTRODUCTION An important element of any employee
Inspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com [email protected]
IEQ Management Plan. Denver Museum of Nature and Science ECF Addition
IEQ Management Plan GH Phipps Construction Companies 5995 Greenwood Plaza Blvd., Suite 100 Greenwood Village, Colorado 80111-4710 303.571.5377 PHONE www.ghphipps.com Denver Museum of Nature and Science
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
AVAILABLE FOR SALE. 1800 Golden Trail Court, Carrollton, TX ± 63,746 SF
AVAILABLE FOR SALE 1800 Golden Trail Court, Carrollton, TX ± 63,746 SF 1800 Golden Trail Court CONTACT INFORMATION Nathan Denton, Principal Direct: 972-934-4015 [email protected] LOCATION DATA:
Space Acquisition and Planning Guidelines
United States Office of July 2004 Environmental Protection Administration and Agency Resources Management (2304) EPA FACILITIES MANUAL, VOLUME Space Acquisition and Planning Guidelines Printed on Recycled
Glossary of Heating, Ventilation and Air Conditioning Terms
Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment
LEASE BETWEEN RALEIGH PORTFOLIO JH RETAIL, LLC AND CITY OF DURHAM FOR SPACE IN THE BUILDING AT 2945 S. MIAMI BOULEVARD; DURHAM, NC EXHIBIT A
EXHIBIT A SCOPE OF WORK TO BE COMPLETED BY LANDLORD FOR THE DISTRICT 4 POLICE SUBSTATION AT 2945 S. Miami Boulevard, SUITES 133,134,135, and 136 Dated August 21, 2012 All work must be done in compliance
U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!
U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or
The UPLANDS at ORO VALLEY Sterling Features
The UPLANDS at ORO VALLEY Sterling Features STERLING FEATURES Enhanced Air Quality System 2x6 Exterior Walls in Living Area Engineered Post Tension Concrete Slab Dual Pane Low-E Windows Covered Patio Gated
164,491 SF Food Production Facility Situated on 10 Acres Available in
164,491 SF Food Production Facility Situated on 10 Acres Available in Buffalo, New York CONSTRUCTION Acid resistant brick and coated floors in the production area with drains; clear ceiling heights from
How To Buy A Building In Northern Texas For $325,000.00
Building Location Description Condition Asking Price 208 $325,000.00 Santa Fe Town Square Mall Blockbuster Video McKenzie Furniture 12,000 sq. ft. mini mall on the main level with 3 shops and office space
LogisticsCentre IV Distribution Center
KCI Intermodal BusinessCentre LogisticsCentre IV LogisticsCentre IV Distribution Center Modern Warehouse/Distribution Space Ranging From 108,000± SF to 432,000± SF 10221 NW Transcon Drive 112th Street
TARRANT COUNTY PUBLIC HEALTH DEPARTMENT 817-321-4960 fax 817-321-4961 FOOD ESTABLISHMENT REVIEW APPLICATION
TARRANT COUNTY PUBLIC HEALTH DEPARTMENT 817-321-4960 fax 817-321-4961 FOOD ESTABLISHMENT REVIEW APPLICATION Date: NEW REMODEL Name of Establishment: Category: Restaurant Institution Daycare Retail Market
Data Center CH1. Elk Grove Village, IL
Data Center CH1 Elk Grove Village, IL powerful/ efficient /reliable solutions > Data Center CH1 ABOUT DUPONT FABROS TECHOLOGY (DFT) DFT is a leading owner, developer, operator and manager of wholesale
SECTION XI OPINION OF PROBABLE COST
SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing
ST. MONICA FOOD PANTRY HOUSTON, TEXAS
PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,
SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS
ASBESTOS SURVEY SUMMARY PACIFIC UNION COLLEGE ANGWIN, CALIFORNIA SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS Definition of terms: Friable: Material that can be crumbled
DIVISION 1 THIRD FLOOR COUNTY ATTORNEY. Remediation Plan Remove approximately 6 SF of mold impacted drywall Remove all carpeting in hatched.
Remediation Plan Remove approximately 6 SF of mold impacted drywall Remove all carpeting in hatched area followed by HEPA vacuum of floor Remove 2 SF of mold impacted drywall on ceiling Remove 2 SF of
Water should be removed as soon as possible once the safety of the structure has been verified.
FACT SHEET Posted October 18 2005 Check List for Infection Control Concerns when Reopening Healthcare Facilities Closed due to Extensive Water and Wind Damage Prior to opening a healthcare facility that
NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.
NARRATIVE REPORT 1.0 BUILDING INFORMATION The original date of construction for Construction Management Engineering was not immediately available; the building has had no major renovations. Construction
