Electron S.R.L. A29 ELECTRICAL POWER SYSTEM TRAINERS. Production Transmission Distribution

Similar documents
Occupational Profile: Electrical & Electronics Engineering Technician

Federal Wage System Job Grading Standards for Electric Power Controlling, Table of Contents

Module Title: Electrotechnology for Mech L7

NATIONAL CERTIFICATE (VOCATIONAL)

Renewable Energy Laboratory for Engineering Students

7. Reactive energy compensation

Lab 14: 3-phase alternator.

Equipment: Power Supply, DAI, Synchronous motor (8241), Electrodynamometer (8960), Tachometer, Timing belt.

Fig. 1 Analogue Multimeter Fig.2 Digital Multimeter

GUIDE FOR TESTING POWER TRANSFORMERS

EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID

2. A conductor of length 2m moves at 4m/s at 30 to a uniform magnetic field of 0.1T. Which one of the following gives the e.m.f. generated?

SUBJECT: How to wire a motor starter Number: AN-MC-004 Date Issued: 2/08/2005 Revision: Original

Three phase circuits

ENERGY: MODULAR POWER SYSTEM SIMULATOR. BASIC MODULE

Photovoltaic Solar Energy Unit EESFB

Reduction of Power Losses Using Phase Load Balancing Method in Power Networks

Equipment: Power Supply, DAI, Wound rotor induction motor (8231), Electrodynamometer (8960), timing belt.

Energy Management Energy Meter Type EM23 DIN

Power measurement in balanced 3 phase circuits and power factor improvement. 1 Power in Single Phase Circuits. Experiment no 1

DDX 7000 & Digital Partial Discharge Detectors FEATURES APPLICATIONS

Current and voltage measuring relays

UNIVERSITY OF WATERLOO ELECTRICAL & COMPUTER ENGINEERING DEPARTMENT ME269 ELECTROMECHANICAL DEVICES AND POWER PROCESSING.

The following table shows approximate percentage wise the

Lab 8: DC generators: shunt, series, and compounded.

THREE PHASE CIRCUITS

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

Equipment: Power Supply, DAI, Variable resistance (8311), Variable inductance (8321)

R448 & R448 V50 A.V.R.

NO LOAD & BLOCK ROTOR TEST ON THREE PHASE INDUCTION MOTOR

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

DHANALAKSHMI COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE ELECTRICAL MACHINES II UNIT-I SYNCHRONOUS GENERATOR

ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only

World Leader in HV Testing Technology

Computer Controlled Generating Stations Control and Regulation Simulator, with SCADA SCE

MULTIFUNCTION TIME RELAY CRM-93H

Smart Grid and Renewable Energy Grid Integration. Jian Sun, Professor and Director Department of ECSE & Center for Future Energy Systems

REVIEWED BY CAPITAL PROJECTS MANAGER (DAN REDDY) GENERAL MANAGER EQUIPMENT ENGINEERING & ASSET MANAGEMENT (HAMILTON NXUMALO)

R438 A.V.R. Installation and maintenance R 438. This manual is to be given to. the end user T10. Armature 6- Field X2 Z1 X1 Z2 E+ E- 0V

SWITCHGEAR. EGP Switchgear

Faculty of Engineering Power Circuit Theory. Lab 2 Three-Phase Circuits

Principles of Adjustable Frequency Drives

Process modules Digital input PMI for 24 V DC inputs for 120 V AC inputs

VOLTAGE REGULATOR AND PARALLEL OPERATION

SIMULATING HYBRID ENERGY GRIDS IN SMART CITIES FOCUS ON ELECTRIC ENERGY SYSTEMS

FAULT FINDING MANUAL For Self Excited and Separately Excited Generators

PHYSICS 111 LABORATORY Experiment #3 Current, Voltage and Resistance in Series and Parallel Circuits

Charged cable event. 1 Goal of the ongoing investigation. 2 Energy sources for the CDE. Content

DDX 7000 & Digital Partial Discharge Detectors FEATURES APPLICATIONS

Measurement of Power in single and 3-Phase Circuits. by : N.K.Bhati

FAULT FINDING MANUAL. For Stamford AC Generators

How To Protect A Motor From Overcurrent

EEL303: Power Engineering I - Tutorial 4

EMERGENCY EGRESS LIGHTING POWER SUPPLY PART NO COMPONENT MAINTENANCE MANUAL WITH ILLUSTRATED PARTS LIST

Low and High Voltage Power Supplies

ET 332b Ac Electric Machines and Power Systems

Step Voltage Regulators

Transmissão em Corrente Contínua

Electric Power Distribution

Grounding Demystified

SHORT CIRCUIT CURRENT CALCULATION AND PREVENTION IN HIGH VOLTAGE POWER NETS

pole, 8 A Safety relay. Screw terminal. 35 mm rail (EN 60715) mounting. 2 CO (DPDT) 8/15 250/400 2, /0.65/0.

Current & Instrument Transformers

Modeling and Testing of Unbalanced Loading and Voltage Regulation

SAMPLE OF THE STUDY MATERIAL PART OF CHAPTER 3. Symmetrical Components & Faults Calculations

Safety automation solutions

LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University

MIT510/2, MIT520/2 and MIT1020/2

38 Series - Relay interface modules A

How To Understand And Understand The Electrical Power System

DC TRANSMISSION BASED ON VOLTAGE SOURCE CONVERTERS

WIND TURBINE TECHNOLOGY

WINDING RESISTANCE TESTING

Electrical Fault Level Calculations Using the MVA Method

of the LED control gear Compact dimming Uconverter LCAI 55W 900mA 1750mA ECO SR ECO series

INSTALLATION MANUAL. SAILOR 5080 AC Power Supply

I. R. D. T INSTITUTE OF RESEARCH DEVELOPMENT AND TRAINING

Properties of electrical signals

Modeling of Transmission Lines

Pilot-wire differential relay for lines with two or more terminals

Panel Meters and Controllers Modular Panel Meter Type EDM 35

CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE

USER MANUAL GEBRUIKSAANWIJZING GEBRAUCHSANWEISUNG

Simulation of Cable Overloading Problem on a University Distribution System

Instrument Transformers Application Guide

Single-phase ( V) voltage monitoring: Undervoltage Overvoltage Window mode (overvoltage + undervoltage) Voltage fault memory selectable

THREE-PHASE POWER SYSTEMS ECE 454/554: Power Systems Laboratory

Technical Description. Transistor D.C. Chopper Controller Type GS 24 S

100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center. 598 N. Buth Rd 3215 Arrowhead Rd

OVERCURRENT & EARTH FAULT RELAYS. To study the protection of equipment and system by relays in conjunction with switchgear.

Certification Awarded to ABB LTDA. AV. DOS AUTONOMISTAS, 1496, VILA CAMPESINA, OSASCO/SP BRAZIL

ABB Drives. User s Manual. Pulse Encoder Interface Module RTAC-01

Estimation of electrical losses in Network Rail Electrification Systems

Safety technique. Emergency stop module BO 5988 safemaster

38 Series - Relay interface modules A

ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU

Chapter 9 Balanced Faults

High Voltage Circuit Breakers 3AP Type 72.5 kv to 800 kv Answers for energy.

TROUBLESHOOTING PRELIMINARY

Daker DK 1, 2, 3 kva. Manuel d installation Installation manual. Part. LE05334AC-07/13-01 GF

Transcription:

lectron S..L. Design Production & Trading of ducational quipment A29 LCTICAL POW SYSTM TAINS Production Transmission Distribution FAX 9065 980 - -mail: electron@electron.it Web: www.electron.it ev 02 Specifications may change without notice Page of 2 File LAFLT A29

A29 - LCTICAL POW SYSTM SIMULATO TAIN This Trainer simulates a real life generation, transmission and utilization system based on standard electrical machines, instruments and a transmission line simulator The simulator reproduces the conditions of a 30kV, 30Km long overhead line. The architecture of this Trainer allows maximum flexibility in choosing the desired configuration from the suggested products (see table at the end) to which others can be added as required. Following is a list of titles of typical experiences that can be executed on this trainer (all of them are described in the Manual supplied with the System) and that are meant to provide a base to be expanded by teachers and students who may wish to design new ones to cover additional training requirements. In a power generation, transmission and utilization system a very large number of different situations may be devised both in normal and abnormal/ failure conditions. They may anticipate what the students are likely to encounter in real life. To take full advantage from these experiments, the students should already be familiar with the laboratory experiences on electrical machines (see our LCTICAL MACHIN TAIN, Model A4): they provide the necessary theoretical background to better understand the practical aspects. LIN XPIMNTS VOLTAG DOP ALONG TH LIN Single Phase Line Three Phase Line POW LOSS Single Phase Line Three Phase Line: Symmetrical and Balanced System Symmetrical and Unbalanced System Three Phase four Wire Line FFICINCY OF TH TANSMISSION LIN Single Phase Line Three Phase Line IMPOVMNT OF POW FACTO Single Phase Line Three Phase Line MASUMNTS OF CUNTS ON TH PHASS Three Phase Line with one open Phase Three Phase Line, four Wires, with Balanced Load Three Phase Line, four Wires, with one Phase open FAX 9065 980 - -mail: electron@electron.it Web: www.electron.it ev 02 Specifications may change without notice Page 2 of 2 File LAFLT A29

SYSTM XPIMNTS POW GNATION Voltage and frequency control of alternators Synchronization and parallel operation No-load operation Operation with -L-C mixed load Active and reactive power control Unbalanced load POW TANSMISSION Transmission Line -L-C characteristics No-load line operation Line operation with -L-C and mixed loads Unbalanced load Phase failure Under-Over voltage Under/Over current POW UTILIZATION -L-C loads Power measurement Unbalanced loads Power factor correction Note: The table in the following pages suggests the most suitable products and quantities for implementing the System. POTCTIONS AND CONTOLS (may be set at the input or output of the transmission line) Phase to phase short-circuit arth fault of one phase FAX 9065 980 - -mail: electron@electron.it Web: www.electron.it ev 02 Specifications may change without notice Page 3 of 2 File LAFLT A29

DC Motor Control B3607-B360G LCTICAL POW SYSTM SIMULATO xample of Implementation - Single/Three Phase, Step-Down, Step-Up Transformers - Starters, Switches - Instruments Trainers Load A4244 DC Motor A4223 AC Generator Alternative connection to simulate local generator Paralleling Board A480 Production, transmission and distribution simulators. ALT. POSITION Paralleling Board A480 L Load C Load Capacit. Bank Power Supply A0245 DC Motor AC Generator Instruments A V W Instruments A V W AC Motor Hz Cosϕ Under/Over Under/Over arth Fault Voltage Current Synchr. Motor A4750D lectrical Machines Laboratory GNATION TANSMISSION/POTCTION/CONTOL UTILIZATION FAX 9065 980 - -mail: electron@electron.it Web: www.electron.it ev 02 Specifications may change without notice Page 4 of 2 File LAFLT A29

Description LCTICAL POW SYSTM SIMULATO COMPONNTS SLCTION TABL Code ssential/ ecomm. Universal Power Supply A0245 / DC Motor Control B3607 DC Motor Control B360G Shunt xcitation DC Machine Compound xcitation DC Machine Synchronous Machine A4223 / Paralleling Board A480 Simulators Purpose Provides power to driving motors and excitation DC power to DC machines and AC generators Provides power and speed control to driving motor Provides power and speed control to driving motor A4244 / Driver for AC generator /2 A4240 / Driver for AC generator /2 A29 IDL3 A29 C/P A29 SL/2 AC synchronous machine as AC generator, and motor as load and power factor correction For paralleling 2 AC generators or generator and a distribution line For simulating the production, transmission and distribution. esistive Load A450 For resistance loading the system Capacitive Load A4520 For capacitive loading the system and for additional power factor correction capability to that provided by the Line Simulator internal capacitors Inductive Load A4530 For inductive loading the system Single Phase Transformer A40 Three Phase Transformer A45 Three Phase Variable Auto-transformer A42 Squirrel Cage 3 Ph. Motor A4220 Slip ing 3 Phase Motor A4222 Single Phase Motor A4232 For step-up-down voltage to single phase loads For step-up-down voltage to three phase loads For stepping up and down voltages in a continuous mode Provides an inductive load and driving power for miscellaneous experiments Provides an inductive load and driving power for miscellaneous experiments Provides an inductive load and driving power for miscellaneous experiments 3 Phase Switch A2-M02 For connecting power to the loads 3 STA/DLTA Starter A4820 For starting three phase AC motors Q.ty /2 /2 Digital Three Phase Power Analyser A4750D To monitor continuously all working parameters of the line 2/4 Analogue meters set: Additional to digital analyser Ammeter SL 50 S 3362 To measure current on the three phases at the generators and at the loads 6 FAX 9065 980 - -mail: electron@electron.it Web: www.electron.it ev 02 Specifications may change without notice Page 5 of 2 File LAFLT A29

Milliammeter Voltmeter Voltmeter Wattmeter SL 50 S 3350 SL 50 S 343 SL 50 S 3435 SL 50 S 2826 Frequency meter A4750 AF Power Factor Meter A4750 AC To measure small leakage currents To measure voltage at the generator and at the load To measure voltage at the generator and at the load To measure power at generator and at load 3 To measure frequency of the generated AC power To measure power factor at various load conditions Phase Sequence indicator SFT 3546 To indicate the sequence of the 3 phases Single Tapping key ST/ Switch for instant closing/opening of a circuit eversing Switch CI/2B To reverse polarities eactive Power Controller A2680 To automatically correct the power factor Capacitor Bank A2685 To correct the line power factor Analogue Under / Over Current Fault elay Analogue Under / Over Voltage elay Analogue arth Fault elay Digital Under / Over Current elay Digital Under / Over Voltage elay A265 A2652 A2653 To detect simulated overloads single phase To detect simulated under and over voltage situations single phase To detect simulated earth failures single phase A266 To detect simulated overloads three phase A2662 Digital arth Fault elay A2663 Programmable Over Current elay Programmable Over Voltage elay Programmable Directional Over Current / arth Fault elay To detect simulated under and over voltage situations three phase To detect simulated earth failures three phase A267 To detect simulated overloads three phase A2672 A2673 To detect simulated under and over voltage situations three phase To detect simulated overloads and phase failures Set of cables A4890 Safety cables for connecting the components Cable support A4890S Support for orderly storing the cables Coupling base A4840 Base for coupling coaxially two machines 2 3 3 3 FAX 9065 980 - -mail: electron@electron.it Web: www.electron.it ev 02 Specifications may change without notice Page 6 of 2 File LAFLT A29

NOTS Code: Model Code - For power range consult the LCTON Catalogue; power of machines, accessories and loads should be matched /: ssential/ecommended component. ssential components are required to perform the basic experiments. ecommended components provide additional and higher level training capabilities Q.ty: ssential/ecommended quantities for an effective and comprehensive training system. FAX 9065 980 - -mail: electron@electron.it Web: www.electron.it ev 02 Specifications may change without notice Page 7 of 2 File LAFLT A29

A29 P LCTIC NGY POCSS SIMULATION SYSTM PODUCTION TANSMISSION DISTIBUTION The system is composed by three independent units that are designed to work stand-alone or connected in series as shown in the picture:. A29 C-P, simulates production of electrical energy 2. A29 SL/2, simulates transmission of electrical energy 3. A29 IDL/3, simulates distribution of electrical energy They actually implement a complete electrical energy process whose working parameters may be read and translated on tables and graphs to study and understand all aspects of the three steps of the energy process. All simulator, when used alone, require 2 nergy Process Power Analyzers A4750D, one to be connected on its input and one on its output. When they are used all together, in series, either 2 instruments can be used (one on the input of the production simulator and one on the output of the distribution simulator) or 6 when, for measurement purposes, it is necessary to control input and output of each one of them. All units are provided with 4mm safety connectors. See the following pages for detailed descriptions. Ordering Codes A29P nergy Process Simulator System (specify the types of simulators required) A4750D nergy Process Power Analyzer Alternative: A29 AP-F nergy Process Power Analyzer www.electron.it MAD IN ITALY lectron Srl. Specifications may change without notice

A29 C-P PODUCTION SIMULATO Dimensions:,000 x 400 x 350 mm Weight: 40 Kg approx. The unit simulates a power station in all respects without rotating machines. Features A variable transformer Start/Stop pushbuttons Typical Power Station protections A step-up transformer that can be connected STA or DLTA Line paralleling devices - Digital voltmeter on the Power Station side - Zero digital voltmeter on the line side - Three synchronizing lamps - Paralleling Circuit Breaker - Paralleling switch Line Simulator - Insulation transformer - Line esistance and Inductance. xamples of xperiences Simulation the transformer configurations Yy0, Yy6, Dy5, Dy Calibration of protections and measurement devices; 2 A2960 units are required in this case. An Instruction Manual describes: Parallel operation with the main line Calibration of protections Connections to the Transmission Simulator www.electron.it MAD IN ITALY lectron Srl. Specifications may change without notice

A29 SL/2 TANSMISSION SIMULATO Dimensions:,000 x 400 x 350 mm Weight: 45 Kg approx. This unit simulates two 3-phase overhead transmission lines, line at 20kV or line 2 at 220kV, 70Km long, whose characteristics can be studied in detail by changing the working parameters. Features Internal load Power factor correction capacitors Protections Self contained Power Supply Hubs for connecting the generation/ distribution simulators and external loads. Lines π Model with concentrated parameters (line resistance, inductance and capacitance) Line : simulated transmitted power 6 MVA Line 2: simulated transmitted power 20 MVA xamples of xperiences Study of unloaded and open lines Loaded lines at different voltages Line losses and efficiency Short circuited lines Lines in parallel Phasing Improvement of Power Factor Benefits of transporting energy at high voltage Voltage increase caused by capacitive load Protection for maximum current, power and energy inversion. An Instruction Manual describes the operation of: No load line 20 kv loaded line 20 kv loaded line with phasing 220kV line without phasing 220 kv line with phasing Paralleled lines Overvoltage caused by capacitive load Protections Connection to the Distribution Simulator www.electron.it MAD IN ITALY lectron Srl. Specifications may change without notice

A29 IDL/3 DISTIBUTION SIMULATO xamples of experiences Study of non-loaded lines Loaded lines at different voltages Losses and line efficiency Voltage drop as a function of load Line loss as a function of load This unit simulates an electrical sub-station and a medium voltage distribution line. Features Line protections Over-voltage dischargers High Voltage to Medium Voltage step-down transformer Power factor correction capacitors Internal load xternal load connectors Self contained Power Supply Protections Line 30-30 3-0 kv, 30Km long T Model with concentrated parameters (phase resistance, inductance and earth capacitance) Dimensions:,000 x 400 x 350 mm Weight: 40 Kg approx. Balanced and unbalanced 3- phase systems Short circuited lines Phasing Improvement of power factor Benefits of transporting energy at high voltage Voltage increase caused by capacitive load An Instruction Manual describes the operation of: 3-phase no-load line 3-phase loaded line Loaded 3-phase line V / 3 arth fault protection of a 3- phase line with insulated Neutral www.electron.it MAD IN ITALY lectron Srl. Specifications may change without notice

OTH LAFLTS A AVAILABL ON: LCTICAL MACHINS TST (0,3 Kw POW) FAX 9065 980 - -mail: electron@electron.it Web: www.electron.it ev 02 Specifications may change without notice Page 2 of 2 File LAFLT A29