Título ponencia: Guidance for GBAS Operations Implementation



Similar documents
Título ponencia: Towards the GBAS Operational Approval. Organizado por:

Título ponencia: RNP APCH Implementation

Título ponencia: Helicopter IFP. Point-in-Space (PinS)

ICAO-ENAC PBN PROCEDURE DESIGN COURSE

airsight Company Profile

DFS Deutsche Flugsicherung GmbH

Título ponencia: GBAS Concept

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

CNS/ATM SYSTEMS IN INDIA

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

THE MASTER PLAN CAMPAIGN. Workshop RPAS (WS 03) 22 January 2015

Performance-based Navigation and Data Quality

DEBRECEN INTERNATIONAL AIRPORT. Prepared by Tamás Sápi Technical Director

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

PBN Aeronautical Charts and Procedure Design

Aerodrome Advisory Circular

How To Improve The Performance Of Anatm

CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'D' PART VI

Quality Assurance DOC 9906 Vol 1 Step 5&6: Apply Criteria & Document and Store

EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August Federal Aviation Administration

International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, July 2016

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

Development and Validation of Procedures. ICAO PBN Seminar Development and Validation of Procedures

Determination of ILS Critical and Sensitive Areas: A Comparison of Flight Measurement versus Simulation Techniques

ILS Replacement. ACI World Safety Seminar November 2008 Kempinski Hotel Beijing Lufthansa Centre

12.0 SAFETY AND SECURITY

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN)

Radio Communications in Class D Airspace by Russell Still, Master CFI

AVIATION INVESTIGATION REPORT A06F0014 MISALIGNED TAKE-OFF

Direct Approach Consulting Inc.

13.0. Safety Management and Airspace Protection

Pavement Management Program

International Virtual Aviation Organization. Hong Kong. Division Report Annual Report

EUROCONTROL Training Activities 2013

SESAR BENEFITS: TOMORROW STARTS NOW

Flight Planning Using an Aeronautical Chart

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

CS5 EAIMS Call For Interest Technical annexe

GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS

OPERATING MINIMA FOR AEROPLANES AND HELICOPTER OPERATIONS PURPOSE REFERENCE 4.0 DEFINITION

Central Route Charges Office

EGHE SCILLY ISLES/ST MARYS

COMMUNICATIONS GROUND COMMUNICATIONS OUTLET (GCO)

EUROCONTROL AT THE WORLD ATM CONGRESS

Trends in Aeronautical Information Management


EUROCONTROL WORKSHOP. Centralised Services: A closer look at the Flight Plan and Airport Slot Consistency Service (CS1) Andy Woollin

INITIAL TEST RESULTS OF PATHPROX A RUNWAY INCURSION ALERTING SYSTEM

Pricing Framework July 2012

Area Navigation (RNAV) and Required Navigation Performance (RNP)

PBN Operational Approval Application and Documentation. ICAO PBN Operational Approval Course

Block 0: Capabilities within our Grasp

Software Development Process

NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013

ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, November 2011

CHAPTER 3 ALTERNATIVES CONSIDERED

Paper presented at ISASI 2014 Seminar, October 2014, Adelaide, Australia. Safety Management; Reversing the False Glide Slope Myth

Interface Requirement Specifications of Vehicle Tracking Service Providers in Hong Kong International Airport

Operational Use of the English Language. ATM Safety around Europe

INTEGRITY AND CONTINUITY ANALYSIS OCTOBER TO DECEMBER 2013 QUARTERLY REPORT FROM GPS. Integrity and Continuity Analysis 08/01/14 08/01/14 08/01/14

TERMS OF REFERENCE. Decommissioning the Sept-Îles non-directional beacon (ZV NDB) Québec

ICAO Safety Management Systems (SMS) Course Handout N 5 Cuzco International Airport operation

How To Manage A Plane With A-Cdm

How To Design An Airspace Structure

ILS-General. Localizer 06. General aspects. 5.4 Twente airbase assessment. Photos: Film No. 7. ILS classification T/Bil. Mixed Military/Civil use.

Air Traffic Management Services Plan

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual

GHANA CIVIL AVIATION AUTHORITY EVALUATING AERONAUTICAL EFFECTS OF PROPOSED CONSTRUCTION ON AIR NAVIGATION & AIRSPACE PERMIT PROCEDURE

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

PLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future.

Flight information that keeps pilots a step ahead.

Performance management Identification of metrics

Safety Oversight Audit Section

Doc 9849 AN/457. Approved by the Secretary General and published under his authority. First Edition International Civil Aviation Organization

Project Management. On-Site Training and Facilitation Services. For more information, visit

51 st CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

Civil Aviation Authority of Nepal Training Program

ACI GLOBAL TRAINING. The leading airport management and operations education provider. Better Education. Better Professionals. Better Airports.

10 Aviation Element Introduction Purpose of Chapter

Potential Effects of Wind Turbine Generators on Pre-Existing RF Communication Networks SEAN YUN. June Software Solutions in Radiocommunications

AIXM Change Management Charter

Honeywell.com FMS Issues and In-Service Status

LRSM AD 2.1 AERODROME LOCATION INDICATOR AND NAME LRSM - SATU MARE / Satu Mare

PRESENTATION SPACE MISSIONS

How to make Uber work in Hong Kong

Safety Risk Impact Analysis of an ATC Runway Incursion Alert System. Sybert Stroeve, Henk Blom, Bert Bakker

FIFTH MEETING OF THE AFI REGION AIS/MAP TASK FORCE

AIRPORT PLANNING & DEVELOPMENT CONSULTING. Aviation and Airport Consultants With Global Reach & Perspective

ANI Procedure Design Training Program and Concept

Transcription:

Título ponencia: Guidance for GBAS Operations Implementation Organizado por:

Index Introduction Guidance for GBAS Operations implementation Decision Making Inception Phase case example

Introduction AmethodologyhasbeendefinedbyPildoLabsinordertosupportStakeholdersintheprocessof implementing GBAS operations Aligned with ICAO PBN Implementation Manual and RNP-APCH ICAO Guidelines Three main phases: Inception Phase(Decision& Analyse) Service provision(includes the GBAS system installation) Operational implementation Those three phases will be illustrated through real cases examples

Index Introduction Guidance for GBAS Operations implementation Decision Making Inception Phase case example

Inception Phase Malaga Case Bremen/Newark Cases

Index Introduction Guidance for GBAS Operations implementation Decision Making Inception Phase case example

Decision Making GBAS Inception Phase Implementing GBAS operations implies an important investment at ground infrastructure level In order to support decision makers on such investment a GBAS Inception Programme is recommended to: - Familiarize Stakeholder with GBAS concept and technology (National Team) - Provides initial assessment on future GBAS service and performance based on real local data - Develops a Cost Benefit Analysis from the Service Provision perspective GBAS Inception Programme developed by Pildo Labs includes five main tasks:

GBAS Inception Phase: GBAS Team Create GBAS Inception Programme Team

GBAS Inception Phase: GBAS Training GenericGBAStrainingisprovidedtotheGBASTeam: - GNSS and GBAS Overview - Up-to-date on GBAS activities worldwide - Training on sitting procedures - GBAS Procedure design training - PEGASUS data processing tool training - GBAS Data processing exercises -

GBAS Inception Phase: Scenario identification & siting A suitable airport is selected for the Programme: - Air Navigation Implementation Plan - Instrumental RWYs - Important traffic figures - ILS actual equippage -...etc Preliminary siting exercise for Reference Receivers is performed Select Candidate Airport Siting Survey Installation of RRS is performed Installation of RRS Scenario Identification

GBAS Inception Phase: Scenario identification & siting Example of Non-Satisfying Areas The red areas of this example are not feasible to allocate an RRS: 1. Outside 3 NM range from each supported runway end 2. Outside Airport Perimeter 3. Runway Protection Surfaces 4. Airport Obstacles Free Zones 5. Roads and taxiways 6. Equipment and shelters 7. Building edges and metallic fences Dakar Aerodrome Chart (ICAO)

GBAS Inception Phase: Scenario identification & siting Example of Satisfying Areas The green areas of this example are feasible to allocate an RRS for the following reasons: 1. Free obstacles zones 2. Power Supply access 3. Site access available 4. Equipment shelter available 5. Equipment Security 6. Multipath Free 7. No installation issues Dakar Aerodrome Chart (ICAO)

GBAS Inception Phase: Data Collection campaign A24hdata collectionisperformedto: - Validate correct installation - AssessqualityofGPSserviceinthearea(localeffectslike multipath, shadowing, etc.) - Position the antenna precisely - Preliminary assessment 24h Data Analysis Antenna precise positioning through phase processing techniques RRS Precise Positioning Launch data collection campaign in support to GBAS performance assessment Data campaign Data Collection Campaign

GBAS Inception Phase: Data Collection campaign Shadowing effect due to a wrong selection of antenna installation Red circle: Shadowing area Shadowing obstacle example. Blue star: Antenna position. Red circle: Tower.

GBAS Inception Phase: GBAS procedure design Procedure design can be performed through PRODAN Flight simulated throughout PLATERO flight inspection portable platform(rtca Doc 9906)

GBAS Inception Phase: GBAS performances simulation GBAS Performance Assessment is enhanced through PEGASUS EUROCONTROL Toolset: - Emulates on-ground and on-board equipment data processing in compliance with RTCA standards

GBAS Inception Phase: CBA Operational benefits and incurred costs are evaluated (total costs including maintenance, pay-back and rough estimated ROI(return on investment)) GBAS Performance CBA at Service Provision Airport level compared to actual scheme ILS based AirlinebasedCBAcanalsobeperformed Business Case Cost Benefits Analysis

Inception Phase Malaga Case Bremen/Newark Cases

Legal Notice No part of this material may be copied, reproduced and/or disclosed, in any form or by any means without the prior written permission of the Pildo Labs (contact@pildo.com). 2012 This material reflects only the author s views and the company is not liable for any use that may be made of the information contained herein.