1 3.0 INTRODUCTION CHAPTER 3 ALTERNATIVES CONSIDERED The existing Afton Airport parallel taxiway, with its approximate 4,360 foot length, only accommodates one half of the runway s length, and is too short to meet the design requirements and recommendations for the existing airport environment. Once a full parallel taxiway extension is constructed, the length will match that of the runway. The increased length, with proposed medium intensity taxiway lighting, will improve operational safety, reduce runway occupancy times, remove obstructions, and provide for operational flexibility in maneuvering on the ground for the flying public. Rehabilitation of the aged direct bury, stake mounted, runway lighting system will facilitate overall operational readiness. Lastly, the acquisition of land will facilitate the future relocation of the AWOS III to provide for accurate, unobstructed weather information to further improve pilot safety. All possible alternatives were reviewed to develop two viable alternatives each for the parallel taxiway extension, runway lighting rehabilitation, and the AWOS III relocation. The viable alternatives evaluated as part of this are as follows: Parallel Taxiway Extension Alternative 1A No Action; and Alternative 1B Extend Parallel Taxiway for Full Length Parallel Taxiway Rehabilitate Runway Lighting Alternative 2A No Action; and Alternative 2B Rehabilitate Runway Lighting Acquire Land for AWOS Relocation Alternative 3A No Action; and Alternative 3B Acquire Land for AWOS Relocation Figure 3-1 reflects the overall airport and general locations of the various alternatives. Afton Lincoln County Airport 21 (February, 2013 Draft)
2
3 3.1 ALTERNATIVE 1A (PARALLEL TAXIWAY EXTENSION) - NO ACTION Keeping the existing parallel taxiway at its existing length, and Not constructing an extension to the existing parallel taxiway, and Not installing Medium Intensity Taxiway Lighting (MITL) and upgrading the PAPI s. This alternative explored the possibility of keeping the parallel taxiway at its existing length and not providing for any extension improvements. In its present configuration the parallel taxiway is not full length and does not provide access to or from the Runway 16 threshold unless via the runway directly. This alternative would also leave the existing taxiway reflectors in place and not install the MITL or PAPI improvements. The existing FAR Part 77 primary and transitional surface penetrations would not be corrected, or reduced with this alternative. The existing parallel taxiway is short of the FAA and WYDOT design requirements and recommendations. The No Action alternative would not provide for the needed improvements in safety regarding extending the parallel taxiway to full length that meets FAA and WYDOT design requirements and recommended criteria for those aircraft using the airport. Conclusion: Alternative 1A (No Action) does not provide for the full length parallel taxiway that is required and recommended by the FAA and WYDOT. This alternative does not remove or reduce existing obstructions, and does not provide for lighting in compliance with design criteria. 3.2 ALTERNATIVE 1B (PARALLEL TAXIWAY EXTENSION) EXTEND TAXIWAY FOR FULL LENGTH PARALLEL TAXIWAY Extending the existing parallel taxiway approximately 2,665 feet for a full parallel taxiway length of 7,025 feet, and Remove existing FAR Part 77 obstructions to the primary and transitional surface in the area of the parallel taxiway extension through grading, and Installing Medium Intensity Taxiway Lighting (MITL) to include conduit/light cans/conductor/fixtures for the full length of the parallel taxiway (7,025 feet), and Relocate existing segmented circle and lighted wind cone. This alternative extends the existing parallel taxiway approximately 2,655 feet to the north, for a full length parallel taxiway length of 7,025 feet. The construction of the parallel taxiway removes the obstruction penetrations to the FAR Part 77 primary and transitional surfaces in the area of the parallel taxiway through site grading. It also Afton Lincoln County Airport 23 (February, 2013 Draft)
4 includes the installation of MITL for the full length of the parallel taxiway to meet design standards. Lastly, the existing segmented circle and lighted wind cone are in the alignment of the proposed taxiway and would be relocated to the far side of the runway to a location in the general vicinity of midfield, just north of Papworth Lane. Reference Figure ALT 1B for additional details and the general location of the proposed improvements on the airfield. Alternative 1B (TW Extension) would provide for the needed improvements in safety regarding extending the parallel taxiway to full length to meet FAA and WYDOT design criteria and recommendations for those aircraft presently using the airport. This alternative also removes the obstruction penetrations to flight that exist with the present configuration, thus improving the safety to the flying public. The full length taxiway will also improve operational safety through the reduction in runway occupancy times, and provide for operational flexibility in maneuvering on the ground for the flying public. Conclusion: Alternative 1B (TW Extension) provides for the full length parallel taxiway that is needed to meet FAA and WYDOT design criteria and recommendations required by aircraft currently using the airport. Afton Lincoln County Airport 24 (February, 2013 Draft)
5
6 3.3 ALTERNATIVE 2A (RUNWAY LIGHTING REHABILITATION) - NO ACTION Keeping the existing stake mounted lights and direct bury conductor in place, and Not installing runway caution zone lighting, Not installing any conduit for airfield conductors, and Not installing any new light cans, transformers, grounding improvements, or lighting fixtures. This alternative explored the possibility of keeping the existing runway lighting system as is and not providing for any lighting improvements. In its present configuration the runway lighting is made up of a combination of conduit/light cans (south end extension completed in 2005) and direct bury/stake mounted lights (1982 and 1996 era). While there are no identified issues at present, beyond the occasional maintenance resulting from rodent damage, the existing conductor is well beyond the 20 year design life for 4,685 feet of the runway, and close to the 20 year design life on the first extension of 535 feet. Failure of the airfield lighting circuit outside of a scheduled project can lead to expenditures outside of airport budgets, runway closures, and overall negative impacts on the airport and local community. The grounding of the existing stake mounted configuration also does not meet current FAA design requirements for grounding. There is also no caution zone lighting on the runway, in accordance with FAA design criteria. The No Action alternative would not provide for the needed lighting improvements in replacing the aged infrastructure and bringing the lighting circuit grounding and caution zone lighting into compliance with FAA design requirements. Conclusion: Alternative 2A (No Action) does not provide for the rehabilitation of the existing runway lighting in accordance with applicable FAA design criteria. 3.4 ALTERNATIVE 2B (RUNWAY LIGHTING REHABILITATION) - INSTALL LIGHTING CIRCUIT IMPROVEMENTS Replacing the existing direct bury conductor and stake mounted lights with new conduit/light cans/conductor/medium Intensity Runway Light (MIRL) fixtures, and Installing grounding improvements in accordance with FAA design criteria, and Upgrading the existing 2-box PAPI s to 4-box PAPI s (potential additive alternative), and Installing caution zone lighting in accordance with FAA design criteria. Afton Lincoln County Airport 26 (February, 2013 Draft)
7 This alternative replaces the aged portion of the runway lighting system with such improvements as conduit, light cans, conductor, MIRL fixtures, and other ancillary items. The project improves the visual vertical descent guidance information during the approach to the runway through the installation of 4-box PAPI s. Lastly, this project includes grounding improvements and caution zone lighting improvements to bring the runway lighting circuit into compliance with FAA design criteria. Completing the runway lighting circuit rehabilitation in a project provides for the coordination and proper prior planning to reduce the impacts of runway closures as much as possible on the airport and local community. Reference Figure ALT 2B for additional details and the general location of the proposed improvements on the airfield. Alternative 2B (RW Lighting Rehab.) would provide for the needed lighting improvements to replace the aged infrastructure and bring the lighting circuit grounding and caution zone lighting into compliance with FAA design requirements. Conclusion: Alternative 2B (RW Lighting Rehab.) provides for the rehabilitation of the existing runway lighting in accordance with applicable FAA design criteria. Afton Lincoln County Airport 27 (February, 2013 Draft)
8
9 3.5 ALTERNATIVE 3A (AWOS LAND ACQUISITION) - NO ACTION Keeping the Automated Weather Observation System III (AWOS) in its existing location, and Not acquiring any land for siting of the AWOS. This alternative explored the possibility of keeping the existing AWOS in its existing location and not acquiring any land for its relocation. In its present location the AWOS is mounted at a height of 43 feet, 10 above the FAA height threshold. There is one existing hangar obstruction at the current height, with increased obstructions should the AWOS be lowered in its present location. The construction of future hangars in the terminal area also have the potential to impact the AWOS clear zones. The Wyoming Department of Transportation Aeronautics Division has also noted that while the Department would consider funding AWOS upgrades such as a new VHF, barometer, T / RH, UHF radios, thunderstorm sensor, tilt tower with LED lights, UPS, equipment frame, and precipitation gauge, they will not do so until FAA siting criteria are satisfied. The No Action alternative would not provide for the AWOS to meet FAA siting criteria in its existing location. The existing location may be impacted by at least one obstruction that could result in the transmittal of inaccurate weather data to pilots. Such inaccurate weather data may degrade overall pilot safety and the safety of those on the ground in the immediate vicinity of the airport. Conclusion: Alternative 3A (No Action) does not provide for siting the AWOS in accordance with FAA criteria and protecting for the necessary clear zones. 3.6 ALTERNATIVE 3B (AWOS LAND ACQUISITION) - ACQUIRE LAND FOR AWOS RELOCATION Acquiring approximately 65 acres adjacent to the airport for relocation of the AWOS III, either through fee or easement(s). This alternative provides for the acquisition of land adjacent to the airport, either in fee title or through easement(s), that meets all FAA siting criteria for the AWOS. Review of all existing airport property reflects that there are no on-site locations that exist that would meet FAA siting criteria that would not be impacted by obstructions to the AWOS clear zones. Obstructions relating to any potential siting locations on the airport are existing structures that would not be economically feasible to address as far as relocation. Acquisition of proposed property next to the airport meets AWOS clear zone requirements, with the proposed property identified on the Airport Layout Plan (ALP) for Afton Lincoln County Airport 29 (February, 2013 Draft)
10 future land acquisition for approach protection. Figure ALT 3B can be referenced for additional details and the general location of the proposed acquisition. Alternative 3B (AWOS Land) would provide the location to site the AWOS in accordance with FAA criteria and meet all AWOS clear zone requirements. Siting the AWOS to meet all FAA criteria and clear zones will also provide for an opportunity for WYDOT to perform upgrades to the AWOS for improved weather information and overall enhanced pilot safety. Conclusion: Alternative 3B (AWOS Land) provides for the siting of the AWOS in accordance with FAA criteria. Afton Lincoln County Airport 30 (February, 2013 Draft)
11
Appendix E FAA ALP Sheet Checklist
Appendix E FAA ALP Sheet Checklist AC 150/5070-6B (incl. Chg. 1, 5/1/07) Airport Layout Plan Drawing Set The following list provides general guidelines in preparing the Airport Layout Plan set. The individual
MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan 2014-2018
MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics Airport Capital Improvement Plan 20142018 Prepared for: West Michigan Regional Airport Holland, Michigan August 2013 Contact: Mr.
How To Know The History Of The Airport
Pekin Municipal Airport (C1) John C. Kriegsman Air Field: Fact Sheet General aviation airport included in the National Plan of Integrated Airport Systems (NPIAS) Federally funded at an estimated $6,81,412
Mary C. Frederick, RCE PMP Division Chief. Caltrans Division of Aeronautics 1
Mary C. Frederick, RCE PMP Division Chief Caltrans Division of Aeronautics 1 Aeronautics Mission Assist in the development and preservation of a safe and environmentally compatible air transportation system
Cuyahoga County Airport - A Guide to Funding Capital Improvements
7.01 General CHAPTER 7 - FINANCIAL PLAN This chapter presents a financial plan to assist with future capital improvements and provide a guide for implementing the development of Cuyahoga County Airport.
Operations at Coulter Airfield
Operations at Coulter Airfield Outline Background Assets Budget Options Questions/Direction Vision (January 2010) 1. Maximize Economic Viability of Coulter Field as an Asset to the City Strategic Issue
8-1 Chapter 8 Radio Operations: Aviation Spoken Here
8-1 Chapter 8 Radio Operations: Aviation Spoken Here Radio Technique 1. [8-2/1/1] Using the radio is no great mystery. When transmitting, hold the radio close to your. A. mouth B. ear C. tongue VHF Transmitions
DEPARTMENT OF INFRASTRUCTURE AND TRANSPORTATION
DEPARTMENT OF INFRASTRUCTURE AND TRANSPORTATION MANITOBA AIRPORT ASSISTANCE PROGRAM PROGRAM GUIDELINES THE MANITOBA AIRPORT ASSISTANCE PROGRAM Grants for airport operations and maintenance are available
WHICH AIR TRAFFIC CONTROLLER TO CONTACT
WHICH AIR TRAFFIC CONTROLLER TO CONTACT 1. Introduction This article is written in order to explain to all beginners in the IVAO network the basics for any pilot to contact the correct air traffic controller.
Los Angeles International Airport North Airfield Assessment
Appendix H-3 LAX SPECIFIC PLAN AMENDMENT STUDY REPORT Los Angeles International Airport North Airfield Assessment May 2007 Prepared for: Los Angeles World Airports One World Way Los Angeles, California
Snohomish County Airport Paine Field
Snohomish County Airport Paine Field PUGET SOUND REGIONAL COUNCIL AND THE REGIONAL AIRPORT SYSTEM The Puget Sound Regional Council (PSRC) is the planning agency for the central Puget Sound region, which
Developing and Maintaining Your Airport Property Map Lessons from St. Louis
Developing and Maintaining Your Airport Property Map Dana Ryan, St Louis Airport Authority Todd Madison, Central Region, FAA Chuck Reitter, Reitter Consulting, LLC Craig Bowles, St. Louis Airport Authority
Radio Communications in Class D Airspace by Russell Still, Master CFI
Radio Communications in Class D Airspace by Russell Still, Master CFI Class D airspace is one of the most common parts of the airspace system that requires specific radio communications. Although you can
TRAINING PROGRAM FOR AIRPORT LIGHTING MAINTENANCE PERSONNEL
TRAINING PROGRAM FOR AIRPORT LIGHTING MAINTENANCE PERSONNEL Copyright 2006 by Navaid Lighting Associates, Inc. About This Training Program This training program was developed at the request of the airport
VDFP General Aviation Firefighting for Structural Firefighters
VIRGINIA DEPARTMENT OF FIRE PROGRAMS Aviation Firefighting for Chapter 3 Communications 3-1 Learning Objectives Understand the correct radio procedures for talking to pilots or airport personnel List examples
> Current Operations & Business Context. Bankstown Airport Master Plan 2004/05. Bankstown Airport / Master Plan > 29
Bankstown Airport Master Plan 2004/05 Bankstown Airport / Master Plan > 29 8.1 Bankstown Airport s Role in the Sydney Basin Bankstown Airport is the premier GA airport in NSW. In addition to servicing
WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010
WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010 TABLE OF CONTENTS WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN
Existing Facilities. Current and Forecast Demand
Existing Facilities JIA is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual Service Volume (ASV) of the runway
Planning requirements for heliports and helicopter landing sites
Practice Note 75 December 2012 Planning requirements for heliports and helicopter landing sites The purpose of this practice note is to: 1. Explain how helicopter activity is regulated by the planning
Flight Planning Using an Aeronautical Chart
Flight Planning Using an Aeronautical Chart By Laura Million INTRODUCTION When a driver in an automobile takes a trip, one hops in the car and drives. Signs along the highway will point the way to the
NORTH TEXAS REGIONAL AIRPORT FACT SHEET. Approximately 60 miles north of Dallas, between Sherman and Denison, Texas
NORTH TEXAS REGIONAL AIRPORT FACT SHEET CONTACT: Mike Shahan, Airport Director 903-786-2904 [email protected] or Bill Retz, Project Manager 484-343-4040 [email protected] LOCATION: AIRPORT: Approximately
MASTER PLAN PREPARATION
Located in the East Valley of the Phoenix Metropolitan Area, Phoenix-Mesa Gateway Airport is a former military airfield that has successfully made the transition to a full service commercial passenger
10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter
10 Aviation Element 10.1 Introduction 10.1.1 Purpose of Chapter This chapter provides the aviation element of the RFATS 2035 Long Range Transportation Plan. It describes the existing conditions and trends
County of Santa Clara Roads & Airports Department Airport Operations
County of Santa Clara Roads & Airports Department Airport Operations RA05 042903 DATE: April 29, 2003 Prepared by:carl Honaker Assistant Director, Airport Operations TO: Board of Supervisors FROM: Michael
Current and Forecast Demand
Existing Facilities A new terminal opened in September 2005 at the Southwest Florida International Airport (RSW), replacing the 17-gate original terminal that opened in 1983. The $438 million Midfield
Part 150: Records of Approval
Part 150: Records of Approval Boca Raton Airport, Florida Approved on 6/28/02 The approvals listed herein include approvals of actions that the airport recommends be taken by the Federal Aviation Administration
Hospital Heliport Inspection Basics
Hospital Heliport Inspection Basics Eric Peltier Aviation Representative Office of Aeronautics 222 E Plato Blvd St. Paul, MN 55107 651 234 7184 [email protected] Sources FAA AC 150/5390 2C Heliport
3.0 FACILITY REQUIREMENTS
3.0 FACILITY REQUIREMENTS This chapter identifies the facility requirements necessary to meet existing and forecast airport requirements, satisfy FAA design standards, and improve safety. The facility
Light Sport West Standard Flight Training Procedures for N110GX (Remos GX, 100 H.P.)
Light Sport West Standard Flight Training Procedures for N110GX (Remos GX, 100 H.P.) Welcome to Light Sport West! Thank you for giving us the opportunity to provide all of your flight training needs. Our
Oregon s Land Use Planning & Air Space Analysis (FAA 7560-1)
Oregon s Land Use Planning & Air Space Analysis (FAA 7560-1) 836.035 Effect of statute on airport zoning. ORS 836.005 to 836.120, 836.200, 836.205, 836.215, 836.220 and 836.240 do not limit any right,
The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.
Public Notice of Application for Authority to Impose and Use Passenger Facility Charges (PFCs) at EWR, LGA, JFK and SWF and Amendment to Approved PFC Applications at EWR, LGA, and JFK The Port Authority
COMMUNICATIONS GROUND COMMUNICATIONS OUTLET (GCO)
388 COMMUNICATIONS GROUND COMMUNICATIONS OUTLET (GCO) An automatic, remotely controlled, ground to ground communications device. Pilots at non-tower airports may contact the local Air Traffic Control (ATC)
Training program for S2 (TWR) rating
Training program for S2 (TWR) rating Introduction This is the official Vatsim Scandinavia training program for students training for the TWR (S2) Rating. Each mentor is expected to take his student through
InFO Information for Operators
InFO Information for Operators U.S. Department InFO 07015 of Transportation DATE: 7/3/2007 Federal Aviation Administration Flight Standards Service Washington, DC http://www.faa.gov/other_visit/aviation_industry/airline_operators/airline_safety/info
Aircraft Radio Operator Certificate of Proficiency
Aircraft Radio Operator Certificate of Proficiency 327 Flight AAFC Designed by PLTOFF(AAFC) Stewart Hignett Amended for 327FLT by SQNLDR(AAFC) Bill Gleeson-Barker, OCT10 Objectives Understand legislation
SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014
SESAR Air Traffic Management Modernization Honeywell Aerospace Advanced Technology June 2014 Honeywell in NextGen and SESAR Honeywell active in multiple FAA NextGen projects ADS-B Surface Indicating and
2014 NIFA CRM Contestant Briefing Guide San Diego, California
2014 NIFA CRM Contestant Briefing Guide San Diego, California Region 2 SAFECON 2014 November 12 15 This document supports the 2014 NIFA Collegiate Cockpit Resource Management Simulation and is not for
Construction Management Program
Use and Limitation: The Sponsor may use this document as a guide in preparing a construction management program for their specific project. Sponsors and Consultants are cautioned that the provision of
Oostwold Airshow 2015
Oostwold Airshow 2015 Briefing visiting aircraft 25 th May 2015 Dear pilots This document deals with procedures to be employed during the Oostwold Airshow day on May 25 th 2015 only. The following procedures
2. AIRPORT INVENTORY 2.1. LOCATION 2.2. HISTORY OF THE AIRPORT
2. A review of existing facilities and conditions provides the baseline for evaluation of the improvements determined necessary to implement future safety and capacity improvements at the airport. This
12.0 SAFETY AND SECURITY
12.0 SAFETY AND SECURITY 12.0 SAFETY AND SECURITY Key points The development plan within this Master Plan: Will improve airfield safety by reducing the towed aircraft runway crossings and other airfield
Table of Contents for Model Airport Affected Area Regulations
Table of Contents for Model Airport Affected Area Regulations Section I. General Provisions A. Title...1 B. Authority...1 C. Purpose and Intent...1 D. Designation of Airport Affected Area...1 E. Jurisdiction...2
APPENDIX E: 2012 Forecasting Report for RCA
APPENDIX E: 2012 FORECASTING REPORT FOR RCA D 1 APPENDIX E: 2012 Forecasting Report for RCA RAVALLI COUNTY AIRPORT ENVIRONMENTAL ASSESSMENT TABLE OF CONTENTS i Table of Contents Table of Contents...
Integrating AGIS into the planning process
Integrating AGIS into the planning process Presented to AAND and SDAMA 2014 Airports Fall Seminar Presented by Mark Holzer Program Manager, Dakota/Minnesota ADO Date September 22, 2014 1 Airports GIS Theories
1: PURPOSE AND NEED 1-1 1.1 INTRODUCTION 1-1 1.2 PURPOSE OF THIS ENVIRONMENTAL ASSESSMENT 1-1 1.3 PROPOSED ACTION 1-4 1.
Table of Contents TABLE OF CONTENTS for a New Runway at Ridgeland Airport Chapter and Section Page CHAPTER 1: PURPOSE AND NEED 1-1 1.1 INTRODUCTION 1-1 1.2 PURPOSE OF THIS ENVIRONMENTAL ASSESSMENT 1-1
FACTUAL REPORT AVIATION
Location/Time Aircraft Registration Number: Most Critical Injury: Minor Investigated By: NTSB N911BL Nearest /Place Zip Code Local Time Time Zone Las Vegas NV 89032 1600 PDT Airport Proximity: On Airport/Airstrip
For Flight Simulation purposes only on the VATSIM Network.
Compiled by Daniel A. Hawton, ZDC Training Administrator For Flight Simulation purposes only on the VATSIM Network. Introduction The goal of the document is to introduce you, the controller, to the appropriate
13.0. Safety Management and Airspace Protection
13.0 Safety Management and Airspace Protection 13.1 Safety management 119 13.2 Security 119 13.3 Airspace protection 119 13.4 Airports (Protection of Airspace) Regulations 1996 120 13.5 Engine-out procedures
COMMERCIAL AND GENERAL AVIATION
Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 7L/25R (10,500 feet long by 150 feet wide),
DALLAS COUNTY, IOWA CHAPTER 48 SMALL WIND ENERGY CONVERSION SYSTEMS ORDINANCE FOR THE UNINCOPORATED AREA OF DALLAS COUNTY, IOWA
TITLE V PROPERTY AND LAND USE SMALL WIND ENERGY CONVERSION SYSTEMS ORDINANCE FOR THE UNINCOPORATED AREA OF DALLAS COUNTY, IOWA 48.01 INTENT 48.05 APPLICATION REQUIRED 48.02 DEFINITIONS 48.06 APPEALS 48.03
COLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary
COLUMBUS REGIONAL AIRPORT AUTHORITY Economic Impact Study Update Executive Summary November 2012 INTRODUCTION Hearing a plane overhead is an everyday occurrence. But how many people stop to think that
Remote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control
Remote Tower Solutions BY SEARIDGE TECHNOLOGIES AND NAVCANatm The cost-effective alternative for airport monitoring and control Advancing Current Methods of Operations Geographic location, low air traffic
Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10
Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10 This document was developed by the Orange County Fire Chiefs Association, Orange County Fire Marshal Committee.
In a majority of ice-crystal icing engine events, convective weather occurs in a very warm, moist, tropical-like environment. aero quarterly qtr_01 10
In a majority of ice-crystal icing engine events, convective weather occurs in a very warm, moist, tropical-like environment. 22 avoiding convective Weather linked to Ice-crystal Icing engine events understanding
AIRSPACE EXPLAINED. Separation of Traffic
AIRSPACE EXPLAINED Airspace is an area of aeronautical knowledge that is commonly poorly demonstrated on airman practical tests. Even when airman applicants demonstrate knowledge of the airspace system
VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT
VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT CLASS 1 COLLOCATION New Commercial Communication Structure Substantial Modification Please check one of the following: CLASS 2 COLLOCATION OTHER
Safety Verification of the Small Aircraft Transportation System Concept of Operations
Safety Verification of the Small Aircraft Transportation System Concept of Operations Victor Carreño 1 NASA Langley Research Center, Hampton, Virginia, 23681 César Muñoz 2 National Institute of Aerospace,
CHAPTER 4. HOSPITAL HELIPORTS
AC 150/5390-2B September 30, 2004 CHAPTER 4. HOSPITAL HELIPORTS 400. GENERAL. Helicopters have proven to be an effective means of transporting injured persons from the scene of an accident to a hospital
H is for HELP! He was employed as an EMS pilot in Buffalo New York for about 2 years, than transferred to work as a relief pilot through out WI.
H is for HELP! Wind Turbines and EMS helicopters in Wisconsin This interview with retired EMS pilot Ray Slavik, was submitted to the Calumet County Ad Hoc Committee researching proposed ordinances governing
Coming To An Airport Near You
Airport GIS Data & ealp Coming To An Airport Near You Kevin Shirer, AAE Project Manager Association of California Airports; September 2009 Today s Presentation & Expectations Take away Basic knowledge
Page Intentionally Left Blank
Page Intentionally Left Blank Division Description The Airports Division, part of the Real Estate Assets Department (READ), is responsible for operating two general aviation airports, Montgomery Field
Airfield Ground Lighting Training from ADB
Airfield. Our Field. Airfield Ground Lighting Training from ADB All persons involved in any activity, including management and maintenance activities, shall have the appropriate and verifiable training,
CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT
CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT 7.1.1 Definition of Resource Airspace management is defined as directing, controlling, and handling flight operations in the volume of air that overlies the
Charlotte County Airport
Charlotte County Airport Origin Originally acquired by Charlotte County in early 1940s County leased the property to the US Army during WWII Army improvements were deeded back to the County as Surplus
CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R
CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL
ACRP Report 108: Guidebook for Energy Facilities Compatibility with Airports and Airspace. Stephen B. Barrett, LEED AP HMMH
ACRP Report 108: Guidebook for Facilities Compatibility with Airports and Airspace Stephen B. Barrett, LEED AP HMMH Stephen B. Barrett, LEED AP Principal Investigator Director, Climate &, HMMH Lead Author,
Page 2 of 7 SPKT FIGURE CHANGES
Page 1 of 7 Gleim Sport Pilot FAA Knowledge Test 2014 Edition, 1st Printing Updates February 8, 2014 The FAA has released a new Computer Testing Supplement. The FAA made every effort to keep the figures
SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT
SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT Proposed Runway Extension and Associated Airport Improvement Projects ATLANTA SOUTH REGIONAL AIRPORT Prepared for: Henry County Board of Commissioners Prepared by:
Advisory Circular Updates Airport Planning and Environmental Division (APP-400)
Advisory Circular Updates Airport Planning and Environmental Division (APP-400) Danielle J. Rinsler, AICP Kent Duffy FAA Office of Airports December 11, 2013 Advisory Circular Update Context As of 2012,
Welcome to the AccessibilityOnline Webinar Series. A collaborative program between the National Network of ADA Centers and the. U.S.
Welcome to the AccessibilityOnline Webinar Series A collaborative program between the National Network of ADA Centers and the US Access Board The Session is Scheduled to begin at 2:30pm Eastern Time We
Runway 12R-30L Lambert St. Louis International Airport
CASE STUDY Runway 12R-30L Lambert St. Louis International Airport Reconstruction of Runway 12R-30L Lambert St. Louis International Airport Sponsor: City of St. Louis Design: Crawford, Murphy and Tilly
Air Medical Transport Planning Good planning can save lives. Planning for air medical transport
Chapter 1 2 15 Air Medical Transport Planning Good planning can save lives. Planning for air medical transport is important to maximize efficiency and safety; it helps create the best care for patients.
ADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground.
ADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground. New Air Traffic Surveillance Technology Air traffic service
2006 Report Card for Pennsylvania s Infrastructure
AVIATION C- 2006 Report Card for Pennsylvania s Infrastructure Philadelphia International Airport (PHL) is currently one of the fastest growing airports in the world. It is also one of the most delay-prone
Air Traffic Management Services Plan 2012-2017
Air Traffic Management Services Plan 2012-2017 Airservices Australia 2012 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process
NAMIBIAN RADIO LICENSE VALIDATION
NAMIBIAN RADIO LICENSE VALIDATION Introduction This procedure is provided as a guide for applicants wishing to complete a Namibian Radio license validation, a requirement of a Namibian Pilot License Validation.
Melbourne city area noise information pack
Melbourne city area noise information pack Contents 1. Purpose and scope Page 2 1.1 Noise and Flight Path Monitoring Page 2 1.2 Runway naming convention Page 3 1.3 Runway selection Page 3 1.4 Noise Abatement
AIR AMBULANCE POLICY
Virginia Beach Department of Emergency Medical Services CASS # 201.02.00 Index # Operations AIR AMBULANCE POLICY PURPOSE: The purpose of this policy is to establish a standard process for activation of
CHICO MUNICIPAL AIRPORT MOVEMENT AREA DRIVER TRAINING PROGRAM
CHICO MUNICIPAL AIRPORT MOVEMENT AREA DRIVER TRAINING PROGRAM Introduction In compliance with Federal Aviation Regulations (FAR) Part 139.329, and to provide for a safe operating environment for tenants,
Airport Safety Management Systems and New Technologies
Airport Safety Management Systems and New Technologies Presented to: By: Eduardo Angeles, FAA Associate Administrator for Airports Date: Overview Safety Management Systems (SMS) Runway Incursions and Excursion
The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport
The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport All proposals shall be addressed to: City of Rockwall Attn: Lea Ann Ewing, Purchasing
AUTOMATED WEATHER OBSERVATION SYSTEM SPECIFICATIONS (FAA)
AUTOMATED WEATHER OBSERVATION SYSTEM SPECIFICATIONS (FAA) PUBLISHED BY Vaisala Oyj Phone (int.): +358 9 8949 1 P.O. Box 26 Fax: +358 9 8949 2227 FI-00421 Helsinki Finland Visit our Internet pages at www.vaisala.com
CHAPTER 23 Wireless Communication Facilities
CHAPTER 23 Wireless Communication Facilities Section 23.1 Purpose It is the general purpose and intent of this Section to comply with the requirements of the Federal Telecommunications Act of 1996, as
03096 PL 12. Integrated solutions for airport operations
03096 PL 12 Integrated solutions for airport operations 1 Complete airport GIS gap questionnaire Airport participants complete a questionnaire to gather information about the current use of spatial technologies.
Takeoff Tools TM Crosswind Calculator Instructions Copyright 2005 by Eric C. King. All rights reserved. Rev. 11Sep05. How to Use
Takeoff Tools TM Crosswind Calculator Instructions Copyright 2005 by Eric C. King. All rights reserved. Rev. 11Sep05 Takeoff Tools TM Suppose you re arriving at, or about to depart from, an airport. You
MPC STAFF REPORT WIRELESS TELECOMMUNCATIONS FACILITY February 19, 2013 MPC FILE NO. 12-002102-PLAN
MPC STAFF REPORT WIRELESS TELECOMMUNCATIONS FACILITY MPC FILE NO. 12-002102-PLAN WTF SUMMARY Report Status MPC Project Planner Petitioner, Property Owner, Agent Information Initial Report Jack Butler,
CHAPTER 6. Precision Approach Systems
ELEC4504 Avionics Systems 77 CHAPTER 6. Precision Approach Systems 6.1. Introduction The word approach is used to describe the phase of flight which immediately precedes the landing. While the approach
Special Specification 6033 Computerized Transportation Management System
6033 Special Specification 6033 Computerized Transportation Management System 1. DESCRIPTION Relocate computerized transportation management system (CTMS) equipment as shown on the plans and as described