Quality Assurance DOC 9906 Vol 1 Step 5&6: Apply Criteria & Document and Store
|
|
|
- Nora Young
- 10 years ago
- Views:
Transcription
1 ICAO WACAF Workshop 1 st 4 th September 2015 Quality Assurance DOC 9906 Vol 1 Step 5&6: Apply Criteria & Document and Store
2 Steps 5 & 6 Apply Criteria Document and Store Conclusion
3 Apply Criteria
4 Apply Criteria Once the relevant data have been collected and the draft IFP has been approved, the design activity can commence. An individual designer should be nominated as the responsible designer. Continued coordination with interested/affected stakeholders should be maintained throughout the design phase. International procedure design criteria are detailed in: PANS-OPS (Doc 8168), RNP AR Procedure Design Manual (Doc 9905). ICAO regularly reviews and amends these criteria.
5 Apply Criteria The technical report includes: Applicable design criteria; Data sources and set of input data used for the design (airport, terrain, obstacles); All calculations including transformation parameters used; All design parameters used (speeds, bank angles, wind velocity, temperature, descent / climb gradients, height loss, obstacle assessment surface (OAS), etc.); Any deviation from selected criteria including justification and link to validation as required; Full design rationale, construction details; Design assumptions and constraints; Document version and date; Draft elements for publication including chart and coding table as applicable; Any other pertinent points of interest resulting from the FPD process, e.g. software tools used for the design, advantages and drawbacks of the assessed scenarios.
6 Apply Criteria To enhance the integrity throughout the design process, the use of automated or semi-automated tools is recommended. All software tools should be validated. Guidance on the validation of software tools is provided in Volume 3 Flight Procedure Design Software Validation. The documentation should include a clear statement of compliance with the State-approved criteria together with detailed notes on any deviations and evidence of approval for each deviation. There should also be a record of each design review and sign-off.
7 Document and Store
8 Document and Store Traceability is the key element in the design of a new IFP. All assumptions made and methods used in the implementation of a new or modified FPD should be documented in a uniform manner and kept available at least during the lifetime of the IFP. Provide documented details Integrity of data Digital archiving is better but not always simple. Each state to establish a method and process. As far as applicable, the archived data should remain available in a state permitting a repetition or validation of the process in a later stage.
9 Conclusion
10 Conclusion Tasks and content of those two steps are clearly identified in the DOC 9906 Detailed design output must be accessible, complete and properly documented and stored as they are inputs to the safety assessment and validation steps. Also necessary for maintenance of IFP. Role of state is limited to : Providing information for designer request Providing list of requirements and any specificities for the documentation and storage (already at Project specification stage)
11 Quality Assurance Introduction Any Questions?
PBN Aeronautical Charts and Procedure Design
PBN Aeronautical Charts and Procedure Design Raúl A. Martínez Díaz RO/AIM [email protected] ICAO NACC 05 May 2015 Topics 1. AIS/AIM 2. Data flow 3. ICAO PBN Documents 4. Procedures design 5. PBN Aeronautical
ICAO-ENAC PBN PROCEDURE DESIGN COURSE
ICAO-ENAC PBN PROCEDURE DESIGN COURSE REFERENCE AND TITLE Performance Based Navigation Concept : Procedure design course for PBN applications: RNAV1 SID and STAR, RNP APCH (Non Precision Approach and APV
Quality Assurance Manual for Flight Procedure Design
Doc 9906 AN/472 Quality Assurance Manual for Flight Procedure Design Volume 1 Flight Procedure Design Quality Assurance System Approved by the Secretary General and published under his authority First
OPERATING MINIMA FOR AEROPLANES AND HELICOPTER OPERATIONS PURPOSE REFERENCE 4.0 DEFINITION
ORDER TCAA-O-OPS034A March 2013 OPERATING MINIMA FOR AEROPLANES AND HELICOPTER OPERATIONS PURPOSE 1. This Order gives guidance to the Authority s Operations Inspector on the procedures for approval of
Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual
3.1 Operations Manual to Contain or Refer to Information 3.1.1 Content CASR 172.060 The content of an Operations Manual must meet the requirements specified in Subpart C of Civil Aviation Safety Regulations
AIRCRAFT PERFORMANCE Pressure Altitude And Density Altitude
Performance- Page 67 AIRCRAFT PERFORMANCE Pressure Altitude And Density Altitude Pressure altitude is indicated altitude corrected for nonstandard pressure. It is determined by setting 29.92 in the altimeter
Block 0: Capabilities within our Grasp
Block 0: Capabilities within our Grasp 1 ICAO Block Upgrades Assumptions and Constraints Current ATM infrastructure and procedures will not support forecasted traffic growth Implementation of major ATM
Título ponencia: Helicopter IFP. Point-in-Space (PinS)
Título ponencia: Helicopter IFP. Point-in-Space (PinS) Organizado por: Index Introduction Helicopter IFP A/C Certification requirements GNSS Certified rotorcrafts Most relevant projects in Europe Introduction
Single Stage Light Business Case Template
Better Business Cases Single Stage Light Business Case Template Prepared by: Prepared for: Date: Version: Status: Better Business Cases Single Stage Light Business Case Template Document Control Document
Advisory Circular. U.S. Department of Transportation Federal Aviation Administration. AC No: 90-111 Change: Date: 06/22/2011 Initiated by: AFS-460
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Guidance for the Validation of Software Tools Used in the Development of Instrument Flight Procedures by Third
Título ponencia: Towards the GBAS Operational Approval. Organizado por:
Título ponencia: Organizado por: Index Introduction Training Procedure design Safety case & System declaration Operational GBAS Cases Introduction The third and final step of the methodology contains those
Título ponencia: RNP APCH Implementation
Título ponencia: RNP APCH Implementation Organizado por: Index Introduction RNP APCH implementation process PBN Europe plans Introduction RNP APCH Without vertical guidance With vertical guidance LNAV
ANI Procedure Design Training Program and Concept
ANI Procedure Design Training Program and Concept All ANI Procedure Design/PANS-OPS courses cope with ICAO document 9906 "Quality Assurance Manual For Flight Procedure Design", vol. II "Flight Procedure
Area Navigation (RNAV) and Required Navigation Performance (RNP)
Area Navigation (RNAV) and Required Navigation Performance (RNP) Program Overview Presented to: CDA Workshop By: Bruce Tarbert RNAV and RNP Group Date: January 19,2006 Roadmap for Performance-Based Navigation
Required Navigation Performance Authorization Required (RNP AR) Procedure Design Manual
Doc 9905 AN/471 Required Navigation Performance Authorization Required (RNP AR) Procedure Design Manual Approved by the Secretary General and published under his authority First Edition 2009 International
Direct Approach Consulting Inc.
Direct Approach Consulting Inc. Flight Procedure Design Your best approach for: safety operational efficiency maximizing revenue Direct Approach Direct Approach is a Canadian based company providing instrument
PBN Operational Approval Application and Documentation. ICAO PBN Operational Approval Course
PBN Operational Approval Application and Documentation ICAO PBN Operational Approval Course Application Phases Step 1 Step 2 Step 3 Step 4 Step 5 Pre-Application Formal Application Document Evaluation
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
Título ponencia: Guidance for GBAS Operations Implementation
Título ponencia: Guidance for GBAS Operations Implementation Organizado por: Index Introduction Guidance for GBAS Operations implementation Decision Making Inception Phase case example Introduction AmethodologyhasbeendefinedbyPildoLabsinordertosupportStakeholdersintheprocessof
Airways New Zealand submission to the Civil Aviation Authority's 2016 Manawatu Airspace Review
submission to the Civil Aviation Authority's 2016 Manawatu Airspace Review Prepared by: John Wagtendonk Policy, Standards and Safety Improvement 7 January 2016 1. Additional Ohakea CTA Airways request
Data Review and Analysis Program (DRAP) Flight Data Visualization Program for Enhancement of FOQA
86 Data Review and Analysis Program (DRAP) Flight Data Visualization Program for Enhancement of FOQA Koji MURAOKA and Noriaki OKADA, Flight Systems Research Center, E-mail: [email protected] Keywords:
OPERATIONS CIRCULAR. OC NO 2 OF 2014 Date: 1 st May 2014. Continuous Descent Final Approach (CDFA) 1. PURPOSE
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 2 OF 2014 Date: 1 st May 2014 OPERATIONS CIRCULAR Subject: Continuous Descent Final Approach (CDFA) 1. PURPOSE This
ATFM Line of Action 7 Consistency between Airport Slots, FPL and ATFM Slots
ATFM Line of Action 7 Consistency between Airport Slots, FPL and ATFM Slots CDM Task force 9th meeting Presented by Jean-Pierre LESUEUR, EUROCONTROL EATM/DAP/APT 1 Objectives of this presentation: Inform
Meeting of the Cooperation Arrangement for the Prevention of Spread of Communicable Diseases Through Air Travel
International Civil Aviation Organization Meeting of the Cooperation Arrangement for the Prevention of Spread of Communicable Diseases Through Air Travel AIR NAVIGATION SERVICE PROVIDER ROLE: ATM Seboseso
CAAP 89W-1(0) Guidelines on provision of obstacle information for take-off flight planning purposes
Civil Aviation Advisory Publication This publication is only advisory. It gives the preferred method for complying with the Civil Aviation Regulations (CAR 1988). It is not the only method, but experience
EUROCONTROL Guidelines for Cold Temperature Corrections by ATS
Guidelines Cold Temperature Corrections by ATS EUROCONTROL Guidelines for Cold Temperature Corrections by ATS DOCUMENT IDENTIFIER : EUROCONTROL-GUID- Edition Number : 1.0 Edition Date : 24.10.2014 Status
Performance-based Navigation and Data Quality
ICAO APAC AAITF/8 Performance-based Navigation and Data Quality A Commercial Data Supplier View Bill Kellogg International Relations May 6-10, 2013 Ulaanbaatar, Mongolia Jeppesen Proprietary - Copyright
Document Control in an ISO Environment
AN INTRODUCTORY GUIDE: Document Control in an ISO Environment How to maintain an up-to-date Quality System Why is Document Control Important? Document control has the ability to ensure that all end users
Development and Validation of Procedures. ICAO PBN Seminar Development and Validation of Procedures
Development and Validation of Procedures 1 Overview From Procedure design to Database -The steps needed to ensure RNAV systems follow the procedure correctly Learning Objectives The translation of procedure
LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents
LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL Introduction of Standard Instrument Departure Procedures to Routes in the London Terminal Control Area Sponsor Consultation 2016 Executive Summary and About
Guide to Enterprise Life Cycle Processes, Artifacts, and Reviews
Department of Health and Human Services Centers for Medicare & Medicaid Services Center for Consumer Information and Insurance Oversight Guide to Enterprise Life Cycle Processes, Artifacts, and Reviews
Implementation of performance-based navigation (PBN) in the SAM Region FOLLOW-UP ON ACTIVITIES OF THE PBN OPERATIONAL IMPLEMENTATION PROJECT
International Civil Aviation Organization SAM/IG/11-WP/04 South American Regional Office 24/04/13 Eleventh Workshop/Meeting of the SAM Implementation Group (SAM/IG/11) - Regional Project RLA/06/901 (Lima,
FIFTH MEETING OF THE AFI REGION AIS/MAP TASK FORCE
International Civil Aviation Organization AIS-MAP-TF-IP/xx 30/04/09 INFORMATION PAPER FIFTH MEETING OF THE AFI REGION AIS/MAP TASK FORCE Agenda Item 3: etod Dakar, Senegal, 11 th May to 12 th May 2009
1. Background and business case
1. Background and business case This section explains the context and why the project is being undertaken. It provides the justification for investing the time and resources in the project. 1.1 Reasons
Civil Aviation Authority of Nepal Regulatory Employees Training Plan 2014-2018
Civil Aviation Authority of Nepal Regulatory Employees Training Plan 014-018 Civil Aviation Authority of Nepal Regulatory Employees Training Plan 014-018 Basic/Initial Training Plan 014-018 Note- An inspector
Vision and Scope Document
Vision and Scope of DSS Database Suite Page i Vision and Scope Document for DSS Database Suite Version 1.0 - Draft Prepared by Iain Smith September 24 th, 2008 Vision and Scope of DSS Database Suite Page
COMMUNICATION MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
COMMUNICATION MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Document Information Document Title Amendment History Document Version Date Author/Reviewer Modifications 5/28/2014 Page i 2014 CSG
SYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT
GLOBAL NAVIGATION SATELLITE SYSTEM LANDING SYSTEM The aviation industry is developing a new positioning and landing system based on the Global Navigation Satellite System (GNSS). The GNSS landing system
CHAPTER 6. Precision Approach Systems
ELEC4504 Avionics Systems 77 CHAPTER 6. Precision Approach Systems 6.1. Introduction The word approach is used to describe the phase of flight which immediately precedes the landing. While the approach
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',
www.ibac.org IBAC Bulletin B00-2 Pacific Implementation of RVSM and RNP 10/50NM Lateral
www.ibac.org IBAC Bulletin B00-2 Subject: Pacific Implementation of RVSM and RNP 10/50NM Lateral Previous notification had been made regarding implementation of RVSM and RNP in the Pacific Region. This
ICAO Safety Management Systems (SMS) Course Handout N 5 Cuzco International Airport operation
ICAO Safety Management Systems (SMS) Course Handout N 5 Cuzco International Airport operation International Civil Aviation Organization Page left blank intentionally ICAO Safety management systems (SMS)
Ref.: AN 13/2.5-09/45 19 June 2009
International Civil Aviation Organization Organisation de l aviation civile internationale Organización de Aviación Civil Internacional Международная организация гражданской авиации Tel.: +1 (514) 954-6711
Clinical Risk Management: Agile Development Implementation Guidance
Document filename: Directorate / Programme Document Reference NPFIT-FNT-TO-TOCLNSA-1306.02 CRM Agile Development Implementation Guidance v1.0 Solution Design Standards and Assurance Project Clinical Risk
USER REQUIREMENTS CHAPTER 16 STATIC DATA REQUIREMENTS
USER REQUIREMENTS CHAPTER STATIC DATA REQUIREMENTS TS Project Team Reference: TS-0-0 Date: July 00 Version:. Status: Draft TS User requirements - Chapter - Static data requirements TABLE OF CONTENTS 0
IT Project Management Methodology. Project Scope Management Support Guide
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Scope Management Support Guide Version 0.3 Version Date Author Change Description 0.1 23 rd Mar, 2013 Gerald
Software Validation in Clinical Trial Reporting: Experiences from the Biostatistical & Data Sciences Department
Software Validation in Clinical Trial Reporting: Experiences from the Biostatistical & Data Sciences Department Andrea Baker Senior Programmer GlaxoSmithKline SeUGI 19 Florence May 29-June 1 2001 Introduction
http://www.nats.aero/rlat/
Reduced Lateral Separation RLATSM, Airline Briefing This guidance brief highlights the key aspects and details appropriate official publications supporting RLatSM implementation. NATS has also produced
Quality Assurance Manual for Flight Procedure Design
Doc 9906 AN/472 Quality Assurance Manual for Flight Procedure Design Volume 2 Flight Procedure Designer Training (Development of a Flight Procedure Designer Training Programme) Approved by the Secretary
SOFT 423: Software Requirements
SOFT 423: Software Requirements Week 3 Class 1 Finish Elicitation & Start Analysis SOFT 423 Winter 2015 1 Last Class Questionnaires Document Inspection Requirements Stripping Use Cases Scenarios SOFT 423
SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014
SESAR Air Traffic Management Modernization Honeywell Aerospace Advanced Technology June 2014 Honeywell in NextGen and SESAR Honeywell active in multiple FAA NextGen projects ADS-B Surface Indicating and
AERONAUTICAL INFORMATION CIRCULAR 26/15
AERONAUTICAL INFORMATION CIRCULAR 26/15 TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE ICAO NORTH ATLANTIC REGION Introduction (Supersedes AIC 18/15) As notified by State letter
References to Computer and Software in FDA s CGTPs (Final Rule and Draft Guidance) for HCT/Ps Preamble to the CGTP Final Rule
Preamble to the CGTP Final Rule Pages 68626-68627 Computers Proposed 1271.160(e) would require establishments to validate computer software used as part of manufacturing or tracking or for maintaining
Flight Operations Briefing Notes
Flight Operations Briefing Notes Altimeter Setting - Use of Radio Altimeter I Introduction Operators with international routes are exposed to different standards in terms of: Altitude measurement, using
Critical Limitations of Wind Turbine Power Curve Warranties
Critical Limitations of Wind Turbine Power Curve Warranties A. Albers Deutsche WindGuard Consulting GmbH, Oldenburger Straße 65, D-26316 Varel, Germany E-mail: [email protected], Tel: (++49) (0)4451/9515-15,
Efficient and reliable operation of LED lighting is dependent on the right choice of current-limiting resistor
Efficient and reliable operation of LED lighting is dependent on the right choice of current-limiting resistor Phil Ebbert, VP of Engineering, Riedon Inc. Introduction Not all resistors are the same and
ITS Projects Systems Engineering Process Compliance Checklist
ITS Projects Systems Engineering Process Compliance Checklist FHWA Final Rule (23 CFR 940) This checklist is to be completed by the MDOT or LPA Project Management Staff. Please refer to the accompanying
CMMI: Specific Goals and Practices
Software Engineering for Outsourced & Offshore Development CMMI: Specific Goals and Practices PeterKolb Software Engineering CMMI Process Areas for R&D Projects Slide 2 Content Management in Projects Project
To provide a procedure and associated guidelines to facilitate the management of project dependencies.
Management DEPENDENCY MANAGEMENT Purpose To provide a procedure and associated guidelines to facilitate the management of project dependencies. Overview Dependencies in this Phase are defined as actions,
Air Traffic Management Services Plan 2012-2017
Air Traffic Management Services Plan 2012-2017 Airservices Australia 2012 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process
THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking
THE SESAR CONCEPT AND SWIM David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking 1 Satellite based Communication & Navigation Advanced Flexible Use of Airspace Integrated Departure & Arrival
Takeoff & Landing Data (TOLD) Software and Training for C-130J
Takeoff & Landing Data (TOLD) Software and Training for C-130J Kevin Halpin Elite Electronic Engineering, Inc. 1516 Centre Circle, Downers Grove, IL [email protected] (630) 495-9770 x 111 www.elitetest.com
CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS
CNS/ATM/SG/1 Appendix C to the Report on Agenda Item 4 4C-1 APPENDIX C CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS First Edition Rev 2.0 TABLE OF CONTENTS Page 1. INTRODUCTION... 2 1.1
8. Master Test Plan (MTP)
8. Master Test Plan (MTP) The purpose of the Master Test Plan (MTP) is to provide an overall test planning and test management document for multiple levels of test (either within one project or across
A. Amendments to AMC/GM to Part-FCL
Anne I to ED Decision 2016/008/R Acceptable Means of Compliance and Guidance Material to Part-FCL (PBN) and Part-ARA (PBN, ARA.MED) A. Amendments to AMC/GM to Part-FCL 1. A new GM2 FCL.010 is inserted
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
Network Rail Infrastructure Projects Joint Relationship Management Plan
Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf
THE FLIGHT COMPUTER TRUE AIRSPEED (TAS)
TRUE AIRSPEED (TAS) POSITION THE TEMPERATURE OVER THE ALTITUDE PRESSURE WINDOW Temperature Celsius Above Density Altitude Altitude below CAS TAS FIND CALIBRATED AIRSPEED ON B, THE TAS IS JUST ABOVE TRUE
Digital Archives Migration Methodology. A structured approach to the migration of digital records
Digital Archives Migration Methodology A structured approach to the migration of digital records Published July 2014 1 Table of contents Executive summary... 3 What is the Digital Archives Migration Methodology?...
NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013
NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013 Effective Date: 14 July 2013 ANA Department Telephone: +971 0 2 4054507 General Civil Aviation Authority Telefax: +971 0 2 4054406 P.O. Box 6558
10.1 Communications Planning 10.2 Information Distribution Figure 10 1 10.3 Performance Reporting 10.1 Communications Planning 10.
PROJECT 10 COMMUNICATIONS MANAGEMENT Project Communications Management includes the processes required to ensure timely and appropriate generation, collection, dissemination, storage, and ultimate disposition
Flight Safety Foundation. Approach-and-landing Accident Reduction. Tool Kit. FSF ALAR Briefing Note 4.2 Energy Management
Flight Safety Foundation Approach-and-landing Accident Reduction Tool Kit FSF ALAR Briefing Note 4.2 Energy Management The flight crew s inability to assess or to manage the aircraft s energy condition
Objectives of this session
Public Health Emergency and Air Transport Regional Seminar on Aviation Medicine Lima, Peru, 01-03 April 2009 Daniel Menucci, IHR Coordination Programme, Lyon Objectives of this session To provide information
Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement
12 AERO Second-Quarter 2003 April CAPT. RAY CRAIG 737 CHIEF PILOT FLIGHT OPERATIONS BOEING COMMERCIAL AIRPLANES
CAPT. RAY CRAIG 737 CHIEF PILOT FLIGHT OPERATIONS BOEING COMMERCIAL AIRPLANES DREW HOUCK ASSOCIATE TECHNICAL FELLOW FLIGHT DECK DISPLAYS BOEING COMMERCIAL AIRPLANES ROLAN SHOMBER ASSOCIATE TECHNICAL FELLOW
Introduction to the forecasting world Jukka Julkunen FMI, Aviation and military WS
Boundary layer challenges for aviation forecaster Introduction to the forecasting world Jukka Julkunen FMI, Aviation and military WS 3.12.2012 Forecast for general public We can live with it - BUT Not
Crosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
The CRM 49 day success programme. Learn how to take control of your business destiny with our mentored CRM skills development service.
The CRM 49 day success programme Learn how to take control of your business destiny with our mentored CRM skills development service. Peter Clements, Microsoft Certified CRM Project Manager, Trainer &
Hong Kong Aviation Requirements
Hong Kong Aviation Requirements HKAR-145 Approved Maintenance Organisations 29 May 2015 Issue 4 Revision 7 CAD 145 Civil Aviation Department Hong Kong, CHINA HKAR-145 Applications for further copies of
Description: ToR RMT.0411 (OPS.094) Issue 2. Group Composition: GC RMT.0411 (OPS.094) Issue 4
ToR RMT.0411 (OPS.094) Description: ToR RMT.0411 (OPS.094) Issue 2 Language: English Group Composition: GC RMT.0411 (OPS.094) Issue 4 ToR number: 094 ToR Series: Related Rulemaking Subject(s): OPS Crew
SCHEDULE 8 Generalist Project Services Framework 2015
SCHEDULE 8 Generalist Project Services Framework 2015 Nominal Insurer And Schedule 8 (Project Services Framework) Page: 1 of 6 Schedule 8 Generalist Project Services Framework Contents Overview... 3 1.
CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include:
BUDGET AND BUSINESS PLANNING POLICY CONTENTS 1.1 Budget and business planning is undertaken to support strategic planning and decision-making and to serve accountability by enabling administration to plan
Quality Management System: 1, 2, 3
Quality Management System: 1, 2, 3 March 2012 Glendell De Souza, Science and Technology Officer, Caribbean Meteorological Organization, Port of Spain, Trinidad What does The ISO 90012:2008 Quality Management
INTRODUCTION TO PROJECT MANAGEMENT
INTRODUCTION TO PROJECT MANAGEMENT OVERVIEW The purpose of presentation is to provide leaders and team members of projects, committees or task forces with advanced techniques and practical skills for initiating,
Multi-Engine Training And The PTS
Multi-Engine Training And The PTS GHAFI John Sollinger/Larry Hendrickson October 28, 2000 Overview FAR differences between original and add-on Multi-Engine PTS Training methods Common training scenarios
COMPANY LOGO. Project Charter Project Charter
Project Name Project Number The is created in the Initiating Process Group. Typically, a Project Manager, external to the project, writes the as an objective assessment. It formally authorizes the project
Agile Metrics. It s Not All That Complicated
Agile Metrics It s Not All That Complicated Welcome About your Trainer, Katia Sullivan VersionOne Product Trainer and Agile Coach Certified Scrum Master Certified Scrum Product Owner Led teams/org s to
Business Continuity Management Planning Methodology
, pp.9-16 http://dx.doi.org/10.14257/ijdrbc.2015.6.02 Business Continuity Management Planning Methodology Dr. Goh Moh Heng, Ph.D., BCCLA, BCCE, CMCE, CCCE, DRCE President, BCM Institute [email protected]
Fuel Efficiency Board & Event Measurement System
AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP Fuel Efficiency Board & Event Measurement System Juan Polyméris Dr. sc. techn. ETHZ Swiss International Air Lines Ltd. Fuel Efficiency
Feasibility Study Proposal & Report Guide. Industrial Optimization Program
Feasibility Study Proposal & Report Guide Industrial Optimization Program Table of contents 1.0 Industrial Optimization Program overview 2 2.0 Feasibility Study offer eligibility 2 3.0 Purpose of the Feasibility
13.0. Safety Management and Airspace Protection
13.0 Safety Management and Airspace Protection 13.1 Safety management 119 13.2 Security 119 13.3 Airspace protection 119 13.4 Airports (Protection of Airspace) Regulations 1996 120 13.5 Engine-out procedures
Business Continuity Planning Workshop Michael Kirk The CIPSA Public Sector Procurement Forum May 25 th, Canberra
Business Continuity Planning Workshop Michael Kirk The CIPSA Public Sector Procurement Forum May 25 th, Canberra Agenda Introductions, objectives and safety Why develop a Business Continuity Plan? Experience
Partnering for Project Success: Project Manager and Business Analyst Collaboration
Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,
