Veterans Memorial Bridge (Orange Avenue) PD&E Study



Similar documents
REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY

Public Information & Public Scoping Meeting

3.1 Historical Considerations

US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Project R-4467 PROJECT DESCRIPTION PROJECT SCHEDULE PURPOSE OF THIS MEETING WHAT WILL BE DONE WITH THE COMMENTS? FOR MORE INFORMATION:

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/ Federal Project: BR-0252(001)D

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

CAPPELEN MEMORIAL BRIDGE REHABILITATION

Chapter 22. Lump Sum Project Guidelines

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

CHAPTER 2 LCCA APPROACHES

FOR IMMEDIATE RELEASE September 17, 2013 Contact:

APPENDIX C LIST OF EA RECIPIENTS

3 Tappan Zee Bridge Rehabilitation Options

Alternatives Presentation Meeting Middlebury WCRS(23)

Alternatives Evaluation Overview

Program guidance that details the eligibility, criteria and application process. Ferry Boat Program. Ohio Department of Transportation

Truss Bridges of Kentucky

2015 ODOT Bridge Design Conference May 12, DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

Belmont Street Bridge Rehabilitation Project

Alterna ves Development & Evalua on

CONCEPTUAL REHABILITATION ALTERNATIVE

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.

Section ALTERNATIVES. 3. Alternatives

Analysis of Accident Statistics

New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012

11 p.m. to. Tuesday, June. will remain open. 14. closed

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS

Historic Bridge Alternatives Analysis Layout

HARBOR INFRASTRUCTURE INVENTORIES Port Austin Harbor, Michigan

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

REHABILITATION PACKAGE 1-a

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

2012 Project Summary NORTHEAST RECREATIONAL BOATER SURVEY

Surface Transportation Program (STP) Projects

INDIANA DEPARTMENT OF TRANSPORTATION BRIDGE INSPECTION PROGRAM CODING GUIDE

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

FHWA Emergency Relief (FHWA-ER) Training

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

IH-635 MANAGED LANES PROJECT, SEG. 3.2

RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity

Arkansas River Corridor Vision & Master Plan

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

Assessing Paved Trails for Compliance with Standards and Best Practices

AYAK GUIDE ISLAND STATE PARKS. NEW YORK STATE George E. Pataki, Governor

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

US 51 Ohio River Bridge Engineering and Environmental Study

Town of Huntsville Municipal Asset Management Plan

QUALITY ASSURANCE FOR MOBILE RETROREFLECTIVITY UNITS

Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT

Safe & Sound Bridge Terminology

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

2. Market Area Background and Demographics Deliverable 1B

Maintenance Management and Asset Management

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL

Peters Canyon Channel (OCFCD Facility No. F06) from Confluence with San Diego Creek Channel (F05) to downstream Barranca Parkway

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

PRIORITIZATION PROCESSES

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Kingsbury Run Greenway Project

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS

Methodology to Identify Preservation Priority Bridges

Federal Guidelines for STP-U Funding

Gold Ray Dam Interagency Technical Team Meeting

I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

CITY OF TRAIL MEMORANDUM

Piers, Wharves & Docks

ENVIRONMENTAL REVIEW SCREENING QUESTIONS

General Obligation Bond Projects FYE

Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC

Jacksonville Port Authority: Fire and Rescue Marine Fire Station #40, Jacksonville, Florida

ESI Consultants, Ltd. PROJECT EXPERIENCE

BRIDGE DESIGN MANUAL

ISB Coalition. 12/15/2009 draft ISB Coalition Overview

Review of Recent Bridge Asset Management Systems

March Prepared by: Irvine Ranch Water District Sand Canyon Avenue. Irvine, CA Contact: Natalie Likens (949)

KYTC, District 2 Chief District Engineer KYTC, District 2 Planning Supervisor & LPA Coordinator. KYTC, Central Office Planning

LONG MEADOW/ OCAB # APPROVE PROJECT MEMORANDUM. City of Bloomington City Council Meeting September 9, 2013

Transcription:

Veterans Memorial Bridge (Orange Avenue) PD&E Study From City Island Parkway to South Peninsula Drive FDOT FPID# 242172-128-01 Volusia County Project# P-5351-1

Project Limits End Project City Island Veterans Memorial Bridge Begin Project

Intracoastal Waterway Daytona Beach US 92 Bridge City Island Veterans Memorial Bridge

Structurally Deficient FDOT Sufficiency Rating 31.1 Scale 1-100

Structurally Deficient Concrete Deterioration

Movable Span

Functionally Obsolete No Shoulder No Barrier Separating Sidewalks from traffic

Does Not Meet US Coast Guard Guidelines 16 Vertical 21 Vertical 90 Horizontal 125 Horizontal

US Coast Guard Regulates Opening Schedule Existing Bridge Opens 6 17 times per day

PD&E Study Meet Transportation Needs Minimize/Avoid Impacts Required by NEPA Required for Federal Funding

PD&E Process Engineering, Social & Environmental Studies Community Involvement Develop and Evaluate Alternatives Select Preferred Alternative Obtain FHWA Approval

Community Input Alternatives Workshop Meet with Stakeholder Groups Coordinate with Local Government Public Hearing Project Website

Alternatives No Build No Build/ Removal of Existing Bridge Rehabilitation Replacement Movable Bridge - 28 Vertical Clearance High-Level Fixed Bridge 65 Vertical Clearance

No Build Alternative Existing Bridge Remains Routine Maintenance Only No Major Improvements 10 Years Remaining Service Life

No Build Alternative Removal of Existing Bridge Routine Maintenance Only No Major Changes Existing Bridge Demolished After 10 Years

Rehabilitation 15 Years Remaining Service Life

Replacement Alternatives New High Level or Movable Bridge in Same Location

Two Year Detour 2.25 Mile Detour 92 2.25 Miles 4050 Veterans Memorial Bridge

Two Year Detour International Speedway Bridge 4050 A1A Veterans Memorial Bridge 1 441 11.0 Mile Detour 421 A1A Dunlawton Bridge

Proposed Typical Section

Movable Bridge 28 feet Vertical Clearance 125 feet Horizontal Clearance Reduce Openings by 30 percent Rendering Not Actual Design

High-Level Fixed Bridge 65 Vertical Clearance 125 Horizontal Clearance Rendering Not Actual Design

East Side High Level Alternative Rendering Not Actual Design High Level and Movable No Impacts to Driveways

West Side View from Chamber of Commerce High Level Alternative Rendering Not Actual Design

West Side of Bridge Driveway Closed

City Island Parkway Intersection Changes High Level Bridge

West Side of Bridge Proposed Storm Water Pond Rendering Not Actual Design

Memorial to Veterans Rendering Not Actual Design Rendering Not Actual Design Rendering Not Actual Design Rendering Not Actual Design

Wetland Impacts Movable and High-Level Alternatives 0.04 Acre Impacted

Wildlife Minimal Impacts to Protected Species

Historic Resources No Direct or Indirect Impacts City Island Resource Group South Peninsula Historic District

Historic Resources Existing Bridge Not Eligible for Listing in National Register of Historic Places

Noise New Bridge No Noticeable Change in Noise Levels

Visual Impacts Rendering Not Actual Design Rendering Not Actual Design

Simulations of Alternatives

View from Riverplace 100 Condominiums Photo Location and View Direction

View from Riverplace 100 Existing Bridge

View from Riverplace 100 Proposed Movable Bridge Rendering Not Actual Design

View from Riverplace 100 Proposed High-Level Bridge Rendering Not Actual Design

View from Shore South of Bridge East Side at Pendleton Condominiums Photo Location and View Direction

View from Shore South of Bridge East Side at Pendleton Condominiums Existing Bridge

View from Shore South of Bridge East Side at Pendleton Condominiums Proposed Movable Bridge Rendering Not Actual Design

View from Shore South of Bridge East Side at Pendleton Condominiums Proposed High-Level Bridge Rendering Not Actual Design

View from Boat Dock North of Bridge East Side at Pier 43 Condominiums Photo Location and View Direction

View from Boat Dock North of Bridge East Side at Pier 43 Condominiums Existing Bridge

View from Boat Dock North of Bridge East Side at Pier 43 Condominiums Proposed Movable Bridge Rendering Not Actual Design

View from Boat Dock North of Bridge East Side at Pier 43 Condominiums Proposed High-Level Bridge Rendering Not Actual Design

View from Chamber Of Commerce Photo Location and View Direction

View from Chamber Of Commerce Existing Bridge

View from Chamber Of Commerce Proposed Movable Bridge Rendering Not Actual Design

View from Chamber Of Commerce Proposed High-Level Bridge Rendering Not Actual Design

View from Halifax Harbor Marina South of Bridge West Side Photo Location and View Direction

View from Halifax Harbor Marina South of Bridge West Side Existing Bridge

View from Halifax Harbor Marina South of Bridge West Side Proposed Movable Bridge Rendering Not Actual Design

View from Halifax Harbor Marina South of Bridge West Side Proposed High-Level Bridge Rendering Not Actual Design

View from Volusia County Courthouse Parking Lot Photo Location and View Direction

View from Volusia County Courthouse Parking Lot Existing Bridge

View from Volusia County Courthouse Parking Lot Proposed Movable Bridge Rendering Not Actual Design

View from Volusia County Courthouse Parking Lot Proposed High-Level Bridge Rendering Not Actual Design

Cost Estimates Rehabilitation New Movable Bridge New High Level Bridge No Build with Removal of Existing Bridge $20.2 M $40.7 M $24.4 M $ 3.2 M

Evaluation Matrix 1 Movable Bridge - Rehab of electrical and mechanical components at 25 and 50 years, clean and paint steel every 10 years

Next Steps County Council recommends preferred alternative Advertise availability of draft report & conduct formal public hearing identifying preferred alternative Distribute final draft report to FDOT & Federal Highway Administration (FHWA) for comment Prepare & submit final report to FHWA for approval

Staff Recommendation Select high-level fixed bridge as preferred alternative because. More cost effective - $24.4M vs $40.7M (movable) ; $20.2M (rehab) Lower operation/maintenance costs - $39K/yr vs $420K/yr (movable & rehab) Better service life - 75 yrs vs 75 yrs with elec/ mech rehabs at 25 & 50 yrs (movable) ; 15 yrs (rehab) Eliminates vehicle & boat traffic delays -

Council discussion/action & public comments