CAPE TOWN STATION REFURBISHMENT BACKGROUND

Similar documents
Granger Bay Boulevard and Green Point Roundabout

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

ACCESS STATEMENT FOR STADIUM TOUR AND MUSEUM, ARSENAL FOOTBALL CLUB

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

Urban planning proposal for areas surrounding Shibuya Station (plan)

CITY OF CAPE TOWN TRANSPORT COMMUNICATION

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

New Waterloo. Transforming the Elizabeth House site

Public Transport Vehicle Management System. Request for Information

HÁ LIMITES PARA O CRESCIMENTO DO SETOR IMOBILIÁRIO? Jacques van Zijl Rea Vaya Project Manager

05 AREA/SITE SPECIFIC GUIDELINES

WELCOME TO OUR EXHIBITION

CITY OF CAPE TOWN TRANSPORT COMMUNICATION LINKIN PARK CONCERT

BRUNSWICK BUSINESS INCUBATOR INFORMATION PACK

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

Measurement Standards for Structures

Heavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations. w w w. platformscreendoors.

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

Metro Rail Gating Study

Welcome to our proposal for Greenwich Peninsula

6. Social & Community Facilities

EDWARDSTOWN SOLDIERS MEMORIAL RECREATION GROUND BACKGROUND REPORT

Brookdale Site. CB6 Update April 1, 2015

FINANCIAL FORECAST. Nelson Mandela Bay Stadium. August 2010

Please describe the proposal accurately and concisely. State the number of storeys proposed and the position of any extensions.

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009

Atlanta City Council Finance Committee February 13, 2013

ENGINEERING DEPARTMENT CHANDIGARH ADMINISTRATION NOTICE INVITING EXPRESSION OF INTEREST (EOI)

Parking Business Plan

Construction of 86 Dummer Street: Questions and Answers for Trustman Residents

Guangzhou, China's ecological future city

Block C Borthwick Street, London, SE8 3JY

1st CONFERENCE IN ETHNOMUSICOLOGY AND ANTHROPOLOGY OF MUSIC Methods, approaches and perspectives for the study of music within culture

Civil Engineering and Architecture (CEA) Detailed Outline

Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.

Market Commentary Canberra Office

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

The Importance of Retail Leasing in Franchising

MESSAGE FROM THE CEO CONTENTS. Brian Morris Chief Executive Officer

FREMANTLE BID COMPANY LIMITED BUSINESS IMPROVEMENT DISTRICT BUSINESS PLAN

a creative space to ignite ideas BALTIMORE, MD COMING SUMMER 2015

VEHICLE CROSSOVER INFORMATION PACK

KEYPORT COMMUNITY PLAN

TRANSPORT PLAN COMMUNICATION Cape Town Stadium: Soccer Cape Town City FC vs. Kaiser Chiefs

Economic Impact of Redeveloping The World Trade Center Site: New York City, New York State, And the New York-New Jersey Area

Glossop Design & Place Making Strategy

Welcome. Purpose of the exhibition

CROYDON MAJOR ACTIVITY CENTRE PARKING STUDY

WELCOME VISITING SUPPORTERS GUIDE

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

Trondheim 2016 UEFA Disabled Supporters Guide

Site Induction Presentation

Guildford Station Regeneration

Teaching Machine Based on the work of Judi Garratt

CITY MEETS CENTRE. Be part of the Cardiff Exciting Hotel Development Opportunity

Case study summary TISSÉO - SMTC France

> Current Operations & Business Context. Bankstown Airport Master Plan 2004/05. Bankstown Airport / Master Plan > 29

Larnaca Urban Sustainable Development Strategy

Newsletter: Construction Information, No June 2010

Connie LeFevre. 22 Texas Home & Living September/October 2009

How to get Rome from the Leonardo Da Vinci Fiumicino Airport

COUNCIL POLICY Smoke Free Areas Policy

Real Estate Dossier. Intermodal Station Area Master Plan of Zaragoza G-44-2 Area. El Portillo Area Master Plan of Zaragoza G-19-1 Area

MANCHESTER UNITED PLC SAFETY POLICY IN RESPECT OF SPECTATORS

Shaping Whanganui. Have your say, korero mai

Statement by the City s Executive Mayor, Alderman Patricia de Lille

one of your best resources

The following should be seen only as general guidelines;

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

CIRCULAR ircular PLANNING SERIES

RETAIL/ INDUSTRIAL/ OFFICES

Saltway Barn. Coln St Dennis, Cheltenham, Gloucestershire

Alternatives and Design Evolution: Planning Application 1 - RBKC

Unique. central. Venue

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

POLICY REGARDING SHORT TERM INSURANCE AND KNOWN RISKS AND LIABILITIES

Guidance Note on the Need for Planning Permission for the Development of Existing Houses and Flats (effective from 6 February 2012)

Householder Application for Planning Permission for Works or Extension to a Dwelling Town and Country Planning Act 1990

How To Manage The Council

Residential Development Travel Plan

Friends Seminary Presentation to NYC Landmarks Preservation Commission 21 April 2015 Kliment Halsband Architects

New Trends in Station Design

Theme 1: Activities. Background

Tall Building Design Guidelines Status Update

800 EMAAR (36227) Marina Plaza

1 Photo courtesy of Bechtel Photo Library. HS2 Jobs Analysis. Leo Eyles. Albion Economics

Woodley Sports Football Club

Deep Ellum Crossroads Redevelopment Project

Curriculum Vitae of DUNCAN CLOETE Strategic Consultant : Safety and Security

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

TRANSPORT PLAN COMMUNICATION Mariah Carey CONCERT

The UK Rail Industry: A Showcase of Excellence

Capital Programme 2016/ /21

Club Policy for Disabled Supporters

Vote on for a: PUTTING PEOPLE FIRST

The business of Gatwick Airport Limited

Date: 15 September Cathedrals FOREWORD COUNCILLOR MARK WILLIAMS, CABINET MEMBER FOR REGENERATION AND NEW HOMES

Impact Analysis: The Atlanta Braves new Stadium Project. March A Cushman & Wakefield Research Publication

Transcription:

CAPE TOWN STATION REFURBISHMENT BACKGROUND The R408-million upgrade and refurbishment of Cape Town Station, formally sanctioned by the SARCC Board of Directors in 2005, is emerging as a significant catalyst in the renewal of the Cape Town Central Business District (CBD). Cape Town Station was constructed in the early 1960s at a time when there was significant development along the Foreshore and within the CBD. The first railway services from the new station commenced in April 1963. Little development or expansion has been undertaken in the ensuing almost 50 years, despite the changing needs of the city and its inhabitants. Today the Cape Town Station precinct plays a pivotal role in the economic life of the City and provides an important interface between the central city and the outlying metropolitan areas. Indeed the station is a key determinant in the quality of life of many residents and the refurbishment of the precinct is vital in enabling it to fulfill its rightful role in the socio-economic development of Cape Town as the city embraces the challenges of growth and social integration. PROJECT INFORMANTS 2010 FIFA World Cup matches are likely to result in the largest spectator gatherings South Africa has ever experienced. Consequently, a significant improvement is necessary to ensure that the rail system, especially at stations, is able to cope with the demands, as well as catering to the needs of daily commuters. Before the refurbishment project began, the station building had become functionally inefficient and seriously degraded, even to the point of becoming a health risk. Green Point Stadium, located within five kilometres of the station, is in the process of being completed to host the 2010 FIFA World Cup matches to be played in Cape Town. It is expected that the soccer fans will converge on the station on match days as they make their way to the stadium.

BENEFITS In addition to the aesthetic benefits of a clean, modern station, the following also apply: Improved operational efficiency; Improved safety and security; Improved information management; Sustainability; and Improved accessibility and ease of movement for all. SCOPE OF THE PROJECT Cape Town Station is divided into four precincts for the planning and design of the construction work: The Station Forecourt The station forecourt comprises three open areas depicted as A, B and C in the diagram, the main concourse running from Old Marine Drive (Precinct 2) to Strand Street (Precinct 3) and a five storey tower block. The station forecourt is the area through which visitors will move to the stadium and therefore a priority for completion. Construction work in Precincts 2, 3 and 4 are mainly refurbishment projects although there are inter-dependencies, e.g. Precinct 4 must be completed (new trading market) to receive the informal traders currently occupying the forecourt. The station forecourt must be open and unobstructed for 2010 to allow free movement through this space to the stadium.

Main Concourse New ticket sale points and information desks at the entrances at Old Marine Drive and Strand Street. Station managers offices and function areas located in the ticket selling point at Old Marine Drive. Demolishing of existing ticket offices and commercial areas to clear the concourse for free movement. Re-tiling the floor. Replacing turnstiles with high-tech access gates. Construction of new food courts, one at each ticket selling point. Five Storey Tower Block Demolition, alteration of internal walls and refurbishment, except the fourth floor and the clinic, which were recently refurbished to accommodate various operational departments. Various operational units are to be housed in the refurbished tower block. Creative Cape Town Space This is one of the station s major retail spaces due to the excellent exposure to the CBD and no direct rail operations present in this corner of the station. Relocation of the Long Distance Bus Facility to Precinct 2. Construction of an urban square with the Food Court in the Main Concourse opening onto the square. Demolition of internal walls, alteration and refurbishment of two storey building along Adderley Street to accommodate retail / creative Cape Town activities and a transport museum on the first floor. Demolition of internal walls, alteration and refurbishment to first floor of the building along Old Marine Drive to accommodate offices and construction of a retail / creative Cape Town activities below.

Station Square This square is seen as an operational space as the main access to the concourse and platforms from the CBD as well as an evacuation space in the event of an emergency or disaster. The informal traders currently occupying the Station Square will be relocated to the Station Deck. Removal of the garden areas and retaining and/or relocation of some of the trees. Construction of hard and soft landscaping of the square to allow movement and maximum usage. Square to allow occasional seasonal / themed events in between rail operational peak times. Station Corner This is a more reflective space featuring public art works. Construction of a square with the Food Court in the Main Concourse spilling opening onto the square; Refurbishment and adjustments to the accesses down into the underground retail areas of the CBD. Old Marine Drive This is the long distance travel precinct featuring the long distance bus facility, Blue Train Lounge and commercial area at the lower end towards Oswald Pirow Street. Relocation of the Blue Train Lounge to the Parcels Building. Construction of new offices and ticket selling points for long distance bus operators, as well as meet & greet and waiting lounges. Civil works to construct new curb lines, pavements and surfaces for new sedan taxi waiting areas, two drop-and-go areas for long distance travel services, pedestrian walkways, cycle routes, parking and long distance bus terminal. Refurbishment of the station building facing Old Marine Drive. Enclosure of the long distance bus facility and possible retail on the outer edge of the enclosure and down Old Marine Drive closer to Oswald Pirow. The commercial components at the long distance bus facility and in Old Marine Drive are not a part of the

scope of the project. The intention is to investigate the possibility of sourcing capital from outside the current allocation in order to facilitate their inclusion. Strand Street This precinct consists of rail operational functions facing platform 1 and retail facing Strand Street. The Cape Town SAPS facility located in this precinct was built recently and is still in good condition. Demolition of internal walls, alterations and refurbishment to accommodate retail edge on Strand Street and rail operations facing platform 1. Rail operations on platform 1: Facilities Access controllers Train Cleaners Protection Services Station Deck The City of Cape Town manages the public parking areas and taxi rank in this precinct. Planning is being coordinated to allow a seamless implementation of the refurbishment of this area. This precinct consists of the Good Hope Concourse next to Oswald Pirow Street, Parade Concourse, train drivers- & Premier Service s offices and mess facilities and traders market. Deck civil works to waterproof the deck and install storm water and other services to serve the market Construction of the top structures in the market, i.e. kiosks for trading, ablution facilities, management facilities for the trading markets and solid waste recycling depository facility Internal demolitions, alterations and refurbishment of the Parade- and Good Hope concourses to accommodate retail and rail operational functions. The Parade concourse is in the current scope of project while the refurbishment of the Good Hope concourse depends on the airport rail link project as the terminal facility for this service will be located in the Good Hope concourse.

Integrated Communication System An integrated communication system consisting of closed circuit television cameras, public address systems, information boards, advertising and infotainment is included in the scope of the project. The integrated communication system touches on one of the regional functions which is funded by the national integrated communication system project. START AND END DATES The project was initiated by the then SARCC in 2005. A professional team was appointed in 2006 with the first contractors appointed towards the end of 2007. The main building contractor stepped on site on the 1 st of September 2008. The 2010 elements of the project will be completed by March 2010 with some refurbishment components continuing. JOB CREATION 11 contracts form part of the project, translating into roughly 650 jobs with a local labour component of at least 20%,of which at least 90% are held by previously disadvantaged individuals. Another three contracts have recently been awarded that will add to the employment figures above. FINANCE FUNDING SOURCES CAPITAL PROVISION EXPENDITURE TO DATE PTIS 110,000,000 110,000,000 MTEF (as per PRASA Bus. Plan) 406,000,000 130,726,860 TOTAL 516,000,000 240,726,860

PROJECT PHOTO GALLERY Old Marine Drive Before Old Marine Drive Entrance after Station Forecourt Before Forecourt during construction Old Ticket sales New ticket sales