1 3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure The design freeze draft one was a point in time in the evolution of the Masterplan which aimed to settle the fundamental components across the scheme for all of the project disciplines, and hence determine the Earls Court Development Proposals that are being sought approval for This stage of design allowed the development of smaller components to continue and be tweaked, whilst having the majority of the scheme settled. This settling of the overall masterplan also enabled the illustrative and executive architects to take on various areas of the scheme and test and develop these in more detail (refer to Figures 3-19 and 3-20 overleaf) Changes that were made from the previous stage included adjusting some of the smaller routes through the Site which in turn adjusted the size and arrangement of some of the building plots, squares and gardens. Also green connections from the public squares in the residential quarters to the Broadway were introduced and significant green spaces were positioned adjacent to the Lost River Park During the Concept Masterplan stage, there were two options running for the buildings that are to be located where the current Earls Court Exhibition Buildings are: one which allowed buildings to be positioned over the rail lines and one which avoided building over them. The two options were tested in terms of their technical and financial implications and a detailed study of the structural constraints was undertaken to assess the impact of the design. This assessment resulted in the option of not building over the rail lines to be taken forward and included in the design freeze draft one, meaning that the layout of the streets and building blocks responded to the rail infrastructure underneath the Site Townhouses were added to the Masterplan along Warwick Crescent and Empress Crescent in response to massing studies After the Concept Masterplan stage, Seagrave Road, a proposed development to the South of the main Earls Court Site, became a real project and gave the Earls Court project more viability and deliverability. During the design development a process of questioning and challenging the strategy of how height was dealt with and distributed on the Earls Court Site was taken. Different urban solutions for dealing with height on the Site were considered and assessed in terms of townscape and daylight/sunlight, and discussions were held with the LBHF and the RBKC. These included height in the form of towers and also in a series of smaller tall elements The compositional solution that was chosen and was included in the design freeze stage one, which is in alignment with the EKWKOA Draft SPD, was a cluster of towers which a form a dance with the Empress State building. In the lead up to the design freeze, the density and quantum of development was interrogated and tested in terms of the resultant townscape, daylight and sunlight analysis, and also in consultation with the consultation with the LBHF and the RBKC. The density and quantum included in the design freeze was a result of this process At the Concept Masterplan stage, the access proposals included a central signalised road junction coming off Lillie Road, which connected traffic coming from the south of the Earls Court Site to the new proposed Broadway. This was a very large junction with high capacity Throughout consultation with the LBHF, the RBKC, and TfL, concern was expressed at relying on this one road junction for the traffic flows approaching the Earls Court Site from the south. Therefore WSP looked into the possibility of introducing more junctions at Lillie Road / Old Brompton Road. Consequently, the access proposals were amended to reflect three junctions coming off Lillie Road / Old Brompton Road. The three junctions create a more permeable access to the Broadway, each have smaller capacity, and there are no traffic lights / signalling, which is in line with the consultation feedback received. The change to the access to the southern boundary of the Earls Court Site has the benefit of helping access the different phases of the Earls Court Development Proposal, as they progress. It stops the reliance on one major access point for demolition and construction vehicles. There is also the added benefit that the additional junction providing access to the RBKC element of the Earls Court Site helps to ease traffic flow pressures along Warwick Road. (Illustrative) Design Freeze Masterplan 3-11 Properties Earls Court Project Application 1 Royal Borough of Kensington & Chelsea Environmental Statement Volume I June

2 Figure 3-20 Design Freeze Masterplan Illustrative Testing and Post-Exhibition 3.91 After the design freeze draft one, a number of illustrative and executive architects were appointed to look in detail at individual character areas and building plots to test the illustrative Masterplan and develop the scheme further. The technical team continued to analyse both the illustrative Masterplan and the Earls Court Development Proposals to be submitted for planning approval As this process was taking place, the fourth public consultation stage was also in progress. An exhibition at Earls Court invited members of the public to view the design freeze draft one Illustrative Masterplan and provide comments and suggestions as to how the scheme should develop further A number of amendments to the design were made following public feedback, comments by various bodies, technical analysis, and the illustrative architects detailed testing. The following points detail the main changes to the massing of the development plots sought for approval following further technical work in relation to townscape, daylight / sunlight, and landscaping / public realm, and taking into consideration feedback and comments received. These changes are also reflected in the illustrative Earls Court Masterplan: Plots WK03, WK04, BW01 and WV01 amended to consider townscape views of the Church on Philbeach Gardens; Plots BW01 and BW03 amended to relate to the massing and scale of adjacent plots and the existing residential buildings on Philbeach Gardens; Location of tall buildings to respond to key townscape views resulting in the massing housed within plots BW04 and NE06 (numerous moves: original position 2010, changed in February and also April/May 2011); Plots WV04 and WV06 extended at High Street to allow potential for enhanced public realm; WV06 maximum parameter reduced to the south to relate scale and massing to adjacent plots and existing buildings of Eardley Crescent; BW01 maximum parameter to the north-west corner extended to account for Energy Centre flues. Location adjusted to consider townscape views; WV04 maximum parameter extended to account for Energy Centre flues; WK03 plan extent of maximum parameter adjusted to align with existing infrastructure constraints; NE01 maximum parameter extended south on residential square as part of design development; Reduction in the massing of WV02 and WV05 to match illustrative scheme to take into consideration the daylight sunlight impacts to Eardley Crescent and Philbeach Gardens; and Plots BW05 and BW07 amended to provide additional, annexed space to the Lost River Park (this is in the illustrative model only and does not change the maximum parameter) (April 2011) Figure 3-21, overleaf, presents the main massing changes, as discussed in the above bullet points Earls Court Project Application 1 Royal Borough of Kensington & Chelsea Environmental Statement Volume I June 2011 Properties

3 Figure 3-21 Changes made (to the Illustrative Masterplan) post-public exhibition in February Properties Earls Court Project Application 1 Royal Borough of Kensington & Chelsea Environmental Statement Volume I June

4 Summary of Key (Illustrative) Masterplan Design Changes 3.95 Throughout this Chapter, design amendments and the development of the design is described through the various stages of Masterplan evolution. These changes are summarised within Figure 3-22, overleaf. Whilst Figure 3-22 presents the Illustrative Masterplan, as discussed previously, the Masterplan is the basis of the resultant scheme which is being submitted for outline planning approval. Subsequently, all design changes were fed through to the scheme which is being sought for approval - the Earls Court Development Proposals Earls Court Project Application 1 Royal Borough of Kensington & Chelsea Environmental Statement Volume I June 2011 Properties

5 Figure 3-22 Summary of Key Masterplan Design Changes 3-15 Properties Earls Court Project Application 1 Royal Borough of Kensington & Chelsea Environmental Statement Volume I June

6 3 Alternatives and Design Evolution: Planning Application 1 - RBKC the direction of the Empress State Building pre-empting the shift in scale between Earls Court Village and the existing structure. As the design team learnt more about the Empress State Building, and its importance to the identity of the local area, this informed the massing study on the Development Option (RBKC) Site and resulted in the lifting of the massing towards the Empress State Building. The Development Option (RBKC) Proposals 3.96 Whilst the above sections discussing the evolution of the Earls Court Site-Wide Masterplan and Earls Court Development Proposals are useful to aid understanding of the evolution of the Development Option (RBKC) Proposals, this section of the Chapter discusses the design alterations and evolution of the Development Option (RBKC) Proposals as a stand alone scheme The Earls Court Proposals have been used as the vehicle to explain the aspirations, principles and content of the Earls Court Masterplan. The aspirations and principles are inherent within the Development Option (RBKC) Masterplan however, there are a number of specific factors to this Development Option that would benefit from further explanation to gain a comprehensive understanding of the evolution of the Development Option (RBKC) Proposals In the Development Option (RBKC) Masterplan (Figure 3-23), the following components of the overall Earls Court Masterplan are included: 3.99 Earls Court Village; The eastern end of West Brompton Village (Counters Place); The southern half of the Lost River Park; The eastern end of the High Street; and The eastern end of West Kensington Village. Figure 3-23 The Development Option (RBKC) Masterplan In addition to these elements which are present in both Development Options, there is the proposed temporary large green open space that will be created on the deck of the existing EC2 exhibition hall, adjacent to the Lost River Park (not accessible by the general public). Although only part of the existing Earls Court Exhibition Centre falls within the red line boundary of this planning application (Application 1), the implementation of the Development Option (RBKC) Proposals assumes the demolition of the Exhibition Centre in its entirety (including EC1 and EC2). This means that the EC2 would be a cleared site which would be the subject of further discussion with the planning authorities. In these Development Option (RBKC) Proposals, it is envisaged that a temporary landscape treatment and boundary condition would come forward. Location of Plots During the concept Masterplan stage of the Development Option (RBKC) Proposals, there were two options running for the location of the buildings that would replace the current EC1 and EC2 exhibition halls: one which allowed buildings to be positioned over the rail lines and one which avoided building over them The two options were tested in terms of their technical and financial implications and a detailed study of the structural constraints was undertaken to assess the impact of the design. This assessment resulted in the option of not building over the rail lines to be taken forward. This was included within the initial design freeze, and the design of the layout of the streets and building blocks consequently responded to the rail infrastructure underneath the site. Below ground studies that were undertaken also informed the massing potential with consideration to existing infrastructure and structural constraints A key consideration for the design evolution of the western portion of the Development Option (RBKC) Site was the relationship with the National Rail and LUL infrastructure on this boundary. These considerations are discussed in more detail within Chapter 5: Deconstruction / Demolition and Construction of this ES. Massing Considerations In the lead up to the design freeze the density and quantum of the development was interrogated and tested in terms of the resultant townscape and also in consultation with the planners There is a degree of flexibility of the building blocks which are defined by the parameter plans. The massing principles made particular reference to the reduction of building height to the Philbeach Gardens and Eardley Crescent street buildings. The massing of the buildings along the eastern boundaries of the Site responds to their context in the same way as they do in the Earls Court Masterplan The buildings along the western edge of the Development Option (RBKC) Site have a slightly different relationship to their surroundings when comparing against the Earls Court Masterplan. The height of these buildings build towards Earls Court Project Application 1 Royal Borough of Kensington & Chelsea Environmental Statement Volume I June 2011 Properties

7 3.106 After the design freeze draft one, a number of executive architects were appointed to look in detail at individual building plots on EC1 to test the masterplan and develop the scheme further. Their design studies tested and informed the Design Guidelines and Parameter Plans The detailed design studies informed the development blocks which are adjacent to the Lost River Park. These development plots form a gentle crescent responding to the curve of the Lost River Park The position of the Lost Rover Park acts as a buffer space dealing with the shift in massing between the proposed buildings within Earls Court Village (refer to Chapter 4: The Development Option (RBKC) Proposals of this ES) and the existing buildings of the West Kensington Housing Estate. Views and Vistas The evolving view from Earls Court underground station into Exhibition Square and along the High Street is organised so that the existing local icon, the Empress State Building, remains its focus. The southern gateway into the Development Option (RBKC) Proposals offers views along the residential crescent and along the Lost River Park with the existing Ashfield House terminating this view. Access References Ref. 3-1 DETR, 1999; Town and Country Planning (Environmental Impact Assessment (EIA)) (England and Wales) Regulations, (as amended 2007). Ref. 3-2 Greater London Authority, October 2009; The Draft Replacement London Plan. Ref. 3-3 GLA, London Borough of Hammersmith & Fulham and Royal Borough of Kensington and Chelsea, 2011; Draft Earls Court West Kensington Opportunity Area: Supplementary Planning Document. First Draft For Public Consultation. Ref. 3-4 GLA, 2010; London View Management Framework SPG. Ref. 3-5 London Borough of Hammersmith & Fulham, 2003; London Borough of Hammersmith & Fulham Unitary Development Plan as amended by the Secretary of State September Ref. 3-6 Terry Farrell and Partners on behalf of Earls Court Properties Ltd, 2010; Shaping West London Changes were made to the existing road junction on Warwick Road from a fork with central road junction to the two one-way crescents linking the areas beyond the first development plots. This developed through understanding the constraints of the ground level changes and obstacles presented by the existing infrastructure (portals, train tunnels etc) The new crescents within the Development Option (RBKC) Site were designed whilst reflecting the many traditional Crescents in West London. Hence, these crescents are not a major primary vehicular connection into the development area. Uses The same uses are proposed as those within the Earls Court Site-Wide Masterplan. A detailed study has been carried out to ensure that the uses provided the required proportions for a scheme located within the RBKC only. Although the uses are the same, the locations have been moved to take into account the requirements of the Development Option (RBKC) Proposals. This included the movement of the hotel use and uses of residential, A1-A5, Hotel, serviced apartments, community and cultural at gateway entrances onto the Development Option (RBKC) Site. Landscape Strategy The public realm and landscape strategy for has been developed as an integral part of the RBKC Masterplan and adheres to the principles established within the Earls Court Masterplan strategy Landscaping has evolved to absorb any wind implications from the west across the EC2 deck towards the building plots and High Street / Warwick Walk To recap, the underling principles for the public realm and landscape on the Development Option (RBKC) only Site is to: Create a framework of open space that provides support to the built proposals; Establishes connections and permeability; Positively reinforces its existing context; Provide a series of open spaces that supports proposed land use, creating a usable and sustainable green landscape; Promote environments that responds to existing and changing climate conditions; and Promote biodiversity and create habitats that are rich, diverse, enjoyable and usable Properties Earls Court Project Application 1 Royal Borough of Kensington & Chelsea Environmental Statement Volume I June

8

Earls Court Project. B Alternatives and Design Evolution. Royal Borough of Kensington & Chelsea Application 1. Properties

Earls Court Project. B Alternatives and Design Evolution. Royal Borough of Kensington & Chelsea Application 1. Properties Earls Court Project Royal Borough of Kensington & Chelsea Application 1 B Alternatives and Design Evolution 74 Appendix B Alternatives & Design Evolution: Development Option (Site Wide) Planning Application

More information

Earls Court Project. London Borough of Hammersmith & Fulham Application 2. Non-Technical Summary. Prepared for EC Properties Ltd by URS.

Earls Court Project. London Borough of Hammersmith & Fulham Application 2. Non-Technical Summary. Prepared for EC Properties Ltd by URS. Earls Court Project London Borough of Hammersmith & Fulham Application 2 Non-Technical Summary Prepared for EC Ltd by URS June 2011 2 Cover Letter Planning Application Forms (including Notices and Certificates)

More information

the Earls Court project a Summary of the planning applications

the Earls Court project a Summary of the planning applications the Earls Court project a Summary of the planning applications SHAPING WEST LONDON Following two years of consultation, in June 2011 EC Properties Ltd submitted planning applications to the London Borough

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007 Development Brief for New Lodge, Bank Mill Lane Berkhamsted Adopted November 2007 This publication seeks your opinions about the design, layout and requirements for new housing development at New Lodge,

More information

Richmond upon Thames College. Draft Planning Brief. May 2008

Richmond upon Thames College. Draft Planning Brief. May 2008 Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition Welcome to this public exhibition for Cherry Park, Westfield, Stratford. This exhibition has been organised to update residents on Cherry Park, the next phase of development in

More information

05 AREA/SITE SPECIFIC GUIDELINES

05 AREA/SITE SPECIFIC GUIDELINES 05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.

More information

3.0 Planning Policies

3.0 Planning Policies 3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The

More information

Millennium Quarter Public Realm Guidance Manual 2008

Millennium Quarter Public Realm Guidance Manual 2008 Millennium Quarter Public Realm Guidance Manual 2008 Table of Contents Introduction Purpose of guide How to use this guide Background and Vision Studies Conservation and Heritage Biodiversity Strategic

More information

HurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park.

HurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. HurlinghamRetailPark Aerial view of site Welcome Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. Londonewcastle, a specialist residential developer, has been

More information

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Application No. 09/00389/LP - 51-61 Whytecliffe Road South, Purley, CR8 1. SUMMARY 1.1 This report concerns

More information

Introduction. Welcome. 358-364 London Road, Mitcham

Introduction. Welcome. 358-364 London Road, Mitcham Introduction View from the southern junction of London Road and Cricket Green Welcome Thank you for attending our public exhibition and viewing the latest proposals for 358-364 London Road. As you may

More information

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas

More information

R&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction

R&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction Building Engineer UK Registration Board n.075077h Design and Access Statement for Application for Planning Permission for demolition of a garage and construction of an extension to an existing Victorian

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

Welcome & background. www.theperfumefactory.info

Welcome & background. www.theperfumefactory.info Welcome & background Essential Living welcomes you to this community involvement event introducing the proposed redevelopment of The Perfume Factory, North Acton. EXISTING SITE PLAN AERIAL VIEW OF SITE

More information

Welcome. Purpose of the exhibition

Welcome. Purpose of the exhibition Welcome Welcome to our exhibition, setting out plans for a redevelopment of Ten Broadway. It is currently the headquarters of the Metropolitan Police, which has made a decision to rationalise and relocate

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

OVERARCHING SPATIAL POLICIES

OVERARCHING SPATIAL POLICIES 3 OVERARCHING SPATIAL POLICIES 29 Overarching Spatial Policies 3.1 This chapter contains policies addressing the following policy themes: OSP 1: Optimising growth OSP 2: Land use OSP 3: Connections and

More information

Earls Court Project Application 2 London Borough of Hammersmith & Fulham Properties 2 Office Assessment June 2011

Earls Court Project Application 2 London Borough of Hammersmith & Fulham Properties 2 Office Assessment June 2011 Earls Court Project London Borough of Hammersmith & Fulham Application 2 Office Market Assessment Prepared for EC Ltd by CB Richard Ellis June 2011 2 Office Assessment June 2011 Application Document Cover

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road.

Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road. WELCOME Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road. The site covers approximately 0.37 hectares and

More information

21 Plumbers Row, London, E1 1EQ

21 Plumbers Row, London, E1 1EQ Committee: Development Date: 19 th October 2011 Classification: Unrestricted Agenda Item No: Report of: Corporate Director of Development and Renewal Case Officer: Shahara Ali-Hempstead Title: Planning

More information

Earls Court & West Kensington Opportunity Area Framework Delivery and Servicing Plan (DSP) EC Properties Limited

Earls Court & West Kensington Opportunity Area Framework Delivery and Servicing Plan (DSP) EC Properties Limited Earls Court & West Kensington Opportunity Area Framework Delivery and Servicing Plan (DSP) EC Properties Limited May 2011 Contents!"! # $ " %!& 1 Introduction ()*!$)*+,!$)**(*, 1.1.1 WSP has been appointed

More information

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site. 1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises

More information

WELCOME TO OUR EXHIBITION

WELCOME TO OUR EXHIBITION WELCOME TO OUR EXHIBITION The purpose of the exhibition is to provide you with the opportunity to view our proposals and give feedback prior to the submission of a planning application to the London Borough

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015

London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015 London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015 Workshop agenda Presentations Breakout workshop sessions Feedback and outcomes for the masterplan

More information

Broadwood Terrace is located to the north of Pembroke Road and to the east of Warwick Road. It comprises:

Broadwood Terrace is located to the north of Pembroke Road and to the east of Warwick Road. It comprises: Consultants Brief Pembroke Road Options Appraisal The Royal Borough of Kensington and Chelsea wish to appoint consultants to undertake an options appraisal of the site known as Pembroke Road, a mixed use

More information

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive.

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive. planning report D&P/2857b/01 30 November 2015 Bollo Lane, Chiswick Business Park and Colonial Drive, Chiswick in the London Borough of Ealing planning application no. PP/2015/5442 Strategic planning application

More information

urban living and contributes positively to the character of

urban living and contributes positively to the character of chapter six objective four Recognise the varied character of Hounslow s districts and seek to protect and improve their special qualities, heritage assets and overall townscape quality and appearance.

More information

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place. 15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places

More information

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take

More information

Design and Access Statement. 141-145 Earls Court Road London SW5 9RH

Design and Access Statement. 141-145 Earls Court Road London SW5 9RH J U L I A N A R E N D T A S S O C I A T E S 1 7 a P i n d o c k M e w s L i t t l e V e n i c e L o n d o n W 9 2 P Y F + 4 4 2 0 7 2 8 6 9 9 0 1 Design and Access Statement T + 4 4 2 0 7 2 8 6 9 9 9 1

More information

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 REPORT BY THE EXECUTIVE DIRECTOR, PLANNING AND BOROUGH DEVELOPMENT Application: /PP/15/02000 Agenda Item: N34 Address:

More information

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment

More information

Page 117. DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010. Report of the Executive Head of Planning and Transportation.

Page 117. DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010. Report of the Executive Head of Planning and Transportation. Page 117 Agenda Item 10 DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010 Report of the Executive Head of Planning and Transportation. Ref: A2010/63099/ADV WARD: A03 / STONECOT Time Taken: 5 weeks,

More information

Framework Servicing Management Plan

Framework Servicing Management Plan Framework Servicing Management Plan 66-74 Notting Hill Gate Stranton Properties Ltd September 2014 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from Stranton

More information

WEST OF WATERLOOVILLE FORUM. 10 April 2006. Councillors: Winchester City Council. Councillor Clohosey (Standing Deputy for Councillor Chamberlain)

WEST OF WATERLOOVILLE FORUM. 10 April 2006. Councillors: Winchester City Council. Councillor Clohosey (Standing Deputy for Councillor Chamberlain) 1 WEST OF WATERLOOVILLE FORUM 10 April 2006 Attendance: Chamberlain Cooper Hiscock (P) Deputy Members: Councillors: Winchester City Council Collin (Chairman) (P) Rees Stallard (P) Councillor Clohosey (Standing

More information

PLANNING STATEMENT. Somerset House / 14 Elmtree Road Teddington. on behalf of Ashill Developments Ltd. May 2010

PLANNING STATEMENT. Somerset House / 14 Elmtree Road Teddington. on behalf of Ashill Developments Ltd. May 2010 PLANNING STATEMENT Somerset House / 14 Elmtree Road Teddington on behalf of Ashill Developments Ltd May 2010 2827 UK House, 82 Heath Road, Twickenham, Middlesex TW1 4BW T 020 8843 8211 F 020 8843 8219

More information

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site

More information

1. These Directions come into force on 24 March 2015. These Directions apply to any application for planning permission which:

1. These Directions come into force on 24 March 2015. These Directions apply to any application for planning permission which: DEPARTMENT FOR TRANSPORT SAFEGUARDING DIRECTIONS FOR DEVELOPMENT AFFECTING THE ROUTE AND ASSOCIATED WORKS PROPOSED BY TRANSPORT FOR LONDON FOR THE CROSSRAIL 2 RAIL PROJECT; WIMBLEDON TO NEW SOUTHGATE;

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

NORTHUMBERLAND. FOR SALE Freehold Office Investment with Planning Consent for a 27,157 sq Ft (GIA) Student Housing Block

NORTHUMBERLAND. FOR SALE Freehold Office Investment with Planning Consent for a 27,157 sq Ft (GIA) Student Housing Block CGI of student housing Existing FOR SALE Freehold Office Investment with Planning Consent for a 27,157 sq Ft (GIA) Student Housing Block G U I D E P R I C E 4. 2 m i l l i o n m i l l i o n NORTHUMBERLAND

More information

Mount Pleasant Sorting Office

Mount Pleasant Sorting Office Mount Pleasant Sorting Office LBI References: P2013/1423/FUL P2013/1425/CAC LBC Reference: 2013/3807/P GLA Reference: D&P/3032a&b/02 Update - Topics Scheme proposal Summary of key resident objections Mayoral

More information

New Waterloo. Transforming the Elizabeth House site

New Waterloo. Transforming the Elizabeth House site New Waterloo Transforming the Elizabeth House site 02 Transforming Elizabeth House 03 Transforming Elizabeth House Transforming Elizabeth House This booklet has been produced by Chelsfield and London &

More information

CONTENTS. Page. Reading The Vision 2. 1. Introduction and Objectives of the Development Brief 3. 2. Information on the Briefing Process 5

CONTENTS. Page. Reading The Vision 2. 1. Introduction and Objectives of the Development Brief 3. 2. Information on the Briefing Process 5 CONTENTS Page Reading The Vision 2 1. Introduction and Objectives of the Development Brief 3 This development brief has been written in accordance with the DETR s Planning and Development Briefs A Guide

More information

RE: CONSULTATION ON THE DEVELOPMENT MANAGEMENT AND THE SITE ALLOCATIONS DPD CONSULTATION DOCUMENT REPRESENTATIONS MADE ON BEHALF OF SAFESTORE.

RE: CONSULTATION ON THE DEVELOPMENT MANAGEMENT AND THE SITE ALLOCATIONS DPD CONSULTATION DOCUMENT REPRESENTATIONS MADE ON BEHALF OF SAFESTORE. 23 March 2015 Haringey Planning Policy River Park House 225 High Road London N22 8HQ Dear Sir RE: CONSULTATION ON THE DEVELOPMENT MANAGEMENT AND THE SITE ALLOCATIONS DPD CONSULTATION DOCUMENT REPRESENTATIONS

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

PLANNING SUPPORT STATEMENT. 29 Fernshaw Road, London SW10 0TG MRS. GAIL TAYLOR & MRS. KAREN HOWES. Prepared For TR/6570

PLANNING SUPPORT STATEMENT. 29 Fernshaw Road, London SW10 0TG MRS. GAIL TAYLOR & MRS. KAREN HOWES. Prepared For TR/6570 PLANNING SUPPORT STATEMENT 29 Fernshaw Road, London SW10 0TG Prepared For MRS. GAIL TAYLOR & MRS. KAREN HOWES November 2012 Contents 1 INTRODUCTION 1 THE APPLICATION PROPERTY AND SURROUNDING AREA 1 RELEVANT

More information

Hybrid Planning Application for mixed use development at North West Cowbridge

Hybrid Planning Application for mixed use development at North West Cowbridge Jane Crofts Development Management Vale of Glamorgan Council Civic Offices, Holton Road, Barry CF63 4RU. Helmont House Churchill Way Cardiff CF10 2HE 029 2043 5880 cardiff@nlpplanning.com nlpplanning.com

More information

Charging for Pre-Application Advice. Guidance Note London Borough of Newham. March 2015

Charging for Pre-Application Advice. Guidance Note London Borough of Newham. March 2015 Charging for Pre-Application Advice Guidance Note London Borough of Newham March 2015 This guidance note provides information regarding the Council s preapplication advice service and the relevant charges.

More information

Glossop Design & Place Making Strategy

Glossop Design & Place Making Strategy Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance

More information

Welcome. Grainger plc. Assael Architecture. Hortensia Road, SW10

Welcome. Grainger plc. Assael Architecture. Hortensia Road, SW10 Welcome 01 Welcome to the public exhibition on Grainger s proposals to redevelop the land on the corner of and the King s Road into high quality new homes. This exhibition presents our emerging proposals

More information

74 Rivington Street. Planning Statement JULY 2013 DP9. 100 Pall Mall. London SW1Y 5NQ. Tel: 020 7004 1700. Fax: 020 7004 1790

74 Rivington Street. Planning Statement JULY 2013 DP9. 100 Pall Mall. London SW1Y 5NQ. Tel: 020 7004 1700. Fax: 020 7004 1790 74 Rivington Street Planning Statement JULY 2013 DP9 100 Pall Mall London SW1Y 5NQ Tel: 020 7004 1700 Fax: 020 7004 1790 CONTENTS Page 1.0 Introduction 1 2.0 Site Description 2 3.0 The Proposed Development

More information

Manchester City Council Planning and Highways Committee 2 June 2011

Manchester City Council Planning and Highways Committee 2 June 2011 Application Number 095804/FO/2011/N1 Date of Appln 21st Mar 2011 Committee Date 2nd Jun 2011 Ward Cheetham Ward Proposal Location Applicant Agent Installation of 929 square metre mezzanine floor area to

More information

DRAYCOT ROAD RED LION ROAD MAYROYD AVENUE KINGSMEAD AVENUE HAMILTON AVENUE. SIte Aerial view courtesy of Bing Maps

DRAYCOT ROAD RED LION ROAD MAYROYD AVENUE KINGSMEAD AVENUE HAMILTON AVENUE. SIte Aerial view courtesy of Bing Maps DRAYCOT ROAD RED LION ROAD MAYROYD AVENUE KINGSMEAD AVENUE HAMILTON AVENUE SIte Aerial view courtesy of Bing Maps South West London and St. George s Mental Health NHS Trust Tolworth Hospital - Landscape

More information

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable

More information

s p planning Date: 26 April 2012 10 CHRISTCHURCH STREET, LONDON SW3 4AR (LPA APP REF: PP/12/00249/Q21) GROUNDS OF APPEAL

s p planning Date: 26 April 2012 10 CHRISTCHURCH STREET, LONDON SW3 4AR (LPA APP REF: PP/12/00249/Q21) GROUNDS OF APPEAL Date: 26 April 2012 Ref: R12229 10 CHRISTCHURCH STREET, LONDON SW3 4AR (LPA APP REF: PP/12/00249/Q21) GROUNDS OF APPEAL 1.1 Based on the Council's reason for refusal we believe the main issue in this case

More information

Former Gala Bingo Kingston TOWNSCAPE STUDY AND SUPPORTING DESIGN + ACCESS STATEMENT January 2014

Former Gala Bingo Kingston TOWNSCAPE STUDY AND SUPPORTING DESIGN + ACCESS STATEMENT January 2014 Former Gala Bingo Kingston TOWNSCAPE STUDY AND SUPPORTING DESIGN + ACCESS STATEMENT January 2014 November 2013 Conran & Partners 22 Shad Thames London SE1 2YU 1st Floor Hanover House 118 Queens Road Brighton

More information

Twickenham AAP Opportunity sites December 2011. Twickenham Area Action Plan. Opportunity Sites

Twickenham AAP Opportunity sites December 2011. Twickenham Area Action Plan. Opportunity Sites Twickenham AAP Opportunity sites December 2011 Twickenham Area Action Plan Opportunity Sites December 2011 1 Twickenham AAP Opportunity sites December 2011 List of opportunity sites for possible improvement,

More information

DEVELOPMENT MANAGEMENT

DEVELOPMENT MANAGEMENT DEVELOPMENT MANAGEMENT Sub Heading Sub Heading 2 march 2012 PRE APPLICATION ADVICE SERVICE FOR PLANNING APPLICATIONS Introduction CONTACT DETAILS Telephone 0191 433 3416 / 0191 433 3426 Fax 0191 477 8422

More information

Guildford Station Regeneration

Guildford Station Regeneration Welcome Thank you for taking the time to view our proposals for the redevelopment of Guildford station. We have now submitted a planning application and would like to hear what you think of our plans.

More information

building on success Trees and Basements Partial Review of the Core Strategy February 2014

building on success Trees and Basements Partial Review of the Core Strategy February 2014 building on success Trees and Basements Partial Review of the Core Strategy February 2014 Regulation 19, Town and Country Planning (Local Planning) (England) Regulations 2012. 2 Contents 1. Introduction...

More information

Neil Taylor Programme Manager Royal Borough of Kingston

Neil Taylor Programme Manager Royal Borough of Kingston Neil Taylor Programme Manager Royal Borough of Kingston James Berry MP for Kingston and Surbiton Greg Hughes Chair, kingstonfirst Opportunity Area Planning Framework Eric Owens Group Manager

More information

WELCOME. www.firstbase-haslemere.london

WELCOME. www.firstbase-haslemere.london Aerial view of the existing site Welcome to the second public exhibition on our ideas for the future of the Haslemere Industrial Estate. We held our first public exhibition in June where we set out our

More information

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve

More information

12 Examples 12.1 EXAMPLE SCHEMES. Lower George Street Twickenham Station Heath Road Kew Plaza Ham and Petersham River Teddington.

12 Examples 12.1 EXAMPLE SCHEMES. Lower George Street Twickenham Station Heath Road Kew Plaza Ham and Petersham River Teddington. 12.1 EXAMPLE SCHEMES Lower George Street Twickenham Station Heath Road Kew Plaza Ham and Petersham River Teddington. 12.2 SUMMARY OF ELEMENTS NOT TO BE USED Items to avoid in the streetscape Elements to

More information

2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan

2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan 2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan 1 OVERVIEW AND PURPOSE...2 1.1 Subject Matter of this Section...2 1.2 Resource Management Issue to be Addressed...2

More information

Sewer Flooding Alleviation in the Counters Creek Catchment

Sewer Flooding Alleviation in the Counters Creek Catchment Sewer Flooding Alleviation in the Counters Creek Catchment London Borough of Hammersmith and Fulham Monday, 14 November 2011 at 7.00pm The Small Hall, Hammersmith Town Hall, King Street, W6 9JU Agenda

More information

BELVEDERE EMPLOYMENT AREA LINK ROAD SCHEME, ERITH COMPULSORY PURCHASE ORDER

BELVEDERE EMPLOYMENT AREA LINK ROAD SCHEME, ERITH COMPULSORY PURCHASE ORDER PUBLIC CABINET 7 APRIL 2009 BELVEDERE EMPLOYMENT AREA LINK ROAD SCHEME, ERITH COMPULSORY PURCHASE ORDER ISSUES The Belvedere Employment Area Link Road Scheme will require land not owned by the Council.

More information

8 DELIVERING THE MOVEMENT FRAMEWORK

8 DELIVERING THE MOVEMENT FRAMEWORK 8 DELIVERING THE MOVEMENT FRAMEWORK Introduction 8.1 The purpose of this section of the design code is to orchestrate the delivery of essential road infrastructure highlighted in the masterplan and movement

More information

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North STAFF REPORT December 20, 2004 To: From: Subject: North District Community Council Director of Community Planning - North Preliminary Report Respecting Revised Application OPA & Rezoning Application 01

More information

APPENDIX B Consultation comments and Council response

APPENDIX B Consultation comments and Council response APPENDIX B Consultation comments and Council response # Stage / 1.1 Draft Transport for London A draft R123 is encouraged as early as possible and should reflect the Borough s transport needs TfL will

More information

Chapter Summary. 5 options were shortlisted; one for comprehensive refurbishment of the existing hospital and four new build variants

Chapter Summary. 5 options were shortlisted; one for comprehensive refurbishment of the existing hospital and four new build variants 5 Option Appraisal 5.1 Overview Chapter Summary A long list of 12 options was identified 5 options were shortlisted; one for comprehensive refurbishment of the existing hospital and four new build variants

More information

FULL APPLICATION FOR ERECTION OF GARAGE MAINTENANCE UNIT AND PORTABLE OFFICE CABIN

FULL APPLICATION FOR ERECTION OF GARAGE MAINTENANCE UNIT AND PORTABLE OFFICE CABIN 6 February 2015 Delivered by post and planning portal Planning and Building Control Nuneaton and Bedworth Borough Council Town Hall Coton Road Nuneaton Warwickshire CV11 5AA Dear Sirs, FULL APPLICATION

More information

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers FOR SALE On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers Land at Teville Gate, Teville Road, Worthing, West Sussex BN11 1AZ ibrochure - www.cbre-ibrochure.co.uk/worthing ENTER

More information

Heritage Statement 22 Royal Crescent London W11 4SL

Heritage Statement 22 Royal Crescent London W11 4SL 15 th June 2015 Tel: 020 8905 7505 Fax: 020 8205 5374 Symal House, 423 Edgware Road, London, NW9 0HU Heritage Statement London W11 4SL 1.0 INTRODUCTION 2.0 STATUTORY PROTECTION 3.0 BUILDING DESCRIPTION

More information

Thames Water is pleased to comment on the proposed changes to the London Plan 2014.

Thames Water is pleased to comment on the proposed changes to the London Plan 2014. Boris Johnson Mayor of London (London Plan) Greater London Authority City Hall More London The Queen s Walk London SE1 2AA Thames Water Property Services Your ref Our ref Name Phone Email London Plan Review

More information

ACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE

ACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE ACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE 1.1 The National Planning Policy Framework sets out what good design should aim to achieve, in a set of six statements that are complementary to policies contained

More information

Long Ditton Ward: Alex King Expiry Date: 24/03/2010 Location:

Long Ditton Ward: Alex King Expiry Date: 24/03/2010 Location: Application No: 2009/2315 Application Type: FULL Case Officer: Long Ditton Ward: Alex King Expiry Date: 24/03/2010 Location: Kingston House Portsmouth Road Thames Ditton Surrey Proposal: Variation of Condition

More information

Planning Officers Society

Planning Officers Society Planning Officers Society Spring Conference: Working in Partnership 15 May 2014 Stewart Murray Assistant Director Planning Email: stewart.murray@london.gov.uk; Mayor s 2020 Vision Global Leading City Double

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS s A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS SURREY COUNTY COUNCIL S LOCAL COMMITTEE FOR REIGATE AND BANSTEAD 12 JANUARY 2004 KEY ISSUE To consider the conclusions of

More information

Tall Buildings in the City of London

Tall Buildings in the City of London Tall Buildings in the City of London Published by the City of London Corporation, Department of the Built Environment, February 2015 Part 2 of 3: Sections 3 & 4 The report is divided into 3 parts, all

More information

Welcome and Introduction

Welcome and Introduction Welcome and Introduction Aerial view of the site Thank you for taking the time to attend our public exhibition. On this and the following boards we will show you the site location, introduce the key members

More information

Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager 4(9) 09/161 Alteration and Extension to Existing Public House to Provide a New Bookmakers

More information

Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council

Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council APPENDIX 1 Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council Introduction: The purpose of this guide is to set out some parameters for assessing planning applications

More information

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

Site No 17 Former Weston Vinyls Site, Frome Location

Site No 17 Former Weston Vinyls Site, Frome Location Location Former Weston Vinyls site is situated on the A362 Vallis Road in the Western Part of Frome. The surrounding uses are primarily residential with residential to the North East and West. The Vallis

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West

More information

PLANNING COMMUNICATIONS GROUP STRATEGIC COMMUNICATIONS

PLANNING COMMUNICATIONS GROUP STRATEGIC COMMUNICATIONS PLANNING COMMUNICATIONS GROUP STRATEGIC COMMUNICATIONS About FTI Consulting FTI Consulting is a global business advisory firm. We are dedicated to helping organisations protect and enhance enterprise value

More information

The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340.

The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340. SITE DESCRIPTION The site is occupied by a large single dwelling house which was built in 2007. The building is surrounded by large trees and has a substantial rear garden. The land is allocated within

More information

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve

More information

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace. APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

RICHARD REID & ASSOCIATES LTD CITYMAKERS

RICHARD REID & ASSOCIATES LTD CITYMAKERS RICHARD REID & ASSOCIATES LTD CITYMAKERS 3/9 Tudor Street Devonport Auckland 0624 NEW ZEALAND T: (09) 445 3289 M: (027) 640 8367 F: (09) 445 4307 richard@richardreid.co.nz www.richardreid.co.nz 2 December

More information

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 APPENDIX C KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005 YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 REPORT BY HEAD OF PLANNING AND DEVELOPMENT SUMMARY