THE CHIEF MECHANICAL ENGINEER 7 TH Floor, Centenary Building Rajaji Salai, Chennai

Similar documents
ITEM DESCRIPTION SPECIFICATION TENDER OFFER

BIHAR SCHOOL EXAMINATION BOARD (SS), PATNA TENDER DOCUMENT

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

LIFT CONTROL SYSTEMS CATALOGUE 2007

LIFT CONTROL SYSTEMS CATALOGUE 2007

S WORK CATALOGUE FAA29100H_BWC

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT SUBMITTAL OF CONVEYANCE INSTALLATION/ALTERATION PLANS

V1504 Vertical Platform Lift OWNER S MANUAL

Schindler 3300 AP A remarkable style that suits the building. The machine room-less passenger elevator that unifies form and function.

V1504 Vertical Platform Lift OWNER S MANUAL

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

INTER PLANT STANDARD STEEL INDUSTRY

FOR SALE: RECYCLING PLANT FOR. - Aluminum scrap - Light metals - WEEE - Mixed industrial waste BANO PREMAC HYDRO. Single shaft shredder

DTW Works Master Specification Version 2006

QUOTATION FOR UPGRADING OF LIFT AT BINJA SAN DAVID, TRIQ SAN DAVID, MTARFA

ELECTRICIAN TRADE REGULATION

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)

Exhibit C Design Review Guidelines

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

P.A.L. S SPECIFICATIONS

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

WE-350 Series ¼ Turn Electric Actuator

Planning Information. Passenger and Freight Elevators.

EXHIBIT A SCOPE OF WORK

sip Sanyo Modbus Guide Technical Specification Pinouts, Cable Connections & Wiring Issue 2: February 2009 Synapsys Solutions Ltd, all rights reserved

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

NELSON VOLTAGE MONITOR INSTALLATION & PROGRAMMING MANUAL

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

SECTION FIRE ALARM AND DETECTION SYSTEMS

SPECIFICATIONS FOR TENDER NO: PSNR/SCP/VKS/E 1635 ANNEXURE I TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST

DELHI METRO RAIL CORPORATION LIMITED. (A Joint Venture of Govt. of India & GNCTD) MASS RAPID TRANSPORT SYSTEM PHASE III. Contract: - CE -16 VOLUME-6

Wireless Home Security Alarm System AM 500

BERMAD Fire Protection

Turnkey Projects, Conversions, Restorations & Property Management. Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE

Oil and Coolant Circulating Heating System. Model - OCSM

Fire Alarm System Plans Review Checklist Property location Date of Review

Magnetic Deburring & Polishing Machine

SECURIT DEPARTMENT CIRCLE OFFICE 802,CHOPASNI ROAD JODHPUR (BY REGD POST) COJ/SEC/ BAC 19/05/

Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

IH E Sigma Island 90

B. Related Sections: 1. Section Raceway and Boxes for Electrical Systems.

SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor

Roped Hydraulic Residential Elevator Specifications

REB 1 REB 3 REB 5 REB 6 REB 8 REB 10 REB 12 REB 16

Service manual. Website: CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL.

Convection Ovens. BX Classic. Models BX4 / FG 189C, BX / FG 158C, BX10 / FG 180C. Operator's Manual

C. Conform to requirements of Americans with Disabilities Act (ADA).

INSTALLATION INSTRUCTIONS: Viewline 85 mm

USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR

DORMA MODEL PS-406BB POWER SUPPLY INSTALLATION INSTRUCTIONS

ELECTRICAL SAFETY Information Bulletin

Model: LCDM LCD Rear Vision Mirror Monitor Installation Manual Features

Power Generation. Power Control PCL System Generator Set Control

Drayton Digistat +2RF/+3RF

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

The KONE Motala 2000 platform lift suits the architecture of any building, thanks to the wide range of car and shaft design options.

Detector transparent with Color Inserts. FAA 500 TR P Trim Ring transparent with Color Inserts. FCA 500 / FCA 500 E Detector Bases

UGVCL/SP/591/11KV HT AB CABLE

helosauna.com STEAM BATH PRODUCTS

USER S MANUAL HSC-24A

RS Security Co., Ltd. RS Security Co., Ltd is specialized in physical access control turnstiles;

SECTION PLANT INTERCOMMUNICATION SYSTEM. City of San Diego, CWP Guidelines

Solar Panel Installations

SECTION ZONED (DC LOOP) FIREALARM SYSTEM

Crawford Inspection Services C.C.B. #

BODY ELECTRICAL TOYOTA ELECTRICAL WIRING DIAGRAM WORKBOOK. ASSIGNMENT Version 1.8 WORKSHEETS.

Panel Mounted Air Conditioners by Dantherm, Inc.

वषय/Sub :- Comprehensive Annual Maintenance Contract (CAMC) for Split & Window AC units of Doordarshan Kendra, Hyderabad for the year

tidesmarine Smart Seal Temperature Alarm System Generation II Installation Instructions Starboard side cable

Local supplier shall be ISO 9001 & OHSAS Certified Company.

Max primary circuit temperature 90ºC Max primary circuit temp. 90ºC Max secondary circuit temperature 45ºC Max secondary circuit temp.

LK Electric Boiler - 4,5

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION SECURITY SYSTEMS

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

IMPORTANT SAFETY RULES TO FOLLOW

TIG INVERTER INSTRUCTION MANUAL

Heat Surge Model X5C Fire Place Insert Service Manual Applies to all units w/ circuit board

INSTALLATION GUIDE. Card Reader & Controller with KIM Swipe Reader for Solitaire 850 / 950 / 850L Learnlok PK2930

Cheshunt Fabrications Ltd

Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering

SECTION 807 PUMP STATION REHABILITATION

AIR CONDITIONING SYSTEM 1. FFH SPECIFICATION AIR CONDITIONING SYSTEM RODIUS

University of North Carolina at Charlotte Design and Construction Manual Section 3, Annex K, 49er Card Systems ANNEX K 49ER CARD SYSTEMS

Summary of Preliminary Assessment on Structural, Fire and Electrical Safety

INSTRUCTION MANUAL (WINDOW WIPER)

NATIONAL INSTITUTE OF BIOLOGICALS

ELECTRONIC THERMOSTAT AND THERMOMETER With SPEED CONTROL

Conventional Fire Detection and Extinguishant Control System Specification

DIVISION 27 COMMUNICATIONS. A. System design shall be completed by a Registered Communications Distribution Designer (RCDD).

SP1790JK 900MHz Wireless Indoor/Outdoor Speakers. User Manual INTRODUCTION FEATURES IMPORTANT SAFETY INFORMATION

1R / 4-BUTTON SERIES

Transcription:

MEE/ GC 5 / 416 / 2015 / Dy.CME(ES&CH) BUDGETARY OFFER FOR REPLACEMENT OF EXISTING 4NOS. PASSENGER LIFTS WITH VARIOUS CAPACITIES AT OLD ADMINISTRATIVE OFFICE BUILDING (VIP LIFT), DIABETIC SPECIALITY CENTRE (B LIFT), USER COMPLEX BUILDING (B LIFT) AND ANCHOR GATE BUILDING LIFT WITH THREE YEARS COMPREHENSIVE ANNUAL MAINTENANCE AND SERVICING CONTRACT IN CHENNAI PORT TRUST SUBMISSION ON OR BEFORE 04.12.2015 THE CHIEF MECHANICAL ENGINEER 7 TH Floor, Centenary Building Rajaji Salai, Chennai 600 001. 1

TECHNICAL SPECIFICATION SCHEDULE A 1.0 GENERAL Chennai Port Trust Proposes To Replace Existing 4 Nos. Passenger Lifts With Various Capacities located at Old Administrative Office building (VIP Lift), Diabetic Specialty Centre (B Lift) User Complex Building (B Lift) and Anchor Gate building Lift including 3 years Comprehensive Annual Maintenance And Servicing Contract in Chennai Port Trust. 2.0 SCOPE OF WORK The Scope of work includes: a. Dismantling of 4 Nos. existing lifts sequentially and the same have to be transported to the Stores Department in scrapped condition at RSA yard in 10th gate. b. Design, Manufacture, Supply, Erection, Installation, Testing, Commissioning and Handing Over of the 4 Nos. Passenger Lifts i) 10 person capacity Lift at Old Administrative Office building (VIP Lift), ii) 10 persons capacity Lift at Diabetic Specialty Centre (B Lift) iii) 13 persons capacity Lift at User Complex Building (B Lift) and iv) Option I : 26 persons capacity Lift at Anchor Gate Building (existing 26 persons bed cum passenger. (OR) Option II: 13 persons capacity Lift at Anchor Gate Building in the existing hoist way of 26 persons bed cum passenger. c. The Firm should carry out necessary civil works & white washing of hoist way. d. The firm shall obtain Lift Inspector certificate with insurance for one year after completion of the work. e. The firm should take Comprehensive Annual Maintenance and Servicing Contract for three years. f. Free monthly periodical service have to be carried out and if any break down occurs, have to be attended immediately during the guarantee period. g. All the lifts shall be installed as per Tamil Nadu Govt. Lift Act 1997 IE Act and IE rules and as per latest ISI Standards. h. Supply and installation of 4 Nos. 2 Ton 3 Star rated Split AC for each machine room. 2

Approved makes: LIFTS OTIS/ JOHNSON / THYSSENKRUPP/ MITSUBISHI / HYUNDAI Split AC VOLTAS/ O GENERAL / CARRIER / DAIKIN / BLUE STAR/ HITACHI Note: 1) The Specifications are indented to give Tenderer the functions, Charactertics which the lift must fulfill. Alternatives and Features other than indicated may be accepted subject to the approval of the Chief Mechanical Engineer. 2) The Firm shall Co-ordinate his work with the work of the civil department, if any. 3.0 DETAILED TECHNICAL SPECIFICATION OF THE EXISTING LIFTS: LOCATION CAPACITY IN PERSON NO. OF FLOOR HOIST WAY SHAFT SIZE W X D PIT DEPTH EXISTING CAR SIZE APPROX W X D SPEED OF THE LIFT IN MTRS MODEL Old.Admn. Office Building (OTIS VIP) 10 G+4 1950MM X 1660MM. 1090 MM 1190MM X 1190MM. Ht.2150 MM 1.5 Mtrs/ sec Centre opening Car - wooden interior Diabetic Specialty Centre (KONE) 10 G+4 2200MM X 1860MM 1500 MM 1600MM X 1300MM. Ht.2000 MM 1.5 Mtrs/ sec Anti-scartch effect Stainles Steel Car Body & Stainless Car Door, landing door. User Complex Building B Lift 1 (ECE) Anchor Gate building (OTIS) 13 26 persons bed cum passenger Lift B+G+5 G+3 2520MM X 1770MM 2850MM X 3200MM 1700 MM 1590 MM 1960MM X 1600MM. Ht.2000 MM 1590MM X 2400MM. Ht.2290 MM 1.5 Mtrs/ sec 1.5 Mtrs/ sec Anti-scartch Stainless Steel Car Body, Toughened Glass Car door & Landing Door Side opening Car - wooden interior. 4.0.TECHNICAL SPECIFICATION FOR PROPOSED LIFTS: 4.1. CONTROL PANEL: Type of Elevator : Passenger Lift Power supply : 3 Ph, 415 V AC, 50 Hz. Type of drive reqd : VVVF Drive for Hoist & Door motor. Yashawa/Hitachi/Fuji makes 3

Controller : Microprocessor based simplex selective and collective controller (with / without attendant) along with Air Circulator have to be provided. Control Switch : Provide a Main control switch to ON/OFF the lift at Ground Floor Landing Side 4.2. LIFT CAR :- Cabin Enclosure : Car door opening Non-Magnetic & Non-Corroded Stainless Steel with hairline finish of 1.5mm thick with anti-scratch effect. Centre opening Flooring : SS /Aluminum Chequered plate have to be provided Ceiling : False ceiling with LED lamps along with light switch, Air Circulator along with Fan switch have to be provided Cabin : a. Non Magnetic & Non-Corroded Slim Stainless Steel hand rail in the back wall of the car cabin have to be provided. b. Annunciation with Music have to be provided for floor identification and also with the reprogramming facility. Car Operating Panel Overload warning device with Display Board have to be provided in a visible manner. Lift should not move further with Lift overload annunciations [Door have to be in open condition in that floor itself during over load) a. Buttons for floor car call registration. b. Emergency alarm & light along with maintenance free battery have to be provided c. Non-stop Button have to be provided to by-pass landing calls in the Attendant mode condition. d. Door open and Door close button shall be provided. e. Display Board should display the direction & floor numbers in the car in a visible manner f. Auto/Attendant key have to be provided for the operator s use. g. Up/Down Arrow switch have to be provided (in the Attendant mode) to change the direction. h. Two way intercom have to be provided to communicate between car and the machine room incase of any emergency. Auto circuit for Fan & Light. 4

Landing Call Operations Floor Position : Safety Aspects : Motor & Door Motor: Control Panel : Hoist Way Shaft Bracket & Assembly : Counter weight : Fire-Man Switch : Display Board have to be provided at all floors and it should display the car direction, Floor numbers along with Buttons for registering hall calls in the Flush type/ surface type fish plate along with audio visual indicators have to be provided at all floors a. Electrical & Mechanical safety have to be provided b. Emergency key opening at all Landing doors. c. Terminal Limits have to be provided d. Over speed governor with barricade have to be provided e. Auto Rescue Device have to be provided with announciator f. Buffers have to be provided g. Releveling mode have to be provided h. Flush type/ surface type buttons in the fish plate have to be provided at all floors. i. Door sensors (Button) /Infra Red Sensor/ Full Screen Sensor/prevailing Sensor to instantly stop and closing of car and landing door on sensing on obstruction and to retract. j. Digital Display Board should display UNDER MAINTENANCE in the landing Operating Plate (Fish Plate) at every floor whenever required during maintenance period. k. Parking key switch to be provided at Ground / Basement floor. Gearless Motor & Door Motor have to be provided. Electronic Motor protection Relay have to be provided. It includes overload, short circuit, Phase reversal, Phase unbalance, Rotor stalling, Leakage current, low voltage,over voltage. Frequency mismatch, Over heat to protect the motor and fault code should display in the display board separately. New rails for car & counterweight M.S. Bracket have to be grouted or welded Counterweight with barricade have to be provided. Fire-Man switch and fire alarm have to be provided at ground floor. NOTE: (1) The firm should inspect the site to acquaint themselves for the systems to be designed and should quote their offer along with the acceptance letter. 5

4.0 Electrical wiring (2)The firm should mention the locations of the building where Maintenance of the Lifts being carried out by the firm for which documentary proof and locations of the fully functioning Service Centre in Chennai. (3) Necessary Barricade (Safety Guard) have to be provided, wherever required. (4) In Generator Supply, resetting mode at nearest floor itself (with resetting programming facility) have to be provided. i. Necessary power and control wiring have to be done as per latest IE Rules and relevant Indian standards. Proof have to be produced. ii. Double copper earthlings have to be carried out as per requirements of latest Indian Electricity Rules and as per latest IS standards for the incoming panel, controller drive motor, ARD panel, all landing door & car door contact lock assembly, car, car top junction box, door motor assembly. iii. iv. The trailing cable shall contain ten spare cores apart from that required for actual operation in addition to two pairs of screened cores for telephone communication. Flat cables have to be insulated conductor, conduits, tubing as well as fittings including metal troughs and ducts shall comply with the requirements of latest IS standards. 5.0. Erection 6.0. Tests The firm shall start the erection work immediately, after supply of all materials and complete the work to the satisfaction of the Chief Mechanical Engineer or his representative from the date of handing over of the site. The firm shall take insurance for men and materials with all safeties. NOTE: NECESSARY TEMPORARY SAFETY MEASURES HAVE TO BE PROVIDED BY THE FIRM FOR THE MEN AND MATERIALS WHILE SCAFFOLDING, CIVIL WORKS AND ALSO DURING ENTIRE ERECTION WORKS. Tests have to be carried out as per latest IS standards to the satisfaction of the Chief Mechanical Engineer or his representative. For the lift installation before handing over, Test certificate for the other equipments have to be submitted. 7.0. Manuals and Drawings The lift contractor shall supply 3 sets of detailed mechanical and electrical drawings with operation and maintenance manuals along with the equipments before acceptance. Troubleshooting manual and circuit diagrams have to be submitted. 6

8.0. Third party Inspection: The Trust will engage a Thirty Party Agency at its own expense to carry out approval of drawings, inspection at manufacture s site, Goods and Related Services and erection.. 9.0 Training The contractor shall arrange training for 3 to 4 Trust s personnel to enable them to secure normal maintenance / trouble shooting at the time of erection and commissioning of the elevator. 10.0. Approval Of Installation And Completion Certificate with Lift Insurance Approval / completion certificate from the electrical inspectorate of Local / State Government for installation and commissioning of lift have to be obtained along with Insurance and made available to the Employer before handing over the lifts at no extra cost. 11.0 Comprehensive Annual Maintenance and Servicing Contract: a) After successful completion of guarantee period, the firm have to take Comprehensive Annual Maintenance and Servicing Contract for the above lifts for 3 years. b) The contractor shall be responsible to keep all the Lifts in perfect working condition, on any day during the tenure of the contract (excepting the period of programmed shut down). In case, any Lifts are out of order/ breakdown shall be attended within a period of 24 hours of being informed. c) The tenderer shall carryout the regular maintenance work for the Lift in every month during the AMC period. d) The tenderer shall inform the Trust at least 24 hours in advance before undertaking maintenance and periodical service in every month. e) The tenderer shall carry out the monthly maintenance service on every 2 nd and 4 th Saturdays of the month. 12.0 General Terms & Condition (i) The firm shall quote the rates only in the Trust format as in Schedule A-1 in duplicate. (ii) The firm shall engage all the men/materials/tools/plants required for the work at the site till the completion of the work. The Trust will not supply any of the same. (iii) The Trust will not be responsible for any loss or damage of the men/materials /tools/ plants engaged by the firm during the work at site or transportation. 7

(iv) The firm will be responsible for any loss/damage to the Trust s property during the work at site. (v) Any alteration / modification suggested and materials / works detailed for rectification of defects pointed later after inspection by the Lift Inspector have to be carried out at the Tenderer s cost. (vi) The tenderer shall arrange for safe storage of all materials, tools and equipments supplied and delivered at site from time to time, till the final handing over of the installation to the Trust. vii) The firm shall take the power supply from the nearest power source of port on payment basis as per actual unit consumed at a rate of Rs.12.00 per unit. viii) The Tenderer shall include regular examinations of the installations during regular working hours by trained employees and shall include all the necessary adjustments, greasing, oiling, cleaning, supplies of genuine standard parts to keep the equipments in proper operation. CHIEF MECHANICAL ENGINEER CHENNAI PORT TRUST 8

SCHEDULE OF QUANTITIES & PRICES SCHEDULE A1 ITEM I OLD ADMINISTRATIVE OFFICE BUILDING (VIP LIFT) Description Unit Qty. Rate/Unit 1 Dismantling of existing 1 L.S. L.S. 10 Persons Capacity Lift at Old Administrative Office building and have to be RSO ed in scrapped condition to RSO yard. 2. Supply,Installation,Testing, Commissioning and Handing Over of new 1 10 Persons Capacity Lift with VVVF drive along with gearless motor including control panel and accessories as detailed in Schedule-A. for Old Administrative Office building. 1 1 3. Provision of Automatic Rescue Device. 4. All Civil Works, if any required LS 1 1 5. Charges for Getting approval from the Lift Inspector, govt. of Tamil Nadu with Lift Insurance Service tax % SUB TOTAL I (Gross ) 9

ITEM II DIABETIC SPECIALITY CENTRE (B LIFT) Description Unit Qty. Rate/Unit 1 Dismantling of existing 1 10 L.S. L.S. Persons Capacity B Lift at Diabetic Specialty Centre and have to be RSO ed in scrapped condition. 2. Supply, Installation, Testing, Commissioning and Handing Over of new 1 10 Persons Capacity Passenger B Lift with VVVF drive along gearless motor including control panel and accessories as detailed in Schedule-A. for Diabetic specialty centre as detailed in Schedule-A. 3. Provision of Automatic Rescue Device. 1 1 4. All Civil Works, if any required L.S. L.S. 1 1 5. Charges for Getting approval from the Lift Inspector, govt. of Tamil Nadu with Lift Insurance. Service Tax % SUB-TOTAL II (Gross ) 10

ITEM - III USER COMPLEX BUILDING (B LIFT) No Description Unit Qty. Rate/Unit 1 Dismantling of existing 1 L.S. L.S. 13 Persons Capacity B Lift at user complex Building and have to be RSO ed in scrapped condition. 2. Supply, Installation, Testing, Commissioning and Handing Over of new 1 13 Passenger B Lift with VVVF drive along gearless motor including control panel and accessories as detailed in Schedule-A for User Complex building. 1 1 3. Provision of Automatic Rescue Device. 1 1 4. All Civil Works, if any required LS LS 5. Charges for Getting approval from the Lift Inspector, govt. of Tamil Nadu with Lift Insurance. 1 Service Tax % SUB-TOTAL III (Gross ) 11

ITEM IV OPTION - I ANCHOR GATE BUILDING Description Unit Qty. Rate/Unit 1 Dismantling of existing 1 L.S. L.S. 1 26 Persons Capacity Lift at Anchor Gate building and have to be RSO ed in scrapped condition to RSO yard. 2. Supply,Installation,Testing, Commissioning and Handing Over of new 1 26 Persons Capacity Passenger Lift with VVVF drive along with gearless motor including control panel and accessories as detailed in Schedule-A. for Anchor Gate building. 1 1 3. Provision of Automatic Rescue Device. 1 1 4. All Civil Works, if any required. 5. Charges for Getting approval from the Lift Inspector, govt. of Tamil Nadu with Lift Insurance LS Service tax % SUB TOTAL IV (Gross ) 12

ITEM V OPTION - II ANCHOR GATE BUILDING Description Unit Qty. Rate/Unit 1 Dismantling of existing 1 L.S. L.S. 1 26 Persons Capacity Lift at Anchor Gate building and have to be RSO ed in scrapped condition to RSO yard. 2. Supply,Installation,Testing, Commissioning and Handing Over of new 1 13 Persons Capacity Passenger Lift with VVVF drive along with gearless motor including control panel and accessories as detailed in Schedule-A. for Anchor Gate building. 1 1 3. Provision of Automatic Rescue Device. 4. All Civil Works, if any required 5. Charges for Getting approval from the Lift Inspector, govt. of Tamil Nadu with Lift Insurance LS 1 1 Service tax % SUB TOTAL V (Gross ) TOTAL AMOUNT I = (SUB TOTAL I) + (SUB TOTAL II) + (SUB TOTAL III) + (SUB TOTAL- IV + SUB TOTAL V) Note: All prices shall be firm inclusive of taxes and duties. Tenderer s Sign & Seal 13

ITEM VI CAMC FOR OLD ADMINISTRATIVE OFFICE BUILDING(VIP LIFT) Description Unit Qty. Rate/Unit/ Month 1. Comprehensive Annual Maintenance And Servicing Contract for new 1 10 Persons Capacity Lift at Old Administrative Office building after the guarantee period. (a) I Year (Guarantee Period) 1 2. (b) II Year (Guarantee Period) 1 3. (c) III Year 1 4. (d) IV Year 1 5. (e) V Year 1 Service Tax % SUB-TOTAL VI (Gross ) Per Year 14

ITEM VII CAMC FOR DIABETIC SPECIALTY CENTER (B LIFT) Description Unit Qty. Rate/Unit/ Month 1. Comprehensive Annual Maintenance And Servicing Contract for 1 10 Persons Capacity B Lift at Diabetic Specialty Centre after the guarantee period. (a) I Year (Guarantee Period) 1 2. (b) II Year (Guarantee Period) 1 3. (c) III Year 1 4. (d) IV Year 1 5. (e) V Year 1 Service Tax % SUB-TOTAL VII (Gross ) Per Year 15

ITEM - VIII CAMC FOR USER COMPLEX BUILDING (B LIFT) No Description Unit Qty. Rate/Unit/ Month 1. Comprehensive Annual Maintenance And Servicing Contract for 1 13 Persons Capacity B Lift at User complex building after the guarantee period. (a) I Year 1 2. (b) II Year 1 3. (c) III Year 1 4. (d) IV Year 1 5. (e) V Year 1 Service Tax % SUB-TOTAL VIII (Gross ) Per Year 16

ITEM IX OPTION - I CAMC FOR ANCHOR GATE BUILDING LIFT Description Unit Qty. Rate/Unit/ Month 1. Comprehensive Annual Maintenance And Servicing Contract for new 1 26 Persons Capacity at Anchor gate building after the guarantee period. (a) I Year (Guarantee Period) 1 2. (b) II Year (Guarantee Period) 1 3. (c) III Year 1 4. (d) IV Year 1 5. (e) V Year 1 Service Tax % SUB-TOTAL IX (Gross ) Per Year 17

ITEM X OPTION - II CAMC FOR ANCHOR GATE BUILDING LIFT Description Unit Qty. Rate/Unit/ Month 1. Comprehensive Annual Maintenance And Servicing Contract for new 1 13 Persons Capacity at Anchor gate building after the guarantee period. (a) I Year (Guarantee Period) 1 2. (b) II Year (Guarantee Period) 1 3. (c) III Year 1 4. (d) IV Year 1 5. (e) V Year 1 Service Tax % SUB-TOTAL X (Gross ) TOTAL AMOUNT II = (SUB TOTAL VI) + (SUB TOTAL VII) + (SUB TOTAL VIII) + (SUB TOTAL IX) + (SUB TOTAL X)) Per Year Note: cost under Item I, II, III,IV & V and Net present value (NPV) of Item VI, VII, VIII, IX & X will be taken for the evaluation of financial merit. Tenderer s seal & sign 18