QUOTATION FOR UPGRADING OF LIFT AT BINJA SAN DAVID, TRIQ SAN DAVID, MTARFA
|
|
|
- Nathan Gibson
- 9 years ago
- Views:
Transcription
1 Housing Authority AWTORITÀ TAD-DJAR HOUSING AUTHORITY 22, Pietro Floriani Street, Floriana Telephone: (356) Fax: (356) Website: ADVERT NUMBER: 145/2015 DEPT. REF: QWO 15/2015 QUOTATION FOR UPGRADING OF LIFT AT BINJA SAN DAVID, TRIQ SAN DAVID, MTARFA Date Published: 31 st July 2015 Closing Date: 14 th August 2015 at 10:00am CET IMPORTANT: A clarification meeting and a site visit will be held by the Housing Authority on the 4 th August 2015 at 9:00 AM Clarifications shall be uploaded and will be available to view/download from 1
2 SPECIFICATIONS PART A - GENERAL 1. Scope of Work These specifications detail the requirements for the repair, refurbishment, and upgrading of a passenger lift installed at Binja San David, Triq San David, Mtarfa. The works involved include the following: i. Repairs works to existing lift; ii. Refurbishment and upgrading works as per T.E. Report (attached); iii. Testing and commissioning and placing the lift into operation. iv. Maintenance of the lift installation for two years. 2. Submittals The Tenderer shall be required to produce at tendering stage: i. Certificates of conformity for any safety components to be installed; ii. Method of placing the lift into service. 3. Quality Assurance Service Provider Qualifications: The Contractor shall have not less than five (5) years of satisfactory experience in the upgrading, refurbishment, repair and maintenance of lifts equal in character and performance to this project. In addition the Contractor must be competent to carry out the works as listed in the Bill of Quantities and as defined under the L.N. 231 of 2007 (Inspection of Lift Regulations). 4. Applicable Legislation & Standards The provision of the services shall comply with the latest versions of: L.N f Inspection of Lift Regulations; MSA EN81-1:1998 Electric Lifts; MSA EN13015 Maintenance of Lifts; I.E.E. Wiring Regulations; Electricity Supply Regulations as issued by the Enemalta Corporation; Design Guidelines Access for All; 89/336 EC Regulation (EMC) & 77/23 EC Regulation (Low Tension). Any deviations from the above standards must be clearly indicated by the Contractor at tendering stage. 2
3 5. Contractor s Responsibility The Contractor shall provide all the required material, tools, instruments and equipment as well as provide transport for his employees to and from the site of work. The Contractor shall be fully responsible for his employees and his equipment. He will also be held responsible for any damage, structural or otherwise, caused as a consequence of the works in progress to Government and/or third party property. This includes protection of all existing finishes while carrying out works. Any damage caused shall be made good by the Contractor at his own expense. The Contractor shall properly dispose of any debris and surplus material at the end of each working day. 6. Occupational Health & Safety The Contractor shall assume full responsibility and accountability regarding the health and safety of his/her employees and/or sub-contractors including any third parties involved in the execution of this contract. He shall also provide onsite all safety measures to ensure safety of third parties at all times during the works and until the installation has been fully completed. The Contractor shall be bound to conform to the Occupational Health & Safety Act as well as any other national legislation, regulations, standards, and/or codes of practice in effect during the execution of the contract, regarding health and safety issues, as they apply for the Contractor's particular operating situation and nature of work activities. 7. Storage The Contractor will not be offered storage facilities for material and equipment during the period of works. 8. Project Conditions 8.1 When the offers are evaluated, it shall be assumed that the respective Tenderers are well aware of the site conditions and have assured themselves of the necessary works required, verified all critical dimensions and examined all other conditions under which the works are to be executed. 8.2 On tender submittal the Tenderer, unless notifying in writing any unsatisfactory site conditions to be corrected including builders work, is accepting the existing site conditions. 8.3 Any deviations from the specifications, as well as valid reasons, must be clearly indicated by the Contractor at tendering stage. 3
4 9. Warranty The successful Tenderer shall submit the manufacturer's standard written warranty agreeing to repair, restore or replace defects in components supplied and workmanship not due to ordinary wear and tear or improper use or care for 24 months from the date of handover. This warranty needs also to cover for an additional 24 months any parts or equipment replaced in the initial 24 months warranty. 10. Maintenance 10.1 Furnish maintenance and call back service for a period of 24 months from date of the initial effective handover and acceptance of works. Service shall consist of periodic examination of the equipment, adjustment, lubrication, cleaning and supply of parts to keep the lift in proper operation. i. Maintenance work, including emergency call back repair service, shall be performed by trained employees of the Contractor during regular working hours. This service shall not be subcontracted. This service shall not cover adjustments, repairs or replacement of parts due to negligence, misuse, abuse or accidents caused by persons other than the Contractor. The maintenance work including servicing work shall be logged in a maintenance book purposely kept. For this purpose, the Contractor shall submit a maintenance agreement to be signed by the parties concerned for the provision of such service Tenderers shall include in their annual lump sum price for: - Eight (8) periodic preventive maintenance visits; - Assisting ACAB where required; - Emergency and normal repair call out within office hours; Prices for emergency call outs after office hours shall be submitted at hourly rates. 11. Tendered Rates The tendered rates shall be inclusive of all work as specified as well as any other works which are of a contingent or indispensable nature for completing the work in its entirety and to the satisfaction of the Engineer in charge. The rates shall be inclusive of all materials necessary, profits, landing charges and levies on all imported goods, all hire of plant and machinery required as well as all transport of materials to the site of works, but exclusive of VAT. Tenderers quoting on a delivered to store/site basis are to submit prices/rates inclusive of Customs Import Duty, Levy and any other charges, as applicable, but exclusive of VAT. Moreover, the successful bidder shall be bound to conform in all respects with VAT legislation and regulations. 4
5 12. Completion Period Tenderers are to state the shortest possible period for the completion of the works. However, all works shall be carried out within a maximum period of 15 weeks from the date of order to start works. If the Tenderer fails to declare his completion period it shall be assumed that the period of completion stipulated above is accepted. The time period may be a determining factor in the award of the contract. 13. Penalty for Delay Failure to complete works within the stipulated period shall entail a penalty of 50 per day of delay inclusive of Sundays and public holidays. 14. Insurance Cover The successful Tenderer shall take up and maintain at his own expense a policy for All Risks Insurance covering the full value of the contract works until the full completion of the works. The policy should also cover third party liability for an amount of not less than 100,000 for any one accident. 15. Arbitration Clause Any dispute, controversy or claim arising out of or relating to this contract, or the breach, termination or invalidity thereof, shall be settled by arbitration in accordance with the rules of the Malta Arbitration Centre as at present in force. Any reference in the attached General Conditions to other arbitration procedures shall not apply. 16. Terms of Payment The terms of payment shall be as follows: 90% settled once the upgrading has been completed in its entirety; 10% settled after 1 year from completion of works. 17. Bad Workmanship The Engineer in charge shall, during the progress of the works, have power to order the removal within such reasonable time or times as may be specified in the order, of any materials which in his opinion are not in accordance with the specifications or his instructions, the substitution by proper materials and the removal and proper reexecution of any work executed with materials or workmanship not in accordance with drawings, specifications or instructions and the Contractor shall forthwith carry out such order at his own cost. In case of default on the part of the Contractor to carry out such order, the Engineer in charge shall have power to employ and pay other persons to carry out such work and all expenses consequent thereon or incidental thereto shall be borne by the 5
6 Contractor and shall be recoverable from him or may be deducted from any moneys due or that may become due to him. 18. Defects after completion The Contractor shall replace at his expense any work, which is proved to be defective even after completion. 6
7 PART B PRODUCTS 1. Product Technical Specifications The products to be supplied, installed and commissioned shall form part of the repair, refurbishment and upgrading works. The products shall conform to the regulations and standards listed in Part A, Para 4 - Applicable Legislation & Standards. The products must be compatible with the existing installation in order to ensure the safe and hassle-free operation of the referred lift and the placing into service of the lift as per Lifts Regulations The existing lift has the following characteristics: a. Lift Capacity: 630 kg / 8 persons b. Lift No.: c. Make: Sideron, Italy d. Year of Manufacture: 1992 e. Type: Traction Electric Any deviations from the specifications, as well as valid reasons, must be clearly indicated by the Contractor at tendering stage. 2. Schedule of Products (to be supplied and installed) The schedule of products which are to be supplied and installed is as follows which form part of the repairs and upgrading works: a. Double acting safety gear assembly with cut-out switch with compatible safety governor assembly (to include new tensioning pulley in pit with tensioning switch); b. Sheave guard and wire rope protection rods; c. Safety protection guards against falling objects inside the well from the machine room. d. Complete control panel with motor overload protection, communications unit, phase-reversal / phase failure protection, and run-time limiter; e. Control operating panel in cabin and landing call buttons; f. Car overload device with indication in COP; g. Communications system (autodialing device) including on top of cabin and pit as per MSA EN81-1 Para & ; h. Shaft lighting as per MSA EN81-1:1998 Electric Lifts; i. Reduction of distance between shaft front wall to sill. j. Safety balustrade on top of car roof; k. Replacement of batteries for alarm bell; l. Emergency light in cabin; m. Pit ladder as per mandatory requirements; n. Counterweight screen as per mandatory requirements; o. Electrical accessories including single phase protection, lockable main switch, etc.; 7
8 p. Emergency instruction sign inside machine room; q. Shaft lighting 2 way switches; r. Socket outlet and light switch in machine room; s. New landing door brackets for level 0; t. Split pins on motor brake solenoid lever; u. Shaft information switches; v. New wire ropes with "socket and wedge" terminations on both ends; w. New maintenance controller on top of cabin. Additional works to include: a. Servicing of all landing doors b. Servicing of car door gear mechanism c. Lubrication of guide rails d. Serving of traction motor. 8
9 PART C - EXECUTION 1. Examination a. Before starting works, verify the lift installation and all other conditions under which the work is to be executed. b. Commencement of works constitutes acceptance of existing conditions and responsibility for satisfactory performance. 2. Execution of Works a. Carry out the necessary repair works, upgrading works and co-ordinate installation of components. b. Work shall be performed by competent personnel in accordance with component manufacturer s installation instructions and as per Part A, Para. 3 Quality Assurance. The Contractor is considered fully responsible for the repair work, supply and installation of the works. c. Comply with the latest edition of the I.E.E. wiring regulations for electrical work required during installation. d. Perform works as per submitted works program. 3. Field Quality Control a. Acceptance testing: Upon completion of the works and before permitting use of the lift, perform acceptance tests as per L.N f Inspection of Lift Regulations. b. Advise Engineer in advance of dates and times tests are to be performed. c. Test certificates are to be handed over to the Engineer in charge. 4. Adjusting Make necessary adjustments of operating devices and equipment to ensure lift operates smoothly and accurately. 5. Demonstration a. Instruct Housing Authority personnel and/or the representatives of the building in the proper use, operation and daily maintenance of the lift. Review 9
10 emergency provisions, including emergency access and procedures to be followed at time of failure and other building emergencies. b. Make a final check of the operation of the lift with Engineer present, immediately before date of Test Certificate. Determine that control systems and operating devices are functioning properly. 10
11 APPENDIX Maintenance Agreement The Tenderer is requested to attach a completed Maintenance Agreement form in this Appendix for the consideration of the Housing Authority. Guidelines to tenderers in their submission of the requested Maintenance Agreement are listed in Clause 10 Maintenance. 11
12 B.O.Q. FOR THE UPGRADING OF LIFT IN BINJA SAN DAVID, TRIQ SAN DAVID, MTARFA Item Description Qty Unit Rate including Taxes, Other Duties & Discounts but exclusive of VAT Amount including Taxes, Other Duties & Discounts but exclusive of VAT up to two (2) decimal place only a b Preambles Contractor is to take all health and safety precautions as required by law in order to ensure safety and cause least possible inconvenience to the public at all times while works are in progress. The Contractor is expected to familiarize himself with every aspect of the works within the respective site in order that his quote may be complete. To this end, it is extremely essential that the Contractor carries out a site visit prior to handing in the quotation. c The contractor is to conform to L.N f Inspection of Lift Regulations and include all expenses associated with placing the lift into service. Such expenses include the services of a Notified Body. d The contractor is to upgrade the electrical installation for the lift inside the machine room as per current Lifts Regulations Supply and install double acting safety gear assembly with cut-out switch Supply & install sheave guards and wire rope protection rods. Supply and install Speed governor assembly (double acting type) including tensioning pulley to be compatible with safety gear; Supply and install control panel including motor overload protection, communications unit, phasereversal / phase failure protection, run-time limiter; shaft information switches, COP, landing call buttons, auto dialler, car overload device; emergency light and all wiring. Supply and install communications system (autodialling device) including on top of cabin and pit. Carried Forward 0.00
13 Item Description Qty Unit Rate including Taxes, Other Duties & Discounts but exclusive of VAT Amount including Taxes, Other Duties & Discounts but exclusive of VAT up to two (2) decimal place only Brought Forward Supply and install galvanised sheet metal plates to reduce shaft wall to sill distance. Supply and install car overload device with indication in COP Supply and install batteries for alarm bell Supply and install safety balustrade on top of car roof Supply and install lighting & power socket outlet inside machine room. Supply and install two-way shaft lighting switches and upgrade system. Supply and install an independent short circuit protection for the single phase circuit inside the machine room Supply and install lockable main switch in machine room Supply and install protection guards against objects falling into the well from the machine room Supply and install emergency instructions inside machine room Supply and install safety guard for counterweight in pit Supply and install new maintenance controller on top of car Supply and install wire ropes complete with socket & wedge terminations Servicing of traction motor compete with new split pins for solenoid lever Servicing of lift including door mechanisms
14 Item Description Qty Unit Rate including Taxes, Other Duties & Discounts but exclusive of VAT Amount including Taxes, Other Duties & Discounts but exclusive of VAT up to two (2) decimal place only Brought Forward Lubrication of guide rails Commission and carry out inspection on the lift including ACAB fees Register lift with MCCAA as per L.N. 231 of Provide maintenance of lift for 24 months. TOTAL BILL CARRIED TO SUMMARY 0.00
15 SUMMARY AMOUNT excluding VAT Grand Total excluding VAT 0.00 I hereby declare that I have visited premises covered by this quotation and therefore I am fully aware of the works involved. Signature of Contractor Date Name of Contractor Address I.D. No. Tel. No. Mobile No.
16
17
18
19
ITEM DESCRIPTION SPECIFICATION TENDER OFFER
TECHNICAL SPECIFICATIONS PL1 & PL2 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER Make (please specify) 1.0 Type Duplex Passenger Lift 2.0 Minimum
CSA CONSTRUCTION, INC. 2314 McAllister Road Houston, Texas 77092 SUBCONTRACTOR AGREEMENT
CSA CONSTRUCTION, INC. 2314 McAllister Road Houston, Texas 77092 SUBCONTRACTOR AGREEMENT THIS AGREEMENT made this day of Month, Year, by and between CSA CONSTRUCTION, INC., a Texas corporation whose principal
QUOTE FOR THE SUPPLY AND INSTALLATION OF METAL GATES AT TRIQ IL-KUCCARD, HAL SAFI
TM REF: RD171/13 TM Quotation 142/13 QUOTE FOR THE SUPPLY AND INSTALLATION OF METAL GATES AT TRIQ IL-KUCCARD, HAL SAFI Date Published: 18 th October 2013 Closing Date: 29 th October 2013 at 10:00am CET
PREFACE. The Contract for the Supply and Delivery of Goods has been prepared for use in supplies contracts which have the following characteristics:
Supply Chain Management Document Number: SCM006 Document Title: Supply Contract Version: 01 Purpose: Standard contract for all supplies of goods PREFACE The Contract for the Supply and Delivery of Goods
SPECIFICATIONS AND CONDITIONS FOR THE PROVISION OF GRIT BLASTING SERVICES
SPECIFICATIONS AND CONDITIONS FOR THE PROVISION OF GRIT BLASTING SERVICES 1. SCOPE 1.1 This tender calls for the provision of grit blasting services of metal components to the desalination section of the
Malta Resources Authority. Call for Quotations
Malta Resources Authority Millennia, Aldo Moro Road, Marsa MRS 9065 Malta Telephone: (356) 21220619 Fax: (356) 22955200 Call for Quotations Closing Date: Date Published: 10 November 2015 at 10:00am Tuesday
Published Call for Quotations QMFA 080/2015
QMFA 080/2015 Page 1 of 6 16 th October, 2015 Published Call for Quotations QMFA 080/2015 CLOSING DATE: Friday 30 th October, 2015 at 10:00 hours The Ministry for Foreign Affairs needs the following item/s:
POWER GEAR SLIDE OUT MANUAL
POWER GEAR SLIDE OUT MANUAL Operation Guide FLUSH FLOOR SLIDE OUT SYSTEM FOR AMERICAN COACH PRODUCTS 82 S0220 01 Rev. 1 AMERICAN COACH SLIDE OUT MANUAL FLUSH FLOOR SYSTEM TABLE OF CONTENTS SECTION PAGE
AGREEMENT FOR THE PROVISION OF CONSULTANCY ENGINEERING SERVICES
AGREEMENT FOR THE PROVISION OF CONSULTANCY ENGINEERING SERVICES This agreement is made and entered into, on day the. of, 1991 by and between: Mr/. of P.O. Box.. hereinafter refereed to as the "Owner" on
GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES
GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES GENERAL CONDITIONS OF CONTRACT FOR MINOR WORKS PAGE 1 BASE D ON WA LOCAL GOVERNMENT ASSOCIATION MODEL 2010 TABLE OF CONTENTS 1 INTERPRETATION 2 RISE
Recommendations to improve the safety of existing lifts
Recommendations to improve the safety of existing lifts Lift & Escalator Industry Association Lift Safety an introduction Lifts are amongst the very few modes of transport available for continuous unsupervised
NHS South Tees CCG. Lease Car Policy
NHS South Tees CCG Lease Car Policy Policy Title: Lease Car Policy Date: July 2013 1. Introduction NHS South Tees CCG Guide to Scheme Principles and Conditions for Employees NHS South Tees CCG has in operation
SPECIAL CONDITIONS FOR THE UPGRADE OF EXISTING MICROSOFT EXCHANGE SERVER 2003 TO MICROSOFT EXCHANGE SERVER 2010
SPECIAL CONDITIONS FOR THE UPGRADE OF EXISTING MICROSOFT EXCHANGE SERVER 2003 TO MICROSOFT EXCHANGE SERVER 2010 1.0 Scope of Tender These specifications and conditions detail the basic requirements for
1. INTERPRETATIONS AND DEFINITIONS Whenever used in this Agreement, the following terms shall have the meaning set out below:
Support and Maintenance Agreement For all CAE Healthcare Products Introduction to Your Support and Maintenance Services With the purchase of any brand new CAE Healthcare Product, customers are provided,
ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1
KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1
BUILDING AGREEMENT. between: ( the Owner ) and. ( the Builder )
BUILDING AGREEMENT between:. ( the Owner ) and. ( the Builder ) Of INTRODUCTION 1. The Owner is desirous of making alterations and additions ( the Works ) to the buildings situated on certain land being
CITY OF CHARLOTTETOWN. REQUEST FOR QUOTATIONS SUPPLY AND INSTALL LIGHTING Municipal Parking Garages
CITY OF CHARLOTTETOWN REQUEST FOR QUOTATIONS SUPPLY AND INSTALL LIGHTING Municipal Parking Garages May 2016 PAGE 2 CITY OF CHARLOTTETOWN REQUEST FOR QUOTATIONS SUPPLY AND INSTALL LIGHTING Municipal Parking
1.1 The contract shall be deemed to have been entered into upon receipt of supplier s written acknowledgement stating its acceptance of the order.
Kendrion (Switzerland) AG Albisstrasse 26 CH-8915 Hausen am Albis of Contract (Rev. 1, valid from 01.01.2013) 1 General 1.1 The contract shall be deemed to have been entered into upon receipt of supplier
GENERAL CONDITIONS FOR CONTRACTORS
GENERAL CONDITIONS FOR CONTRACTORS GENERAL CONDITIONS (DOCUMENT 21/23 FOR 05-2012 CONTRACTORS REV.2) Contd. 1. DEFINITIONS (i) The Contract means the documents forming the tender and acceptance thereof,
This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.
Introduction This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site. It was put together by members of the Food & Drink
SCOPE OF WORK Part A: Provision of Biometric Attendance System
SCOPE OF WORK Part A: Provision of Biometric Attendance System Scope of Work : Supply, installation, testing and commissioning of Biometric Attendance System at 18 Locations (LC gate 12, RT 03 & TRT 03)
REQUEST FOR QUOTATION Quote #30-452-1808 CAR WASH PUMP REPLACEMENT (This Is Not A Sealed Bid)
Purchasing Division 211 West Oakley Street Flint, Michigan 48503 Ph: 810.767.4920 Fax: 810.767.4405 Quotations will be received by the Purchasing Division of Genesee County Road Commission, until 1:45
IKM-I-K-01E Standard conditions of purchase IKM Gruppen Side 1 av 6
IKM-I-K-01E Standard conditions of purchase IKM Gruppen Side 1 av 6 Løvås Svein Firma/Company: IKM Gruppen AS 1. GENERAL 1.1 These conditions of purchase shall apply unless otherwise agreed in writing.
Central Plumbing (Wellington) Limited
TERMS OF TRADE Central Plumbing (Wellington) Limited The terms of trade set out below govern all supplies of goods and services from Central Plumbing (Wellington) Limited ( Central Plumbing (Wellington),
GENERAL SPECIFICATIONS REHABILITATION RESIDENTIAL CONTRACTORS HANDBOOK
GENERAL SPECIFICATIONS REHABILITATION RESIDENTIAL CONTRACTORS HANDBOOK CITY OF GRAND PRAIRIE, TEXAS HOUSING AND NEIGHBORHOOD SERVICES COMMUNITY DEVELOPMENT (CDBG) DIVISION 205 WEST CHURCH GRAND PRAIRIE,
Fire Damage Repairs, 2510 Burton Street
Fire Damage Repairs, 2510 Burton Street Introduction: The Housing Authority of the County of San Joaquin (Authority) is seeking quotes from Class B General Building Contractors (Contractor) to provide
General Contractual Terms and Conditions of KRÁLOVOPOLSKÁ SLÉVÁRNA, s.r.o.
General Contractual Terms and Conditions of KRÁLOVOPOLSKÁ SLÉVÁRNA, s.r.o. 1. General provisions 1.1. These terms and conditions (TC) govern the sale of products and services (hereinafter as goods ) of
P.A.L. S SPECIFICATIONS
PART 1- GENERAL 1.1 SCOPE To furnish all labor, materials and equipment necessary or required to complete the installation of the lift as indicated on the Drawings and Specifications. This specification
Memorandum Potentially Affected AIA Contract Documents AIA Document A105 2007 AIA Document B105 2007 Important Information
Memorandum Important information related to requirements of state or local laws to include additional provisions in residential construction contracts Potentially Affected AIA Contract Documents AIA Document
a. Proposals shall be submitted in a sealed envelope and addressed as follows:
1 CITY OF ATCHISON REQUEST FOR QUALIFICATIONS & PROPOSAL HVAC SERVICES JANUARY 1, 2014 THROUGH DECEMBER 31, 2014 DUE: DECEMBER 10, 2013 10:00 A.M. The City of Atchison (City) invites interested and qualified
Tender for Procurement of -2- Nos of GeoTrust SSL Certificate (Secure Site with EV) Tender Ref. No. - BCC:IT:PROC:108:26 Tender Date - 10 th June 2016
Tender for Procurement of -2- Nos of GeoTrust SSL Certificate (Secure Site with EV) Tender Ref. No. - BCC:IT:PROC:108:26 Tender Date - 10 th June 2016 A. BRIEF PROJECT REQUIREMENT Bank of Baroda has a
SKANSKA SPECIFICATIONS TO GENERAL CONDITIONS FOR BUILDING CONTRACTS 1998
1 (6) SKANSKA SPECIFICATIONS TO GENERAL CONDITIONS FOR BUILDING CONTRACTS 1998 Offer If the offer diverges from the invitation to tender, it must be mentioned explicitly and relevantly in order to be able
General Terms of Purchase. of HAN University of Applied Sciences
General Terms of Purchase of HAN University of Applied Sciences HAN-Terms of Purchase; Page 1 of 6 Versie14 september 2010 Content Article 1 Definitions Article 2 Quotation; Creation Article 3 Applicability
Replacement of Heat System Components
STATEMENT OF WORK FOR Replacement of Heat System Components At Warehouse Takoraudantie 4 08/17/2013 REV 8-24-13 Project 2013-021 Page 1 of 6 1.0 INTRODUCTION 1.1 Overview: The U.S. Embassy Helsinki has
Government of the Kingdom of Lesotho. Ministry of Public Works and Transport. Principal Building Agreement
Government of the Kingdom of Lesotho Ministry of Public Works and Transport Project Employer Contractor Contract Date Contract No Principal Building Agreement MINISTRY OF PUBLIC WORKS & TRANSPORT BUILDING
GENERAL RENTAL CONDITIONS. adopted by the
GENERAL RENTAL CONDITIONS adopted by the Vereniging van Fabrikanten van en Handelaren in Bouwmachines, Magazijninrichtingen, Wegenbouwmachines en Transportmiddelen B.M.W.T., based in The Hague, deposited
Construction Contract
Construction Contract Case Number: Date: Borrower Name(s): Phone #: Phone #: THIS IS A MODEL DOCUMENT FOR USE IN RENOVATION OR CONSTRUCTION LOAN TRANSACTIONS. THIS FORM IS PROVIDED AS AN EXAMPLE AND IS
Request for Quote Number: 2015-06-PRC Baseball Diamond Backstop Re-Fence
Request for Quote Number: 2015-06-PRC Baseball Diamond Backstop Re-Fence Sealed request for quotes will be received by Brian Tocheri, CAO/Clerk at 341 10 th St. Hanover, Ontario, N4N 1P5 until 2:00 pm,
EASY LED Oy General Terms of Sale
EASY LED Oy General Terms of Sale 1. Scope of application These General Terms of Sale (hereinafter referred to as the Terms ) shall be applied to the sale and supply of lighting products manufactured by
How To Write A Contract In The European
(Form-9) Agreement with Contractor for THIS AGREEMENT (hereinafter, together with the appendices and all the documents annexed hereto and forming an integral part hereof, referred to as the Contract )
Request for Quotation
City of Richmond Business and Financial Services Department Request for Quotation Supply and Delivery of NETWORK SWITCHES Bidders are requested to respond to this Quotation call as instructed subject to
STATE BANK OF INDIA LOCAL HEAD OFFICE CHENNAI-600006
1 P a g e STATE BANK OF INDIA LOCAL HEAD OFFICE CHENNAI-600006 APPLICATION FOR SALE OF SALVAGED STEEL & OTHER METAL SCRAP ON AS IS WHERE IS CONDITION AT STATE BANK OF INDIA, 84 RAJAJI SALAI, CHENNAI 600001
A Guide to Small Works. A brief explanation
A Guide to Small Works A brief explanation A Guide to House Extensions/Small Works - a brief explanation Small works are an ongoing, cherished part of DDC's activity and restricted only by distance. Here
Retractable Screen. Replacement Screen Instructions
Retractable Screen Patent Pending Replacement Screen Instructions For RTS, RET, & RTM Products ATTENTION! Retractable screens are not intended to provide security or provide for the retention of objects,
CONTRACTOR GUIDELINES
CONTRACTOR GUIDELINES WORKING IN NEIGHBORHOODS (WIN) HOUSING DIVISION 175 East Second Street, Suite 580 Tulsa, OK 74103 Telephone 918.576.5552 Fax 918.699.3239 Website www.cityoftulsa.org/housing Email
Introduction to EN 81-20/-50. Issue: 2015-03-27
Introduction to EN 81-20/-50 Issue: 2015-03-27 Background CEN/TC 10 Technical Committee 10 (TC10) in CEN Developing and maintaining European standards for lifts, escalators and moving walks Established
Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer
Conditions of Offer A1 The offer documents comprise the offer form, letter of invitation to offer (if any), these Conditions of Offer and Conditions of Contract (Works & Services), the Working with Queensland
Atrium Skylight Repair Carleton Lodge
Requirement Period of Contract The successful bidder shall complete the work no later than 27 November 2015. Closing Date Quotations must be submitted no later than close of business day (11:59 pm) on
TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.
The Passenger and Freight Elevator Act
1 PASSENGER AND FREIGHT ELEVATOR c. P-4 The Passenger and Freight Elevator Act being Chapter P-4 of The Revised Statutes of Saskatchewan, 1978 (effective February 26, 1979) as amended by the Statutes of
V1504 Vertical Platform Lift OWNER S MANUAL
V1504 Vertical Platform Lift OWNER S MANUAL (To Be Retained by Owner After Installation by Authorized Savaria Dealer) Part No. 000692 03-m12-2013 2 IMPORTANT Ensure that only an authorized Savaria Dealer
THE NATIONAL TREASURY. Republic of South Africa
THE NATIONAL TREASURY Republic of South Africa GOVERNMENT PROCUREMENT: GENERAL CONDITIONS OF CONTRACT 8 May 2007 THE NATIONAL TREASURY: Republic of South Africa 2 TABLE OF CLAUSES 1. Definitions 2. Application
CONTRACT AND PERM TERMS OF BUSINESS THE SUPPLY OF LIMITED COMPANY CONTRACTORS AND TEMPORARY STAFF SERVICES
CONTRACT AND PERM TERMS OF BUSINESS THE SUPPLY OF LIMITED COMPANY CONTRACTORS AND TEMPORARY STAFF SERVICES 1. DEFINITIONS 1.1 In these Terms of Business the following definitions apply: Assignment means
Terms and Conditions. 3012436v2 12285.01010
Terms and Conditions ACCEPTANCE. Except as otherwise agreed in a written agreement signed by both parties, these Terms and Conditions will govern Buyer s purchase order. BI Technologies acceptance of Buyer
U.S. COMMUNITIES EQUIPMENT SALE AND MAINTENANCE AGREEMENT (EQUIPMENT SALES, BREAK-FIX SERVICES WITH NO ON-SITE LABOR)
U.S. COMMUNITIES EQUIPMENT SALE AND MAINTENANCE AGREEMENT (EQUIPMENT SALES, BREAK-FIX SERVICES WITH NO ON-SITE LABOR) CUSTOMER INFORMATION Legal Name Bill To Address City State Zip Code This Equipment
MTU Extended Propulsion Coverage (EPC) Marine Pleasure Craft
Contract Number: Filled out by MTU only This Contract is entered into between MTU Friedrichshafen GmbH, Maybachplatz 1, 88045 Friedrichshafen ( MTU ) and the customer and governs the extended propulsion
Request for Quotation
City of Richmond Finance & Corporate Services Division Request for Quotation Supply and Delivery of STORAGE AREA NETWORK AT WORKS YARD STORES Bidders are requested to respond to this Quotation call as
TOWN OF GROTON INVITATION TO BID EMAIL ARCHIVING SYSTEM
TOWN OF GROTON INVITATION TO BID EMAIL ARCHIVING SYSTEM BID NUMBER: 12-07 BID OPENING: 2:30 P.M. October 27, 2011 LOCATION: Purchasing Office, Groton Town Hall ADDRESS: 45 Fort Hill Road, Groton, CT 06340
PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS
PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS 2014 Public Sector Standard Conditions of Contract for Construction Works 2014 Building and Construction Authority First published 1995
TERMS AND CONDITIONS
TERMS AND CONDITIONS THIS AGREEMENT IS FOR THE RENTAL OF ALL ITEMS, EQUIPMENT AND/OR VEHICLES SHOWN ON THE OTHER SIDE THIS PAGE, INCLUDING ALL PARTS OF AND ACCESSORIES TO SUCH ( EQUIPMENT ). 1. RENTAL
Roped Hydraulic Residential Elevator Specifications
January 1, 2004 Roped Hydraulic Residential Elevator Specifications P.O. Box 749, 5191 Stump Rd., Plumsteadville, PA 18949 Toll Free: 888-443-2800, Phone: 215-766-3380, Fax: 215-766-3385 CONTENTS Part
LOCAL COUNCILS ASSOCIATION
LOCAL COUNCILS ASSOCIATION SIBIT PROJECT 153, Main Street, Balzan, Malta Phone: 21446428 Fax: 21446427 Email: [email protected] LCA/10/2012: Tender for the Repairs to Roadworks in Malta and Gozo, in relation
Regional Council of Goyder
Regional Council of Goyder Request for Quotation for the design/supply and installation of a Solar Photovoltaic System to the Eudunda Swimming Pool. RFQ Number 07.2015.15 Tender Closing Time: 3:00pm on
Safety and Environmental Information for External Companies
Health and and al Health and at 1. Delivery, Notice, Signature After receiving the following information sheets, the assembly leader from every external company is required to read through them, explain
REQUEST FOR PROPOSAL THE LEE: WINDOW TREATMENTS DELIVER SEALED PROPOSALS TO:
REQUEST FOR PROPOSAL THE LEE: WINDOW TREATMENTS DELIVER SEALED PROPOSALS TO: Common Ground HDFC II Lee/Pitt Street LP Attn: Brian Ferrier 505 Eighth Avenue 15th Floor New York, NY 10018 DUE DATE: April
ACG Commissioning Guideline
ACG Commissioning Guideline Appendix A Sample Commissioning Specification NOTES TO APPENDIX A This appendix contains a sample Request for Proposal (RFP) for Commissioning Services as would be issued by
GENERAL CONDITIONS OF THE FEDERAL DEPARTMENT OF FOREIGN AFFAIRS FOR LOCAL MANDATES
Annex 3 GENERAL CONDITIONS OF THE FEDERAL DEPARTMENT OF FOREIGN AFFAIRS FOR LOCAL MANDATES 1. Phase Prior to Contract Conclusion 1.1. Up to the conclusion of the contract, withdrawal from the negotiations
Terms & Conditions Operational Leasing BYD Europe b.v.
Terms & Conditions Operational Leasing BYD Europe b.v. Version 1.1 Date of Release: March 25, 2014 1. Relevance 1.1. These General Conditions apply to all operational leases of BYD Europe b.v. (hereinafter
V1504 Vertical Platform Lift OWNER S MANUAL
V1504 Vertical Platform Lift OWNER S MANUAL (To Be Retained by Owner After Installation by Authorized Savaria Dealer) Part No. 000692 01-m03-2016 2 IMPORTANT Ensure that only an authorized Savaria Dealer
BUILDING CONTRACT MEMORANDUM OF AGREEMENT AND CONDITIONS OF CONTRACT
BUILDING CONTRACT MEMORANDUM OF AGREEMENT AND CONDITIONS OF CONTRACT MADE and entered into by and between: (hereinafter referred to as the OWNER); and (hereinafter referred to as the BUILDER) WHEREAS the
INTERNATIONAL COMMITTEE OF THE RED CROSS
INTERNATIONAL COMMITTEE OF THE RED CROSS GENERAL CONDITIONS FOR WORK CONTRACTS 1. DEFINITION A contract for work is an agreement whereby the Contractor 1 obligates himself to produce a work, and the client
THE SUSTAINABLE ENERGY AUTHORITY OF IRELAND PURCHASE ORDER TERMS AND CONDITIONS OF PURCHASE
THE SUSTAINABLE ENERGY AUTHORITY OF IRELAND PURCHASE ORDER TERMS AND CONDITIONS OF PURCHASE WHEREAS The Sustainable Energy Authority of Ireland (hereinafter called SEAI ) of Wilton Park House, Wilton Place,
BIHAR SCHOOL EXAMINATION BOARD (SS), PATNA TENDER DOCUMENT
BIHAR SCHOOL EXAMINATION BOARD (SS), PATNA TENDER DOCUMENT FOR SUPPLY AND INSTALLATION OF 2 PASSENGER NEW LIFT UNDER BUYBACK OF EXISTING LIFT AT BIHAR SCHOOL EXAMINATION BOARD, BUDH MARGE, PATNA Last date
Tallinn Airport Ltd. Conditions of infrastructure use for ground handling service providers. Valid since 01.11.2010. Lennart Meri Tallinn Airport
Authorised with the 01 October 2010 Directive of the Chairman of the Management Board no 48 Tallinn Airport Ltd. Conditions of infrastructure use for ground handling service providers Valid since 01.11.2010
HAWAII STANDARD GENERAL CONDITIONS FOR FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR
HAWAII STANDARD GENERAL CONDITIONS FOR FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR TABLE OF ARTICLES 1 AGREEMENT 2. SCOPE OF WORK 3. SUBCONTRACTOR S RESPONSIBILTIES 4. CONTRACTOR'S RESPONSIBILITIES
Canterbury Park Pool Chamber Replacement
Requirement Request For Quotation To provide services, equipment and materials to replace the Concrete Pool Service & Drainage vault at the Canterbury Park Pool located at 2185 Arch Street, Ottawa, ON
Operating Precautions: User configuration options:
A Division of Lippert Components, Inc. PNP BED-LIFT USERS MANUAL Product Usage: This product is designed and intended ONLY to be used as a Bed-Lift mechanism. Any other use of this system will void any
(insert name and address)
Lease Agreement for Plant and Machinery LESSOR; LESSEE; DATE: (insert name and address) (insert name and address) 1. LEASE: The lessor hereby agrees to lease to Lessee and the Lessee hereby agrees to take
LIFT AND ESCALATOR INDUSTRY ASSOCIATION. Guidance on the management of lifts, escalators and similar products
LIFT AND ESCALATOR INDUSTRY ASSOCIATION Guidance on the management of lifts, escalators and similar products This Guidance has been prepared by the Lift and Escalator Industry Association with the aim
Assured Shorthold Tenancy Agreement Scotland
Landlord documents free from LandlordExpert.co.uk Assured Shorthold Tenancy Agreement Scotland This rental agreement comprises the particulars detailed below whereby the property is hereby let by the landlord
REQUEST FOR QUOTE NUMBER: 09RD65575YB WILL BE RECEIVED UNTIL 1/21/2009
DEPARTMENT OF PURCHASING & CONTRACT COMPLIANCE Winner 2000-2008 Achievement of Excellence in Procurement Award National Purchasing Institute Jerome Noble, Director REQUEST FOR QUOTE NUMBER: 09RD65575YB
General Terms and Conditions
1zu1 Prototypen GmbH & Co KG, Färbergasse 15, A-6850 Dornbirn T +43 (0)5572 52946-0, F -15, [email protected], www.1zu1.eu General Terms and Conditions Färbergasse 15, 6850 Dornbirn, Austria -- in the following
Faithful Performance Bond/Certificate of Deposit Application City of Temecula Planning Department
Faithful Performance Bond/Certificate of Deposit Application City of Temecula Planning Department Planting, Wall and/or Fence Installation Date Stamp Landscape Maintenance Model Home Conversion Sales Trailer
WINTERSHALL NORGE AS GENERAL TERMS & CONDITIONS I FOR ONSHORE GOODS. Table of Content
WINTERSHALL NORGE AS GENERAL TERMS & CONDITIONS I FOR ONSHORE GOODS Table of Content Page 1. APPLICATION... 2 2. DEFINITIONS... 2 3. PURCHASE ORDER; ORDER CONFIRMATION... 2 4. THE GOODS... 2 5. QUALITY
[This translation is provided for guidance. The governing text is the Arabic text.] Public Works Contract
[This translation is provided for guidance. The governing text is the Arabic text.] Public Works Contract Form for Public Works Contract 1 Section One Contract - Basic Document It has been agreed in the
BANKA SOCIETE GENERALE ALBANIA
BANKA SOCIETE GENERALE ALBANIA Request for Proposals (RFP) for: Printing of Bank stationeries and Marketing materials Issued on February 09 th, 2016 Deadline for Response: February 29 th, 2016 14:00 CET
DAIMLER GROUP NORTH AMERICAN COMPANIES
DAIMLER GROUP NORTH AMERICAN COMPANIES General Purchasing Conditions for IT Part H Individual Software Development, Maintenance and Customization 1 Subject Matter / Scope of Performance 1.1 General The
REQUEST FOR QUOTES (RFQ)
REQUEST FOR QUOTES (RFQ) Lincoln County Public Works is requesting quotes (RFQ) through its Small Works Roster Process. Quotes are being requested for a project to replace the roof on the Crew Headquarters/Truck
PURCHASE ORDER TERMS AND CONDITIONS
PURCHASE ORDER TERMS AND CONDITIONS 1. DEFINITIONS: In these Terms and Conditions and all documents related to the Purchase Order: Purchaser means the entity issuing the Purchase Order as identified on
Terms and Conditions for Purchase Orders for Recycling Materials
Terms and Conditions for Purchase Orders for Recycling Materials This Agreement is made by and between AEROJET-GENERAL CORPORATION, an Ohio corporation with a place of business at Rancho Cordova, California
NOTICE INVITING TENDER. Supply of office chairs at 2 nd floor MTNL Bldg., CBD Belapur, Navi Mumbai 15 days from the date of issue of work order
NOTICE INVITING TENDER Limited and sealed tenders are hereby invited on behalf of State Bank of India, Estate Department, GITC, CBD Belapur for the following work. Name of work Completion Time Supply of
BROOKFIELD GLOBAL INTEGRATED SOLUTIONS STANDARD PURCHASE ORDER TERMS FOR SUPPLIES
BROOKFIELD GLOBAL INTEGRATED SOLUTIONS STANDARD PURCHASE ORDER TERMS FOR SUPPLIES Entire Agreement: These standard terms and any Purchase Order will together comprise the complete contract between Brookfield
