Denmark s fastest railway

Similar documents
Train Fund Denmark. Electrification of the main railway lines Realisation of the 1 Hour Model vision. 1 Hour. Transportministeriet

Banebranchen New line Copenhagen-Ringsted

The Danish Transport System. Facts and Figures

Organizing the future railway

DRAFT APPENDIX D MID/EASTERN CORRIDOR, RAILWAY

A Greener Transport System in Denmark. Environmentally Friendly and Energy Efficient Transport

The Follo Line Project

The Gotthard Base Tunnel

Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits

Why build the Silvertown Tunnel?

Summary Summary

Member Nation Report 2010 from Denmark.

Success with three networks: SBB Infrastructure. InnoTrans 2012.

Financial Analysis, Traffic Forecast and Analysis of Railway Payment

Development Strategy. (English abstract)

Informal meeting of EU ministers for Transport Luxembourg, October 7th, Declaration on Cycling as a climate friendly Transport Mode

The Signalling Programme A total renewal of the Danish signalling infrastructure

What is Nordic Link?

- WHERE DID WE COME FROM? -

World Bank Transport Forum, April 2009

2008 On track for More! Photo: RuneFossum,Jernbanefoto.no

After a turnaround, DSB is ready to pursue topline growth

COWI s Role in the Copenhagen Metro Project

The UK Rail Industry: A Showcase of Excellence

AARHUS LIGHT RAIL PROJECT

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:

Banedanmark. TØF Jernbane i vækst. Signalprogrammet. Morten Søndergaard, Programme Director

HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW

Tendering of passenger rail traffic in Norway

Connecticut s Bold Vision for a Transportation Future

This is why the Swedish Transport Administration was formed

NETWORK EFFECTS IN RAILWAY SYSTEMS

Development of a Concept for the Public Transport Interconnectivity for Savaria International Airport. Report

THE DANISH WADDEN SEA NATIONAL PARK THE DANISH APPROACH TO NATIONAL PARKS. FOTO: John Frikke

The Øresund Bridge and its Region 15 years

The development of the electronic health record in Denmark

Tender Package 40 Scope of work

Agenda. Welcome. Introduction to Ringsted Fehmarn. E3006 King Frederik IX s Bridge. E1001 Track Works. Break: Networking and Sandwich

Road freight transport across a fixed Fehmarn Belt link

Cathkin Relief Road Planning Statement

Strategies for goods transport in Skåne

Alignment design for Citybanan in Stockholm

IQ-C Action plan for rail freight corridor Rotterdam-Genoa

TEN-T guidelines and CEF

LETBANE PÅ RING 3. Information about the public procurement process

Optimised rail-ferry connections from Berlin to Scandinavia

Thameslink new Class 700 trains

The Rail Freight Corridor through Denmark. Formative Years and Future Perspectives for Customers

OPENING THE DOOR TO EUROPE AND THE WORLD

Denmark - on your bike!

usage of these types of fuels with production price far higher then diesel and petrol, is also a measure. We can say that in Bulgaria there are

LIGHT RAIL ON RING 3 NOVEMBER 19 TH Supplier Workshop. Islevbro station (Rødov

London Underground Environment Strategy

Sustainable goods transport in the Fehmarn-Øresund corridor. Per Homann Jespersen ENSPAC, Roskilde University

High-speed train Oslo-Berlin

Banekonference. 17. April Co-financed by the European Union Trans-European Transport Network (TEN-T)

Copenhagen, Denmark - Trends in Public Perception

Trade & Transport Corridors. European Projects & Initiatives

MELBOURNE METRO RAIL NEWSLETTER

Transport planning in the Stockholm Region

Connecticut s Bold Vision for a Transportation Future

ANNEX 1 Summary of Danish responses to consultation Page 1

The Norwegian Point of View

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM

The Danish Road Directorate Evaluation of test with European Modular System

Energy and. Resources

Lineside Signal Spacing and Speed Signage

Aalborg. T69.1 On-trip Bus Traveller Information in Aalborg

High speed railway principles

Simulation of modified timetables for high speed trains Stockholm Göteborg

Financing the European Mobility Network with the Connecting Europe Facility

How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, VeloForum, 16 Oct.

ERTMS for a competitive railway

The Helsinki-Tallinn rail tunnel SHORT CUT TO CENTRAL EUROPE. Summary of the preliminary project plan

2013 On track for more!

Gröna Tåget [grœ:na 'tɔ:gɛt] to make train travel more attractive

Evergreen Line Rapid Transit Project Business Case Executive Summary. February Reviewed by

REPORT OF THE ROAD SAFETY CAMERA COMMISSIONER TO THE MINISTER FOR POLICE AND EMERGENCY SERVICES

Norwegian Foreign Visitor Survey 2011

News Service. The new DB: Satisfied customers for a successful future. The details of DB's customer and quality campaign

THE LOCAL GOVERNMENT REFORM IN BRIEF

Innovative Tender forms. Danish Experiences and Wishes

ALIGNMENT ASSUMPTIONS

Broadband Mapping 2013

TRANSPORT IMPACTS OF THE COPENHAGEN METRO

5 ALTERNATIVE SOLUTIONS AND EVALUATION

Planning Railway Safety in Canada

On a mission to reduce traffic congestion for all

Cable action plan kv grids March 2009

Supplier Information Day October 19th 2015 Metroselskabet & Hovedstadens Letbane

North Wales and Mersey Dee Alliance Rail Improvement Task Force: - Terms of Reference (February 2016)

Mapping and Modelling the Impact of Land Use Planning and Management Practices on Urban and Peri-Urban Landscapes in the Greater Dublin Area

Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI (608) Fax: (608)

Stouffville Corridor Rail Service Expansion

Application Form Part A

High Speed Rail in Poland plans & activities

Climate Change and Air Pollution in the Transport Sector: Measures and Messages of Japan

Wilmington to Newark Commuter Rail Improvement Project

Transcription:

Denmark s fastest railway The New Line Copenhagen-Ringsted

Denmark s fastest railway will be completed in 2018 More departures, shorter travel time and fewer delays Between 2010 and 2018 Banedanmark will build a new dual track, electrified railway running from Copenhagen to Ringsted via Køge. The line will be Denmark s first high speed railway and will handle up to 250 km/h for passenger trains. Why a new railway? The existing line that runs from Copenhagen to Ringsted via Roskilde is one of Denmark s busiest and most important routes. It is used by commuters between Copenhagen and the rest of Zealand as well as for nationwide and international passenger and freight traffic. The current line has become a bottleneck when working at full capacity. The new track will result in a significantly improved timetable with more departures, shorter travel time and fewer delays. As Denmark s first high speed rail line it will contribute significantly to meeting the transport requirements of the future. Shorter travel time and new connections The new Køge Nord Station will create a central hub that allows transfers to and from the S-train system. There will also be opportunities to establish a park-andride facility just off the motorway. Trains will depart from here for Copenhagen, West Zealand, Funen and Jutland plus via Køge Station directly to Næstved. A journey from Køge Station to Copenhagen H by S-train takes 38 minutes today. The same journey will take only 24 minutes for regional trains on the new stretch via Køge Nord Station, a 14 minute gain. The travel time can be further reduced to 20 minutes for non-stop services between Køge and Copenhagen. The current travel time is 59 minutes for regional trains from Haslev to Copenhagen, including transfer to S-trains at Køge station. The new line, with direct regional connections, saves 21 minutes and cuts the journey to 38 minutes. The journey from Hårlev to Copenhagen along the East line (Østbanen) and transfer to the S-trains at Køge Station takes 61 minutes today. The same journey changing at Køge to the direct regional trains will take 45 minutes in future; that is 16 minutes saved. The new line will provide improved travel services. Other examples of time saved between Copenhagen and other cities include 6 minutes for Odense and 10 minutes for Næstved, Vordingborg and Nykøbing F. Most freight trains will move from the existing line to the new line, which allows for improving train services on the existing line via Roskilde, Ringsted, Holbæk and Kalundborg. 3

The New Line Copenhagen-Ringsted will mean more train traffic between the Danish regions, more regional train departures on Zealand and improve the conditions for international freight traffic in transit through Denmark. The first stage of The One Hour Target The new line is the future proof solution to the capacity problems between Copenhagen and Ringsted. It is also part of The One Hour Target, a political plan to shorten travel time between Denmark s largest cities so that passengers can travel by train between each of the cities Copenhagen, Odense, Aarhus and Aalborg in just one hour. The new line is the first stage of the One Hour Target and is part of the overall scheme. Other stages will be initiated within the next few years. The new line will run through 10 municipalities. The picture shows the track in Greve. What will be built? The new line is Denmark s largest rail project for many years. The approximately 60 kilometre stretch passes through 10 municipalities and involves many people, directly or indirectly. Preparatory work The client group for the new line manage and coordinate the project from an office in Brøndby. A number of consultants from Danish and international advisor teams have been attached to the project. Between 2010 and 2013 they will assist Banedanmark with a range of preparatory work such as drillings, utility relocation, archaeological preliminary investigations, expropriations and the final decision on the route. What we will build The physical construction work will begin in 2012. It will include: A new dual track, electrified railway between Copenhagen and Ringsted Platforms at Ny Ellebjerg Station for regional and long distance trains A new station (Køge Nord) with connections to a new station on the S-train line A connection at Køge Nord for the Lille Syd line to/from Køge and Næstved An additional track at Køge Station Track renovation at Ringsted Station The new line will be built for high speed trains travelling at up to 250 kilometres per hour. 4 5

The new line built out of Copenhagen will run close to the Holbæk motorway. Hvidovre can be seen at the bottom of the picture. The route The new line will pass through the municipalities of Copenhagen, Hvidovre, Brøndby, Vallensbæk, Høje-Taastrup, Ishøj, Greve, Solrød, Køge and Ringsted. It will run through densely populated and trafficked areas as well as historical, cultural and recreational locations. The new railway will follow the motorway network in the main but takes physical conditions and space constraints into account. These may be roads, buildings and environmentally sensitive areas as well as minimum curvature requirements for the line. As a result the railway may deviate away from the motorway in some places. In others it will cross the motorway as well as associated ramps and other roads. Tracing the route The route begins at Vigerslev at Frugtmarkedet where the two new tracks fork from the existing line. It will be constructed in a wide curve out of Copenhagen, through Vigerslevparken and on along the north side of the Holbæk motorway. The line then goes under and follows the south side of the motorway to Vallensbæk Mose. Here it crosses over Motorring 4 and continues along the west side of Køge Bugt motorway to the large curve at the Scandinavian Transport Centre at Køge. Banedanmark will build a new station named Køge Nord Station. It will be linked to a new station for the S-trains and to the Lille Syd line in the direction of Køge- Næstved. An additional track will be laid from Københavnsvej to Køge Station. Two new tracks will be built north of the West motorway from Køge Nord to Fjællebro. The line will follow the south side of the existing railway from Fjællebro to Ringsted Station. Roskilde Copenhagen Ny Ellebjerg At www.banedanmark.dk/copenhagen-ringsted you will find a map of the new line. You can also find your address here and follow what will happen in your local area. The map will be updated continuously. Køge Nord Station Køge The new line Existing line New station Existing station N Ringsted 0 15 km 6 7

Improved rail connections are imperative if the railway is to be an attractive option for passengers and freight transport in the future. More efficient train services contribute significantly to increased mobility and development of society on a sustainable basis. Across national borders The New Line Copenhagen-Ringsted assumes international importance as part of the Trans-European Network that will link Scandinavia and the rest of Europe. The railway is also a significant part of the freight corridor from Northern Sweden to Northern Italy. The opportunities to expand freight traffic and to improve conditions for international travellers will increase after the opening of the Fehmarnbelt Fixed Link and the associated upgrading and expansion of the line from Ringsted to Rødby. Dialogue with citizens Banedanmark maintains close contacts with citizens, particularly landowners affected by the project. In part this is in relation to temporary or permanent expropriations but it is also with regard to measuring and drilling, nature studies, archaeological excavations and so on. This is achieved through meetings, phone calls and correspondence. Banedanmark updates the website regarding project activity and interested parties can subscribe to news and information on progress. When the construction work begins in 2012, signage will show diversions and re-routing of roads. Wherever possible the greatest possible consideration will be given to motorists and residents along the new line. In partnership with motorway expansion While Banedanmark builds the new railway line, the Danish Road Directorate (Vejdirektoratet) will upgrade the Køge Bugt motorway from six to eight lanes between Greve Syd and Solrød Syd. Given two major construction projects in the same vicinity, the authorities will maintain a close dialogue with affected citizens, businesses and municipalities. Accordingly, Banedanmark work closely with the Road Directorate with regard to planning, expropriations, construction work and communication. Consideration for nature and culture along the line Banedanmark will take nature and cultural heritage along the line into consideration. The project will be administered according to the Museum Act at construction locations and will work closely with the Danish Agency of Culture. It will also comply with the Nature Conservation Act and do so in collaboration with the Nature Agency. The Act and the Minister of Transport give the authority for Banedanmark to administer these two acts. 8 9

Timetable 2011 2012 2013 2014 2015 2016 2017 2018 Soil and groundwater investigations Archaeological preliminary investigations Site survey Expropriation Cutting the first turf work work work Railway technology of Køge Nord Station Railway technology Trial runs Noise barriers Inauguration Utility relocation Further information You can keep up with what is happening on the project at www.banedanmark.dk/copenhagen-ringsted. If you have any questions you are welcome to contact Banedanmark on +45 8234 0501 or at kobenhavn-ringsted@bane.dk You can also sign up to the project s neighbour information service on the website. This will mean that you will automatically receive news updates via email. Remember to check the item Copenhagen-Ringsted when signing up. 10 About Banedanmark Banedanmark s mission We develop and supply a safe, reliable and attractive railway while continuously improving punctuality, traffic information and efficiency. Banedanmark s vision Toward 2020 we are creating the railway of the future with the aim of doubling passenger and freight usage. Banedanmark s functions Approximately 2200 employees nationwide are working to: Plan, operate, renew and maintain the Danish state s railway infrastructure Manage and monitor traffic on the rail network Prepare the overall train timetable for the state rail network Allocate capacity to train operators Determine and collect revenue from the track operators The New Line Copenhagen-Ringsted mission We build the new railway between Copenhagen and Ringsted as a foundation for more and faster trains across and through Denmark. The New Line Copenhagen-Ringsted vision We want to construct The New Line Copenhagen-Ringsted European bestin-class by purchasing in a competitive market and leveraging from economy-ofscale and state-of-the-art technology in the life cycle perspective. The new railway will achieve a doubling of passenger and freight transport and provide the potential for optimising capacity and usage on adjacent lines. Because no similar tracks have been constructed in Denmark in recent times we will place emphasis on learning from comparable projects abroad. Holland, Belgium and France are among the countries from where we will acquire knowledge and experience with regard to high speed railways. This applies both to procurement of materials and hire of employees as well as when we exploit economies of scale and technological opportunities. 11 Frontpage photo: New French railway. Fotos: RFF/Photolabservices, Getty Images and Peter Thornvig fotografi. Design: Punktum Design. Print: Pekema. November 2012

The New Line Copenhagen-Ringsted Between 2010 and 2018 Banedanmark will construct a new dual track, electrified railway from Copenhagen to Ringsted via Køge. The track will be designed to handle speed of up to 250 km/h for passenger trains and will be Denmark s first railway for high speed trains. The Danish Parliament passed the Act for the new line on May 18th 2010. The total construction budget is DKK 10.4 billion. Banedanmark The New Line Copenhagen-Ringsted Ringager 4B 2605 Brøndby Telefon: 8234 0501 kobenhavn-ringsted@bane.dk www.banedanmark.dk/copenhagen-ringsted ISBN nr. 978-87-7126-171-4