Transport systems. Development of the high speed railway concept in Poland. Agata Pomyka a. Pendolino tested on CMK (8.12.2013); photo: G.

Similar documents
Construction programme of high speed railways in Poland July 2011

High Speed Rail in Poland plans & activities

Investment projects on PKP Polish Railway Lines network

Possibilities for short-term improvements Strengthening the interchange points

Wrocław/Poznań Łódź Warszawa High Speed Line Project

Possibilities and benefits for Poznan as part of TEN-T core network corridor

CENTRUM NAUKOWO-TECHNICZNE KOLEJNICTWA HIGH SPEED RAILWAY LINE WROCŁAW/POZNAŃ ŁÓDŹ - WARSAW

Wojciech Rybak Dyrektor Biura Realizacji Inwestycji. INVESTMENT PLANS CONCERNING MODERNISATION OF THE PAN-EUROPEAN TRANSPORT CORRIDOR no VI

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:

Trade & Transport Corridors. European Projects & Initiatives

Economic and Social Council

PASSENGER RAIL TRANSPORT IN POLAND. Katarzyna Dohn

Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives

A Proven. Partner. Bombardier Transportation in Poland

Study on development potentials for long-distance passenger rail transport along TEN-T Corridor III

Ministry of Infrastructure Warsaw, r..

usage of these types of fuels with production price far higher then diesel and petrol, is also a measure. We can say that in Bulgaria there are

Introducing Mazovia to the THE ISSUE project

VBB Cross-border railcars Core Output INTER-Regio-Rail Removing barriers to regional rail transport

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV

For over 20 years, we have specialized in complex implementation of projects in the field of transport construction.

''The construction of the Public Urban Centre in Sikorskiego St. and Legionów Ave. in Łomża

The German High Speed Rail System. DB International GmbH Ottmar Grein Bilbao,

Financing the European Mobility Network with the Connecting Europe Facility

TEN-T guidelines and CEF

What to do to do? A framework for high speed trains system development in Poland. Prof. Adam K. Prokopowicz, akp10@onet.pl

2015 CEF Transport Calls for Proposals COUNTRY FICHE. Czech Republic

Traffic Forecasting Prospects for high speed rail in Poland forecasting demand

European Strategy 2050 TEN-T Methodology: Italian TEN-T network proposal

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

Airports, Intermodal and Intelligent Transport Systems (ITS) projects: Recommendations to Project Beneficiaries

ANNUAL ACTIVITY REPORT. July 2005 July European Coordinator. Pavel Telička. PRIORITY PROJECT No 27. «Rail Baltica»

European Railway Area

ACTION PLAN

Project. Projecting, building and operating the broadband network for developement of Eastern Poland

Informal meeting of EU ministers for Transport Luxembourg, October 7th, Declaration on Cycling as a climate friendly Transport Mode

How To Make Money From Shipping

CTCS Chinese Train Control System

POLAND CEE & CIS GATEWAY.

Siemens AG Mobility Division Nonnendammallee Berlin Germany

UIC Security Platform. BIRC Working. Security of International freight transport within the East-West Corridor

SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME. Terms of reference

POLISH INFORMATION AND FOREIGN INVESTMENT AGENCY. Doing Business in Poland. Iwona Chojnowska Director Foreign Investment Department

1. Towards the Baltic-Adriatic corridor work plan

AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE

Alignment design for Citybanan in Stockholm

ANNEX Removing bottlenecks and bridging missing links; Ensuring sustainable and efficient transport in the long run;

Estimation of electrical losses in Network Rail Electrification Systems

Case Study. Reconfiguration of the Supply Chain Structure. European Commission

The Danish Transport System. Facts and Figures

LIGHT RAIL ON RING 3 NOVEMBER 19 TH Supplier Workshop. Islevbro station (Rødov

POLISH TELECOM SECURITY INCIDENT RESPONSE TEAM

infrastructure Optimal information lifecycle management Comarch Backup, Archive and ILM Solutions

1. Towards the North Sea-Baltic Corridor work plan

IMPACT OF URBAN TRANSPORT SYSTEMS ON THE ATTRACTIVENESS OF POLISH AIRPORTS

Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009

post questions on

SWEDEN SWEDEN DENMARK CZECH REP. CZECH REP. AUSTRIA AUSTRIA CROATIA CROATIA ITALY TURKEY GREECE PORTUGAL TURKEY GREECE PORTUGAL

Ministry of Infrastructure PROGRAMMES FINANCED WITH EU FUNDS

DLA THESIS HIGH-SPEED INTERCITY PASSENGER RAIL CARRIAGES FOR MÁV BALÁZS LENKEI SUPESRVISOR: PROF. JÓZSEF SCHERER

Fit for the European Rail Market Training Competence - Certification

infrastructure Guaranty of business functioning continuity Disaster Recovery Center

Dear Sir or Madam, President of the Management Board of Polimex-Mostostal SA. Konrad Jaskóła

Rail research Successes and challenges

Annual Report 2007 COMMERCIAL FINANCE

BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS.

Procedure: Admission of products, which are not subject to authorization of the President of the Rail Transport Office, to placing in

A review of rail freight initiatives in the urban supply chain

BaltMet Network. Mayors of major metropolises in the Baltic Sea Region unified for the competitiveness and innovation of the Region

C a b l i n g s o l u t i o n s a t t h e c o r e o f R a i l w a y N e t w o r k s

How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, VeloForum, 16 Oct.

RAILWAY CATENARY SYSTEMS. Components and Systems for the Electrification of Railway Lines. ibemo

infrastructure Millions of users connect to us everyday Comarch Data Center

Guidelines of Rīgassatiksme an up-to-date and socially responsible company

Automated underground transportation of cargo

THE INDUSTRIAL GROUND AT NATIONAL ROAD No 44 IN BIERUŃ

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa

SERVICE LEVEL AGREEMENT! CONFIRMATION

VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s.

Poznań University of Life Sciences. Poland

M3S ANPR Automatic Number Plates Recognize System

Marco Polo Project. NePol Express

THE ROUTE MAP TO A CONNECTED EUROPE

TRANSPORT INFRASTRUCTURES TO APPROXIMATE THE YEREVAN INTERNATIONAL AIRPORT ZVARTNOTS

Chapter II Euro 2012: an Opportunity for Major Investments. Chapter III Planned Investments in Poland s Biggest Cities

Summary Summary

Millions of users connect to us everyday. Comarch Data Center

Projekty Inženýring Konzultace

PLUSK the common Polish Slovak web portal of international system of information exchange

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

ERTMS for a competitive railway

25 27 May Rail Transport Fair. summary.

TAPS is a private enterprise owned by Mr. Maciej Kowalski and employs 138 persons with a 4.77 million annual turnover (2008).

High speed railway principles

The implementation of the TEN-T policy

Technology and System Layout of the Transrapid Maglev Project

Thales: World leader in signalling technology and the worldwide ETCS infrastructure leader with the most successful track record in the industry

Region and City Frankfurt Rhein-Main

Finances and Cooperation in Higher Education (in Poland) Jan Madey University of Warsaw May 2008

TransBaltic. Deployment of ICT toolbox supporting companies in optimal modal choice. TransBaltic

Transcription:

Agata Pomykaa High Speed Railway Construction Programme for Poland updated state of preparations Pendolino tested on CMK (8.12.2013); photo: G. Koclega Until the end of 2015 the necessary feasibility studies for the requirements of high speed railway construction programme will be performed. The last part of research is the analysis of the optimal connection of the future high speed line Warsaw Lodz Poznan/Wroclaw with Berlin and Prague. The contractor of the study is supposed to choose the best options for the construction of new lines from Poznan to Berlin and from Wroclaw to Prague. The complete feasibility study will be carried out on the basis of the presented proposals on the second stage of works. In this way, the liabilities resulting from the inclusion of the future line to the new trans-european transport network will be accomplished. The construction programme for high speed railway in Poland that is currently under preparation, which had its beginnings in the nineties of the past century, is a key element of restructuring Polish railways towards their modernisation and implementation into the European railway system. The standards and quality of the latter make it possible to meet contemporary social and economic demands. At the same time there will be carried out the modernisation of Central Railway Line (CMK) to the parameters of high speed line and its extension from Warsaw to Krakow and Katowice and further to the Polish-Czech border. In 2014 it is planned to start on this line the exploitation of the trains Pendolino ED250 delivered by Alstom. On the first stage the trains will reach the maximum speed of 200 km/h. Development of the high speed railway concept in Poland The Directional Programme for High Speed Lines in Poland drawn up in 1993 was the first concept for high speed rail lines construction in Poland. Although the programme in question was formed in the early nineties, the possibility of its execution was set to 2030. Its main assumptions were to build a new east west line through Warsaw, Lodz and Poznan in the trans-european axis from Berlin to Moscow and the extension of CMK line from the area of Grodzisk near Warsaw through Plock and farther to Gdansk. At the time works concerning demarcation of this new line as well as the necessary reservation of land were completed. The route at the section Warsaw Lodz was marked out along the A2 motorway. The project for the Warsaw Poznan Lodz line was published in the document called National Transport Policy for 2001 2015 elaborated by the Ministry of Transport and Maritime Economy, 2001. In the first place it intended to construct the new Warsaw Lodz line. The 1993 study was the basis for the analysis on high speed railway connections development in Poland in Passenger Traffic Study 2020 Poland and Czech Republic, drawn up at the order of UIC in 2003. The summary of the Study in question contained the conclusions justifying the construction of high speed line at the section Warsaw Lodz Poznan Berlin. In 2002 a new concept of an radically improvement of Wroclaw Warsaw connection was presented. However, even costly and significant modernisation of the existing line will not reduce the travel time between these cities to less than 2 hours. In consequence, there was proposed another economically justified conception of exploiting Warsaw Poznan connection for trains operating on Warsaw Wroclaw line with the turning to Wroclaw localised to the west of Lodz nearby Sieradz or Kalisz. The idea of constructing a junction in the vicinity of Kalisz has gained the greatest recognition and its advantage would be the minimalisation of the length of the new line with nearly equal times of travel 14 6/2014

from Warsaw to Poznan and Wroclaw ranging from about 90 to 100 minutes. In this way, such dynamically developing metropolitan areas as Warsaw, Lodz, Poznan, Wroclaw and lesser Kalisz and Ostrow (approximately 5 million inhabitants in total) would be connected by a high speed railway. One more concept concerned linking this new line with the planned to modernise to high speed parameters Central Railway Line (CMK). This connection may be created through the modernisation of Lodz Opoczno line (station localised at the CMK Line) or at the further stage by building a new line between these cities. As a result, there would exist high speed railway network of approximately more than 900 km, linking the largest metropolitan areas of Poland and numbering altogether around 10 million inhabitants. Furthermore, modernisation of the lines coming out of these urban areas and both extensions and adaptation of these lines for high speed trains create the possibility for most of provincial cities in Poland of being included in the high speed railway network. It is estimated that almost a half of Polish citizens would benefit directly or indirectly from these new high speed lines. This concept gained extreme recognition and, as a result, in 2005 commissioned pre-feasibility study for its development. Planned Y line and its inclusion into CMK line system The route of a new Warsaw Lodz Poznan/Wroclaw line was determined in the study elaborated by the Polish Railway Institute (IK) in 2005 and, after its revision conducted during consultations, it became a basis for the analysis performed in a study carried out by IDOM (Spain). In 2013 the study was completed and the recommended optima variant of the route of the line was approved by the Inter-resort Team. The route of the given line: from the stations Warszawa Centralna Warszawa Zachodnia trains would operate on the current diameter line and from Warszawa Zachodnia there would be marked out a new route through grounds to the north of existing lines. At the border of Warsaw trains would reach the speed of 200 km/h and then change traction power supply system from 3 kv DC into 25 kv AC, and enter a new line; a route in the corridor of currently built A2 motorway between Warsaw and Strykow near Lodz, in the area of Grodzisk (about 30 km from Warsaw) would ramify to the south of the existed CMK line to Korytow station. Such solution would allow trains that run in the west and south directions to exploit the common high speed corridor; then from the crossing of A1 and A2 motorways the route would run under Strykow and then through A1 motorway corridor to the south and farther to Lodz Widzew station; from Lodz Widzew station through a tunnel and new underground station Lodz Fabryczna and farther by the tunnel under the city centre in westward direction (tunnel length will be about 4 km); next section of the line would run to the south of Jeziorsko Reservoir on the Warta River; POZNAN Sektion 03 WROCLAW then turning near Kalisz in the directions of Poznan and Wroclaw; the route to Wroclaw would run between Kalisz and Ostrow Wielkopolski. Near Ociaz and Antonin would be built junctions that will provide connection across the existing lines of Ostrow Wielkopolski junction would be built; the introduction of the line to the Wroclaw junction from the south east side with modernisation of the existing section Czernica Wroclawska Siechnice Wroclaw Brochow Wroclaw Glowny; the construction of a link at the east side of Wroclaw from a new line to E30 Wroclaw Opole Katowice line in order to connect Opole with Warsaw in travel time not longer than 2 hours; the introduction of a line to the Poznan junction from the side of Poznan Staroleka station at the west side of Ostrow Wielkopolski there is designed a connector about 10 km long which will enable direct linking of Poznan and Wroclaw with a high speed line. The total length of Warszawa Centralna Wroclaw line will amount to 351,8 km and the route Warsaw Poznan to 340,5 km. At the same time the variant of connecting the new line with the CMK line between Lodz and Warsaw was chosen. It was decided that the modernisation of the existing railway lines to the speed of 160 km/h would be the best option. After its completion the distance of 90 km/h will be covered in about 40 min. Railway nodes The governmental project for Constructing and Launching High Speed Transport in Poland requires the construction of central intermodal nodes that would link high speed, regional and urban systems with public transportation services in four cities at the Warsaw Lodz Poznan/Wroclaw line. Detailed feasibility studies have been conducted for adjusting these nodes to high speed railway operation with simultaneous integration with the existing conventional network. This is particularly important in case of Lodz, as more than 50 percent of passengers of this new line will be travelling between Lodz and Warsaw. As a result, effective conducting of the line through Lodz will decide on the success of the entire project. Station Jarocin Sektion 04 Station Nowe Skalmierzyce Sektion 01 LODZ Station Sieradz Tomaszow Maz. The route of the KDP Line Warsaw Lodz Poznan/Wroclaw Source: Elaborated by IDOM. Opoczno Sektion 01 Sektion 05 6/2014 WARSZAWA Station Technology station Diversion post Maintenance base 15

Building in Lodz a multimodal station determines then the profitability of constructing this new line. The Lodz node in its current state is dated from the 19 th century and consists of two poorly connected systems with two stations of very low standard. Until now it has not been possible to join these systems by a diametric line. It is a major barrier for transport development in the region as well as for creating efficient interregional connections in Katowice/Krakow Bydgoszcz and Warsaw Kalisz Wroclaw directions. An investment package for transport permeability in this region of Poland has been prepared. The package consists of regional and central funds. To the most significant railway projects belong: construction of urban railway system from local governments and European funds (the beginning of its exploitation took place in June 2014); modernisation and revitalisation of railway lines in the region from regional and PKP PLK s funds, and development of regional network connections based on them; construction of a diametric tunnel under the city centre. The construction project of a new central station as a regional multi-modal junction joins these projects together. The construction of this station was planned within the second stage of the modernisation of the current connection Lodz Warsaw. This will enable the creation of important for high speed railway system effectiveness of trans-regional node in both east west and north south directions (regions of Gorny Slask Kujawy and Pomorze). Map 2 describes a framework line system in the Lodz Map 1. The scheme of the route Warsaw Lodz Poznan/Wroclaw junction. The completion of building works together with a tunnel in the west direction is planned for the end of 2015. Currently study works for the west part of the tunnel are carried out, which will enable the beginning of construction works in 2016. The length of the west tunnel is estimated for 3 km and it will have 4 rail routes, similarly to the east tunnel, where two of those rail routes will be designed for high speed lines. Technical parameters of the new line The feasibility study, prepared by the Polish Railway Institute in 2006, determined elementary technical parameters for a new line Warsaw Lodz Poznan/Wroclaw on the basis of a foreign experience and current technical specifications of interoperability TSI. The values of the most important parameters approved during the new line routing are presented in table 1. High Speed Railway was designed taking into account highly rigorous parameters concerning the comfort of travelling so as to increase the exploitation speed to 400 km/h in the future. Therefore, on the sections outside railway junctions and apart from the sections where specific conditions appeared (avoidance of environmentally important locations) the increase of the speed up to 400 km/h will be possible. Reaching the maximum speed of 400 km/h will be possible thanks to increasing the tilt up to 180mm, i.e. to the maximum value allowed by TSI. Owing to this, even on the arcs with the radius R = 7500 m and clothoids L = 500 m it will be possible to increase the speed to this value. Traction power system 2x25 kv 50 Hz with traction substations localised every 40 60 km and power supplied from isolated power line 220/400 kv AC were adopted for the new line sections where the speed reaches over 300 km/h, according to TSI [11] specification. Between these substations sectioning points equipped with autotransformers will be located. This system expects the construction of a contact line with diameter of 300 320 mm 2. Traction system parameters together with power supply should enable trains to operate with a maximum speed of 350 km/h. In the power system of 2x25 kv 50 Hz non-traction needs can be supplied from 27,5 kv catenary or railway tracks of traction substations and sectioning points via single-phase transformers. However, in 3 kv DC system non-traction needs require non-traction need line with SN/NN transformers. Public power supply can be a back-up power supply for both of the systems. The basic requirement for control and command devices is providing high speed railway with Level 2 European Train Control System (ERTMS/ETCS) centralized devices which could constitute control and command system for trains based on data transmission between the track and the vehicle. ERTMS 2 system was also selected as a target system for Polish railway network. 16 6/2014

CMK line Warsaw Katowice/Krakow The existing CMK line from Warszawa to Krakow and Katowice is going to be modernised and the speed can be raised even up to 300 km/h. It is possible due to its geometrical parameters (this line was built in the 70s of the 20 th century). Moreover, the conducted study has analysed extensions of this line by new lines from Psary to Krakow and Katowice. The most convenient option is the extension of the CMK line in the south direction to Olkusz and the construction of new lines from there in the direction of Krakow and Katowice. Entering the CMK line from Warsaw, which practically begins 30 km from Warsaw to the west in Grodzisk, would take place by means of a new line Warsaw Lodz Poznan/Wroclaw with the turning to the north from Grodzisk. Currently the CMK line at the section Grodzisk Psary Zawiercie is being modernised to reach the speed of 200 km/h. At the second stage of modernisation the speed can be increased to 300 km/h. The new sections of the lines would be built to reach the maximum speed of 300 km/h. In the future the line would be electrified with the power of 25 kv AC. Technical standards for the line would be the same as for the newly built line Warsaw Lodz Poznan/Wroclaw. Table 1. Rudimentary initial designing parameters of Warsaw Lodz Poznan/Wroclaw line Parameter Proposed values Proposed value - 160 mm Tilt Maximum value 180 mm Unstable acceleration Proposed value a dop = 0,6 m/s 2 Minimal radius of horizontal arc Longitudinal inclination Radiuses of vertical arcs Width of interrail Basic value R = 6000 m Exceptional value R = 4500 m Proposed value 15% Maximum value 35% Basic value - 25 000 m Exceptional value - 20 000 m 4,75 m Table 2. Travel times in exemplary relations Relations Current times High Speed times (including modernised conventional lines) Warszawa Lodz 1:30 0:35 Warsaw Poznan 2:45 1:35 Warsaw Wroclaw 5:00 1:40 Poznan Wroclaw 2:00 0:50 Warsaw Szczecin 5:30 3:15 Warsaw Krakow 2:35 1:15 Warsaw Katowice 2:25 1:15 Krakow Poznan 7:00 3:00 Map 2. The inclusion of Warsaw Lodz Poznan/Wroclaw high speed line into Lodz Railway Junction Outcomes and forecasts The construction of new lines will radically reduce travel time between largest agglomerations in Poland, 2-3 times on average. As a result, also competitiveness of railways should be remarkably improved in comparison to other means of transport. In many cases such short travel times will be unattainable for other conveyances. Consequently, there should be better synergy of cities and revival of economic and social relations. Exemplary travel times are described in table 2. International Connections The construction of a new Warsaw Lodz Poznan/Wroclaw line and the modernisation of the existing CMK Warsaw Katowice/ Krakow line should lead to the development of international railway connections. The main relation which will significantly benefit from building a new Warsaw Lodz Wroclaw/Poznan line is Warsaw Berlin. The travel time for this relation is estimated for approximately 3 hours and it will enable the creation of attractive for passenger night trains to different cities in west Germany, Belgium or the Netherlands. Moreover, it will be possible to launch high speed trains from Krakow through Lodz and Poznan to Berlin with the travel time not exceeding 4 hours and 20 minutes. Radical improvement of Warsaw Wroclaw connection and modernisation of E30 line from Wroclaw to the country border will create comforting conditions for the return on tracks of the eliminated few years ago trains from Poland to Drezden and Leipzig. It will be also possible to create a good connection from Warsaw through Wroclaw to Prague. There is a proposal of building a new line in the direction of Walbrzych and through the tunnel 6/2014 17

Map 3. Future High Speed TEN-T in Poland under new regulation of the European Parliament and the Council 1315/2013 under the Sudety and from Prague by a newly built high speed line to Nuremberg. The final spatial solution will be established through consultations with foreign partners. Upon implementation of the Rail Baltica Line project, it is feasible to obtain convenient links from Wroclaw and Poznan at least with Lithuania. Warsaw Lodz Wroclaw line is a natural extension of E75 line (the first Pan-European corridor). International connections are the subject of the agreement within the frameworks of Visegrad Group from 20 April 2010. They were the basis of establishing the route of Trans-European transport network in Poland and neighbouring countries. In the scope of international connections it was accepted that the designed high speed line Warsaw Lodz Poznan/Wroclaw would be lengthened from Poznan to Berlin and from Wroclaw to Prague. Moreover, the central main line from Warsaw to Katowice will be extended to Ostrawa and included into the Czech high speed network. In December 2013 a new regulation of the European Parliament and the Council 1315/2013 was published, specifying the directions of TEN-T network development for all kinds of transport. According to the White Book of European Commission from 2011, high speed railways play a significant role on the transport map of Europe. Both Polish high speed lines and their connections with high speed networks of the Czech Republic and Germany appeared on the maps in the regulation. modernised CMK line. In the following years this speed can be increased even to 250 km/h. The installation of the ERTM system level 1 on the line is being finalized. After the first tests, since August 2013, on a testing rail of the Railway Institute near Zmigrod exploitation tests of the trains on the CMK line between Psary and Gora Wlodowska have been started and they have been conducted by specialists from the Railway Institute, Alstom, PKP Intercity, PKP Polskie Linie Kolejowe and PKP Energetyka. The operation of security systems European Train Control System-ETCS and RADIO- STOPU has also been tested. On 24 th November 2013 team train PKP Intercity ED250-01 during technical and movement tests on the Central Main Line at the section Psary Gora Wlodowska reached the speed of 293 km/h, setting a new speed record on the Polish railway network. The former record 250 km/h had belonged to Pendolino ETR460 since 1996. This record is also the highest speed reached in the history of exploiting Pendolino trains in the world. The previous record of these trains equalled to 283 km/h and was established in 2007. The tests in Poland were carried out without any vehicle modifications for their realisation. The Polish record is also the world record of a vehicle powered from a system of direct current under the voltage of 3 kv. The previous record belonged to a train from Russian railways Sapsan, Siemens production (the family of high speed trains Velaro) and was established on the line Moscow Petersburg in 2010. Author Agata Pomykała Polish Association of Transport Engineers and Technicians 293 km/h a new speed record on Polish tracks and preparations for launching the first high speed trains in Poland Currently 20 trains from ED250 series based on the construction of Pendolino ETR610 produced by Alstom are being delivered. Thanks to this, at the turn of 2014/2015, it will be possible to reach the speed at the first stage up to 200 km/h on the currently 24 October 2013 new speed record on Polish tracks; photo: A. Pomykała 18 6/2014