Description Quantity Cost Total Cost



Similar documents
Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

SECTION SITE PREPARATION

East Lake Park {xäñ Çz uâ Äw t à z{àxü véååâç àç

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

UNIT PRICE LIST January 2009

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

DESCRIPTION OF WORK:

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

FY08 SEWER POINT REPAIRS BID TABULATION

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Lake Charles Ward 3 Recreation Improvements To University Park

Request for Qualifications (RFQ) City of Farmersville, Texas Parks Planning and Development Services

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

Figure 3 Pipe Cracking

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

Clean, Green, Fun! Cady Way. Trail

MIAMI BLUFFS COMMUNITY ASSOCIATION LINE ITEM BUDGET (9058)

SECTION SELECTIVE DEMOLITION

SECTION EARTH MOVING

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

Chapter 22. Lump Sum Project Guidelines

M E M O R A N D U M. April 15, Planning, Housing, and Economic Development Committee

Infrastructure assets are distinguished from other capital assets because they normally:

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Unit Price Averages Reports

Storm Drain Inlet Protection - IP

NAHB PRODUCT DEFINITION

DENSITY AND PUBLIC SPACE AT BISHOP STREET

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

Guidelines for Rights of Way

C-2 Construction, Inc. - NAICS Codes

Item No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description

Exhibit A Scope of Work

Koser Field. 7th St SE 2.25

Roadway Cost Per Centerline Mile Revised June 2014

SECTION 13 REPLACEMENT AND CLEANUP SCOPE OF WORK

Architectural Inspection Site Structures

A. Structures Quantity Item Price $3,500 EA

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

Summary Form. Partner Information. Project Information. Primary Contact Name: David Cosgrove Phone:

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Accounting and Administrative Manual Section 100: Accounting and Finance

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

B. Improve the appearance and character of areas surrounding new development.

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)

FDOT Specifications List

Carlton Fields Memorandum

SPOTSYLVANIA PARKS AND RECREATION COMMISSION MINUTES. August 16, 2007

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

City of Valdosta Land Development Regulations. Table of Contents

Street Audit Tool: Web 2.0 Tools

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Welcome to the future of Terwillegar Park a Unique Natural Park

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015

UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY

Appendix 2 Asset Classes, Thresholds, Useful Lives. General Tangible Capital Assets. Capitalization Threshold* Asset Description/Notes.

Update on Previous Related Transportation Enhancement Grants

Guide for Capitalization and Depreciation of Capital Assets Prepared by the Office of Statewide Reporting and Accounting Policy

SECTION INLETS INLET LOCATIONS

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.:

Preliminary Plan Application and Checklist

Appendix C. Municipal Planning and Site Restoration Considerations

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

CID STREET INFRASTRUCTURE ASSESSMENT

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

Sims Bayou Federal Flood Damage Reduction Project

Local Road Assessment and Improvement Drainage Manual

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.

The Towns at Legacy Park

RainScapes. Runoff/Erosion: RainScapes for Schools Environmental Report Card. Excess runoff will affect these indicators of Bay health:

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

How Walkable is Your Neighborhood? A project of Health by Design

MODERNIZATION AND DEVELOPMENT. Current and Recently Completed Projects

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

SECTION XI OPINION OF PROBABLE COST

PUBLIC NOTICE. Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, Project Description

Transcription:

APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000 $500,000 Mechanical Repairs - Plumbing, Vaults/Chambers Lump Sum $400,000 $400,000 Electrical Upgrades - Sidewalk Lights, Fountain Lights Lump Sum $500,000 $500,000 (LED), Special Effects, Wiring Acoustics - Synchronized with Electrical/Mechanical Lump Sum $250,000 $250,000 Perimeter Fencing - 8' Ornamental with Gates 2,000 LF $120 $240,000 Contingency $378,000 Engineering, Survey, Permits, Testing $340,000 Total: $2,608,000 1b Expanded Cascade Falls Area: 9 Features Structural/Mechanical 9,000 SF $300 $2,700,000 Electrical - Sidewalk Lights, Fountain Lights (LED), Lump Sum $350,000 $500,000 Special Effects, Wiring Acoustics - Synchronized with Electrical/Mechanical Lump Sum $250,000 $250,000 Concrete Pavement - 6" Thick 19,500 SF $8 $156,000 Flagpole - 50' Tall 1 Each $20,000 $20,000 Benches 30 Each $1,000 $30,000 Landscape/Irrigation Lump Sum $100,000 $100,000 Contingency $750,000 Engineering, Survey, Permits, Testing $675,000 Total: $5,181,000 1c Amphitheater Area Site Demolition - Buildings, Pavement, Walls, Seating Lump Sum $100,000 $100,000 Earthwork 7,000 CY $8 $56,000 Retaining Walls 500 LF $750 $375,000 Concrete Pavement - 6" Thick 52,000 SF $8 $416,000 Concrete Stage 1,600 SF $20 $32,000 Concrete Amphitheater 22,000 SF $15 330,000 Seating 2,500 Each $150 $375,000 Lighting/Electrical Lump Sum $125,000 $125,000 Acoustics Lump Sum $50,000 $50,000 Ornamental Fencing - 8' tall 550 LF $200 $110,000 Columns 30 Each $5,000 $150,000 Drainage Lump Sum $50,000 $50,000 Concessions Buildings - 3,000 SF each 2 Each $1,050,000 $2,100,000 Landscape/Irrigation Lump Sum $50,000 $50,000 Contingency $836,000 Engineering, Survey, Permits, Testing $777,000 Total: $5,932,000 Total Cascade Falls: $13,722,000 A-1

2 HISTORIC PAREDO RESTORATION Vegetation Removal Lump Sum $20,000 $20,000 Grade Surface of Path and Widen 1,500 LF $30 $45,000 Place Fill Along Perimeter to Raise Grade - 20' Wide 2,200 CY $15 $33,000 Seed and Mulch 2 Acres $4,000 $8,000 Gateway Plaza (Gravel Surface) 21,000 SF $1 $21,000 Historic Benches 16 Each $1,000 $16,000 Gateway Historic Railing 100 LF $500 $50,000 Arched Historic Bridge 3 Each $50,000 $150,000 Landscape Lump Sum $15,000 $15,000 Contingency $71,000 Engineering, Survey, Permits, Testing $64,000 Total: $493,000 3 CHILDREN'S PLAY AREA Bituminous Parking Lot by Playground - 30 Stalls, 12,800 SF $1.75 $22,400 3" Thick Earthwork for Parking Lot 12,800 SF $1 $12,800 Parking Lot Drainage Lump Sum $15,000 $15,000 Concrete Wheel Stops 30 Each $70 $2,100 Parking Lot Striping and Signage Lump Sum $400 $400 Bituminous Sidewalk 3,100 SF $1.75 $5,400 Expanded Playground Lump Sum $100,000 $100,000 Interactive Splash Pool 3,700 SF $200 $740,000 Concrete Splash Pool Patio - 4" Thick 3,600 SF $4 $14,400 Multi-Use Structure - Pool Mechanical, Lump Sum $250,000 $250,000 Picnic Shelter and Restrooms Picnic Tables 12 Each $600 $7,200 Reconstruct 40 Stall Gravel Lot East of Ice Cream 17,500 SF $2 $35,000 Concessions Building and Install Bituminous Pavement - 3" Thick Concrete Wheel Stops 40 Each $70 $2,800 Parking Lot Striping and Signage Lump Sum $500 $500 Seed and Mulch Lump Sum $5,000 $5,000 Contingency $242,000 Engineering, Survey, Permits, Testing $218,000 Total: $1,673,000 4 OPEN FIELD AREA - PASSIVE RECREATION Disk Golf - Galvanized Steel Deluxe Baskets 9 Each $600 $5,400 Picnic Tables (informal Placement) 15 Each $600 $9,000 Cooking Grills 5 Each $600 $3,000 Contingency $3,500 Engineering, Survey, Permits, Testing $3,100 Total: $24,000 A-2

5 BANDSHELL AND RESTROOMS Demolition - Parking Lot Pavement Removal Lump Sum $5,000 $5,000 Resurface Parking Lot - 220 Stalls, 1.5" Lift 56,000 SF $1.25 $70,000 Bituminous Entry Drive - 3" Thick 8,800 SF $2 $17,600 Striping/Signage Lump Sum $4,000 $4,000 Concrete Sidewalk - 8' Wide, 4" Thick 5,600 SF $4 $22,400 Parking Lot Gate 2 Each $5,000 $10,000 Bandshell Façade Modifications Lump Sum $15,000 $15,000 Tree Plantings, Seed and Mulch Lump Sum $15,000 $15,000 Contingency $32,000 Engineering, Survey, Permits, Testing $28,000 Total: $219,000 6 NATURAL AREA - TROUT POND Pond Dredging - 10' Average Depth 3,700 CY $10 $37,000 Grade Disposal Area 1.5 Acres $5,000 $5,000 Stream Channel Construction - 4' - 5' Wide 800 LF $300 $240,000 Wood Fishing Platform - 40' x 25' 1,000 SF $50 $50,000 Picnic Shelter - 30' x 60' 1 Each $80,000 $80,000 Concrete Pavement for Picnic Shelter 2800 SF $4 $11,200 Sidewalk 5' Wide 750 SF $4 $3,000 Interpretive Sign Panels 10 Each $2,000 $20,000 Seed and Mulch 2 Acres $4,000 $8,000 Picnic Tables 20 Each $600 $12,000 Grill 4 Each $600 $2,400 Contingency $94,000 Engineering, Survey, Permits, Testing $83,400 Total: $646,000 A-3

8 ACTIVE RECREATION AREA Basketball Court - 60' x 110' 6,600 SF $5 $33,000 In-Line Hockey Rink - 125' x 250' 31,250 SF $7 $218,750 Skateboard Park - 100' x 200' 20,000 SF $10 $200,000 Double Tennis Court - 100' x 120' 12,000 SF $6 $72,000 Batting Cages Lump Sum $30,000 $30,000 Putt-Putt Golf Course - 200' x 200' Lump Sum $300,000 $300,000 Landscape Screening Lump Sum $15,000 $15,000 Footbridge Across Trout Stream Lump Sum $35,000 $35,000 Sidewalk 6' Wide 3,000 SF $4 $12,000 Contingency $183,000 Engineering, Survey, Permits, Testing $164,250 Total: $1,233,000 8a Batting Cages Lump Sum $30,000 $30,000 8b Maintenance Building Building - 30' x 80' 2,400 SF $175 $420,000 Sitework Lump Sum $100,000 $100,000 Bituminous Pavement - 3" Thick 8,500 SF $2 $17,000 Landscape Plantings, Seed and Mulch Lump Sum $30,000 $30,000 Contingency $113,400 Engineering, Survey, Permits, Testing $101,600 Total: $782,000 Total Active Recreation Area: $2,045,000 9 ACTIVE RECREATION AREA - OPEN FIELD Reconstruct Ball Field and Backstop Lump Sum $85,000 $85,000 Parking Lot - 3" Thick Bituminous, 35 Stalls 16,600 SF $2 $33,200 Concrete Wheel Stops 35 Each $70 $2,450 Parking Lot Sitework Lump Sum $20,000 $20,000 Parking Lot Striping and Signage Lump Sum $500 $500 Sidewalk - 5' Wide Concrete 1,500 SF $4 $6,000 Picnic Shelter - 30' x 30' 1 Each $65,000 $65,000 Concrete Pavement for Picnic Shelter 1,600 SF $4 $6,400 Concrete Sidewalk - 5' Wide 600 SF $4 $2,400 Picnic Tables 10 Each $600 $6,000 Grills 2 Each $600 $1,200 Landscaping Lump Sum $15,000 $15,000 Contingency $48,630 Engineering, Survey, Permits, Testing $43,220 Total: $335,000 A-4

10 GATEWAY LANDSCAPING 10a Brown Street / Randolph Street Roundabout Pavement Removal 8,000 SF $1.50 $12,000 Bituminous Road Pavement - 5" Thick 9,000 SF $3 $27,000 Special Pavement - Crosswalks 1,100 SF $15 $22,500 Special Pavement - Perimeter Walk 2,500 SF $15 $37,500 Curb and Gutter 500 LF $20 $10,000 Road Signage Lump Sum $500 $500 Special Features/Park Signage 150 LF $500 $75,000 Landscape and Irrigation Lump Sum $20,000 $20,000 Contingency $40,900 Engineering, Survey, Permits, Testing $36,600 Total: $282,000 10b Randolph Street / High Street Intersection Special Pavement - Crosswalks 1,400 SF $15 $21,000 Curb and Gutter 300 LF $20 $6,000 Road Signage Lump Sum $500 $500 Special Features/Park Signage 60 LF $500 $30,000 Landscape Lump Sum $10,000 $10,000 Contingency $13,500 Engineering, Survey, Permits, Testing $12,000 Total: $93,000 10c Denton Road / Kibby Road Intersection Special Pavement - Crosswalks 700 SF $15 $10,500 Special Pavement - Sidewalks 2,000 SF $15 $30,000 Road Signage Lump Sum $500 $500 Special Features/Park Signage 100 LF $500 $50,000 Landscape and Irrigation Lump Sum $20,000 $20,000 Contingency $22,200 Engineering, Survey, Permits, Testing $19,800 Total: $153,000 10d Brown Street / Denton Road Intersection Special Pavement - Crosswalks 1,700 SF $15 $25,500 Special Pavement - Sidewalks 3,500 SF $15 $52,500 Curb and Gutter 200 LF $20 $4,000 Fountain in Pond Lump Sum $5,000 $5,000 Road Signage Lump Sum $500 $500 Landscape and Irrigation Lump Sum $20,000 $20,000 Contingency $21,500 Engineering, Survey, Permits, Testing $19,000 Total: $148,000 Total Gateway Landscaping: $676,000 A-5

11 INTERPRETIVE / VISITORS CENTER Building - Furnishings Not Included 5,000 SF $400 $2,000,000 Site Work Lump Sum $50,000 $50,000 Site Utilities Lump Sum $20,000 $20,000 Concrete Sidewalk/Patio 4" Thick 2,500 SF $4 $10,000 Landscape and Irrigation Lump Sum $30,000 $30,000 Benches 5 Each $1,000 $5,000 Wood Livery Platform - 60' x 40' 2,400 SF $50 $120,000 Wood Warming Hut - 20' x 20' 400 SF $75 $30,000 Bituminous Parking - 80 Angled Stalls Along Randolph 12,800 SF $2 $25,600 Parking Lot Signage and Striping Lump Sum $400 $400 Contingency $458,200 Engineering, Survey, Permits, Testing $412,800 Total: $3,162,000 12 NATURAL AREA 12a Canal and Pond Dredging (Golf Course is included) (quotation provided by Jackson County from Ripstra & Scheppleman, Inc.) Soil Removal and Placement in Open Field Area at the Driving Range (item 4) and in Open Field Area (Item 9) Open Ditch Excavation 5,300 LF $12 $63,600 Pond Hydraulic Dredging 95,000 CY $10 $950,000 Channel Dredging 25,400 CY $12 $304,800 Dam Replacement (Golf Course) 3 Each $25,000 $75,000 Bridge Replacement (Golf Course) 6 Each $50,000 $300,000 Topsoil, Seed, Fertilize and Mulch Lump Sum $100,000 $100,000 Erosion Control Measures Lump Sum $10,000 $10,000 Contingency $270,500 Engineering, Survey, Permits $26,100 Total: $2,100,000 12b Wetland Interpretive Opportunities Wood Boardwalk - 8' Wide 29,200 SF $35 $1,022,000 Bituminous Path - 8' Wide 3" Thick 1,100 LF $15 $16,500 Wood Fishing/Viewing Platforms - 3 @ 40' x 25' 3,000 SF $50 $150,000 Wood Benches 15 Each $400 $6,000 Raised Foot Bridges Across Canal - 4 @ 8' x 75' long 2,400 SF $50 $120,000 Interpretive Sign Panels 20 Each $2,000 $40,000 Native Meadow Restoration - Grow Zones 5 Acres $5,000 $25,000 Contingency $275,900 Engineering, Survey, Permits, Testing $248,600 Total: $1,904,000 12c Viewing Chamber Viewing Chamber - 15' x 15' w/heavy Timber and 1 Each $350,000 $350,000 Concrete Construction with Interpretive Signage Contingency $70,000 Engineering, Survey, Permits, Testing $63,000 Total: $483,000 Total Natural Area: $4,487,000 A-6

13 OPEN AREAS Picnic Shelter - 30' x 60' 1 Each $80,000 $80,000 Concrete Pavement for Picnic Shelter - 4" Thick 2800 SF $4 $11,200 Concrete Sidewalk - 5' Wide, 4" Thick 750 SF $4 $3,000 Picnic Tables 20 Each $600 $12,000 Grills 4 Each $600 $2,400 Bituminous Pavement Parking Lot Reconstruction 15,600 SF $2 $31,200 Along Denton Road - 35 Angled Stalls, 3" Thick Site Earthwork for Parking Lot 15600 SF $1 $15,600 Concrete Wheel Stops 35 Each $70 $2,450 Parking Striping and Signage Lump Sum $500 $500 Bituminous Path Replacement - 10' Wide, 3" Thick 500 LF $22 $11,000 Landscape Lump Sum $10,000 $10,000 Contingency $35,850 Engineering, Survey, Permits, Testing $32,800 Total: $248,000 14 CASCADES MANOR HOUSE Gazebo - 40' Diameter 1 Each $100,000 $100,000 Formal Garden - 100' x 200' Lump Sum $100,000 $100,000 Irrigation Lump Sum $20,000 $20,000 Manor House Façade Repairs Lump Sum $75,000 $75,000 Contingency $59,000 Engineering, Survey, Permits, Testing $53,000 Total: $407,000 15 MULTI-USE PATH West of Brown Street Bituminous Path - 10' Wide, 3" Thick 6,500 LF $22 $143,000 Earthwork for Path 6,500 LF $6 $39,000 Clearing and Grubbing - 20' Wide 600 LF $5 $3,000 Signage/Striping Lump Sum $5,000 $5,000 Fitness Trail - 16 Stations 16 Each $1,500 $24,000 Restoration Lump Sum $8,000 $8,000 Contingency $44,400 Engineering, Survey, Permits, Testing $39,600 Total: $306,000 Along Randolph Street Bituminous Path - 10' Wide, 3" Thick 800 LF $22 $17,600 Earthwork for Path 800 LF $6 $4,800 Signage/Striping Lump Sum $1,000 $1,000 Restoration Lump Sum $1,000 $1,000 Contingency $4,880 Engineering, Survey, Permits, Testing $4,720 Total: $34,000 Total Multi-Use Path: $340,000 A-7

16 BROWN STREET IMPROVEMENTS 16a Road Improvements Remove West 2 Lanes 42,000 SF $1.50 $63,000 Earthwork and Topsoil Restoration 800 CY $20.00 $16,000 Resurface East 2 Lanes - 1.5" Lift 42,000 SF $1.25 $52,500 Curb and Gutter 500 LF $20 $10,000 Road Signage Lump Sum $5,000 $5,000 Drainage Lump Sum $15,000 $15,000 Contingency $32,300 Engineering, Survey, Permits, Testing $29,200 Total: $223,000 16b R.O.W. Enhancements Special Pavement in Front of Amphitheater 6,000 SF $15 $90,000 Pedestrian Crosswalks - Special Pavement 10' Wide 1,000 SF $15 $15,000 Concrete Sidewalk - 12' Wide, 6" Thick 4,560 SF $8 $36,480 Ornamental Street Lights - 80' Apart 36 Each $8,000 $288,000 Landscape Plantings and R.O.W. Irrigation Lump Sum 150,000 $150,000 Contingency $115,900 Engineering, Survey, Permits, Testing $103,620 Total: $799,000 Total Brown Street Improvements $1,022,000 GRAND TOTAL $29,498,000 A-8