Overview. Introduction Cooling Tower Basics Principles of Operation Types of Cooling Towers Common Applications Design Considerations



Similar documents
A Guide to Trouble-Free Cooling Towers

COMMERCIAL HVAC CHILLER EQUIPMENT. Air-Cooled Chillers

How To Design A Refrigeration System

AIR CONDITIONING TECHNOLOGY

Chilled Water HVAC Systems

Closed Circuit Cooling Towers

SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS

Cooling Systems 2/18/2014. Cooling Water Systems. Jim Lukanich, CWT ChemCal, Inc. Grapevine, TX

5.2. Vaporizers - Types and Usage

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

Commissioning - Construction Documents (Page 1 of 6)

How much do you know about HVAC? Try testing yourself with the following questions and then take a look at the answers on the following page.

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Heating Water by Direct Steam Injection

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, Table of Contents

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

HVAC Systems: Overview

CHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS

It will be available soon as an 8.5 X 11 paperback. For easier navigation through the e book, use the table of contents.

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

DEFROSTING. Service Engineers Section Technical Bulletin No 3

HEAT RECOVERY FROM CHILLED WATER SYSTEMS. Applications for Heat Reclaim Chillers

VXT. Open Cooling Towers. Open Cooling Towers. Product Detail VXT - B 1. Engineering Data... B2. Structural Support... B6

Oil and Coolant Circulating Heating System. Model - OCSM

Open Cycle Refrigeration System

HS-901(A) BASIC STEAM HEATING SYSTEMS

STEAM HEATING SYSTEM TROUBLESHOOTING GUIDE

C. starting positive displacement pumps with the discharge valve closed.

How To Clean Up A Reactor Water Cleanup

TOPIC: KNOWLEDGE: K1.01 [3.3/3.5] Which one of the following contains indications of cavitation in an operating centrifugal pump?

ABSTRACT. aspects of potential waste heat recovery systems and the economics of installing them at selected survey factories.

ASHRAE Boston Chapter Meeting Designing AC Refrigeration Systems Lessons Learned February 11, 2014

Action Plan Template HVAC Page 1

1.2 Refrigerant Equipment. General

Element D Services Heating, Ventilating, and Air Conditioning

Filtration Guide. Introduction. Benefits of Clean Water

HVAC Checklist - Long Form

PUMPS TYPE OF PUMP PRESSURE/FLOW RATING CHARACTERISTICS. Centrifugal Low Pressure/High Flow Flow changes when

Steam System Best Practices Condensate System Piping

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

Efficiency on a large scale CFB Steam Boilers

APC APPLICATION NOTE #112

Engineering Recommendation on: Accumulators Revised Issued January 10, 1979 Page 1 of 7

Geothermal Alliance of Illinois. TXVs Theory and Fundamentals John Haug Senior Application Engineer Emerson Climate Technologies - Flow Controls

Boiler Preparation, Start-Up and Shutdown

Mechanical Seal Piping Plans

THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS.

Why and How we Use Capacity Control

A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities.

Rittal White Paper 508: Economized Data Center Cooling Defining Methods & Implementation Practices By: Daniel Kennedy

Frequently Asked Questions

Desuperheater Online Program Sizing Guidance

FLASH TANK ECONOMIZER PRODUCT GUIDE

Optimization of Water - Cooled Chiller Cooling Tower Combinations

BRAZED PLATE INSTALLATION MANUAL

RECON WATER HEATER INSTALLATION FORM

HOT & COLD. Basic Thermodynamics and Large Building Heating and Cooling

Dry-out Design Considerations and Practices for Cryogenic Gas Plants

Printing and Publishing Energy Savings Guide

REGULATING VALVE APPLICATIONS

1932 Lexington Houston, Texas (713) Recommendations for installation of cooling systems

Facilities Maintenance Standards rev

TABLE OF CONTENT

By Steven C. Severini, P.E., Member ASHRAE

COMMERCIAL HVAC EQUIPMENT. Condensers and Cooling Towers

By: Jaap Hoogland SPX Cooling Technologies GmbH. CW /Jaap Hoogland/ Seawater Cooling Tower Circuits 1

The Different Types of Air Conditioning Equipment for IT Environments

Residential Plumbing BCN 1058

- White Paper - Data Centre Cooling. Best Practice

Large Energy Savings Per Installation VFDs for Large Chillers

Routine and Emergency Boiler Operation

Water Fired Chiller/Chiller-Heater. WFC-S Series: 10, 20 and 30 RT Cooling

SWIMMING POOL HEAT PUMP Owners Manual

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

How and Why Mission- Critical Cooling Systems Differ From Common Air Conditioners

Water for Injection (WFI) and Pure Steam Production in a Lean Manufacturing Environment. Larry Zanko Project Manager STERIS Corporation

How To Use A Water Source Heat Pump

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES

Why Do I Need Precision Air Conditioning?

Evaporative Cooling for Residential and Light-Commercial

CENTRIFUGAL PUMP OVERVIEW Presented by Matt Prosoli Of Pumps Plus Inc.

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

BOWIE PUMPS OPERATION - MAINTENANCE

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

TRAINING, EXAMINATION AND CERTIFICATION

No. Name Description Main input Data Main Output Data. cooling duty, process in/out temperature, inlet air temperature

HOT WATER SYSTEMS CONTENTS

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Condensate Trapping: Don't Get Caught in a Trap of Your Own! - From the Trane Inc Website 1

COIL INPUT SCREENS. ITEM NUMBER: Always use a 1 through? In this field you might also use a dash and place quantity of coils here.

HVAC Preventative Maintenance Basics. Presented by Mike Crawley

Enclosed Football Stadium Design History and Lessons Learned

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.

Refrigeration Basics 101. By: Eric Nelson

The Data Center Dilemma - A Case Study

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

Transcription:

Stephen Lowe ASHRAE Hampton Roads Chapter Past President AECOM Design Mechanical Engineering Discipline Manager, Virginia Beach Division Professional Engineer Commonwealth of Virginia, NCEES BSME University of Virginia, 2002 Sheet metal fabricator, equipment installer, refrigeration service technician during high school and college Consulting Engineer from 2003 Present

Overview Introduction Cooling Tower Basics Principles of Operation Types of Cooling Towers Common Applications Design Considerations Selection Criteria Open Piping and Pumping Systems Water Quality Tower Location Ancillary Systems Construction Issues Constructability, Quality Control and Startup Rating and Certification Lessons Learned Conclusion Resources Questions and Discussion

Cooling Tower Basics Principles of Operation Cooling Via Evaporation depends on Wet Bulb Temperature Design Dry Bulb Temperatures commonly exceed 95 deg F: poor delta T for cooling processes Design Wet bulb much less: ~80 deg F Use a process that depends on WB to take advantage of greater delta T Evaporative effect is a change of state and thus a large transfer of energy occurs relative to the required mass flow

Open Cooling Tower Closed Circuit i Cooling Tower

Cross Flow Arrangement Counter Flow Arrangement

Cooling Tower Basics Common Applications Power Plant Steam Condensation Process Cooling HVAC Heat Rejection Chiller Condenser Heat WSHP Loop Heat *We will be focusing on open, cross flow cooling towers for chiller condenser heat rejection for the remainder of the presentation.

Basic HVAC Cooling Tower Application

Design Considerations Design Considerations Selection Criteria Open Piping and Pumping Systems Water Quality Tower Location Ancillary Systems

Design Considerations Selection Criteria Process (Chiller Condenser) Temperature Requirements Hot Water Temperature (HWT): Temperature of water entering the tower Cold Water Temperature (CWT): Temperature of water leaving the tower Tower Range: HWT CWT Lower CWT generally results in higher Chiller Efficiency Flow Rate or Capacity Ambient Conditions Evaporation (or Entering) Design Wet Bulb (EWB) Approach: CWT EWB Lower approach generally results in a larger tower

Design Conditions

Design Conditions NO YES

Design Conditions Use Evaporation Design WB for selection of evaporative equipment Use of 0.4%, 1%, or 2% condition i is up to the designer based on specific application and design firm practice A 2 degree F margin of safety is recommended to account for recirculation (rule of thumb further analysis is required for the specific application) Condenser water delta T depends on many factors such as the process that is cooled and optimization of the pumping system

Design Considerations Open Piping and Pumping Systems Cooling tower pumping application troubles are generally related to one of the following issues: Incorrect Pump Head Estimation Pump Cavitation Air Introduction to Pump Suction Improper Bypass Configuration/Control

Design Considerations Open Piping and Pumping Systems Pump Head Estimation Determine actual static lf lift height h Determine impact of siphon draw: either break the siphon or design to maintain it. Determine friction head Pipe Equipment (condenser, tower spray nozzle, etc.) Components (valves, strainers, etc.)

Design Considerations Open Piping and Pumping Systems Pump head estimation errors can cause: Unstable pump operation Unstable condenser flow at the chiller Admission of air into the pump pinlet Energy waste due to need for extensive throttling Many wasted hours and headaches finding the problem!

Design Considerations Open Piping and Pumping Systems Pump cavitation is the flashing (boiling) of the working fluid (water) into a vapor due to excessively low suction pressure and is often confused with air introduction ti into the pump suction. Net Positive Suction Head (NPSH) is the measure of suction pressure. The required suction pressure for a particular pump is indicated NPSHR and is published as a curve on the pump selection chart. The suction pressure available to the pump in a particular system is indicated NPSHA and must be calculated by the engineer. If NPSHA < NPSHR, cavitation ti will occur.

NPSHA Example Calculation

Design Considerations Open Piping and Pumping Systems B & G Cooling Tower Pumping and Piping Manual has 4 rules concerning the pump suction piping: i 1. Leave the suction Line Alone! 2. Place the pump pbelow tower pan water level 3. Avoid above the pump air traps in the suction line 4. Avoid fine mesh, high pressure drop strainers in the suction line

Design Considerations Open Piping and Pumping Systems Air admittance to the pump inlet is typically caused by: Tower pan vortexing Tower pan drain down Incorrect bypass arrangement

Design Considerations Open Piping and Pumping Systems Tower pan vortexing is caused by excessive velocity in the tower exit piping i and can be controlled by: Do not excessively oversize the pump Maintaining tower exit pipe pp size for a minimum of 10 pipe pp diameters Increase pan depth Provide a vortex breaker in the tower pan Install tower on the equator

Design Considerations Open Piping and Pumping Systems Tower pan drain down is caused by insufficient water depth to flood the tower exit piping i and can be avoided d by: Correctly sizing the makeup water line Evaporation Rate Blowdown Rate Providing a check valve to keep the piping system flooded on pump shut down Properly isolating tower cells in multiple cell installations

WRONG Condenser and a significant portion of the piping system will drain pack to pan on pump shutdown. Pan may flood and chiller could start with a dry condenser. CORRECT Condenser will remain flooded on pump shutdown. Minimal system volume will drain to pan on shutdown, therefore pan should not flood.

WRONG Bypass connected to pump suction piping i can cause air introduction to pump inlet and unstable pump operation. CORRECT Bypass discharging i to basin with balancing valve set equal to discharge nozzle pressure drop will result in constant pump head and flooded pump psuction.

CORRECT Separate operators allow valves to maintain a constant total flow as both valves modulate. WRONG Linked valves will result in unstable flow.

Bypass Configuration Example

Design Considerations Water Quality Removal of Solids Chemical Treatment Consult a chemical treatment professional for your specific application Biological Contamination Minimize drift Site towers away from air intakes Avoid piping designs that result in stagnant water Chemically treat

Design Considerations Water Quality Removal of Solids What s that floating in the basin???? Whatever it is, it has a good shot at ending up inside your chiller!!!!

Design Considerations Water Quality Removal of Solids Guy with shovel and bucket In line strainers Side stream filters Basin sweeping system

Design Considerations Tower Location Visibility Sound Drift

Getting the proper Real Estate Location, location, location Cooling Towers are highly visible due to physical size and plume Need ample clearance to minimize recirculation and ensure proper performance Low frequency sound emitted from large fans travels great distance Drift can mark windows and paint jobs

Design Considerations Ancillary Systems Freeze Protection Tower Sump Basin Electric Steam Injection Recirculation Piping Water Treatment Systems Chemical Systems Solids Filtration Control Systems Pneumatic operators will require freeze protection in some climates Large valves require lots of torque electric operators may need to be industrial grade

Construction Issues Constructability, Startup, Quality Control There is lots of large piping underneath the tower, make sure you get plenty of space for it Consider laying out all of the piping based on a manufacturer s particular tower Use the manufacturer s startup checklist on your site visit Read the installation and operation manual during design; there are lots of options that affect the cost of the tower. You need to specify them if your application needs them.

Construction Issues Ratings and Certification Manufacturer s Rated Performance CTI Certification Performance Based Commissioning

Construction Issues Lessons Learned Tower Basin Freeze Protection Direct steam injection is popular in industrial and large scale HVAC applications. Chemical used for boiler feedwater may react with condenser water chemical treatment resulting in the release of noxious gases. A hot water circulator pump coupled to a heat source can be p p p used instead.

Construction Issues Lessons Learned Vertical Loop in Suction Piping Tower mounted on grade adjacent to mechanical room Cold water pipe exits bottom of basin and passes through mechanical room wall Pipe is the run up the wall to the roof structure to get the pipe across the room to the pump Upon shutdown, the system equalizes and the piping at the roof level becomes air locked The pump will require manual priming in order to start

Construction Issues Lessons Learned Flooding Tower on Pump Shutdown Tower is mounted on grade adjacent to mechanical room. There is a significant volume of water located above the tower basin due to a long horizontal run of hot condenser water pipe in the mechanical room. The diverting valve is installed in the horizontal with the bypass connection facing down. Whenever the pump shuts down, all of the water in the horizontal pipe runs through the diverting valve and back to the basin. The basin overflows in the parking lot resulting in an unsightly puddle and wasted chemical treatment

Construction Issues Lessons Learned Air introduced to pump suction via bypass

Construction Issues Lessons Learned Air introduced to pump suction via bypass AIR CAN BE DRAWN INTO PUMP SUCTION

Construction Issues Lessons Learned Air introduced to pump suction via tower discharge manifold

Construction Issues Lessons Learned Air introduced to pump suction via tower discharge manifold MUST ISOLATE TOWER DISCHARGE

Construction Issues Lessons Learned Flooding hot water pans on manifolded towers

Construction Issues Lessons Learned Flooding hot water pans on manifolded towers AUTOFLOW VALVE

Construction Issues Lessons Learned Multiple connected towers should have an equalization line. When adding or replacing towers connected through an equalization line, design the tower and framing to ensure that the existing operating water level is matched with the new tower. If it is necessary to provide vibration i isolation i for the tower, the piping system must be isolated from the tower.

Resources B & G Cooling Tower Pumping and Piping Manual Marley Cooling Tower Company Cooling Tower Fundamentals Baltimore Air Coil Product and Application Handbook Evapco Equipment Layout Manual www.cti.org ASHRAE H db k 8 HVAC S t d ASHRAE Handbook 2008 HVAC Systems and Equipment, Chapter 39

Questions?