1 Part 1 General 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying heating, ventilation and air conditioning (HVAC) work. These standards are not intended to restrict or replace professional judgment. 1.2 Refrigerant Equipment.1 Centrifugal chillers are to be preferred over single stage absorption chillers. Standalone rooftop glycol units are to be avoided..2 Chillers shall use 134a refrigerant or better ozone friendly for units above 100 tons, shall have proven service and reliability, parts, services, all inclusive service contract for five (5) years and a five (5) year renewal clause. No McQuay 3600 Motor chillers..3 Chilled water coils shall have 25% extra capacity of refrigeration with respect to the design load required by the system..4 All multicoil DX shall be provided with interlaced type circuiting. Avoid multicoil DX with single compressor..2 Glycol Re-circulation Systems.1 It is the responsibility of the design engineer to use the appropriate type of glycol for each respective application taking into accounts the applicable laws and regulations..2 For glycol re-circulation systems, add expansion tanks for glycol replenishing and testing, an automatic glycol feed system to replenish glycol, a pressure transducer at the pump to monitor for low pressure and shutdown the pump, and monitoring sensor connected to the central Building Control Management System..3 Install by-pass filter on glycol and chill water loops. 1.3 Heating, Ventilation, Air Conditioning Equipment.1 Design Control for Mechanical Systems.1 The professionals responsible for system design shall inform the Executive Director Facilities Management and Development in writing whenever budgetary constraints may prevent the performance objectives of this standard form from being respected..2 Longevity and Performance Criteria for any new systems may be introduced if and only if the supplier can provide an obsolescence statement guaranteeing a minimum of ten years serviceability for the system, including the refrigerant gas..2 General.1 Loading docks shall be provided with air curtains or other means to minimize air infiltration and be isolated from the rest of the building. Provide minimum heating at the docks by ducting the building exhaust air to this area. (Use air curtain wall).2 Humidifiers shall be ARMSTRONG or DRI STREAM or reusable canister. An approved equivalent manufacturer shall be considered if approved in writing by the representative of McGill s Facilities Operations Department (FOD). octobre 2014 Page 1 of 5
2 .3 Perimeter rooms shall be air-conditioned with sill type grilles and ceiling diffusers (Linear)..4 All mechanic HVAC equipment shall be housed in a penthouse; rooftop units shall be avoided..5 Relative pressures for labs shall be negative with respect to corridor. Intermediate and high-level radiation labs shall be negative with respect to other labs, and buildings shall be slightly negative to the outside..6 If peripheral heating is required, it shall be fed from under the floor. An all-air system with a two-supply (hot and cold), one return fan dual duct variable air-column system shall be supplied along exterior walls from under the floor..7 The return air shall supply the hot duct 100%; excess air shall supply the cold duct (with outside air)..8 See section for HVAC units design..3 Mechanical Preheat, Reheat or Cooling Coils.1 Whenever possible and applicable, the design engineer shall consider using "dual service" type coils (same coil for heating and cooling - depending on the season) filled with glycol and serviced by heat exchangers if required..2 Integral Face and Bypass (IFB) or Vertical Integral Face and Bypass (VIFB) preheat or reheat coils shall not be used. Glycol heating coils shall be provided instead..3 Coils shall be tested in accordance with A.R.I. standard Cooling coils air velocities shall not exceed 490 ft/min (2.5 m/s)..5 Coils construction:.1 Coil casings shall be minimum 16-gauge 304L stainless steel..2 Headers shall be copper..3 Water and DX coils tubes shall be 5/8 inch (16 mm) minimum seamless drawn copper, thickness minimum..4 Steam coils tubes shall be 1.0 inch (25.4 mm) minimum seamless drawn copper, thickness minimum..5 Coil fins shall be flat type (flat fin rippled design) aluminum 0.010" thickness, maximum spacing of 10 fins per inch. If helical fins are provided for cooling or heat recovery coils, stainless steel mist eliminators are required in order to avoid water carryover..6 A strainer shall be installed before the control valve on any coil..7 All coils shall be equipped with a vacuum breaker at the highest point..8 Each hydronic coil shall be provided with isolation valves, balancing valve manometers, thermometers and air vent. The thermometers and manometers shall be installed on the supply and also on the return water sides..9 Steam traps shall be installed with recommended slopes for drainage..4 Vibration Isolators.1 Vibration eliminators shall be provided for all moving equipment called for in all projects. Equipment shall be effectively isolated from the building structure to prevent undue vibration and noise transmission to the building. octobre 2014 Page 2 of 5
3 1.4 Air Distribution.1 Transformer grilles in doors or transoms are not permitted. Air transfer shall be achieved by duct transfer grilles installed in ceilings, with fire dampers and provision for sound attenuation as required..2 Air intakes shall be located away from vehicle circulation areas and exhausts at roof level, not at street level for car fumes. If this cannot be done, then airflow studies shall be considered with respect to the positioning of air intakes and wind..3 Air intake velocity shall be 200 feet per minute or less. All basins in air handling units shall be drained with slopes to drains..4 Duct insulation shall be installed on the outside of ductwork. Insulation on the inside of ductwork shall be avoided. Acoustical insulation shall be accomplished with silencers..5 Transformer rooms shall have their own exhaust and supply with no heating to be provided..6 Mechanical room and washroom exhaust fans shall be stop-start programmable..7 Air supply to transformer rooms shall be filtered (using 2 deep - Merv 8 filters, combining standard sizes of 24 x24 and 12 x14 only)..2 Ductwork.1 Ductwork shall be as per the latest SMACNA and ASHRAE standards..2 If the ductwork needs to be insulated, then the insulation shall be placed on the outer wall of the ventilation ducts (i.e. no insulation allowed in the air tunnel). If required, acoustic silencers shall be provided..3 All new ductwork for chemical fume hood exhaust systems shall be 316 stainless steel, low carbon, round, with annealed welds; or fibreglass reinforced plastics depending on the application..3 Diffusers.1 All new and replacement ceiling diffusers shall be selected in order to achieve an efficient air distribution. Color to be coordinated with the project architect. Provide balancing dampers for each diffuser..4 Terminal boxes (mixing boxes and VAV boxes).1 For each new project, verify that the terminal boxes serving the designated area are still functional and have not exceeded their life expectancy, in which case they would need to be replaced..2 All new mixing or variable air volume (VAV) terminal boxes shall be Direct Digital Control (DDC) type and be connected to McGill University s Building Automation System (BAS). This shall be done even when the existing terminal boxes are pneumatic type..3 Each box shall serve a designated zone and be controlled by its dedicated DDC thermostat connected to the BAS system..5 Air Filters.1 For general applications pre-filters shall be MERV 8 2 "(50mm) and final filters shall be MERV 13-12" (300mm) rigid box type. octobre 2014 Page 3 of 5
4 .2 Always use standard filter sizes 24"x24" and 12"x24". Other filters sizes shall be used when it is impossible to use standard size or when the standard size is not available for a given application. When this is the case, notify in writing the maintenance mechanical engineer of McGill University Facilities Operations Department..6 Fans.1 Whenever available, fans shall be direct driven type rather than belt driven..7 Access Doors.1 Access doors shall be provided at locations in the duct systems where access to manual or automatic fire dampers, coils, thermostats or any other apparatus requires inspection..2 Doors shall be constructed with an external built-up metal frame for stiffening. Doors on insulated ductwork shall be of double panel construction provided with glass fibreboard filler..3 Access doors shall be provided ahead of all fan inlets and on both sides of all coils to allow for cleaning and inspection..8 Flexible Connections and Isolating Connections.1 Flexible connections shall be provided on joints between ducts and air-handling equipment. They shall be 150 mm (6 inch) wide Ventglass type flexible connections. Two 13 mm (1/2 inch) wide heavy flexible braised copper conductors with clamps shall be installed to ground all systems..2 Flanges shall be provided on the ducts to make proper connections. Connections shall have a minimum of 100 mm (4 inch) between the flanges and shall be airtight. Similar connections shall be supplied for the joints between dissimilar metals in the ductwork. Flexible conductors shall be used to bridge all flexible connections in ductwork. 1.5 Testing, Adjusting, and Balancing.1 Before renovations, all HVAC systems affected by the change shall be checked and airflow readings shall be recorded..2 After renovations, all HVAC systems affected by the change shall be checked and balanced..3 Commissioning of new HVAC systems shall wait until all construction work is complete and all dust and dust sources have been cleaned-up and eliminated..4 Air handling units shall not be turned on during construction..5 Filters on the return air shall be changed after construction is finished and before final balancing..6 Final inspections shall be made to assure after start-up that filter frames are not damaged, ducts are clean, balancing is correct..7 The project contractor has the responsibility to document the test..8 The project engineer has the responsibility to conclude on the passage of the test..2 Balancing and Testing.1 All air handling units and their respective distribution networks shall be balanced for air quantities as shown on the engineering drawings. octobre 2014 Page 4 of 5
5 .2 Trades shall provide all belts and pulleys required for balancing all fan systems..3 Trades shall submit all testing and balancing results on 8.5 x 11 inch sheets with cross-referenced drawing showing diffuser location and air quantities removed..4 Fan test shall be submitted. The entire document shall be bound in a title binder with hard fibreboard cover. 1.6 Cooling Towers.1 Cooling towers and all interior surfaces and components shall be made of 304L stainless steel. The unit s floor shall be complete with heavy duty 304L stainless steel grating..2 The fans shall be direct driven type. If direct driven is not available, provide gearbox driven motor. Belt driven fans shall be avoided..3 The motors must be controlled by variable frequency drives see VFD section Cooling tower shall be complete with 304L stainless steel ladder and railing..5 Depending on the cooling tower location and its surroundings there might be a risk that contaminants (dust, pollen, etc.) get into the cooling tower causing clogging and premature stoppage of the unit. Removable stainless steel mesh screens shall be provided at the air intake in order to ensure proper operation. END OF SECTION octobre 2014 Page 5 of 5
UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
SAM HOUSTON STATE UNIVERSITY
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
Element D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer
SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM
SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2
SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION
SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the specifier in correctly specifying Mechanical System Testing
HVAC Checklist - Long Form
HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,
Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,
4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.
Mechanical Rooftop Custom Capabilities
Mechanical Rooftop Custom Capabilities Mechanical Construction Capabilities Price manufactures a wide range of custom gas heat and DX cooled units to meet your new construction and retrofit needs. In addition
SECTION 23 81 43 HEAT PUMPS
SECTION 23 81 43 HEAT PUMPS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop heat pumps. 1.2 REFERENCES A. American Society of Heating, Refrigerating and Air-Conditioning Engineers:
Energy Efficiency in Industrial HVAC Systems
Energy Efficiency in Industrial HVAC Systems Heating, ventilation and air conditioning (HVAC) constitutes up to 35 percent of energy used in manufacturing facilities. This fact sheet is geared towards
HVAC Systems: Overview
HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct
Basics of HVAC Cleaning
Basics of HVAC Cleaning Seminar Outline Residential 1. Types of systems used and why 2. Types of air distribution systems 3. System components 4. Determining the need for cleaning (ACR2002) 5. Project
COMMISSIONING OF HVAC SYSTEMS
FORM CL-01 SYSTEMS / EQUIPMENT INCLUDED : SYSTEM STARTUP CHECKLIST I - PRE - STARTUP INSPECTION EQUIPMENT MOUNTING & SETTING CONTROL, INTERLOCK & POWER WIRING ALIGNMENT OF MOTORS & DRIVES PIPING, CONNECTIONS
SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS
SECTION 15750 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for roof mounted, self-contained units, with electric cooling, and electric or reverse refrigeration cycle (heat pump) heating
Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks
Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same
B.C. Buildings Corporation. Mandatory Preventive Maintenance Standard. To Meet Section 4.78 of the WCB OH & S Regulation
B.C. Buildings Corporation Mandatory Preventive To Meet Section 4.78 of the WCB OH & S Regulation Prepared by: BCBC WCB-IAQ Steering Committee Mandatory Preventive TABLE OF CONTENTS Page no. INTRODUCTION...1
Bring the fresh in. Dedicated Outside Air Systems
Bring the fresh in. Dedicated Outside Air Systems The inside story on outside air. On average, we breathe in 3,400 gallons of air each day. Ambient indoor air pollution is a major problem, affecting health
DIVISION 23 - HVAC 23 30 00 HVAC Air Distribution
PART 1 - GENERAL 1.01 GENERAL CRITERIA A. General Design Criteria 1. System standards require that buildings be fully ducted (supply, exhaust and return air). 2. Provide positive exhaust ventilation for
Glossary of Heating, Ventilation and Air Conditioning Terms
Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment
AABC Specifications for Testing and Balancing HVAC Systems
AABC Specifications for Testing and Balancing HVAC Systems The Associated Air Balance Council (AABC) Total System Balancing Specifications for HVAC Testing, Balancing and Performance Verification TOTAL
TOP 10 NOISE CONTROL TECHNIQUES
TOP 10 NOISE CONTROL TECHNIQUES The following are 10 simple noise control techniques that have wide application across the whole of industry. In many cases, they will produce substantial noise reductions
2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT
Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com
Element D Services Plumbing
PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL
NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
6 MECHANICAL HVAC SYSTEMS
Conventional Facilities Chapter 6: HVAC Systems 6-1 6 MECHANICAL HVAC SYSTEMS 6.1 Design Criteria 6.1.1 Codes and Standards The latest edition of the codes, standards, orders, and guides referred to in
SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK
SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions
Lesson 36 Selection Of Air Conditioning Systems
Lesson 36 Selection Of Air Conditioning Systems Version 1 ME, IIT Kharagpur 1 The specific objectives of this chapter are to: 1. Introduction to thermal distribution systems and their functions (Section
A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly
SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING
SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION PART 1 - GENERAL 1.1 SUMMARY A. Section includes cleaning of interior surfaces of HVAC equipment. The HVAC equipment cleaning work includes the following: 1. Air
Building Energy Systems. - HVAC: Heating, Distribution -
* Some of the images used in these slides are taken from the internet for instructional purposes only Building Energy Systems - HVAC: Heating, Distribution - Bryan Eisenhower Associate Director Center
HVAC Processes. Lecture 7
HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump
Nominal Life Expectancy for Building Components
Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes
Evaluate, Clean, and Tune Guidance
Evaluate, Clean, and Tune Guidance The Evaluate, Clean and Tune (ECT) process serves three essential purposes in the Weatherization Assistance Program (WAP). The first is to evaluate the existing system
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled
National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook
National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction
Chilled Water HVAC Systems
Chilled Water HVAC Systems By Ron Prager, Brinco Mechanical Services, Inc. Types of water based systems: There are three types of HVAC systems that utilize water as a heat transfer medium. The first system,
Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents
Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 HELPER AND INTERMEDIATE JOBS...
The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.
MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating
ENHANCED LABORATORY HVAC SYSTEM
ENHANCED LABORATORY HVAC SYSTEM INTRODUCTION Since the early 1980's the attention to more energy efficient laboratory designs has been on the rise due to the increase in energy cost and the emergence of
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
MECHANICAL TRADE SCOPE OF WORK GUIDELINES
MECHANICAL TRADE SCOPE OF WORK GUIDELINES OTTAWA REGION 2009 Comprised of Piping Trade, Ventilation (HVAC) Trade, Fire Protection Trade Endorsed by the following organizations Ottawa Construction Association
AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries
AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries
How much do you know about HVAC? Try testing yourself with the following questions and then take a look at the answers on the following page.
Demystifying HVAC Test Your HVAC Knowledge By Ron Prager How much do you know about HVAC? Try testing yourself with the following questions and then take a look at the answers on the following page. 1)
HVAC Characteristics. Test Space HVAC Characteristics
HVAC Characteristics Information on the characteristics of the heating, ventilation, and air conditioning (HVAC) system(s) in the entire BASE building including types of ventilation, equipment configurations,
RPV - RP - RA air handling units
APPLICATIONS Heating, ventilation, cooling >> FACTORIES >> WAREHOUSES >> HALLS >> DISTRIBUTION CENTRES >> COMMERCIAL PREMISES >> PLACES OF WORSHIP RPV - RP - RA air handling units www.reznor.eu RPV - RP
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may
Attachment J-C18.1. HVAC Work Instructions
. RFP: Attachment J-C18.1 HVAC Work Instructions NNC13ZFD017J SOW Item No. Title Page C18-02 Control Air Systems Annual PM 2 C18-03 Split System AC Indoor Section Annual PM 3 C18-04 Condensing Unit Semi-Annual
Circuit breaker panel. Power supply for condensing unit. Power supply for furnace. Air handler (Furnace)
UNIT OBJECTIVES Describe the concept of year-round air conditioning List three typical year-round air conditioning system types List the five ways to condition the air Determine airflow for a cooling system
Mechanical Systems Proposal revised
Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option
Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis
Components HVAC General System Selection Life Cycle Cost Analysis Outdoor Air Design Values Indoor Air Design Values Outdoor Air Ventilation Welding Ventilation Temperature Control Systems Ductwork HVAC
HVAC Design Requirements
Maintenance of HVAC HVAC Design Requirements Air Flow Diagram แบบ Recirculation Air Flow Diagram แบบ Once Through Definition Of Conditions As built At rest In operation air air air Maintenance GMP Requirements
HVAC Preventative Maintenance Basics. Presented by Mike Crawley
HVAC Preventative Maintenance Basics Presented by Mike Crawley Air Handlers/Package Units: Coils have to be clean! The main purpose of any coil is to absorb or reject heat If coils are dirty; air flow
COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN
COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN Umesh Atre Innovative Design Inc 850 W Morgan St Raleigh, NC 27603 [email protected]
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
Glossary of HVAC Terms
Glossary of HVAC Terms Heating, Ventilation and Air Conditioning (HVAC) is a major sub- discipline of mechanical engineering. The goal of HVAC design is to balance indoor environmental comfort with other
Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client
Order of Magnitude Mechanical Estimating Justin Apprill, P.E. Topics for Today Estimate Goals A Concept for Accurate Conceptual Estimating HVAC Systems Common System Types and Rules of Thumb Pricing Example
3/29/2012 INTRODUCTION HVAC BASICS
INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.
Terms of Reference Air Handling Unit (HVAC System) Cleaning
Terms of Reference Air Handling Unit (HVAC System) Cleaning Introduction General cleaning of the air handling units is currently undertaken by the Mechanical Division staff composing of 3 personnel. Cleaning
Innovent LASER Packaged Fresh Air Conditioning Units
LASER Latent And Sensible Energy Reduction Latent And Sensible Energy Reduction For Outside Air Innovent LASER Packaged Fresh Air Conditioning Units Innovent LASER units provide both sensible and latent
Product Data Bulletin
Product Data Bulletin Adjustable Frequency Drives and HVAC Systems An Application Guide September, 1994 Raleigh, NC, U.S.A. INTRODUCTION All buildings pose the same problem: how to heat or cool the air
Air Conditioning Clinic
Air Conditioning Clinic Introduction to HVAC Systems One of the Systems Series February 2012 TRG-TRC018-EN Introduction to HVAC Systems One of the Systems Series A publication of Trane Preface Introduction
HVAC SYSTEMS ACOUSTICAL, COST & ENERGY STUDY
HVAC SYSTEMS ACOUSTICAL, COST & ENERGY STUDY Prepared for the Los Angeles Unified School District Facilities Services Division June 6, 2005 By Maroko & Shwe, Inc., Professional Engineers With Schaffer
SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP
research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design
HIGH EFFICIENCY RTU. www.reznorhvac.com HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING. DX System IEER> 13.2 Gas Heat Efficiency > 92% Capacities Tons
Capacities 10-25 Tons 100-400 MBH HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING DX System IEER> 13.2 Gas Heat Efficiency > 92% HIGH EFFICIENCY RTU 30-120 kw 3,000-11,550 CFM Comfort Comfort is determined
HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget
A PRIMER Educational HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget Contents: Introduction: The best HVAC system is durable, reliable
SECTION 15936 AIR INLETS AND OUTLETS
SECTION 15936 AIR INLETS AND OUTLETS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Diffusers. 2. Registers. 3. Grilles. 4. Louvers. 5. Lowered Penthouses. 6. Gravity Roof Hoods. 7. Gravity Roof
Why is my air conditioner dripping on my customers?
De-Mystifying HVAC Why is my air conditioner dripping on my customers? By Ron Prager One of the most frequent emergency service requests is a call for an air conditioner leaking water into the store. These
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB
PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT
PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant
Preliminary Final Proposal
1 Butler Memorial Hospital New Inpatient Tower Senior Capstone Project Mechanical Option Preliminary Final Proposal Mechanical System Re-design and Breadth Topics Butler Memorial Hospital New Inpatient
KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM
KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...
ASTACEA4 Inspect complex/central air conditioning systems
Overview This Unit covers the competences required to inspect complex/central air conditioning systems as defined by the CIBSE TM 44 Figure 1.1: Summary of system types and their component parts. The air
DESIGN STANDARDS SECTION 23 60 00
PART 1 - GENERAL 1.01 Work included: A. Piping, tubing and fittings. B. Piping specialties. C. Special duty valves. D. Refrigerants. E. Chillers. F. Refrigerant monitors. 1.02 General requirements: A.
VertiCool Space Saver 2 to 15 tons Water-Cooled and Chilled Water
2 to 15 tons Water-Cooled and Chilled Water Unique Solutions for Challenging HVAC Projects Your Choice for Limited Space Applications Water-Cooled Chilled Water The VertiCool Space Saver allows installation
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
Line Card. www.mechreps.com
Line Card www.mechreps.com Air Movement Products ACCUREX www.accurex.com Kitchen Hood Systems, Make-Up Air Equipment, Exhaust Fans, Controls, Fire Suppression Systems ACME MANUFACTURING CORPORATION www.acmetulsa.com
Presented By: WALTER E. JOHNSTON, PE CEM, CEA, CLEP, CDSM, CPE <[email protected]
Presented By: WALTER E. JOHNSTON, PE CEM, CEA, CLEP, CDSM, CPE
ASHRAE Boston Chapter Meeting Designing AC Refrigeration Systems Lessons Learned February 11, 2014
ASHRAE Boston Chapter Meeting Designing AC Refrigeration Systems Lessons Learned February 11, 2014 Explanation of the refrigeration cycle. Compressors. Benefits and operating characteristics. -Reciprocating
Solicitation Items Report
Solicitation Items Report Solicitation 91036-12295-208 Title: M/R of Air Conditioning Units & Split A/C Units Estimated Total Value: Description: Delivery Terms: Free On Board Destination Payment Terms:
Radford University. Indoor Air Quality Management Plan
Radford University Indoor Air Quality Management Plan Spring 2015 Introduction Concerns with Indoor Air Quality (IAQ) have increased since energy conservation measures were instituted in office buildings
Commissioning - Construction Documents (Page 1 of 6)
Commissioning - Construction Documents (Page 1 of 6) A. General Information Climate Zone: Building Type: Conditioned Area (sf): Reviewer's Name: Reviewer's Agency: Note: Design Review for each system/subsystem
Center for Energy Education Laboratory
Paper ID #7072 Center for Energy Education Laboratory Dr. Robert Gilbert, Sinclair Community College Robert B. Gilbert, Ph.D., LEED AP, BA, is an Associate Professor of Energy Management Technology, and
A. Air-Conditioning and Refrigeration Institute: 1. ARI 850 - Commercial and Industrial Air Filter Equipment.
SECTION 23 40 00 - HVAC AIR CLEANING DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Activated carbon filters. 2. Extended surface rigid air filter with synthetic media. 3. Disposable panel
Defining Quality. Building Comfort. Heating and Cooling Coils
Defining Quality. Building Comfort. Heating and Cooling Coils Heating and Cooling Coils Heating and Cooling Coils For over 20 years, AAON has supplied the coil needs of industrial and commercial HVAC customers.
CLASS B AIR CONDITIONING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION
CLASS B AIR CONDITIONING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION The General Trade Knowledge portion of the examination will be administered in one session on the morning on
Training for Building Technicians: Energy Efficiency & Sustainability (BEST) Program. Seminar Outline & Sample BEST Exam Questions
Training for Building Technicians: Energy Efficiency & Sustainability (BEST) Program Seminar Outline & Sample BEST Exam Questions Buildings in the United State consume a significant amount of energy. According
DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED
DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATETYPE REVIEW_ REVIEWER DRAWINGS REVIEWED EVERY ITEM WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON- APPLICABILITY (NA). A. GENERAL SECTION 7 PLUMBING
Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)
Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) I. Demonstrate safety skills in typical HVACR work situations to NATE Core Installer Knowledge Areas for Technician Excellence for Safety
Contents and Nomenclature
DX Coils Contents and Nomenclature Nomenclature... 1 Evaporator Coil Types EN... 2 EF... 2 ER... 2 EJ... 3 EK... 3 Evaporator Construction Connections... 4 Tubing... 4 Headers... 5 Tube Supports... 5 Coil
MECHANICAL AND PLUMBING BASIS OF DESIGN FOR BRIDGING DOCUMENT
MECHANICAL AND PLUMBING BASIS OF DESIGN FOR BRIDGING DOCUMENT 1. MECHANICAL 1.1. Goal: A. Provide design, engineering, installation, and start-up, testing, adjusting, balancing, and commissioning of the
Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings
Advanced Energy Design Guide LEED Strategies for Schools and High Performance Buildings Today s Presenters Stephen Koontz, LEED AP Energy Services Leader Tampa Bay Trane Allen Irvine General Sales Manager
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression
Mechanical Heating Ventilation and Air Conditioning Ductwork and Duct Accessories
Basis of Design This section applies to the design and installation of ductwork, air terminal boxes, air outlets and inlets, volume dampers, pressure relief dampers, smoke/fire dampers, and smoke/fire
Johnson Air-Rotation Systems
AR Series TM Johnson Air-Rotation Systems Solution TM D Series TM FF Series TM 80/20 PR Series TM Johnson Air-Rotation systems announces a major addition to its product line, completing its line of high
HVAC Systems in Schools & Commercial Buildings and Radon
HVAC Systems in Schools & Commercial Buildings and Radon References US EPA Radon Prevention in the Design and Construction of Schools and Other Large Buildings http://www.epa.gov/ordntrnt/ord/nrmrl/pubs/1993/air/
SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS
SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS UNIT OBJECTIVES After studying this unit, the reader should be able to explain the purpose of the condenser in a refrigeration system. describe differences