4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP 4.5-1 ESTIMATION OF TRIP REDUCTIONS WITH TIMP TRANSIT AND TDM PROGRAMS



Similar documents
1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Appendix B Billboard Photos and Sign SUD Site View Simulation

TRAFFIC IMPACT ANALYSIS HANDBOOK VOLUME I METHODOLOGIES & REQUIREMENTS

Appendix E Transportation System and Demand Management Programs, and Emerging Technologies

Advantages and Disadvantages of One Way Streets October 30, 2007

MOUNTAIN HOUSE MASTER PLAN CHAPTER TEN AIR QUALITY AND TRANSPORTATION MANAGEMENT

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

Los Angeles Metro Rapid

Overview of the Travel Demand Forecasting Methodology

INTRODUCTION TO TBEST. An FDOT Model for Short Range Transit Ridership Forecasting

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination Attachment A

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone

Appendix G.3 Crain & Associates, Peer Review

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

Transportation Impact Assessment Guidelines

The Fresno COG Travel Demand Forecasting Model How the Pieces Fit Together

When is BRT the Best Option? 1:30 2:40 p.m.

GTA Cordon Count Program

Proposed New Starts/Small Starts Policy Guidance

Office of Internal Audit

ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama

Guidelines for the Preparation of Transportation Impact Studies 8 th Revision

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects

Proposed Service Design Guidelines

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER

Research Results Digest 352

2013 Annual Service Plan Five year Service Plan Updates

Master Transportation Plan

Congestion Management Systems: A Federal Perspective. 7 Key CMS Components

APPENDIX E TASK 5 TECHNICAL MEMORANDUM: TRAVEL DEMAND FORECASTING PROCESS

Mount Royal College Transit Service Plan

TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL

TRAFFIC DEMAND MANAGEMENT IN ACTION! Sue Peden, Travelwise Development Manager Southampton University Hospitals NHS Trust

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)

11. Monitoring Performance monitoring in LTP2

Bus Priority Measures in Calgary: Past, Present and Future. Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit

EXECUTIVE SUMMARY. Study Approach. Background. ERP in Concept and in Practice

ROUTE 178 CORRIDOR STUDY. Prepared For: KERN COG, CALTRANS, CITY OF BAKERSFIELD

Retooling School Drop-off/Pick-up Zones to Meet Demand Keith B. Higgins, PE, TE

T-BEST: Nothing But the Best for All Your Transit Planning and Ridership Forecasting Needs

CHAPTER 4 ALTERNATIVES COMPARISON

Figure L3: Level 2 SR 99 Elevated Light Rail Alternative Detail - 1 of 4

2012 King County Metro Transit Peer Agency Comparison on Performance Measures

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

Anchorage Travel Model Calibration and Validation

CRENSHAW/LAX TRANSIT CORRIDOR PROJECT

3. FORECASTING TRAVEL DEMAND IN THE CORRIDOR

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

6. Cost Summary and Analysis This chapter summarizes and analyzes the cost estimates from previous chapters.

The Region s Most Expensive Commutes:

TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations. Part 2: Station Typology and Mode of Access Planning Tool

Best Practice For Selecting Bus Stop Locations

Table of Contents B.2 Traffic/Access - Parking

TRANSPORTATION ENGINEERING DESIGN STANDARDS. Adopted by City Council Ordinance

Bromley Town Centre. Transport Strategy Supporting the Area Action Plan. Evidence Base

city Transportation Services Fee - Proposed and Reviewed

Downtown Los Angeles Streetcar Economic Analysis

Evergreen Line Rapid Transit Project Business Case Executive Summary. February Reviewed by

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT

Light Rail Transit in Phoenix

An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP

TRANSPORTATION MODELLING IN CALGARY

FIRESTONE EDUCATION CENTER MASTER PLAN SUBSEQUENT FINAL ENVIRONMENTAL IMPACT REPORT

110 EXPRESSLANES PERFORMANCE UPDATE, AS OF 2/28/13

City of Ottawa Transit Network Planning Project. October ENTRA Technical Report. Excellence in Transportation Planning

Stouffville Corridor Rail Service Expansion

TRANSIT DEVELOPMENT PLAN

CITY OF DES MOINES COMMUTE TRIP REDUCTION PLAN

U.S. Department of Homeland Security Nebraska Avenue Complex Master Plan DRAFT ENVIRONMENTAL IMPACT STATEMENT APPENDIX C

California High Speed Rail Ridership and Revenue Forecast Model Run Summary

Wilmington to Newark Commuter Rail Improvement Project

Protected Bicycle Lanes in NYC

Photo credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT

How To Plan A City Of Mason

Chapter 6. Intersections. 6 Intersections

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street Market Street 11-14

Study of Transportation Long-Range Funding Solutions. Report to the Legislature

Simulating Traffic for Incident Management and ITS Investment Decisions

The Top 50 Highway Projects to Support Economic Growth and Quality of Life in Alabama

6 REGIONAL COMMUTE PATTERNS

IMPLICATIONS AND LESSONS LEARNED

A Review of Transit Technology Specifications

Collection and Use of MAC Address Data for the Travel Demand Model

Needs and Equity in Prioritizing Sidewalk

REQUEST FOR PROPOSAL. Consulting Services for a Thomas Street Corridor Master Plan

Technical Report 4: Congestion Management Process Final Plan for Adoption October 2015

Presto Fare Card ibus (Automated Stop Announcements, Cameras) Transit Operating System Replacement

Miami-Dade Transit Service Standards

BULLETIN NO. 6. Car-Share Requirements and Guidelines for Car-Share Spaces ZONING ADMINISTRATOR. 1. Car-share Basics PURPOSE: OVERVIEW:

TRANSPORTATION IMPACT ANALYSIS (TIA) Guidelines

Evaluating Air Quality Benefits of Freeway High Occupancy Vehicle (HOV) Lanes in Southern California

The LYNX Transit Master Plan. METROPLAN Orlando Presentation

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Joel D. Montero, Chief Executive Officer Fiscal Crisis and Management Assistance Team

Transcription:

Draft Environmental Impact Report State Clearinghouse No. 2002061090 City of LA EIR No. 2003-1922-EIR CPC No. 98-0010 (CPU) 4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP This chapter summarizes an analysis of projected 2025 market conditions both with and without implementation of the proposed Westchester-Playa del Rey TIMP. The chapter first provides a discussion of potential vehicular trip reductions with implementation of the transit and TDM components of the proposed TIMP, followed by an assessment of projected traffic volumes and roadway segment levels of service with implementation of these components plus the highway infrastructure and transportation system management components of the TIMP. 4.5-1 ESTIMATION OF TRIP REDUCTIONS WITH TIMP TRANSIT AND TDM PROGRAMS The transit and TDM elements of the proposed TIMP are intended to reduce the number of vehicle trips generated within the study area, particularly "home-work" commute trips during peak periods. The increased transit services envisioned in the proposed TIMP are focused along the Lincoln Boulevard, Manchester Avenue, and Sepulveda Boulevard corridors, supplemented by expanded circulator and feeder services in and around the Westchester-Play del Rey CPA, a transit center in or near Playa Vista, and a Playa Vista shuttle bus system. Potential transit ridership increases along the Lincoln, Manchester, and Sepulveda BRT corridors were estimated based on the potential peak hour capacity of the proposed BRT service. Based on this analysis, reductions in peak hour vehicle trips generated within and between zones along the BRT corridors were estimated. These reductions were estimated at eight percent for zones within walking distance of the BRT corridors (nominally one-quarter to one-half mile) and four percent for zones within nominally one mile of the corridors. It was further estimated that implementation of the TDM components of the TIMP could reduce commute vehicle trips generated within the Westchester-Playa del Rey CPA by an additional two percent. 4.5-2 YEAR 2025 TRAFFIC VOLUMES WITHOUT AND WITH PROPOSED TIMP The programmed improvements listed in Section 2.3.1 and the Playa Vista Phase I mitigation measures listed in Appendix A were incorporated into the Westchester-Playa del Rey travel demand model calibrated 1997 highway network to produce the 2025 base highway network. This network was utilized in traffic simulation runs for the 2025 No Growth (without CPU project) and 2025 Market (with project) scenarios. To estimate the effectiveness of the proposed Westchester-Play del Rey TIMP, the 2025 base highway network was then modified to incorporate the physical improvement elements of the proposed TIMP. With implementation of the transit and TDM elements of the TIMP, an increase in average vehicle ridership would be expected that would translate to a reduction in vehicular trips. To compute the trip reductions, the 2025 trip tables were modified to incorporate the vehicle trip Westchester -Playa del Rey Community Plan Update Page 4.5-1

Draft Environmental Impact Report State Clearinghouse No. 2002061090 City of LA EIR No. 2003-1922-EIR CPC No. 98-0010 (CPU) reduction parameters discussed in Section 4.1. Based on modification of the trip tables and network, the travel demand model produced new estimates of traffic generation in the Westchester-Playa del Rey CPA and assigned that traffic to the network. To evaluate overall traffic volume increases due to growth in the Westchester-Playa del Rey CPA both with and without implementation of the TIMP, projected 2025 Market and 2025 Market with TIMP volumes for freeway, major highway, secondary highway, and collector street segments throughout the CPA were compared against those projected for the 2025 No Growth scenario. Tables C-1 and C-2 in Appendix C present the projected PM peak hour volumes on the analyzed segments for the various scenarios. Total projected traffic volume across all of the analyzed roadway segments increased by about 5% for the 2025 Market scenario in comparison to volumes projected for the 2025 No Growth scenario. Overall cumulative traffic growth from the 1997 base year to 2025 Market conditions is projected to be about 28%. The proposed TIMP would be effective in reducing commute trips generated in the Westchester- Playa del Rey CPA, but travel demand model forecasts indicate that the TIMP would be less productive in reducing total on-street traffic within the study area, as the TDM and transit elements of the proposed TIMP would be less effective in reducing non-commute trips and would not directly affect regional traffic passing through the CPA. 4.5-3 ROADWAY SEGMENT LEVEL OF SERVICE ANALYSIS Tables C-1 and C-2 in Appendix C summarize the estimated V/C ratios and the corresponding levels of service for the analyzed freeway, major highway, secondary highway, and collector street roadway segments in the Westchester-Playa del Rey CPA under 1997 base levels, 2025 No Growth conditions, 2025 Market conditions, and 2025 Market with TIMP conditions. Figures 4-1, 4-2, 4-3 and 4-4 illustrate the roadway segment levels of service under the respective four scenarios. Roadway segment levels of service (LOS) under the 2025 Market condition are compared to the 1997 base year condition to determine cumulative impacts of traffic (including that generated by regional growth) during the study period. The 2025 Market condition is also compared to the 2025 No Growth condition to determine direct impacts of traffic growth associated with development under the Westchester-Playa del Rey CPU project during the study period. The roadway system is considered to be significantly impacted if the weighted average V/C ratio under projected year 2025 Market conditions for all of the analyzed roadway segments is greater than that projected under 2025 No Growth conditions or the number of roadway segments projected to operate at unsatisfactory levels of service (i.e., LOS E or F) under Year 2025 Market conditions is greater than the number projected under 2025 No Growth conditions. Westchester -Playa del Rey Community Plan Update Page 4.5-2

Draft Environmental Impact Report State Clearinghouse No. 2002061090 City of LA EIR No. 2003-1922-EIR CPC No. 98-0010 (CPU) 4.5-4 1997 AND 2025 CONDITIONS WITHOUT TIMP Table 4-1 provides a summary of the results in Appendix C. This shows that 25 segments were operating under unsatisfactory conditions (LOS E or F) during the PM peak hour under 1997 base conditions. For the projected 2025 No Growth scenario, the number of segments estimated to operate at LOS E or F during the PM peak hour is 33. Comparison to the 1997 base year scenario indicates that an additional eight segments would be operating at unsatisfactory levels of service, the effects of which are attributable to regional growth. Under the 2025 Market scenario (without implementation of the proposed TIMP improvements), the number of segments expected to operate under unsatisfactory conditions during the PM peak hour increases to 42. Comparison of the 2025 Market scenario to the 2025 No Growth scenario reveals that the number of segments operating at unsatisfactory levels of service is projected to increase by nine, the effects of which are attributable to growth associated with the CPU project. It can be seen that a substantial portion of the projected deterioration in future operating conditions is attributable to regional growth. However, the increase in the number of segments operating at unsatisfactory conditions between the 2025 No Growth and 2025 Market scenarios indicates that the CPU project, without implementation of the proposed TIMP improvements, would have a significant impact on the roadway system. 4.5.5 2025 CONDITIONS WITH TIMP With implementation of the proposed Westchester-Playa del Rey CPA TIMP, Table 4-1 indicates that 33 segments are projected to operate under unsatisfactory conditions during the PM peak hour. This, however, represents an improvement over the projected 2025 Market conditions without the TIMP, under which 42 link segments are projected to operate at unsatisfactory levels of service. Comparing the 2025 No Growth and the project scenario with the TIMP, the same number of segments (33) are projected to operate at unsatisfactory levels of service under both 2025 No Growth and 2025 Market with TIMP conditions. Figure 4-4 illustrates level of service of the link segments for the 2025 Market with TIMP conditions. Also, comparing the 2025 Market scenarios with and without the TIMP, it can be observed that the weighted average V/C ratio for all of the analyzed link segments within the Westchester-Playa del Rey CPA is estimated to decrease by about 0.045 with the implementation of the TIMP, from 0.824 to 0.779. This is also 0.025 lower than the weighted average V/C ratio of 0.804 projected for the Year 2025 No Growth scenario. Therefore, the proposed TIMP would be effective in improving overall operating conditions over both 2025 Market and No Growth conditions as measured by average V/C ratio, and would mitigate the significant impacts of the CPU project per this significance criterion. The TIMP is also projected to maintain the same number of segments at LOS E or F under 2025 Market conditions Westchester -Playa del Rey Community Plan Update Page 4.5-3

Draft Environmental Impact Report State Clearinghouse No. 2002061090 City of LA EIR No. 2003-1922-EIR CPC No. 98-0010 (CPU) as under 2025 No Growth conditions, meaning that significant impacts of the CPU project would also be mitigated per this significance criterion. TABLE 4.5-1 SUMMARY OF PM PEAK HOUR ROADWAY SEGMENT LEVELS OF SERVICE WESTCHESTER-PLAYA DEL REY CPA Scenario Number of Segments* Operating at: Weighted Average V/C Ratio (All segments*) LOS D or better LOS E LOS F Unsatisfactory LOS (E or F) 1997 Base Year 185 11 14 25 0.745 2025 No Growth 185 14 19 33 0.804 2025 Market 176 18 24 42 0.824 2025 Market with TIMP 185 11 22 33 0.779 Note: * Segments include freeways, major highways, secondary highways, and collector streets within CPA. Westchester -Playa del Rey Community Plan Update Page 4.5-4

APPENDIX A Playa Vista Phase I Mitigation Measures in Westchester-Del Rey CPA Page 4.5-5

APPENDIX B City of Los Angeles TDM Ordinance Page 4.5-6

APPENDIX C Roadway Segment Level of Service Tables Page 4.5-7

APPENDIX D Improvements Considered, but not Included in Proposed TIMP Page 4.5-8