Modular Locomotive System Instruction Manual for HBK8 George Body Kit



Similar documents
Modular Locomotive System Instruction Manual for HBK5 Billy Body Kit

Modular Locomotive System Instruction Manual for HBK Chassis Kit. Covering Billy, Katie and George models

MGB Chrome Bumper Conversion

BUILDINGA 1/10 SCALE FLATBED TRAILER

SHOP NOTES METAL SHAPER FOR YOUR SHOP

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

Integral Kit Instructions

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT

LYCOMING O-360. Engine Installation

DIY CABINET REFACING INSTALLATION GUIDE

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.

Pole Lathe and Shave Horse Design

SERVICE MANUAL. Corpus 3G. Seat system for electric wheelchair

Installation Manual. SKU# series (Base Rails) SKU# series (Overhead Racks)

1976 McWilliams Wines Rail Tank Car Kit

Installation Instructions

Build Your Own Solar Car Teach build learn renewable Energy! Page 1 of 1

BUILD A TABLETOP LOOM

Router Table Plans.

Lathe Milling Attachment

Owner's Manual & Assembly Instructions

Removable Aluminium posts

Installation Instructions S

WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS

Fabricating a chassis from clad PCB board material

HOW TO MAKE A MOTOR BRACKET

Heavy Glass Frameless Shower Door With Return Panel

INSTALLATION AND SERVICE MANUAL

Instructions: General American 8,000 Gallon Acid Tank Car Kit 12/2014

GENUINE PARTS INSTALLATION INSTRUCTIONS

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

Wren Kitchens Installation Tips Carefully check your kitchen delivery Measuring out and marking up Fitting the base cabinets...

VW Caddy W INSTALLATION INSTRUCTIONS

2&3 SECTION LOFT LADDER

OWNER S MANUAL Table Tennis Table Patent Pending

PARTS NEEDED FOR CONVERTING FROM LP TO NG

How to Build a Poker Table

Speed-Mat Rectangle Cutter

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

VOYAGER 570G. 744A Sprayer Control

Installation instruction do88 Intercooler for Volvo S40 / V50 / C30

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************

Children s Furniture Projects

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

Drive shaft, servicing

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair


Cedar Cottage Doghouse Plans

Gripper Kit for the Boe-Bot Robot (#28202)

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

TONNEAU INSTALLATION GUIDE

Trillium 40 Axis Spring Tensioner Wire Replacement Instructions

How To Launch A Rocket From A Formica

Build a Junior Solar Sprint Model Car Kit Materials: 1 PITSCO Ray Catcher Sprint Kit or Solar Made Junior Solar Sprint Kit 1 White Sheet of Plastic

Arctic Leash Instruction Manual Alaskan Products Company LLC.

Gate Leg Drop Leaf Table Plans

W I T H I N J O I ST S I N STA L L AT I ON

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250/F-350 Single Wheel 2WD Ford F350 Dually 2WD IMPORTANT NOTES

COOPER S PULLEY UPGRADE KIT INSTALLATION INSTRUCTIONS PART NUMBER NME5011

Installation Instructions

SELF-STEERING AXLE TABLE OF CONTENTS

Front brakes (FN- 3), servicing

TABLE OF CONTENTS. I. TROUBLESHOOTING Section 1.01: Common Problems/Solutions... 2

Installation instructions, accessories - Handsfree for cellular phone, system B, entry level

1500 Follow Spot Yoke

Rear wheel brakes, servicing. Стр. 1 из 45. Note:

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN

CONFER ABOVE GROUND CURVE STEP / ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL

Installation Instructions

PANELIZED HOME INSTALLATION GUIDELINE

Installation Guide 2010 BMW S1000RR Full Exhaust System

Check for deteriorated, shifting or missing tie-down pads. Replace if needed.


ADDING AN ELECTRIC AUXILIARY FAN TO RADIATOR STACK ON 03 ALPINE COACH

Folding Bath Screen Instruction Manual

INSTRUCTIONS. FLHR/C/S (Road King) FRONT END LOWERING KIT 1WARNING -J03242 REV General. Removal (Left and Right Forks) Kit Number

Dave s Sheet Metal Bending Brake

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250 Single Wheel 4WD Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

SPIRAL STAIR KIT INSTALLATION MANUAL

Installation Instructions

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports

Instructions: General American Dry-Flo Covered Hopper Car Kit 9/2014

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

Hive Top Ventilation Shims

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

Triple Threat 3-in-1 Game Table 3 IN 1 GAME TABLE

ZAP THE GAP by Peter Atonna

DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

Double Glider Assembly Instructions.

Rack installation instructions

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation

KITCHEN INSTALLATION GUIDE

COMMERCIAL GAS DRYER

Transcription:

Modular Locomotive System Instruction Manual for HBK8 George Body Kit Roundhouse Engineering Co. Ltd. Units 6-10 Churchill Business Park. Churchill Road, Wheatley. Doncaster. DN1 2TF. England. Tel. 01302 328035 Fax. 01302 761312 Email. mail@roundhouse-eng.com www.roundhouse-eng.com 1

HBK32 George Body Kit Introduction These instructions cover the construction of the body kit intended to fit the George chassis and boiler kits. The brass panels are photo etched to shape and all fold lines and holes are etched into the parts where necessary. Only a minimum of cleaning up is required and will normally simply mean running around the edges with a small file or emery cloth to remove any sharp edges or pips that may be left due to the photo etching process. As a general rule, all folds should be 90 degrees with the etched lines on the inside of the angle except if specifically stated otherwise. The kit is designed for either manual or radio control operation and all fixing holes are provided for both versions. The panels have been designed for assembly with soft solder, however, if preferred holes can be drilled at the joints and small rivets or screws used. If soldering, a small to medium butane blowtorch is ideal, as the large areas of brass will dissipate the heat of a soldering iron too quickly unless a very powerful one is used. Use a suitable flux with the solder, Bakers fluid being particularly good, though extreme care must be taken during use. Follow the manufacturer s instructions on the packaging of any solder, fluids or glues at all times. Glue of any kind is not suitable for the main structure, but is required for the headlamp lens. Refer to diagrams where necessary and hold parts together with small clamps such as toolmakers clamps or miniature G or C clamps, during soldering or drilling of joints. It is advisable to run through the full instructions identifying all parts and mountings and have a dry run before soldering anything in place. All painting is left to the builder and Acrylic paint is readily available in spray cans for a good finish. A good primer is essential and if available an etch primer should be used on brass parts. A good model shop will stock more specialised paints and should include etch primer in the range. Read carefully and follow the maker s 2

instructions that appear on the can before using any paint. All parts must be thoroughly cleaned and rubbed down with fine wet and dry paper prior to painting. Construction Dia. A Fold up the cab floor and regulator r/c servo bracket as shown in the diagram (Dia. A). Place the two tabs on the bottom of the servo bracket into the slots on the footplate and fix with soft solder. General Note. When folding long sections, i.e. the side flanges, it is better to hold the flanges between two pieces of angle iron in a vice or clamps, as illustrated (Dia. B). In this way, all the flange is bent over in one go and the result is a much neater job. 3

The floor can now be painted then fitted to the chassis as follows. If the chassis/boiler unit is complete, it is necessary to remove the lubricator, gas burner and gas tank and the screw fixing the rear boiler mounting foot to the frame spacer. Pull the boiler backwards out of the smoke box then lift the rear end and slide the foot plate in place. Reposition the boiler and fasten again with the screw up through the rear frame spacer and into the mounting foot, this time also passing through the hole (1 on Dia. C) in the foot plate. The mounting hole is slotted to allow the foot plate to be squared up to the rear buffer beam before finally tightening the screw from underneath. Dia. C 4

Replace the gas equipment and lubricator as before. Note that there is a slot in the foot plate for the gas tank mounting to pass through. Two holes (3 on dia. C) are provided on the left hand side of the foot plate for mounting the manual reversing lever. The front screw is used with a large brass washer and so that the washer clamps under the edge of the large cut-out in the floor. Diagram D shows the basic layout of controls and fittings on a manual control engine. Radio control versions differ slightly but this is covered in detail in the R/C fittings kit instruction manual. Dia. D 5

Fold up left and right hand body sides as shown in Dia. E, ensuring that all folds are at 90 degrees. Clamp together tab A and the tank front and solder the two together making sure that the tank top is at 90 degrees to the tank side. Dia. E Dia. F Fold up the cab back as shown in dia. F. Note that four large flanges with holes in bend the same way, i.e. facing into the cab interior however, the four narrow flanges (B) fold the opposite way and point outwards. Fold up the cab front as shown in dia. G. Note that the two side flanges bend one way, i.e. facing into the cab interior however, the two bottom flanges fold the opposite way. Dia. G 6

Dia. H Clamp tabs C and D (dia.h) on the cab front to the left hand cab side and underside of tank top, ensuring that all faces are at 90 degrees to each other, then solder both joints. A slot will be left at the top for the roof hinge. Repeat for the right hand side. Clamp tab E (dia. I) on the cab back to the cab side ensuring that the handrail holes line up and the back face is parallel to the back edge of the cab before soldering. Repeat for other side. As with the front panel, a slot is formed in the top left hand corner for the roof hinge. Dia. I 7

The side tank front steps can now be fitted. Push the half etched tab through the slot in the tank front and bend it up on the inside then solder. Two lamp brackets are provided which can be fixed to the cab rear if required. Remove the two side tabs from each Dia. J bracket and fold as shown in dia. K. The brackets can now be laid on or clamped in place and soldered to the cab back in a position to suite your needs. Dia. K 8

The cab roof can now be assembled. Fold the cab roof hinge as shown in the picture below, and attach it to the underside of the cab roof using two 8BA countersunk screws and nuts. The holes on the top of the roof that these screws pass through are countersunk, so that the head of the screw is flat with the roof. The hinge has slotted holes to allow for adjustment of the roof position. Check roof and hinge position on top of the cab and tighten the screws up. File away any excess thread that protrudes through the nut plus about half the thickness of the nut as well. 9

All assemblies and the brass dome can now be prepared and painted as outlined in the introduction. When the painted items are thoroughly dry, the four cab handrails can be fitted using 8BA nuts on the inside. The dummy whistle valve is screwed to the cab front using the nut supplied. The polished brass dummy whistle can then be glued onto the top of the valve. The dummy tank fillers can be glued in place. The spectacle rims are held in place by tabs which pass through the slots above and below the spectacles. Note that the top tab on each rim should be bent down inside the cab and the bottom ones bent up. Finally, the cab roof is attached using the two M2 x 6 screws, washers and nuts. These screws pass through from the outside of the cab with the washers and nuts on the inside of the hinge. Leave them slightly loose to allow the hinge to operate. A spot of Loctite or, if this is not available, paint, on the threads will prevent the nut from coming off. To open the roof, it should be lifted slightly on the left hand side so that the hinge slides up on it s slotted brackets, and should then hinge open freely. Check that when closed, it sits squarely on top of the cab and that its curve matches the radius of the spectacle plates on which it sits. The brass boiler bands should be cleaned to remove any sharp edges and then polished and fitted over the front of the boiler wrapper as follows. One touching the rear of the smokebox. One just in front of the dome. One just in front of the cab spectacle plate. 10

The finished body is fastened to the chassis in four places. Two M3 screws pass down through the cab back base flanges and cab footplate with nuts underneath. Two more pass through the front of the side tanks and the vertical flange on the rear of the front footplate with nuts inside the tanks. The dummy roof vent is purely a cosmetic addition to the roof and is attached using the double sided sticky pads. Finally, place the dome over the boiler filler plug. 11

HBK8 George Body Kit Checklist Loose items:- 1 Cab Floor. 1 Cab Front. 1 Cab Back. 1 Cab Roof. 3 Boiler Band with M2 Long Steel Screw & Nut fitted. 1 pair of Right and Left cab/side tanks. 1 Brass dome. 1 Dummy Roof Vent with sticky pads. Sealed Pack No.1 2 Front tank steps. 1 Cab Roof Hinge 1 R/C servo mount. 1 Dummy Whistle valve casting with fixing nut. 1 Brass dummy whistle 2 Spectacle Rims. 2 Dummy Tank Fillers. 4 Handrails Sealed Pack No.2 8 Handrail Knobs 13 8BA Nuts 4 M3 x 6 Brass Screws - Body Mounting Screws 4 M3 brass nuts. 2 8BA x 3/16 Countersunk Screws 2 M2 x 6 Screws, Washers & Nuts PARTS CHECKED 12