Maliakos Kleidi Project Construction & Challenges faced. Presentation to ELAC 2014



Similar documents
44 TH ASECAP STUDY & INFORMATION DAYS 2016

Road tolls to pay for the Metro construction in Athens possible way towards free public transport

Unit Price Averages Reports

The Follo Line Project

BONATTI: COMPANY OVERVIEW

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

Road Asset Management

ATHENS METRO LINE#2 and LINE#3 - GREECE

TBM CROSSING OF STATIONS

Coastal Highway Route E39 Project

IH-635 MANAGED LANES PROJECT, SEG. 3.2

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

AEG-ASCE SHORT COURSE

ATHENS METRO. Past, Present & Future ATHENS METRO LINES. 46 th ECCE Meeting Athens, 19 October Dr. G. Leoutsakos ATTIKO METRO S.A.

Member Nation Report 2010 from Denmark.

SÖDERLEDSTUNNEL STOCKHOLM FIRE PROTECTION OF THE WESTERN TUBE A CASE STUDY

Company Profile.

Role of the Environmental Management Representative (EMR)

Round Table PPP with the Minister of Economic Affairs of Estonia, Juhan Parts. - A-Models in General / A5 in Baden-Württemberg -

Rockfall Attenuator System

The Gotthard Base Tunnel

Asset Management Policy for Major PFI Projects

PRESIDIO PARKWAY FINANCIAL PROPOSAL FINANCIAL PROPOSAL EXECUTIVE SUMMARY GOLDEN LINK PARTNERS

Auditing A Tool to Ensure Safety Compliance in Public Private Partnerships

Traffic Management During Construction

PPPs: INSIGHTS FROM NORTH AMERICA. Presenter: Brian Middleton. worldwide

ACO Construction & Building Products

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Professor Dimitrios Tsamboulas National Technical University of Athens, Greece Expert

NETLIPSE NETWORK MEETING Seppo Mäkinen Finnish Transport Agency

RECORD TURKISH HIGHWAY

Brief Company s Profile

BARRIER LIFT SYSTEM 2 BARRIER LIFT SYSTEM

Current opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction

Gebze Izmir Motorway & Izmit Bay Crossing Project

700 Life-Cycle Cost Analysis

(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT Nina Tveiten Norwegian National Rail Administration

Granger Bay Boulevard and Green Point Roundabout

Project Implementation and Administration Seminar Case Studies

Temporary Traffic Management

CHAPTER 8 CIVIL DESIGN

The unit costs are based on the trend line of the 3 low bids for the average quantity.

Business Unit. Tunnelling & Civil Engineering. Infrastructure solutions from a single source.

Road Asset Management

Public-Private Partnerships Forum PPP Law, Structures and Contracting

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

Trenching and Excavation Safety

Queen Alia International Airport Project, Jordan

1 Introduction. 1.1 General. 1.2 Historical development

CONSTRUCTION COST MODELS

BRIDGES ARE relatively expensive but often are

(4) All required markings shall be present on the vehicle when on the AOA. Markings are not transferrable between vehicles.

Söderströmtunnel: immersion in downtown Stockholm, Sweden

Urban Vehicle Crossing Application To be completed and fees paid for prior to approval

Monitoring Highway Assets with Remote Technology

3 Tappan Zee Bridge Rehabilitation Options

Township of Enniskillen. Asset Management Plan

Clean, Green, Fun! Cady Way. Trail

Emergency repair of Bridge B421

Mine Wide Risk Assessment What is the State of your Arteries. L.Human, J Doolan and L Potts Xstrata Zinc

Transportation Infrastructure Asset Management

MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

MLD: Domestic Maritime Transport Project

Sub-Saharan Africa Transport Policy Program (SSATP) Output- and Performance-based Road Contracts (OPRC)

Expression of interest for the delivery of an Initial Operating Segment

Hellinikon S.A. The Site

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Integrated Tunnelling Data Management, Analysis and Visualization New IT Tools for Better Projects

Exhibitions - Conferences - Events

Before applying for a Road Opening Licence, please read and understand the following information.

In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section:

CURRICULUM VITAE. Institution (Date from - Date to) Degree(s) or Diploma(s) obtained:

Special Issue Nr. 3 Regional Information - Mexico February 2015

IFC s Experience in Financing Airports Queen Alia Airport: A Case Study. Dubai, February 23, 2011

Drainage Composites. The ready-made solution to sub soil drainage

Thoughts on Warm Mix Asphalt production (..among other things!)

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM

Sector Design Concepts

PPP Experience on the Canada Line

The new Athens Airport

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

Tirana International Airport SHPK Tirana International Airport Nënë Tereza Administration Building, Rinas Tirana, Albania Phone: Fax:

Entreprenørdagen 14. mars 2011

Guidelines. Motorcycle and Bicycle Work Zone Safety

5 ALTERNATIVE SOLUTIONS AND EVALUATION

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA

Chapter 13 Route Window C11 Isle of Dogs station. Transport for London

European Field Operational Test on Safe, Intelligent and Sustainable Highway Operation

Section 2100-Trenching and Tunneling

Geotechnical Building Works (GBW) Submission Requirements

Undergrounding high voltage electricity transmission. The technical issues

Current as of 11/10/08 1 of 1

FINANCIAL EVALUATION OF FLEXIBLE PROTECTION SYSTEMS FOR NATURAL HAZARD MITIGATION IN MODERN RAILROAD APPLICATIONS

Nu-Guard 31 Steel Guardrail System

Transcription:

Maliakos Kleidi Project Construction & Challenges faced Presentation to ELAC 2014 Dimosthenis Papakrivopoulos, Civil Engineer, Deputy Project Director of MKCJV 09.05.2014

Index Introduction The Project Tunnels Rock fall protection Works Open Sections 2

INTRODUCTION

Introduction Aegean Motorway S.A. was founded on June 13, 2007. The Shareholders of Aegean Motorway S.A. are: Hochtief PPP Solutions GmbH 35.00% AKTOR CONCESSIONS S.A. 20.00% J&P-AVAX S.A. 16.25% VINCI CONCESSIONS S.A. 13.75% AEGEK S.A. 10.00% ATHENA Α.T.Ε. 5.00% 4

Introduction On June 28 2007 Aegean Motorway S.A. signed together with the Ministry of Environment and Public Works the Concession Agreement for the Design, Construction, Financing, Operation, Maintenance and Exploitation of the motorway of PATHE section Maliakos-Kleidi, for 30 years. The Concession Agreement was ratified on 08.08.2007 under Law Ν. 3605/08.08.2007. The Construction Works were partially suspended from 1/6/2011 up to 17/12/2013 Project Reset 17.12.2013 under Law N. 4219/13 5

Introduction Concession Structure LENDERS STATE DIRECT AGREEMENT GREEK STATE GREEK STATE S FINANCIAL ADV. LENDERS LEGAL ADVISORS LOAN AGREEMENT S EYDE/DC/CPP CONCESSION AGREEMENT INDEPENDENT ENGINEER LENDERS TECHNICAL ADVISORS SPONSORS' CONCESSIONAIRE PARTNERS SHAREHOLDERS AGREEMENT CONCESSIONAIRE AEGEAN MOTORWAY S.A. DESIGN & CONSTRUCTION CONTRACT I.E. CONTRACT IBI & OTHER TOLLING AND SERVICE PROVIDERS OTHER CONTRACTORS CONTRACTOR S DIRECT AGREEMENT CONSTRUCTION JV PARTNERS JV AGREEMENT CONTRACTOR MKCJV UMBRELLA PROJECT MANAGEMENT WORKS ALLOCATION HOCHTIEF AKTOR J&P AVAX VINCI AEGEK ATHENA 6

Introduction Works Allocation to MKCJV Partners 1. Hochtief (39.5%) 2. Aktor (19.3%) 3. J&P Avax (15.7%) Olympia JV 4. Vinci Construction Grand Projects (10.5%) 5. Aegek (10.0%) 6. Athena (5.0%) 7

THE PROJECT

The Project The part of the motorway that Aegean Motorway has rehabilitated and is operating since Concession Commencement ( 5/03/2008 ), starts at Raches of Fthiotida prefecture and ends at Kleidi of Imathia prefecture, i.e. from 240+700 km of the existing National Road of Athens Thessaloniki up to km 469+700. A total length of 230 kms. Moreover, Aegean Motorway will construct a new part of the motorway which will comprise 3 twin tunnels in the area of Tempi and Platamon. The construction of this new part will be completed by the end of 2015. After the conclusion of the Concession period, Aegean Motorway will return the motorway to the State in full working condition. 9

The Project Rehabilitation Works on existing Sections Raches Evangelismos (135.52Km) and Skotina Kleidi (63.61Km) Interventions on the existing motorway Tempi Skotina (33Km) Interventions on the existing National Road Skotina Kleidi (63.61Km) Re-construction of Katerini urban area above existing Cut and Cover Tunnel Re-construction of Korinos I/C (incl. 1 bridge) and Eginiou I/C (incl. 1 bridge) Completion of Markigialos I/C. Improvement of Agathoupolis I/C and Kleidi I/C. 10

The Project Construction of the New Part between Tempi and Skotina One of the major parts of the Project is the construction of three twin tunnels. These are Tunnels T1, T2 and T3 of 2km, 6km and 2,7km length respectively. Tunnels T1 and T2 will be located in the area of Tempi. Tunnel T3 will go through the area of Panteleimonas. Tunnels T1 and T2 will pass through mount Kissavos, while T3 through mount Olympos and the max. depth of their construction is close to 300 meters below surface. Each Tunnel will have two (2) driving lanes and an emergency lane per tube, thus having a width of approx. 10,5 m. Every approx. 300 meters there will be a cross passage to the other tube for pedestrian use in case of an emergency, while every 900 meters the cross passage can be used by the vehicles of the emergency services. 11

The Project Construction of the New Part between Tempi and Skotina The light blue line indicates old National Road The orange line indicates the new part of the Motorway where the new tunnels are shown in blue. 12

The Project Construction of the New Part Additionally to the tunnels, the construction includes: 11,3 km motorway 17 km of secondary roads 20 big structures (culverts, underpasses and bridges with length up to 220 m) 2 new interchanges, one in Rapsani and one in Platamonas 80 small hydraulic culverts 6 tunnel E&M buildings and 3 tunnel ventilation buildings (for tunnel T2) Pyrgetos new Toll Station 3 interchanges at the Katerini Kleidi part of the motorway (North Katerini, Korinos, Eginio) Kleidi new Toll Station 13

TUNNELS

Tunnels Tunnels Section Evangelismos Rapsani Tunnel T1 1.9 km Tunnel T2 6 km T1 North - Vinci T2 North - Hochtief T1 South - Athena T2 South - AEGEK Tembi Rapsani Tunnel T2 Evangelismos Tunnel T1 Tunnel T1 Tunnel T2 15

Tunnels Tunnel Section Platamonas Skotina Tunnel T3 2.7 km T3 North - AKTOR T3 South - J&P Tunnel T3 Evangelismos Tunnel T1 Platamonas Tunnel T2 Skotina Tunnel T3 16

Tunnels FL 1 17

Tunnels FL 3B 18

Tunnels T1 North portal 19

Tunnels Excavation Temporary support 20

Tunnels 21

Tunnels 22

Tunnels 23

Tunnels Waterproofing 24

Tunnels Final Lining 25

Tunnels Asphalt works 26

Tunnels T2 South smoke extraction building 27

Tunnels T2 Central smoke extraction building 28

Tunnels T2 North smoke extraction building 29

Tunnels T2 North shaft 30

ROCK FALL PROTECTION WORKS

Tembi Valley Panteleimonas The works include : Rock bolts Placing of Fences Placing of nets Scaling Rock fall protection Works 4,5 Km. 2,0 Km. Rock fall protection works 32

Rock fall protection works 33

Rock fall protection works Measures against rock fall «Active» measures: «Scaling» of loose and unstable material Light (by hand, using portable gear) Heavy (blasting, breaking) Bolting of unstable pieces Placing of nets on the slopes (Spider, Tecco) «Passive» measures: Installation of barriers (type TXI, RXI) Construction of Galleries 34

Rock fall protection works 35

Rock fall protection works Active measures 36

Rock fall protection works Active measures 37

Rock fall protection works Active measures 38

Rock fall protection works Passive measures 39

Rock fall protection works Passive measures 40

Rock fall protection works Total quantities of performed rockfall protection works in Tembi valley 2.500 ton of scaled rock 3 km. Installed fences (Geobrugg RXI, TXI etc. ) 8.500 m2 of installed nets (Τecco & Spider) 700 single grouted rock bolts (6-8m long) 41

OPEN SECTIONS

Open sections GU10 43

Open Sections GU10 Bridge B420 44

Open sections GU14 General view 45

Open sections GU14 Pinios Bridge B445 46

Open sections GU14 Bridge B455 47

Open sections GU14 Bridge B460 48

Open sections GU16 Road works 49

Open sections GU17 Road works 50

Open sections GU17 Bridge B530 51

Open sections GU19 Bridge B560 52

Open sections GU19 Bridge B560 53

Thank you for your attention