1 Road Asset Management Raja Shekharan, Ph.D., P.E. Virginia Department of Transportation National Workshop on Modern Trends in Pavement Engineering IISc, Bangalore July 15, 2011
2 Transportation Asset Management - Definition Transportation Asset Management is a strategic and systematic process of operating, maintaining, upgrading and expanding physical assets effectively throughout their life cycle. It focuses on business and engineering practices for resource allocation and utilization, with the objective of better decision making based upon quality information and well defined objectives. - AASHTO Transportation Asset Management Guide, 2011
3 Transportation Asset Management A business model, a decision support system and a management approach that addresses (AASHTO Transportation Asset Management Guide): What is the current state of physical assets? What are the required levels of service and performance delivery? Which assets are critical to sustained performance? What are the best investment strategies for operations, maintenance, replacements, and improvement? What is the best long-term funding strategy?
4 Asset Management Methodology Manage assets using a life-cycle analysis approach Use a Needs Based Budget approach to identify and prioritize maintenance and operations needs based on the inventory and condition assessments Employ processes to plan, budget, implement, monitor and measure performance
5 Maintenance The focus of maintenance is on physical assets Interstate, Primary, Secondary Roads Roads Tunnels Bridges Rest Areas Roadside
6 Operations The focus of operations is on movement of traffic Ops Centers Cameras Incident Mgt Messaging
7 AASHTO Guide to Transportation Asset Management
8 Asset Management Program The Business Process
9 Incremental Development Methodology Also known as Spiral Iterative Evolutionary Progressive Extreme RUP (IBM) etc.
10 Budget Process Cycle Data Collection Analysis Planning Needs-based Budget District Allocations Work Activities
11 Modules of Asset Management System PMS, BMS, RCA Needs Based Budget Planning Module Work Accomplishments Inventory Analysis Tools
12 Pavement Management
13 Pavement Condition Data Collection Length Total yearly collection: approx. 32,600 directional km Interstate: approx. 3,500 directional km (100% of IS system) Primary: approx. 16,800 directional km (100% of PR system) Secondary: approx. 12,300 directional miles (~20% of SC system) SC system is on a 5-year collection cycle
14 Pavement Condition Data Collection and Analysis Program Data Collection & QA Control Sites Production Data Collection Contractor s QC (RWG) Independent Verification & Validation (QES) QA by VDOT Database Acceptance Pavement Condition Database Data loaded in PMS Data Analysis & Reporting System Condition Ride Quality State of the Pavement Report Legislative Reports HPMS Reports GIS Maps Unconstrained Needs Analysis Define M&R Activities Extract Unit Costs from TRNS*PORT Decision Matrices Unconstrained Needs Estimation Network Optimization Set Performance Targets & Goals Develop Perf. Prediction Models Optimization Performance based needs Allocation Distribution
15 Photolog Single view Panoramic view 1300 x 1030 pixel 1920 x 1080 (HDTV) Direct-to-digital Custom angles Geometry & Spatial Inertial measurement unit HPMS curve type Long. Grade Cross slope Centerline mapping Spatial referencing for GIS integration Data Collection Equipment Capabilities Pavement Image recognition software Strobe-lit pavement video Roughness Texture Rutting Surface Distress Ground Penetrating Radar Assets Inventory from imagery Location determined Offset measured Height and width measured Sign code recorded Condition assessment
16 Distance Measuring Instrument (DMI) DMI utilizes a precision optical shaft encoder that is mounted on the left rear driving wheel. The DMI records 2,000 pulses per revolution. Accuracy is ±0.02% of the linear distance traveled. Ensures accurate low speed roughness measurements down to 20 km/h (12.5 mph).
17 Pavement Images Rear downward facing cameras Continuous pavement images of full lane width Renders pavement distresses down to 2mm (0.08 inches) in width
18 Pavement Distress Marking
19 Laser Rut Measuring System Pair of rear mounted INO Lasers Measure full transverse profile of the road surface to over 1,200 points Transverse profile is evaluated to determine the depths of ruts
20 International Roughness Index (IRI) Laser SDP System 16 khz laser in each wheelpath Measures continuous longitudinal profile of the roadway
21 High Definition Right of Way Images True High Definition 1920 x 1080 CCD Camera Wide angle High Definition images A single image every 21 feet (variable)
22 GPS Data Trimble System Applanix POSLV (Position and Orientation System) Collected every station interval Two antennas to give vehicle heading
23 GPS Data Real Time GPS Data Collection to ensure proper collection and referencing. Inertial referencing system allows for fill in of missing GPS data.
24 Automated Distress Surveys Project Quality Process Daily/Weekly checks Control Sites Production data collection checks Independent Verification and Validation Data Acceptance checks
25 Software to View Data
26 Data Reporting Reporting of Condition Data Statistics: Percent/Lane-Miles Deficient Condition Distributions Density of Key Distresses GIS Maps Distribution of Condition on Network (E, G, F, P, VP) Interstate Asphalt Pavement - Transverse Cracking (% of total area ) 0.0% 0.1% 0.4% 0.0% 0.2% 0.7% 0.0% 0.3% 0.7% 0.0% 0.3% 1.0% 0.2% 0.6% 1.1% 0.1% 0.3% 0.5% 0.0% 0.1% 0.4% 0.1% 0.3% 0.9% 1/BR 2/SA 4/RI 5/HR 6/FR 7/CU 8/ST 9/NO Severity Level 1 Severity Level 2 Severity Level 3 Project and Treatment Selection Type and Distribution of Distress on Pavement
27
28 Needs Analysis Two Types of Needs Analysis Unconstrained Provides a recommended treatment for entire network Based on network condition data and augmented using Age, Traffic and FWD Data Network Optimization Uses performance target to optimize treatment recommendations for budgeting and allocation
29 Maintenance Activity Categories Do Nothing (DN) Preventive Maintenance (PM) Corrective Maintenance (CM) Restorative Maintenance (RM) Major Rehabilitation/Reconstruction (RC)
30 Framework for Treatment Selection Pavement Surface Distresses Fatigue Cracking Transverse Cracking Patching Decision Matrices Preliminary Treatment Selection Decision Trees Final Treatment Selection Rutting Potholes Traffic Level Structural + + Integrity Capacity Construction History
31 Unconstrained Needs Decision Matrix Alligator Cracking Frequency Rare Alligator Cracking Severity NS Severe Very Severe Alligator Cracking Rutting Freq. N <10% >10% N <10% >10% N <10% >10% Rutting Sevrty <0.5" >0.5" <0.5" >0.5" <0.5" >0.5" <0.5" >0.5" <0.5" >0.5" <0.5" >0.5" Frequency <0.5" >0.5" <0.5" >0.5" <0.5" >0.5" P0 DN DN DN CM CM RM DN DN DN CM CM RM CM CM CM CM CM RM P1 DN DN DN CM CM RM DN DN PM CM CM Alligator RM CM Cracking CM CM CM CM RM P2 CM CM CM RM RM RC CM CM CM RM RM RC Severity CM CM CM RM RM RC P0 DN DN DN CM CM RM DN DN DN CM CM RM CM CM CM CM CM RM P1 DN DN DN CM CM RM DN DN PM CM CM RM CM CM CM CM CM RM P2 CM CM CM RM RM RC CM CM CM RM RM RC CM CM CM RM RM RC Rutting Sevrty P0 CM CM CM CM CM RM CM CM CM CM CM RM CM CM CM CM CM RM P1 CM CM CM CM CM RM CM CM CM CM CM RM CM CM CM CM CM RM P2 RM RM RM RM RM RC RM RM RM RM RM RC RM RM RM RM RM RC P0 DN DN DN CM CM RM DN DN DN CM CM RM CM CM CM CM CM RM P1 DN DN DN CM CM RM DN DN PM CM CM RM CM CM CM CM CM RM P2 CM CM CM RM RM RC CM CM CM RM RM RC CM CM CM RM RM RC P0 DN DN DN CM CM RM DN DN DN CM CM RM CM CM CM CM CM RM P1 DN DN DN CM CM RM PM PM PM CM CM RM CM CM CM CM CM RM P2 CM CM CM RM RM RC CM CM CM RM RM RC CM CM CM RM RM RC P0 RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM P1 RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM P2 RM RM RM RM RM RC RM RM RM RM RM RC RM RM RM RM RM RC P0 DN DN DN CM CM RM DN DN DN CM CM RM CM CM CM CM CM RM P1 DN DN DN CM CM RM DN DN PM CM CM RM CM CM CM CM CM RM P2 CM CM CM RM RM RC CM CM CM RM RM RC CM CM CM RM RM RC P0 PM PM PM CM CM RM PM PM PM CM CM RM CM CM CM CM CM RM P1 PM PM PM CM CM RM PM PM PM CM CM RM CM CM CM CM CM RM P2 RM RM RM RM RM RC RM RM RM RM RM RC RM RM RM RM RM RC P0 RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC P1 RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC P2 RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC P0 PM PM PM CM CM RM PM PM PM CM CM RM CM CM CM CM CM RM P1 PM PM PM CM CM RM PM PM PM CM CM RM CM CM CM CM CM RM P2 CM CM CM RM RM RC CM CM CM RM RM RC CM CM CM RM RM RC P0 CM CM CM CM RM RM CM CM CM CM RM RM CM CM CM CM RM RM P1 CM CM CM CM RM RM CM CM CM CM RM RM CM CM CM CM RM RM P2 RM RM RM RM RM RC RM RM RM RM RM RC RM RM RM RM RM RC P0 RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC P1 RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC P2 RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC Transverse cracks per mile >=200 NS S VS NS VS S NS VS S NS VS S NS Rutting Freq. N <10% <0.5" >0.5" <0.5" >0.5" <0 P0 DN DN DN CM C P1 DN DN DN CM C P2 CM CM CM RM RM P0 DN DN DN CM C P1 DN DN DN CM C P2 CM CM CM RM RM P0 CM CM CM CM C P1 CM CM CM CM C 0-50 NS S S
32 Performance Based Needs Optimization Collect and apply condition data to management sections Utilize pavement condition prediction models Use criteria for pavement maintenance activity selection Establish performance measures and targets Create planning scenarios and run optimizations Determine performance based needs
33 Performance Based Budgeting Optimization Single Year, Multi-Constraint Optimization Optimization of maintenance activities on pavement management sections to achieve the objective function against multiple constraints for one year at a time Multi-Year, Multi-Constraint Optimization Optimization of maintenance strategies on a set of pavement management sections to achieve the objective function against multiple constraints over multiple years
34 Multi-Constraint Optimization Objective Functions Two types of objective functions available Minimize Cost Maximize Benefit (or other condition indicator) Pavement Condition Index Trigger Limit Min. Performance Existing Pavement Performance Predicted Pavement Performance Benefit Age
35 Optimization Results % Deficient % of Pavement Network in Deficient Condition by Lane Mile 25.0% % Deficient 23.0% 21.0% 19.0% 17.0% 15.0% FY Baseline-10% Baseline Baseline+10% Baseline+20%
36 Optimization Results % Needing Reconstruction % of Pavement Network Needing Reconstruction by Lane Mile 20.0% % Needing RC 15.0% 10.0% 5.0% 0.0% FY Baseline-10% Baseline Baseline+10% Baseline+20%
37 Optimization Results Average LM-Weighted CCI Pavement Network Average CCI by Lane Mile 80.0 Average CCI FY Baseline-10% Baseline Baseline+10% Baseline+20%
38 Bridge Management
39 Bridge Management VDOT maintains 19,356 structures, including 11,930 bridges and 7,426 large culverts. Structures receive routine inspections. The inspection quantifies the condition of the structure and provides a basis for determining asset needs. AASHTO Pontis bridge management system software is used to process inspection data and perform network-level analysis for needs based budgeting.
40 Data Collection Federal regulations mandate the inventory and inspection of structures and the annual reporting of data to the National Bridge Inventory (NBI). Each structure is inspected at regular intervals by qualified Bridge Safety Inspectors in accordance with the requirements of the National Bridge Inspection Standards (NBIS). Typically, a structure is inspected once every two years.
41 Determining Needs Pontis application software is used to analyze the needs of the bridge and large culvert assets. A program simulation using a predefined funding scenario is modeled to determine the unconstrained, unmet, preservation needs of structures. In general, Pontis recommends the most beneficial action/treatment based on level of funding, element condition, probabilistic deterioration trends and the cost of action/treatment.
42 Other Assets
43 RCA Stands for Random Condition Assessment Establishes a statewide inventory and condition assessment by extrapolation of randomly selected and surveyed samples Does not include mainline pavements and bridges RCA assets constitute approximately 15% of total unconstrained needs
44 Assets Included in the RCA Survey Pipes and Small Culverts Guardrails Guardrail Terminals Traffic Signs Pavement Markings Paved Ditches Unpaved Ditches Unpaved Shoulders
45 Planning Module
46 Planning - Inputs Parameters Extrapolation Factors Deterioration Rates Planning Module Condition and Inventory Pavement actual quantities RCA Assets sampled quantities Total Asset Quantities Asset Repair Quantities Regional Cost Factors Inflation Factor Ordinary Maintenance Corrective Replacement Rehabilitation Asset Repair Costs
47 Planning - Outputs Including Total Asset Quantities Starting Repair Quantities Annual Work Quantities Planning Module High Level Maintenance Plan (1 6 years) Annual Work Costs By... District Roadway System Asset Repair Group
48 Planning Module - Output In terms of the NBB process, the Planning Module produces Planning Module Total Unmet Needs Cost to Maintain Current Condition For pavements and RCA assets
49 Determining Unconstrained Needs Modeled Assets flexible and rigid pavements, ditches, cross pipes, unpaved shoulders, guardrail, end terminals, traffic signs, paved shoulders, nonhard surface roads, bridges and large culverts, traffic signals, overhead signs, smart traffic centers, tunnels, ferries, rest areas, moveable bridges Non-Modeled Assets roadside assets, retaining walls, drainage, traffic devices, facilities Cost Centers and Programs snow prep and removal, equipment rental, etc.
50 Asset Management Maturity Scale AASHTO 2011 TAM Maturity Scale Level Initial Awakening Structured Proficient Best Practice General Description No systematic processes in place and little motivation to improve existing processes. Recognition of the need for more systematic processes and data collection activities. Efforts at this level typically rely on one or more champions. Processes and tools developed. There is a shared understanding and motivation that results in coordination of activities. Asset management strategies, processes, and tools provide information to establish agency expectations and accountability. Asset management strategies, processes, and tools support decisions and are regularly evaluated and improved.
51 Why Asset Management? Successful implementation of Transportation Asset Management (TAM) is fundamentally about good management, effective leadership, and achieving the right organizational culture. It does not happen overnight, and requires consistent direction, focus, and attention over time. AASHTO 2011
52 Thank You
Transportation Infrastructure Asset Management
2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE [email protected] (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between
CONVERGENCE OF MMS AND PAVEMENT INSPECTION SENSORS FOR COMPLETE ROAD ASSESSMENT
6th International Symposium on Mobile Mapping Technology, Presidente Prudente, São Paulo, Brazil, July 21-24, 2009 CONVERGENCE OF MMS AND PAVEMENT INSPECTION SENSORS FOR COMPLETE ROAD ASSESSMENT C. Larouche
Pavement Management Implementation: Success Stories for Maryland Counties
Pavement Management Implementation: Success Stories for Maryland Counties September 25, 2015 Aaron D. Gerber, P.E. How Does Your Organization Manage Pavement Assets? By Experience/Past Practice? By Customer
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY
How To Improve Road Quality
A Customer Service Level Approach for Maine DOT s Asset Management System Jeffrey L. Zavitski, B.A. Senior Implementation Specialist Deighton Associates Limited Chip Getchell, P.E. Director, Work Plan
CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON
Council Meeting Date: August 11, 2014 Agenda Item: 7(c) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Motion Authorizing the City Manager to Execute a Contract with Transmap Corporation
RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity
RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY Transverse Cracking- Extreme Severity Slab Cracking Class II Regular Joint- High Severity Pattern Cracking-High Severity Alligator Cracking- High Severity Shoulder
USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS. Paul W. Wilke, P.E. Applied Research Associates, Inc.
USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS Paul W. Wilke, P.E. Applied Research Associates, Inc. August 11, 2014 Words: 3,280 Figures: 3 Tables: 0 Photographs: 3 ABSTRACT
Maintenance Management and Asset Management
Defining and Understanding the Difference Between Maintenance Management and Asset Management Dr. Simon Lewis AgileAssets, Inc. 12th AASHTO-TRB Maintenance Management Conference Annapolis Maryland, July
Monitoring Highway Assets with Remote Technology
Monitoring Highway Assets with Remote Technology For the Michigan Department of Transportation July 2013 DYE MANAGEMENT GROUP, INC. Project Scope Summary of Technologies Aerial Imagery with LiDAR Mobile
Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D
Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Contents Introduction... 3 Introduction to Corridor Targets... 3 Surface Targets... 4 Width and Offset Targets... 5 Elevation or Slope Targets...
Pavement Management Systems
Pavement Management Systems Presented by Bill Weiss, P.E. Applied Pavement Technology, Inc. (APTech) At the 2015 Municipal Streets Seminar Ames, Iowa Why Pavement Management??? Pavements are expensive
Performance-Based Road Management and Maintenance Contracts Worldwide Experiences
International Seminar on Road Financing and Investment Arusha, Tanzania, April 16 20, 2007 Performance-Based Road Management and Maintenance Contracts Worldwide Experiences by Dr. Gunter Zietlow 1 e-mail:
Implementing Pavement Management Systems, Do's and Don ts at the Local Agency Level
Implementing Pavement Management Systems, Do's and Don ts at the Local Agency Level Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University 1 Do Understand Basic Pavement
How To Manage Transportation Asset Management
1 TRANSPORTATION ASSET MANAGEMENT THE NEW BUSINESS MODEL FOR TRANSPORTATION AGENCIES Presented at the AASHTO Subcommittee on Transportation Finance Policy Business Meeting Irvine, California June 26, 2012
Managing the Risk of Aging Pavement Infrastructure in New Brunswick Through Innovative Decision Making
Managing the Risk of Aging Pavement Infrastructure in New Brunswick Through Innovative Decision Making Jay Cunningham, MSc.Eng., P.Eng. New Brunswick Department of Transportation John MacNaughton, BSc.
VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS
VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post
Asset Management for MAP-21. Gary Lasham, P.E. Jonathan Pollack
Asset Management for MAP-21 Gary Lasham, P.E. Jonathan Pollack Replaced Intermodal Surface Transportation Efficiency Act (ISTEA) MAP-21 is transforming the policy and programmatic framework for investments
I-66 Pavement Rehabilitation
I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal
Transportation Asset Management Program 2009 Federal Aid PASER Road Survey. August 2009
Transportation Asset Management Program 2009 Federal Aid PASER Road Survey August 2009 WEST MICHIGAN SHORELINE REGIONAL DEVELOPMENT COMMISSION (WMSRDC) The WMSRDC is a regional council of governments representing
Chapter 5 RISK MANAGEMENT ANALYSIS CHAPTER 5 RISK MANAGEMENT ANALYSIS PAGE 49
Chapter 5 RISK MANAGEMENT ANALYSIS CHAPTER 5 RISK MANAGEMENT ANALYSIS PAGE 49 This page intentionally left blank. PAGE 50 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN RISK MANAGEMENT ANALYSIS
SIAMA. SIAMA Asset Management Technologies Advanced Inspection Technology
Prolonging Infrastructure Assets Life Asset Management Technologies Advanced Inspection Technology Smart Infrastructure Asset Management Australia () Research and Development Research & Development company
How To Manage Big Data For The Ohio Department Of Transportation
Big Data & Asset Management Ohio Planning Conference 2014 John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Big Data: Asset Management Andrew Williams, Administrator Office
Road Asset Management: Evolution and Trends
Road Asset Management: Evolution and Trends Clinic AC 6 Road Asset Management Gerardo W. Flintsch Associate Professor, The Via Department of Civil and Environmental Engineering Director, Center for Sustainable
DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job
MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments
IP-S3 HD1. Compact, High-Density 3D Mobile Mapping System
IP-S3 HD1 Compact, High-Density 3D Mobile Mapping System Integrated, turnkey solution Ultra-compact design Multiple lasers minimize scanning shades Unparalleled ease-of-use No user calibration required
DEVELOPMENT OF A NATIONAL ROAD ASSET MANAGEMENT SYSTEM FOR THE KINGDOM OF SAUDI ARABIA. Hazim M Abdulwahid Abdullah Al Kahtani Mustafa Abdulaziz
DEVELOPMENT OF A NATIONAL ROAD ASSET MANAGEMENT SYSTEM FOR THE KINGDOM OF SAUDI ARABIA Hazim M Abdulwahid Abdullah Al Kahtani Mustafa Abdulaziz Contents Introduction Methodology Pavement Management System
Impacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements
Impacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements Author: Harry Sturm, P. Eng. Stantec Consulting Ltd. 16-77 Mississauga Road Mississauga, ON L5N 7G2 Phone: (95) 817-296
Cornell Asset Management Program - Roads & Streets (CAMP-RS) 2014
Cornell Asset Management Program - Roads & Streets (CAMP-RS) 2014 Distributed by: Cornell Local Roads Program CLRP No. 14-01 Table of Contents 1 - Introduction to Cornell Asset Management Roads & Streets
Using Cloud-Computing to Promote Asset Management Best Practices A Ministry of Transportation Ontario Case Study
Using Cloud-Computing to Promote Asset Management Best Practices A Ministry of Transportation Ontario Case Study Benjamin Ong Fugro Roadware 2505 Meadowvale Blvd. Mississauga, ON L5N 5S2 Ph: (905) 567-2870
SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
Real-time 3D Scanning System for Pavement Distortion Inspection
Real-time 3D Scanning System for Pavement Distortion Inspection Bugao Xu, Ph.D. & Professor University of Texas at Austin Center for Transportation Research Austin, Texas 78712 Pavement distress categories
MODULE 3. Upon completion of this module the participants will be able to:
MODULE 3 PAVEMENT MANAGEMENT SYSTEMS OVERVIEW 2.1 Module Objective This module describes the basic components of a Pavement Management System, as well as provides some historical perspective on the evolution
Date: 10/10/2014 Initiated by: AAS-100
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Pavement Management Program (PMP) Date: 10/10/2014 Initiated by: AAS-100 AC No: 150/5380-7B Change:
FLH Asset Management
FLH Asset Management What is Asset Management? Asset Management is not a specific product or service, but rather a way of doing business It provides a solid foundation from which to monitor the transportation
Sub-Saharan Africa Transport Policy Program (SSATP) Output- and Performance-based Road Contracts (OPRC)
Sub-Saharan Africa Transport Policy Program (SSATP) Work in Progress and New Developments in RMF Output- and Performance-based Road Contracts (OPRC) (Based on presentations by Schliessler/Gericke WB) Olav
IP-S2 HD. High Definition 3D Mobile Mapping System
IP-S2 HD High Definition 3D Mobile Mapping System Integrated, turnkey solution High Density, Long Range LiDAR sensor for ultimate in visual detail High Accuracy IMU and DMI Odometry for positional accuracy
Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL
-- South Africa COTO Committee of Transport Officials Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL M a r c h 2013 C ommittee of Transport Officials Contents Background Process Contents of Manual Quo Vadis
Practical Guide for Quality Management of Pavement Condition Data Collection
Practical Guide for Quality Management of Pavement Condition Data Collection U.S. Department of Transportation Federal Highway Administration Notice This document is disseminated under the sponsorship
Cost-Effective Collection of a Network-Level Asset Inventory. Michael Nieminen, Roadware
Cost-Effective Collection of a Network-Level Asset Inventory Michael Nieminen, Roadware Introduction This presentation is about using a mobile vehicle to collect roadway asset (feature) data. Asset/Feature
Active Asset Management in State DOTs
Active Asset Management in State DOTs Stuart Hudson, P.E. Charles Pilson, PhD, and Eric Perrone AgileAssets Inc. Prepared for : 9 th National Conference on Transportation Asset Management San Diego, CA
CHAPTER 2 LCCA APPROACHES
2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting
IP-S2 Compact+ 3D Mobile Mapping System
IP-S2 Compact+ 3D Mobile Mapping System 3D scanning of road and roadside features Delivers high density point clouds and 360 spherical imagery High accuracy IMU options without export control Simple Map,
THE USE OF HIGHWAY MAINTENANCE MANAGEMENT SYSTEMS IN STATE HIGHWAY AGENCIES
THE USE OF HIGHWAY MAINTENANCE MANAGEMENT SYSTEMS IN STATE HIGHWAY AGENCIES Introduction The American Association of State Highway and Transportation Officials (AASHTO) published its Guidelines for Maintenance
Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE
Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE A partnership of the Virginia Department of Transportation and the
Automated Pavement Distress Survey: A Review and A New Direction
Automated Pavement Distress Survey: A Review and A New Direction KELVIN C.P. WANG AND WEIGUO GONG 4190 Bell Engineering Civil Engineering University of Arkansas, Fayetteville, AR 72701 Email: [email protected]
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
Louw Kannemeyer. Asset Management
Louw Kannemeyer Asset Management South African Road Network Authority Paved Gravel Total SANRAL 18,247 0 18,247 Provinces - 9 46,099 136,640 182,739 Metros - 8 51,682 14,461 66,143 Municipalities 37,691
Integrating GIS-Based Videolog and Asset Data With Commonly Used Systems Provides Major Benefits With Minimal Effort
Integrating GIS-Based Videolog and Asset Data With Commonly Used Systems Provides Major Benefits With Minimal Effort Presented By: Debbie Burns, GIS Manager Michael Nieminen, Project Manager Introduction
High-Speed Nondestructive Testing and Intelligent Construction Systems
High-Speed Nondestructive Testing and Intelligent Construction Systems 1st International Conference on Transportation Construction Management February 9-11, 9 2008 Orlando, Florida Ted Ferragut, P.E. NDT
Pavement Design. Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION. 1005 Terminal Way, Suite 125 Reno, Nevada 89502
Pavement Design Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION ENGINEERS,, INC. I 1005 Terminal Way, Suite 125 Reno, Nevada 89502 Topics Introduction Design Factors Pavement Types Fundamentals
PRIORITIZATION PROCESSES
PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take
Earth Retaining Structures
Earth Retaining Structures and Asset Management Earth Retaining Structures and Asset Management A Critical Component Tool in Maintaining Public Safety Earth Retaining Structures (ERS) are often an overlooked
Land Mobile Mapping & Survey
Land Mobile Mapping & Survey Trimble Geospatial Solutions Trimble s geospatial solution portfolio has been designed to put information to work. Mobile sensors on the land, in the air or indoors capture
Review of Recent Bridge Asset Management Systems
Review of Recent Bridge Asset Management Systems Takeshi Hanji 1 and Kazuo Tateishi 1 1. EcoTopia Science Institute, Nagoya University, Nagoya, Japan Abstract: A number of transportation agencies throughout
Asset Management Highway Division Plan
Asset Management Highway Division Plan 3/17/15 Leading the Nation in Transportation Excellence 1 U.S. Transportation Agencies Challenges Rising Costs Higher customer demand for better and safer roads Highly
Advancing Asset Management at DelDOT
DCT 230 Advancing Asset Management at DelDOT By SUE McNEIL QIANG LI Department of Civil and Environmental Engineering November 2012 Delaware Center for Transportation University of Delaware 355 DuPont
QUALITY ASSURANCE FOR MOBILE RETROREFLECTIVITY UNITS
State of Florida Department of Transportation QUALITY ASSURANCE FOR MOBILE RETROREFLECTIVITY UNITS FDOT Office State Materials Office Authors Patrick Upshaw Joshua Sevearance Hyung Lee Date of Publication
Asset Management Plan
Example Transportation Asset Management Plan Outline This outline was created using the Transportation Asset Management Plan (TAMP) Builder ( www.tamptemplate.org ), a product of NCHRP Project 8-36/116.
Minimizing Reflective Cracking With Applications of the Rolling Dynamic Deflectometer and Overlay Tester
Minimizing Reflective Cracking With Applications of the Rolling Dynamic Deflectometer and Overlay Tester Dar-Hao Chen, 1 Moon Won, 2 Tom Scullion, 3 and John Bilyeu 4 ABSTRACT Since reflective cracking
REQUEST FOR INFORMATION
STATE OF NEVADA DEPARTMENT OF TRANSPORTATION REQUEST FOR INFORMATION Specifications, Instructions and Submitting Information for Enterprise Asset Management (EAMS) Project Due Date: April 8, 2015 Rudy
The City of Owen Sound Asset Management Plan
The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to
Bridges & Culverts Condition by Quantity
3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received
Email: [email protected] Phone: + 64.9.87.7703 Fax: +64.9.87.7704. ROMDAS Manufactured by Data Collection Ltd. New Zealand
For further information on the ROMDAS road measurement system please visit www.romdas.com Email: [email protected] Phone: + 64.9.87.7703 Fax: +64.9.87.7704 ROMDAS Manufactured by Data Collection Ltd. New
PIPE INSPECTION AND REPAIR. Larry Ritchie
PIPE INSPECTION AND REPAIR Larry Ritchie February 23, 2010 PIPE INSPECTION AND REPAIR The Florida Department of Transportation builds and maintains hundreds of miles of underground infrastructure as part
HIGH-PERFORMANCE INSPECTION VEHICLE FOR RAILWAYS AND TUNNEL LININGS. HIGH-PERFORMANCE INSPECTION VEHICLE FOR RAILWAY AND ROAD TUNNEL LININGS.
HIGH-PERFORMANCE INSPECTION VEHICLE FOR RAILWAYS AND TUNNEL LININGS. HIGH-PERFORMANCE INSPECTION VEHICLE FOR RAILWAY AND ROAD TUNNEL LININGS. The vehicle developed by Euroconsult and Pavemetrics and described
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
VENETOREGION ROAD NETWORK ROAD MAPPING LASER SCANNING FACILITY MANAGEMENT
VENETOREGION ROAD NETWORK ROAD MAPPING LASER SCANNING FACILITY MANAGEMENT ing. Augusto Burchi [email protected] Siteco profile Italian software house specialized in GIS and RDBMS dedicated to Road networks
INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY
INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY Allison Daniello Ben Powell Nicholas Schaeffer Aaliyah McClinton Yusuf Mehta Rowan University United States Kimberly
OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES
ROAD PAVEMENTS FORUM TWENTY-FIFTH MEETING 7 May 2013 OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES Michael Roux (CSIR Built Environment) Acknowledgements SANRAL Team Members:
Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT
Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT Comprehensive Asset Management Planning What Is Your Asset Management Organization? What Do You
Caltrans - Asset Management Implementation. March 2015
Caltrans - Asset Management Implementation March 2015 Asset Management Plan Definition An asset management plan is a strategic plan for managing an organization's infrastructure and other assets to deliver
Traffic Signal Asset Management. Edward Fok USDOT/FHWA Resource Center
Traffic Signal Asset Management Edward Fok USDOT/FHWA Resource Center Fundamental Objectives 1. Preserve our assets and minimize their whole life costs. 2. Operate in a financially sustainable manner.
IT Infrastructure Problems for Asset Management
IT Infrastructure Problems for Asset Management W. J. Rasdorf, Ph.D., P.E., F. ASCE 1 ; J. E. Hummer, Ph.D., P.E., M. ASCE 2 ; E. A. Harris, S. M. ASCE 3 Department of Civil, Construction, and Environmental
Validity of Skid Resistance Data Collected Under Western Australian Conditions
Validity of Skid Resistance Data Collected Under Western Australian Conditions Soet W.J. and Barnsley R. Main Roads Western Australia ABSTRACT Main Roads Western Australia manages an extensive arterial
South African Pavement Design Method (SAPDM) Revision Status Report. 26 th RPF Meeting 6 November 2013 L Kannemeyer
South African Pavement Design Method (SAPDM) Revision Status Report 26 th RPF Meeting 6 November 2013 L Kannemeyer Slide 2 Aka GODZILLA SAPDM Revision - Historical Overview Process initiated at RPF -May
Road Asset Management vs Pavement Management A new Paradigm. Arthur Taute Stewart Russell
Road Asset Management vs Pavement Management A new Paradigm Arthur Taute Stewart Russell Contents Background Definitions Improvements over PMS TMH22 elements Conclusions BACKGROUND Municipal AMS GRAP17
Grinding equipment that causes raveling, aggregate fractures or disturbance to the joints shall not be permitted.
Guide Specification: Diamond Grinding for City Streets Publication Date: May 24, 2010 SCOPE City streets are defined as roadways with a closed drainage system along with numerous structures such as manholes,
Life Cycle Cost Analysis (LCCA)
v01-19-11 Life Cycle Cost Analysis (LCCA) Introduction The SHRP2 R-23 Guidelines provide a number of possible alternative designs using either rigid of flexible pavements. There is usually not a single
DEVELOPMENT OF INTEGRATED HIGHWAY MANAGEMENT SYSTEM IN KOREA
DEVELOPMENT OF INTEGRATED HIGHWAY MANAGEMENT SYSTEM IN KOREA Chunjoo YOON Researcher Highway Research Department Korea Institute of Construction Technology 2311, Daehwa-Dong, Ilsan-Gu, Goyang-Si, Gyeonggi-Do,
Benefit Cost Models to Support Pavement Management Decisions
Benefit Cost Models to Support Pavement Management Decisions Eddie Y. Chou Shuo Wang University of Toledo for the Ohio Department of Transportation Office of Research and Development and the U.S. Department
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
A GUIDE TO COLLECTING, PROCESSING, AND MANAGING ROADWAY ASSET INVENTORY DATA FINAL REPORT
NCHRP Project 20 07/Task 357 A GUIDE TO COLLECTING, PROCESSING, AND MANAGING ROADWAY ASSET INVENTORY DATA FINAL REPORT Requested by: American Association of State Highway and Transportation Officials (AASHTO)