Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank



Similar documents
BLADDER SURGE CONTROL SYSTEM

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

Dual wall sub-base fuel tanks-ibc Certified kw DGHCA/CB/CC/DA/DB (4BT3.3G5) DSFAA/B/C/D/E (QSB5G3) DSGAA/B/C/D/E (QSB7G5) DSHAA/B/C/D (QSL9G2)

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

Morrison Bros. Co. General Product Specifications

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code

PREPIPED LIQUID FUEL MANIFOLDS PLPM

NFPA31FuelOilPiping 1 Revised

FAIRBANKS NIJHUIS FIRE PUMPS.

Design & Construction Standards, Revised January

Element D Services Plumbing

BERMAD Fire Protection

Reliant Series Fuel Tanks. Day Tanks Filtration Tanks Specialty Tanks

BERMAD Fire Protection

The following definitions apply with regard to requirements specified in this document:

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI).

Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering

Fire Pump Plan Review March 2010

American Fireglass Outdoor Fire pit kit information. General instructions/warnings for outdoor gas pan and burner systems

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

The following definitions apply with regard to requirements specified in this document:

Utility Distribution Systems

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.

Requirements for Hydrogen Storage and Use

Industrial Generator Set Accessories

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

Magnum Mobile Generator MMG55 Specifications

Diesel Engine Driven Generators Page 1 of 6

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

Ethanol Vehicle and Infrastructure Codes and Standards Citations

Industrial Generator Set Accessories

Commercial Semi-Instantaneous Water Heaters

NAVIEN AMERICA INC FITCH AVENUE

OREGON FIRE CODE Interpretations and Technical Advisories

Valve Proving System VPS 504 Series S06 (120 VAC) Series S05 (24 VDC)

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Your safety and the safety of others are very important.

Commercial Electric Water Heater

Spill Containers. 517 Series 3 ½ Gallons AST Spill Container. 518 Series 7 ½ Gallon AST Spill Container. 515 Series AST Remote Spill Container

FTA1100-J DIESEL ENGINE FIRE PUMP CONTROLLERS STANDARD SUBMITTAL PACKAGE

Commercial Gas Furnace Upflow

C18 ACERT Fire Pump Tier bkw/ rpm

SIOUX HYBRID WATER HEATER

An Engineering Guide to Modern Fuel Systems

SECTION HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

G234X-55 Conventional Gas Boiler

Fire Pump Controllers Remote Alarm Panels

Light Duty Commercial Electric Water Heater

Medical Air Systems: Scroll

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

Technical Data. Installation

ENGINEERING SPECIFICATIONS FOR CO2 EXTINGUISHING AGENT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS

Installation Manual DIAPHRAGM WELL TANK

SUBMERSIBLE PUMPING SYSTEMS SUBMERSIBLE TURBINE PUMPS

Midwest Industrial Tanks

SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches

FAIRBANKS NIJHUIS PACKAGED FIRE PUMP SYSTEMS.

COMPRESSED GASES. 1.2 The contents of each cylinder and container must be clearly identified (by tag or stamp) on the cylinder.

Introduction. Safety Guidelines. Part Numbers. Operation and Maintenance Manual. Operation and Maintenance Manual

Commercial Gas Water Heaters

HELIPORT FUEL/WATER SEPARATOR MODEL H-200

E-Version SECTION CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT

VANGUARD A OPERATOR S MANUAL PORTER. FM-952 Rev. E 7/07

LOADING DOCK EQUIPMENT. A. Section Concrete Forms and Accessories: Placement of anchors into concrete.

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi CONTROL PANEL

Automatic Door Openers and ADA Devices Rev. 0 Bid # Scope of Work

Shop Fabricated Aboveground Tank Construction Standards

Maxi Pressurisation Units (Maxi, Maxi Plus & HP)

DC400 Dispensing Cutoff System

Air Eliminators and Combination Air Eliminators Strainers

D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.

SECTION ( ) FIRE DETECTION AND ALARM SYSTEM

Float and Thermostatic Traps Series H, C and X

Recommended Fuel Piping Specification For UPP Piping, UL-971

Model 1210C Battery Powered Pump Shown. Description

MBA-MM-1040/10/13/1665 MULTI MEDIA FILTERS

INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL EEMAX ELECTRIC TANKLESS WATER HEATERS IMPORTANT SAFETY INFORMATION

USER MANUAL OPERATION AND USE OF CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM

Sanitary Type Electronic Flow Switches

D Youville College July 31, 2008 New Academic Building Cannon Design Project No

LTR Series Uninterruptible Power Systems 700 VA KVA. General Specification

NÜVE SANAYİ MALZEMELERİ İMALAT VE TİCARET A.Ş. OT 020 BENCH TOP STEAM STERILIZER USER S MANUAL

Operational Overview and Controls Guide

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

Installation Manual DIAPHRAGM WELL TANK

Oil and Coolant Circulating Heating System. Model - OCSM

Section 8 Storage Tanks & Equipment

ASME Packaged Indirect Fired Water Heater

Freeze Protection Thermostats MODELS SST 2. Installation and Operation Manual

Commercial Electric Water Heater

Installation & Operation

INSPECTION AND TESTING OF EMERGENCY GENERATORS

Generator 101: Buying and Installing a Generator for Your Home or Office. bruniandcampisi.com

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

TANKLESS WATER HEATER INSTALLATION DIAGRAMS

Important Ontario Fire Code Information for Building Owners in the City of Windsor

Transcription:

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank This specification describes requirements for a Diesel Fuel Day Tank System consisting of one or more fuel tanks, an Electronic Control Module (ECM) and fuel supply pumps sized to support the Emergency/Standby Power System, Diesel Generator Sets. The codes and standards that are referenced are typical for North American applications. Note that optional features are described in the text of this document in blue. The designer may include or delete these features at his discretion. Be sure to delete the options described that are not needed on a project. Notes to the designer are provided in RED text. These should be removed prior to use or publishing of the document.

GUIDE SPECIFICATIONS Fuel Day Tank with Supply Pump and Motor 1.0 GENERAL 1.1 SUMMARY These specifications describe requirements for a fuel day tank system consisting of one or more fuel tanks, an electronic control module (ECM) and fuel supply pumps sized to support the generator set. The fuel day tank system shall automatically maintain fuel levels specified within. The manufacturer shall design and furnish all materials and equipment to be fully compatible with electrical, environmental and space conditions of the site. It shall include all equipment to safely support the full demands of the generator set and be designed for unattended operation. 1.2 CODES AND STANDARDS 1.2.1 The fuel day tank system and all associated equipment and components shall be manufactured in accordance with the following applicable standards: Underwriters Laboratories: UL-142 Above Ground Flammable Liquid Tanks Underwriters Laboratories: ULC-S601 (Canada) Steel Above Ground Tanks for Flammable and Combustible Liquids Underwriters Laboratories: UL-508 Industrial Control Equipment (ECM) American Welding Society (AWS) Welders certified AWS standards D 1.1 / D 1.1M Office of Statewide Health Planning and Development (OSHPD) California Health Care facility Preapproval OSP-0254-10 (10 through 350 Gallon) IBC Seismic Certification Design in accordance with ASCE 7-05 Chapter 13 (10-350 gallons; also available for other capacities) 1.2.2 The installing contractor shall be an experienced firm regularly engaged in the installation of fuel day tanks and fuel piping systems, and be responsible to conform to the requirements of the codes and standards, as applicable. The fuel day tank shall be manufactured to allow the necessary features to meet the requirements of these standards. National Fire Protection Association (NFPA): NFPA 30 Flammable and Combustible Liquids NFPA 37 Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines NFPA 70 National Electrical Code. Equipment shall be suitable for use in systems in compliance to Article 700, 701, and 702. NFPA 99 Essential Electrical Systems for Health Care Facilities NFPA 110 Emergency and Standby Power Systems. 1.3 ACCEPTABLE MANUFACTUERS Only approved bidders shall supply equipment provided under this contract. Equipment specifications for this project are based on microprocessor-based fuel day tanks manufactured by Tramont Manufacturing LLC. Equipment by other suppliers that meets the requirement of this specification is acceptable, if approved not less than 2 weeks before scheduled bid date. Proposals must include a line-by-line compliance statement based on this specification. 1.4 SUBMITTALS Manufacturer submittals must include the following: A. Shop drawings: 1. Outline drawings of assembly. 2. One line diagrams and wiring diagrams for assembly and components. B. Product data: 1. Technical data on all major components. 2. Seismic certification, as required. 1

C. Project information: 1. Test reports and certifications. 2. Factory test procedures. 1.5 QUALIFICATIONS The fuel day tank manufacturer shall be certified to ISO 9001 International Quality Standard and shall have third party certification verifying quality assurance in design/development, production, installation and service, in accordance with ISO 9001. The manufacturer of this equipment shall have produced similar equipment for a minimum period of ten years. When requested by the engineer, an acceptable list of installations with similar equipment shall be provided, demonstrating compliance with this requirement. Production pressure test shall be performed by the manufacturer on each tank prior to shipping in accordance with prevailing standards of UL-142 and ULC-S601. These tests are intended to verify compliance with production requirements of the standard for leakage. The test is to be conducted before painting the tank by applying an internal air pressure and using soap suds, or equivalent material, for the detection of leaks. For a horizontal or rectangular tank, the test gauge pressure is to be not less than 3 psi (21 kpa). If a leak should be detected during production testing, the leak shall be repaired. Tanks shall be retested until zero leaks are apparent during two (2) successive test periods. A record of the manufacturer s testing shall be permanently maintained and available to the purchaser and/or end user. The installing contractor must have a minimum of five (5) years experience in the design, installation and testing of fuel day tank systems. A list of systems of a similar nature and scope shall be provided on request. The installing contractor shall test the system during start-up to assure the overflow line transfers an overflow through continuous piping, without valves or traps, back to the source tank or to a collection system. The installing contractor shall test the system during start-up to assure the return pump system will move fuel overflow back to the source tank or to a collection system. 1.6 WARRANTY The manufacturer shall warrant the material and workmanship of the fuel day tank for a minimum of one (1) year from date of shipment. The manufacture of the fuel day tank shall offer an extended coverage (years 2 5). (SEE NOTE 1) 2.0 PRODUCTS 2.1 CAPACITY Fuel Day Tank capacity shall be based on National Electric Code (NEC) 2011, NFPA 70, Article 701.12 (B) (2) where internal combustion engines are used as the prime mover, an on-site fuel supply shall be provided with an on-premise fuel supply sufficient for not less than two (2) hours of full-demand operation of the system. The day tank shall be sized in accordance with these standards and the capacity shall not be less than gallons. (SEE NOTE 2) 2.2 CONSTRUCTION Fuel Day Tank shall be made of heavy gauge steel construction. Tank shall include removable, non-conductive top cover for indoor applications. (applicable, not applicable) Tank shall include removable, welded steel top cover for indoor applications. (applicable, not applicable) Tank shall include removable, welded steel weather resistant cover for indoor or outdoor applications. (applicable, not applicable) Tank shall be coated with rust inhibitor within inner tank, primed and finish painted on external tank. The installing contractor shall provide schedule 40, ASTM A 53, black iron pipe connections to the day tank fittings. 2

All connections to be made with pipe unions to facilitate tank service/removal. The tank shall include at a minimum the following fittings: o 1 NPT engine supply o 1 NPT engine return o NPT fitting for emergency vent, sized per the requirements of NFPA 30 and UL-142/ULC- S601 o 1 NPT overflow o 2 NPT normal vent o 4 ½ square inspection port below electrical controls The tank shall be provided with atmospheric (normal) vent cap with screen and emergency pressure relief vent as shown on drawing sized per the requirements of NFPA 30 and UL 142 / ULC S601. Emergency vent cap shall be spring-pressure operated. Opening pressure shall be 0.5 psig; full opening pressure 2.5 psig. Flow rate shall be marked on top of each vent. 2.3 DESIGN REQUIREMENTS 2.3.1 Fuel Day Tank Control, Alarm and Status Display. The microprocessor-based electronic control module (ECM) shall be specified for control of non-redundant (applicable, not applicable) or redundant (applicable, not applicable) pump operation. Where power is needed for the operation of the fuel transfer pumps to deliver fuel to a generator set day tank, the pumps shall be connected to the legally required standby power system. The ECM shall receive a signal from a single electrical analog float sensor. The ECM shall be provided with the following indications: fuel level, alarm, function, and existing warning and shutdown conditions and be located within a Type 1 zinc-plated enclosure for indoor use. The lamps shall be high-intensity LED type. The lamp condition shall be clearly apparent under bright room lighting conditions. All warnings shall be provided with normally open and normally closed, dry contacts for remote annunciation (3 amps @ 120 VAC). The following minimum alarm, shutdown and status conditions are required: 2.3.2 Fuel Level Display Full 100% Green LED Indicator 95% Green LED Indicator 85% Green LED Indicator 75% Yellow LED Indicator 50% Yellow LED Indicator 25% Yellow LED Indicator 10% Yellow LED Indicator Empty 6% Red LED Indicator 3.3 Alarm Display High Fuel 106% or greater of capacity Low Fuel 62% of capacity Critical Low Fuel 6% of Capacity Fuel Within Containment ECM Functional tank fault Function Display Power On This button activates the ECM after the Off button has been depressed. On any initial power up condition, after a power outage, the ECM shall be in an on condition. Pump Running For redundant pump operation fuel pump control panel shall indicate Pump A or Pump B Running. Pump running relay shall provide local contacts for remote monitoring, indicating pump is running. 2.3.5 Remote Contact Connections Tank Fault (ECM Functional)/Fuel in Containment (Shared)/Loss of Power 3

Critical High Fuel 106% or greater of capacity Pump Running Option Indicating supply pump is in operation High Fuel 106% of capacity Low Fuel 62% of capacity Critical Low Fuel 6% of capacity 2.3.6 Mode On Power available to ECM Off Turns off power within ECM Test Shall force supply pump(s) to operate at time of start-up to verify overflow return line has been piped correctly and that there are no leaks within the system. 2.3.7 Start-up test switch shall test contacts for high, low, critical low, ECM functional and containment switch to assure wiring of remote contacts is correct. 2.3.8 Critical high-level automatic discrete shutoff switch shall stop supply pump delivery to the fuel day tank at the tank critical high liquid level. The critical high-level fuel switch shall be hard-wired to override any other alarms or signals received by the ECM. 2.4 PUMP OPERATION 2.4.1 For non-redundant pump operation (applicable, not applicable), a single supply pump shall provide a minimum of 17 feet of vertical lift at sea level and shall activate when fuel level decreases to 87% of capacity and shall stop at 100% tank full. The single pump shall be sized to accommodate the Emergency/Standby Power System Generator Set and supplied as a 2 GPM pump with 1/3 HP, 115 VAC, 1 phase 60 Hz, thermally protected motor. GPM pump with 1/3 HP, 115 VAC, 1 phase, 60 Hz, thermally protected motor. 7 GPM pump with 1/2 HP, 115 VAC, 1 phase, 60 Hz, thermally protected motor. 10 GPM pump with 3/4 HP, 115 VAC, 1 phase, 60 Hz motor and motor starter. 19 GPM pump with 1 HP, 115 VAC, 1 phase, 60 Hz motor and motor starter. 2.4.2 For redundant pump operation (applicable, not applicable), two supply pumps and motors are supplied and the pumps shall alternate as the lead when refueling day tank. The lead pump shall activate when fuel level decreases to 87% of capacity; the lag pump shall activate in tandem with the lead pump if the fuel level decreases to 75% of capacity. The supply pump operation shall stop at 100% of tank capacity. The pumps shall provide a minimum of 17 feet of vertical lift at sea level. Appropriately sized check valves with fuel strainers shall be provided on the pump fuel inlets. The lead pump shall be sized to accommodate the Emergency/Standby Power System Generator Set (SEE NOTE 3) and be supplied as Two (2) quantity 2 GPM pumps with 1/3 HP, 115 VAC, 1 phase 60 Hz, thermally protected motors. Two (2) quantity 4 GPM pumps with 1/3 HP, 115 VAC, 1 phase, 60 Hz, thermally protected motors Two (2) quantity 7 GPM pumps with 1/2 HP, 115 VAC, 1 phase, 60 Hz, thermally protected motors. Two (2) quantity 10 GPM pumps with 3/4 HP, 115 VAC, 1 phase, 60 Hz motors and motor starters. Two (2) quantity 19 GPM pump with 1 HP, 115 VAC, 1 phase, 60 Hz motor and motor starters. 2.4.3 Return pump system shall be supplied when the Main Fuel Tank has a fuel pick up point that is higher than the fuel day tank overflow. The return pump operation shall be designed for automtaic unattended operation when the day tank level exceeds 110% of its normal capacity. The return pump shall be activated by a separate, critical high level switch. The return pump shall exceed the delivery capacity of the fuel supply to the fuel day tank. The ECM is hard-wired to override any other indications given by the controller. 4

FUEL CONTAINMENT The fuel day tank shall include a welded steel containment basin to prevent escape of fuel in the event of a tank rupture, sized at a minimum of 150% of the tank capacity. The basin shall be primed and finish painted. 2.5.1 Indoor containment basin (applicable, not applicable): The basin shall consist of an open-top, welded heavy gauge steel structure. Leak detection switch shall be wired into the electronic control module (ECM). This will shut down the supply pump and motor in case of a fuel leak into the containment basin. 2.5.2 Containment basin (applicable, not applicable) (indoor or outdoor): The containment tank shall consist of a welded heavy gauge steel structure. The containment tank shall feature a welded steel top with an emergency pressure relief vent as shown on drawing and sized per the requirements of NFPA 30 and UL 142 / ULC S601. Emergency vent cap shall be spring-pressure operated. Opening pressure shall be 0.5 psig; full opening pressure shall be 2.5 psig. Limits shall be marked on top of each vent. Leak detection switch shall be wired into the electronic control module (ECM). This will shut down the supply pump and motor in case of a fuel leak into the containment basin. NOTE 1: System designer should consult with facility owner to determine equipment warranty requirements. Consideration should be given to extended warranty period when an owner expects to occupy the facility indefinitely and needs long term support for the system design. NOTE 2: GenSet kw Range Typical tank capacity US Gallons (Liters). Supporting kw range referenced. 20-50 10 (38) 51-80 15 (57) 81-150 25 (95) 151-300 50 (189) 301-500 75 (284) 501-650 100 (378) 651-1000 150 (568) 1001-1250 200 (757) 1251-1750 275 (1041) 1751-2000 300 (1136) 2001-2800 400 (1514) 2801-3100 450 (1703) 3101-3250 500 (1893) 1251-1750 275 (1041) 1751-2000 300 (1136) 2001-2800 400 (1514) 2801-3100 450 (1703) 3101-3250 500 (1893) NOTE 3: Refer to generator set manufacturer s data for information on Fuel Consumption at 100% full load demand to determine supply pump capacity. Typical supply pump capacity for 60 Hz generator set are as follows when the engine return is piped back to the day tank based on consumption: kw Rating Supply Pump based on fuel consumption 20-650 2 GPM 651-1000 4 GPM 1001-3250 7 GPM Tramont Manufacturing LLC 2015 5