1. Division-16 Basic Materials and Methods sections apply to work of this section.

Chapter 9. Bonding and Grounding

DIVISION 26 - ELECTRICAL SECTION CABLES FOR INSTRUMENTATION

GUIDELINES HAS/PDC/DESIGN DIVISION TITLE

STRUCTUREDGROUND SYSTEM FOR DATA CENTER GROUNDING

CDGRD-10. Grounding. Solutions For Comm/Data Applications

Section 4.3: Grounding and Bonding

SECTION TELECOMMUNICATION ROOMS

Introduction to Data Centre Design

DIVISION 27 COMMUNICATIONS. A. System design shall be completed by a Registered Communications Distribution Designer (RCDD).

STREETLIGHT SYSTEM GROUNDING AND BONDING

Grounding of Electrical Systems NEW CODE: Grounding and Bonding

SECTION 22 LIGHTNING PROTECTION SYSTEM

Presenters Brett Weiss, Gabe Martinez, Brian Kroeger.

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

Expanding a 40-Type Cabinet

HP UPS R1500 Generation 3

Video Camera Installation Guide

OFFICE OF INFORMATION TECHNOLOGY/ NETWORKING AND TELECOMMUNICATIONS SERVICES (OIT/NTS) EQUIPMENT, INFRASTRUCTURE, AND WIRING STANDARDS

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

Grounding & Bonding Why it is done And How to Install Properly

ANSI/TIA/EIA-606. Administration Standard for the Telecommunications Infrastructure of Commercial Buildings

LIEBERT VNSA Installation Sheet

ATS Overhead Table Shelf System INSTRUCTION MANUAL

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Requirements for Electrical Installations

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents and Prior Addenda if any, as identified above.

Electrical Grounding. Appendix C

EMC Engineering Guidelines For Automation Systems PS 4 PS /97 AWB GB

Project Name: Nortrax Section Project No: SURGE PROTECTION DEVICES Page 1

Grounding Practice at Data and Communications Centers. David Brender, P.E., CPQ National Program Manager Copper Development Association Inc.

SECTION COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY

David Brender Copper Development Association Inc. Miramar, March 8, 2013

1. Furnish and install faceplate and modular jacks at each single gang outlet as described below:

BLUE RIBBON CORP. BC001 Birdcage Installation Manual

1. Division 26 Section "Underground Ducts and Utility Structures" for ground test wells. 2. Division 26 Section Electrical General Requirements.

AC and DC Drive System Installation Information

Lightning Arresters P KVA P KVA. Description & Installation

TABLE OF CONTENT

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

Co-location Interconnect Power Panel (CIPP) Installation Guide

Document Purpose: Document Scope:

Standards. 5 ANSI/TIA/EIA-569-A (CSA T530)

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

TELECOMMUNICATIONS STRUCTURED CABLING GUIDELINES AND SPECIFICATIONS. University of Chicago IT Services Infrastructure Services October 2011

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

Title: Grounding and Bonding Rev-01

SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES

East Central College HANSEN HALL LEVEL 300/400 RENOVATIONS PACKAGE

Universal Vehicle Power Supply 9007AX01. Installation Instructions

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

COMMUNICATIONS

BX7000 Multi-Access Gateway Getting Started Guide

Innovative Connectivity Solution for Maximum Performance and Security

800 Communications Circuits

About the BitStorm 6051 POTS Splitter

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

Canopy Surge. User Manual

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables

ELECTRIC METERING COMMERCIAL & INDUSTRIAL

ELECTRICAL SAFETY Information Bulletin

Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide

Lake County EOC. Vendor Quotes for Lightning Protection

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

DDP-3 Engineering Guide

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D

ANSI/TIA-942 Telecommunications Infrastructure Standard for Data Centers

CalMod Design-Build Electrification Services

ANSI/TIA-942 Telecommunications Infrastructure Standards for Data Centers

SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches

CITY OF LOS ANGELES CALIFORNIA

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Intersection Preassembled 19-inch Rack

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

TCTC Cabling Specifications

Building Telecommunications Infrastructure Requirements

5.2. Overview. The better method to install solderless compression connectors on power cable

Generic Category 5e Cabling Specification

SYSTIMAX SCS PowerSum and GigaSPEED XL Cabling Installation Guidelines

RAY-MAX Integrated Solar Power Strip

1. Franklin Rod Performance 2. LEC/DAS Performance

Specifying an IT Cabling System

Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

Advantium 2 Plus Alarm

Doc Ref: baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

PXL-250: Network Wiring

EMBEDDED ACCESS CONTROL Hardware Installation Guide

B. Cross-Connect: A facility enabling the termination of cable elements and their interconnection or cross-connection.

Contractors Guide Central Inverter System Installation

CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS

Transcription:

270526-TC Grounding and Bonding for Telecommunications Systems Part 1 - General Related Documents The following related sections of the OT standards shall also be applicable to this section. OT Engineer shall approve all product cut sheets prior to purchasing and installation by contractor. Reference S9 Approved Products. S1 Approved Product Request S1 Change Request S1 Request for Variance S1 Resource Allocation Permit S2 Introduction S3 SOP and Policy S4 275116-TC CORE PA and Emergency Tenant Paging System S7 271119-TC Termination Blocks and Patch Panels S7 270000-TC Common Work S7 270100-TC Systems Cabling S7 270101-TC COMCAST Standard S7 271116-TC Cabinets Racks Frame Enclosures S9 Approved Products 1.1 Work Included 1.2 Scope of Work A. Provide all labor, materials, tools and equipment required for the complete installation of work called for in the Construction Documents A. This document describes the products and execution requirements relating to furnishing and installing Grounding/Earthing and Bonding for Communications Systems. B. This section includes minimum requirements for the following: Grounding/Earthing System Telecommunications Grounding Bus bar (TGB) Telecommunications Main Grounding Bus bar (TMGB) Telecommunications Bonding Backbone (TBB) Rack Grounding/Earthing and Bonding S7 270526-TC Grounding and Bonding-1

C. All cables and related terminations, support and grounding/earthing hardware shall be furnished, installed, wired, tested, labeled, and documented by the telecommunications contractor as detailed in this document. D. Product specifications, general design considerations, and installation guidelines are provided in this document. Quantities grounding/earthing products, typical installation details and cable routing will be provided as an attachment to this document. If the bid documents are in conflict, this specification shall take precedence. The successful vendor shall meet or exceed all requirements for the cable system described in this document. 1.3 Regulatory References A. The following industry standards are the basis for the grounding/earthing and bonding system described in this document. TIA/EIA TIA-942 J-STD-607-A TIA/EIA-606 IEEE Std 1100 NFPA NFPA-70 Telecommunications Infrastructure Standard for Data Centers Commercial Building Grounding/Bonding Requirements Administration Standard for the Telecommunications Infrastructure of Commercial Buildings IEEE Recommend Practice for Powering and Grounding Electronic Equipment (IEEE Emerald Book) National Electric Code (NEC) 1.4 Quality Assurance B. The most recent versions of all documents shall apply to this project. If there is a conflict between applicable documents, the order above shall dictate the order of precedence in resolving the issue unless an enforceable local or national code is in effect. S7 270526-TC Grounding and Bonding-2

All grounding and Bonding shall be tested and accepted prior to any equipment installation shall be permitted Contractor shall submit field quality control test reports indicating that all testing has been performed. All grounding and bonding conductors shall be labeled IAW 6.5.2 of TIA 707-B All equipment installed in all racks, cabinets or in the room shall be grounded 1.5 Definitions Bonding The permanent joining of metallic parts to form an electrically conductive path that will assure electrical continuity and the capacity to conduct safely any current likely to be imposed. Common Bonding Network (CBN) The principal means for affecting bonding and earthing inside a building. Ground/Earth A conducting connection, whether intentional or incidental, by which an electric circuit or equipment is connected to earth, or to some conducting body of relatively large extent that serves in place of the earth. Retrofit Rack Grounding/Earthing The application of grounding/earthing products and technology where equipment is already deployed and functioning. 1.6 Overview The purpose of the grounding/earthing system is to create a low impedance path to earth ground for electrical surges and transient voltages. Lightning, fault currents, circuit switching (motors turning on and off), and electrostatic discharge are common causes of these surges and transient voltages. An effective grounding/earthing system minimizes the detrimental effects of these electrical surges, which include degraded network performance and reliability and increased safety risks. The grounding/earthing system must be intentional, visually verifiable, adequately sized to handle expected currents safely, and directs these potentially damaging currents away from sensitive network equipment. As such, grounding/earthing must be purposeful in its design and installation. Four issues require special consideration: S7 270526-TC Grounding and Bonding-3

1.7 Workmanship Although AC powered equipment typically has a power cord that contains a ground/earth wire, the integrity of this path cannot be easily verified. Thus, many equipment manufacturers require grounding/earthing above and beyond that which is specified by local electrical codes, such as the National Electrical Code, etcetera. Always follow the grounding/earthing recommendations of the manufacturer when installing equipment. While the building steel and metallic water piping must be bonded to the grounding/earthing system for safety reasons, neither may be substituted for the telecommunications bonding backbone (TBB). Electrical continuity throughout each rack or cabinet is required to minimize safety risks. Hardware typically supplied with bolttogether racks is not designed for grounding/earthing purposes. Additionally, most racks are painted. Paint is an insulator. Unless rack members are deliberately bonded, continuity between members is incidental, and in many cases, unlikely. Any metallic component that is part of the data center, including equipment, racks, ladder racks, enclosures, cable trays, etc. must be bonded to the grounding/earthing system with a 1 ohm resistance between 2 points. The ground/earth system must be designed for high reliability. Therefore, the grounding/earthing system shall meet following criteria: Local electrical codes shall be adhered to. The grounding/earthing system shall comply with ANSI/TIA-942 and J-STD-607-A. All grounding/earthing conductors shall be copper. Lugs, HTAPs, grounding strips, and bus bars shall be UL Listed and made of premium quality tin-plated electrolytic copper that provides low electrical resistance while inhibiting corrosion. Antioxidant shall be used when making bonding connections in the field. Two-hole lugs shall be used because they resist loosening when twisted (bumped) or exposed to vibration. All lugs shall be irreversible compression at a minimum of (2) crimp points., and meet NEBS Level 3 as tested. Lugs with inspection windows shall S7 270526-TC Grounding and Bonding-4

be used in all non-corrosive environments so that connections may be inspected for full conductor insertion (battery rooms are an exception where windowless lugs may be used). Die index numbers shall be embossed on all compression connections to allow crimp inspection. Cable assemblies shall be UL Listed. Cables shall be a distinctive green or green/yellow in color, and all jackets shall be UL, VW-1 flame rated. Part 2 - Products 2.1 Grounding/Earthing and Bonding The Telecommunications Grounding Bus bar (TGB) in each telecommunications space will be grounded/earthed to the Telecommunications Main Grounding Bus bar (TMGB) located at the service entrance. The gauge of the connecting ground/earth cable, known as the Telecommunications Bonding Backbone (TBB) will follow J-STD-607-A guidelines, as is shown in the table below. S7 270526-TC Grounding and Bonding-5

Sizing of the TBB TBB Length in Linear meters TBB Size (AWG) (feet) Less than 4 (13) 6 4-6 (14-20) 4 6-8 (21-26) 3 8-10 (27-33) 2 10-13 (34-41) 1 13-16 (42-52) 1/0 16-20 (53-66) 2/0 Greater than 20 (66) 3/0 The TMGB will be bonded to building steel and grounded/earthed to the electrical service ground according to BICSI TDM Manual and J-STD-607-A guidelines. Local codes may supersede these requirements. In telecommunications spaces with only one rack, the rack jumper cable can be connected directly to the TGB. 1.01 Cable Sizes for Other Grounding/Earthing Applications Purpose Copper Code Cable Size Aisle grounds (overhead or #2 AWG or larger (1/0 preferred) under floor) of the common bonding network Bonding conductor to each PDU Size per NEC 250.122 & or panel board serving the room. manufacturer recommendations Bonding conductor to HVAC 6 AWG equipment Building columns 4 AWG Cable ladders and trays 6 AWG Conduit, water pipe, duct 6 AWG 2.2 Components, Kits and Hardware STRUCTURED GROUND Grounding System (STRUCTURED EARTH Earthing System) kits, components, and hardware shall be used to construct the grounding/earthing system. Use lugs when connecting conductors to the TMGB and TGB. S7 270526-TC Grounding and Bonding-6

Route the TBB to each TGB in as straight a path as possible. The TBB should be installed as a continuous conductor, avoiding splices where possible. Use HTAP kits to provide a tap from the TBB to each TGB. When more than one TBB is used, bond them together using the TGBs on the top floor and every third floor in between with a conductor known as a Grounding Equalizer (GE). Use the J-STD-607-A guidelines for sizing of the TBB when sizing the GE (shown in the table above). Avoid routing grounding/earthing conductors in metal conduits. If the grounding/earthing conductor must be routed through a metal conduit, bond each end of the conduit to the grounding/earthing conductor. Use grounding clamps to bond to the conduit, and #6 AWG copper conductor to connect the GPL grounding clamp to the HTWC HTAP. S7 270526-TC Grounding and Bonding-7

2.3 Rack Grounding/Earthing Equipment and racks shall be bonded in accordance with the methods prescribed in ANSI/TIA-942, as is shown in the figure below. Aisle Ground Paint Piercing Grounding Washer Common Bonding Network to Rack Jumper (Alternate Location) Rack Ground Strip Standard Equipment Rack Electrostatic Discharge Port (ESD) Network Equipment Equipment Jumper Common Bonding Network Common Bonding Network to Rack Jumper Figure 1 - Properly Grounded/Earthed Rack (Back of Rack Shown) S7 270526-TC Grounding and Bonding-8

To provide electrical continuity between rack elements, paint piercing and grounding star washers, shall be used where rack sections bolt together, on both sides, under the head of the bolt and between the nut and rack. When the equipment manufacturer provides a location for mounting a grounding connection, that connection shall be utilized. Use the appropriate jumper for the equipment being installed and the thread-forming screws provided in the kit. Do not bond racks or cabinets serially. Use the copper compression HTAP that comes with the kit to bond the conductor to the common bonding network. All grounding shall be at the top of the rack and cable trays. All grounding wire shall have a :Lazy S loop rather than a 90 degree or linear path so spikes are directed away from the protected equipment. 2.4 Retrofit Rack Grounding/Earthing If the racks already have network equipment installed, with OT approval it may not be feasible to install the rack ground strip without disrupting data cables. Further, it may be undesirable to disassemble rack hardware to install paint piercing grounding washers S7 270526-TC Grounding and Bonding-9

Network Equipment Rack Grounding Bus bar Grounding Jumper Grounding Jumper Figure 2 - Retrofit Rack Grounding/Earthing RGW paint piercing grounding washers are not used in this scenario. Thus, the grounding bus bar provides continuity through the vertical channels of the rack, but not the top and bottom of the rack. Thus, wherever practical, the solution using the RGS rack grounding strip and the RGW paint piercing washers shall be used instead of the retrofit rack grounding kits. All other grounding/earthing requirements apply to retrofit installations without exception. S7 270526-TC Grounding and Bonding-10

Part 3 - Execution 3.1 Grounding System The communications grounding system shall be designed and/or approved by a qualified PE, licensed in the state that the work is to be performed. The communications grounding system shall adhere to the recommendations of the ANSI/TIA-942 and J-STD-607-A standards, and shall be installed in accordance with best industry practice. A licensed electrical contractor shall perform installation and termination of the main bonding conductor to the building service entrance ground. All Cable pathways (trays, conduit etc) shall be follow the grounding as specified in this section. New and existing grounding shall be tested to standards listed in this document. Existing grounding shall be tested and/or repaired to meet the standards listed in this document prior to connection of any new grounding S7 270526-TC Grounding and Bonding-11