MEGA-TEK Company Profile
Mega-Tek Construction and Foreign Trade Company was founded in 2000 for the intention of activities especially in procurement of technological equipments and solutions about electro/mechanical systems, project design, contract and management either in domestic or abroad projects. By means of these, we have the ability of producing suitable solutions by our expert staff and project solution partners in several items by coordinating with our experiences and knowledges. PROJECT DESING, CONSULTANCY AND CONSTRUCTION SERVICES Activity Fields Mechanical Systems Design and Construction Design Evaluation, Improvement and Development Heat Load Analysis Technical Specs, Take-Off and BID File Preparation Mechanical Systems coordination Services International Codes and Standards Inspection and Compliance Control Existing Mechanical System Performance Analysis System Analysis, Energy and Performance Inspection and Studies HVAC Renovation and Improvement Project Feasibility Studies Mechanical Systems Cost Preparation and Control Take-Off Services Bid Preparation Value Engineering Operation and Energy Expenses Control and Reporting Services Work and Work Progress Planning Project and Construction Controlling, Consultancy, Observation, Supervision and Technical Services for Procurement Project Management and Consultancy Testing & Commissioning, Start-up and Operation Services
Activity Subjects HVAC Systems Heating Systems (Steam and Hot/Warm Water) Steam and Condense Systems Cooling Systems District Heating Indoor Air Quality and Ventilation Systems VAV Systems Industrial Ventilation Precision AC Systems Clean Room Systems Surgery and Intensive Care Systems Medical Gas and Vacuum Systems Heat and Energy Recovery Systems Co-Generation Systems Plumbing Systems Potable and Process Water Preparation, Purification, Treatment and Distribution Systems Waste Water Treatment Systems Rain Water and Drainage Water Building Automation and Management Systems Fire Fighting, Extinguishing and Suppression Systems Irrigation Systems Kitchen and Laundries Cold Rooms
Construction Types for Design and Construction Services Industrial Structures Hotel & Office Buildings Shopping Malls Hospitals Libraries and Museums Air Ports Schools, University Complex and Educational Buildings Military Facilities Public and Government Buildings Broadcast Studios Residences Bank Agencies Health, Wellness and SPA
LIST OF KEY PEOPLE Europass Curriculum Vitae Personal information First name(s) / Surname(s) Isik YARAMIS Nationality Turkish Date of birth 02 May 1965 Gender Male Work experience Occupation or position held Main activities and responsibilities Name and address of employer Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Occupation or position held Name and address of employer Dates 1988-1989 Mechanical Systems Design Engineer Mechanical Systems Design TMA Engineering C.O. Limited Company Ankara (Turkey) Dates 1989-1991 Cost Estimator Engineer Cost Estimating MNG MECHANICAL SYSTEMS INC Ankara (Turkey) Construction Dates 1991-1992 Chief of Proposal Department MNG MECHANICAL SYSTEMS INC Ankara (Turkey)
Type of business or sector Construction Occupation or position held Name and address of employer Type of business or sector Occupation or position held Name and address of employer Type of business or sector Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Dates 1992-1997 Assistant General Manager MNG MECHANICAL SYSTEMS INC Ankara (Turkey) Construction Dates 1997-2001 General Manager MNG MECHANICAL SYSTEMS INC Ankara (Turkey) Construction Dates 2001-2002 My Own Business Feasibility studies and Project developments of Cogeneration systems for the small and mid scale manufacturing complexes My Own Business Ankara (Turkey) Construction Dates 2002-2003 Technical Office Manager Responsible from Construction works machinery equipments, Electro-Mechanical department, planning and budgeting/budget control department and construction design department. During that period, also deputized Purchasing & Procurement Management Department. OYAK Construction Ankara (Turkey) Construction Dates 2003-2004 Logistics Manager Responsible for Technical Office Management and Purchasing & Procurement Management OYAK Construction Ankara (Turkey) Construction Dates 2004
Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Owner Owner MEGA-TEK Construction Engineering and Foreign Trade limited company Ankara (Turkey) E/M Design, Consultancy and Construction Personal skills and competences Mother tongue(s) Turkish Other language(s) Self-assessment Understanding Speaking W r i t i n g European level (*) Listening Reading Spoken interaction English C2 Proficient user C2 Proficient user C2 Proficient user (*) Common European Framework of Reference (CEF) level Spoken production C2 Proficient user C2 Proficient user
Europass Curriculum Vitae Personal information First name(s) / Surname(s) Mehmet CEYLAN Nationality Turkish Date of birth 08 April 1979 Gender Male Work experience Occupation or position held Main activities and responsibilities Name and address of employer Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Occupation or position held Name and address of employer Type of business or sector Occupation or position held Name and address of Dates 2002-2003 Mechanical Design Engineer Mechanical Design MNG Holding Ankara (Turkey) Dates 2003-2004 Mechanical Design Engineer Mechanical Design Beşeli Engineering Company Ankara (Turkey) Construction Dates 2004-2013 Mechanical Design Team Leader Moskay Engineering Company Ankara (Turkey) Construction Dates 2013- November 2013 Mechanical Senior Expert ECORYS Consulting and Engineering Ltd
employer Type of business or sector Ankara (Turkey) Construction Occupation or position held Name and address of employer Type of business or sector Dates November 2013-... Mechanical Design Team Leader Mega-Tek Engineering and Foreign Trade Ankara (Turkey) Construction Personal skills and competences Mother tongue(s) Turkish Other language(s) English Self-assessment Understanding Speaking W r i t i n g European level (*) Listening Reading Spoken interaction English C2 Proficient user C2 Proficient user C2 Proficient user (*) Common European Framework of Reference (CEF) level Spoken production C2 Proficient user C2 Proficient user
Europass Curriculum Vitae Personal information First name(s) / Surname(s) Ufuk YARAMIS Nationality Turkish Date of birth 25/07/1969 Gender Male Work experience Dates Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector 2001 FINANCE AND BUSINESS DEVELOPMENT coordinating and managing financial activities coordinating and managing business development activities MEGA-TEK ENGINEERING CONSTRUCTION AND FOREIGN TRADE LIMITED COMPANY ANKARA (Turkey) Construction Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Dates 1997-2000 DIRECTOR OF FINANCE coordinating and managing financial activities SERA CONSTRUCTION ANKARA (Turkey) Construction Dates 1996-1997 SALES REPRESENTATIVE coordinating and managing sales activities and staff. managing competitive market researches ECZACIBAŞI GİRİŞİM PAZARLAMA A.Ş ANKARA (Turkey) GENERAL CONSUMPTION GOODS MARKET Dates 1993-1996
Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector project analyst, economist preparing pre feasibilities and feasibilities, evaluating and making technical researches surveying potential investment areas privatization studies reevaluating current industrial establishments for privatization KOYTEKS (state owned enterprise) Ankara (Turkey) Construction Education and training Title of qualification awarded Principal subjects / occupational skills covered Name and type of organization providing education and training Title of qualification awarded Name and type of organization providing education and training Title of qualification awarded Name and type of organization providing education and training Dates 1995-1995 beginner and expert certificates Beginner Certificate of European Union ( History, Policies, Affairs in Union, Targets, etc.) and Expert Certificate of International Affairs ATAUM (EUROPEAN RESEARCH CENTER), ANKARA UNIVERSITY ANKARA (TURKEY) Dates 1987-1991 Bs degree of Business Administration HACETTEPE UNIVERSITY (FACULTY OF BUSINESS ADMINISTRATION) ANKARA (Turkey) Dates 1980-1987 GRAD. DEGREE OF HIGH SCHOOL, COLLEGE TED ANKARA COLLEGE (COLLEGE) ANKARA (TURKEY) Personal skills and competences Mother tongue(s) Turkish Other language(s) Self-assessment Understanding Speaking W r i t i n g European level (*) Listening Reading Spoken interaction English Spoken production C C C C C 2 Proficient user 2 Proficient user 2 Proficient user 2 Proficient user 2 Proficient user
Europass Curriculum Vitae Personal information First name(s) / Surname(s) Nationality A. Nihat AKMEHMET Turkish Date of birth 24 April 1958 Gender Male Work experience Dates 2010 - Occupation or position held FREELANCE CONSULTANT Main activities and responsibilities Name and address of employer Type of business or sector Project Based Solution Partner MEGA-TEK ANKARA (TURKEY) Construction Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Occupation or position held Main activities and responsibilities Dates 2008-2009 COMPANY FOUNDER PARTNER Raw Iron plants / Electrical Detail Design Drawings / Pervourskaya Al-Fateh University Pharmacy,Technical Medical and Dental Faculty / Electrical Detail Design Drawings/ Libyan Sheraton Hotel / Electrical Detail Design Drawings / Batumi-Georgia National University Dormitories /Electrical Detail Design Drawings/Kazakhistan Cengelkoy Housing blocks / Electrical Detail Design Drawings/ Istanbul Riga Housing Blocks and Trade Center / Electrical Detail Design Drawings/Lithuanian Mias River Side Shopping Mall / Electrical Detail Design Drawings/ Russia Erbil Trade Center / Electrical Detail Design Drawings/ Iraq Bornova Cultural Center / Electrical Detail Design Drawings/ Izmir PRO-PEK Engineering Consultancy and C.O Limited Company Ankara (Turkey) Construction Dates 2006-2008 GENERAL MANAGER Adnan Saygun Art Center /Detail Design and Construction drawing / Izmir HWP Group Dubai Health City Centers of Excellence /Detail Design and Construction drawing / Dubai Istanbul Municipality Aquarium Life support System / Detail Design and Construction drawing / Istanbul Page 1 / 4 - Curriculum vitae of A. Nihat AKMEHMET For more information on Europass go to http://europass.cedefop.europa.eu European Communities, 2003 20060628
Name and address of employer Type of business or sector Nazım Memedov Suvelan Housing Building / Detail Design and Construction drawing / Baku Istanbul Municipality Car Park Building / Detail Design and Construction drawing / Istanbul Botas Corum Compressor Station / Detail Design and Construction drawing / Izmir Oguz-Gabala-Baku water pipeline project / Ancillary buildings Detail Design and Construction drawing / Baku Antalya Plaza Trade Center / Detail Design and Construction Drawings/ Antalya Esenboga airport Apron Gate A / Detail Design and Construction Drawings/ Ankara Libyan El Egailat Hospital / Detail Design and Construction Drawings/ Ankara TSK Elele Vakfı Special Care Center / Detail Design and Construction drawing / Ankara GMD Engineering Consultancy and C.O.Limited Company Ankara (Turkey) Construction Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Occupation or position held Main activities and responsibilities Dates 2000-2006 FOUNDER PARTNER Istanbul Pharmacy Factory / Design of Electrical systems /Istanbul T Is Bank Nene Hatun Branch Office / ly Electrical Work /Ankara WOW Topkapi Palace Personel Residence/ ly Electrical Work /Antalya T.C. Centarl Bank Social and Administration Building Renovation Project/ Installation of Generator sets and Low Voltage Switchgear /Ankara WOW Kremlin Palace Personnel Residence / ly Electrical Work /Antalya Bornova Private Tevfik Fikret School / ly Electrical and Mechanical Work /Izmir Polatlı Municipality Social Building / ly Electrical Work /Polatli Kundu Tourism Investment / waste water treatment factory /Antalya T.C. Central Bank Head Quarter of Ankara / Installation of Electrical Infrastructure /Ankara TRT Radio and TV production center / ly Electrical Work /Izmir WOW World Palace / Electrical Work of guest rooms /Antalya GATA Military Hospital Renovation / ly Electrical Installation of Operation Rooms / Ankara Australia Embassy New Building / ly Electrical Work / Ankara Konya 3. Main Base Peace Eagle Ground Support Center / ly Electrical Work / Konya Elektrio Eng. and Construction C.O. limited company Ankara (Turkey) Construction Dates 1990-2000 DESIGN MANAGER SIDE IBER HOTEL /Side-Antalya VAKIFLAR GOYNUK HOTEL /Goynuk-Antalya MNG GOYNUK HOTEL /Goynuk-Antalya TOKAT GRAND HOTEL /Tokat GUNAL TRADE CENTER /Ankara MEGA CENTER HOTEL /Ankara KİRİŞ MEGA HOTEL/Kiriş-Antalya TOTAŞ HOLIDAY VILLAGE/Kiriş-Antalya SAPANCA ARCADIA VILLAS/Sapanca Gaziantep Gold Center/Gaziantep / ly Electrical Work Page 2 / 4 - Curriculum vitae of A. Nihat AKMEHMET For more information on Europass go to http://europass.cedefop.europa.eu European Communities, 2003 20060628
Name and address of employer Type of business or sector FIRST RESIDENCE AT GIZA FOUR SEASONS HOTEL GIZA / ly Electrical Work /Cairo-Egypt MNG- ESMAS Electrosystems Eng., Industry and Trade Inc. Ankara (Turkey) Construction Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Occupation or position held Main activities and responsibilities Name and address of employer Occupation or position held Main activities and responsibilities Name and address of employer Type of business or sector Education and training Title of qualification awarded Principal subjects / occupational skills covered Name and type of organisation providing education and training Personal skills and competences Dates 1986-1990 SENIOR DESIGNER Eczacıbaşı Serum and Paranteral Solution Sets Factory Eczacıbaşı Gentamicine Antibiotic Factory / Design of all electrical systems and installation of Low voltage and small power systems / Istanbul TBMM Housing Project / ly Electrical Work / Ankara Hilton Hotel / ly Electrical Work / Ankara Hilton Hotel / ly Electrical Work /Izmir MNG-ESMAS Electrosystems Engineering, Industry and Trade Inc. Ankara (Turkey) Construction Dates 1984-1986 Dates 1980-1984 Site Electrical engineer/chief TBMM Housing Project / ly Electrical Work / Ankara KADIRBEYOGLU Construction Co Ankara (Turkey) Chief Site Engineer Eczacıbaşı Serum and Paranteral Solution Sets Factory Eczacıbaşı Gentamicine Antibiotic Factory / Design of all electrical systems and installation of Low voltage and small power systems / Istanbul ELOMSAN Machinery and Electricity Ltd. Co. Ankara (Turkey) Construction Dates 1976-1980 B.Sc. Electrical Design of power and small power system for office tower, hotels, shopping malls, trade centres, neutral gas pumping station etc. YILDIZ TECHNICAL UNIVERSITY (TECHNOICAL UNIVERSITY) ISTANBUL (TURKEY) Mother tongue(s) TUR Page 3 / 4 - Curriculum vitae of A. Nihat AKMEHMET For more information on Europass go to http://europass.cedefop.europa.eu European Communities, 2003 20060628
Other language(s) Self-assessment Understanding Speaking W r i t i n g European level (*) Listening Reading Spoken interaction English B 2 Indepe ndent user B 2 Indepe ndent user B 1 Indepe ndent user (*) Common European Framework of Reference (CEF) level Spoken production B 1 Indepe ndent user B 2 Indepe ndent user Page 4 / 4 - Curriculum vitae of A. Nihat AKMEHMET For more information on Europass go to http://europass.cedefop.europa.eu European Communities, 2003 20060628
WORKS IN PROGRESS Project Design, Design Inspection & Consultancy Services Ikitelli Integrated Health Campus (950.000 m2) ISTANBUL, TURKEY. Mechanical Systems Design Works for 2. Phase Construction Design Stage EMSAS Kayseri Integrated Health Campus High Secure Psychiatry Hospital (25.000 m2) Mechanical Systems Design YDA COMPLETED WORKS Project Design & Controlling Services Ikitelli Integrated Health Campus (950.000 m2) ISTANBUL, TURKEY. Mechanical Systems Design Works for 1. Phase Final Design Stage -EMSAS Al-Fateh University, Technical Medicine Faculty, LIBYA 35.000 m2 GURIS CONSTRUCTION (E/M Design and Consultancy Service Service) Al-Fateh University, Dental Faculty and Common Blocks, LIBYA 40.000 m2 GURIS CONSTRUCTION (E/M Design and Consultancy Service Al-Fateh University, Pharmacy Faculty, LIBYA 7.500 m2 GURIS CONSTRUCTION (E/M Design and Consultancy Service Service) FUGA Resort Hotel and Villas (30.000 m2) Bodrum, MUĞLA, TURKEY Buyukhanlikardesler Batum SHERATON Hotel, GEORGIA 27.000 m2 NUROL CONSTRUCTION (E/M Design and Consultancy Services)
Batum SHERATON Hoteli Casino, GEORGIA 1.000 m2 NUROL CONSTRUCTION (E/M Design and Consultancy Services) Papillion Belluna Golf Hotel 135.000 m2 Hotel - MUNA CONSTRUCTION, Antalya, TURKEY (E/M Design and Consultancy Service Service) NUROL BATUM Residence Complex (6.000 m2) Batum NUROL CONSTRUCTION CANYON Shopping Mall, Health Club, İstanbul, TURKEY MARS Group (Mechanic Design Services) MUNA Side Shopping Mall, Antalya, TURKEY 15.000 m2 Closed Car Park and Shopping Mall Center MUNA CONSTRUCTION (E/M Design Services) OZALTIN Istanbul Contact Office Building, İstanbul, TURKEY OZALTIN CONSTRUCTION (E/M Design Services) Konya Industrial Zone II. and III. Sector Landscaping, Irrigation (1.800.000m2), Pools-Lakes (60.000 m2) and all related Infrastructure Works, KONYA, TURKEY (E/M Design Services) Fenerbahce Sport Club Ankara Incek Complex, TURKEY 6.000 m2 (E/M Design Services) XUMA BEACH CLUB HOTEL, BODRUM, TURKEY 7.000 m2 Hotel ve Villas (Mechanic Design Services) PERA KITCHEN SCHOOL İstanbul, TURKEY SUADIYE Tourism (Mechanic Design Services) Carmiklı Residence 1.000 m2 NUROL CONSTRUCTION (E/M Design Services) Maiden Student Dormitory, Konya 20.000 m2 - AKKANAT (Mechanic Design Services) ATV Hill Plaza 200.000 m2 Baku, AZERBAIJAN (Feasibility Studies including system alternatives, cost comparisons and work methodology, Preliminary Design & report)
SHARK Plaza 170.000 m2 Baku, AZERBAIJAN (Feasibility Studies including system alternatives, cost comparisons and work methodology, Preliminary Design & report) Guvensoy Luxary Residence 1.000 m2 TURKEY (Mechanic Service) Ankara SHERATON Hotel Lobby-Restaurant-6.Floor-King Suit Flat, TURKEY NUROL CONSTRUCTION Libyan Army Soldier Dormitory (10.000 m2) Sirte, LIBYA NGCC MIM Engineering Utility and Service Units. TEPE construction NARTEPE RESIDENCES, Mechanical Systems, Alternatives and Investment Feasibility Studies. AGACLI Residence, 1000 m2- Ankara, TURKEY Consultancy (E/M) Services Etlik Integrated Health Campus (1.069.000 m2) ANKARA, TURKEY The ministry of Health of Turkey General Directorate of Health Investments, Department of Public Private Partnership, mechanical systems consultancy & support to Consultant Group NKY-ITEC J.V. Kayseri Integrated Health Campus (384.000 m2) KAYSERI, TURKEY The ministry of Health of Turkey General Directorate of Health Investments, Department of Public Private Partnership, mechanical systems consultancy & support to Consultant Group NKY-STUDIO ALTIERI J.V. Bilkent Integrated Health Campus (1.130.000 m2) ANKARA, TURKEY The ministry of Health of Turkey General Directorate of Health Investments, Department of Public Private Partnership, mechanical systems consultancy & support to Consultant Group IPMC-APM J.V. Constructional materials, systems or/and Project based procurement & submittal services for the OBO & CORPS of Eng. Projects together with an American company DMT Int. ( Nowadays, our services are still going on in various subjects for short
terms of periods). Most important references of our services: EPIK, YENIGUN, TEPE, ZAFER, GEMTAS, SASEL, METAG, GAMA CONSTRUCTION, MET ENGINEERING.. etc. 400 bed capacity general hospital (65.000 m2) NECEF, IRAQ- Iraq Ministry of Health, Value engineering, design assessment and improvement services to the E/M contractor YATSIZ CONSTRUCTION Bilgi University, Central İstanbul Campus Project (E/M consultancy service) NGCC Libya, during 2006-2010, Libya based Project investment, evaluation and bid preparation E/M consultancy services. JORDAN Armed Forces Headquarters new placement (250.000 m2) Amman, JORDAN, Yuksel Construction ( Project design coordination and consultancy services) Construction Services PERA KITCHEN SCHOOL İstanbul SUADİYE Truism, Contract Value; 150.000Euro TRT (TURKISH RADIO TELEVISION) KURUÇUŞME STUDIO BUILDING DOĞUSAN Const., Contract Value; 500.000 Euro
COMPLETED WORKS DURING PROFESSIONAL EXPERIENCE
REFERENCES Işık Yaramış PROJECT NAME DESCRIPTION CLIENT MAIN CONTRACTOR DURATION OF PROJECT VALUE IN USD REMARKS Ankara Hilton Hotel Automatic Control Design & Built Ankara Entern. Otelcilik A.Ş. 08/1986 09/1988 3.000.000 Side Sorgun İber Hotel Automatic Control Design & Built A.Ş. Taksim Otelcilik 12/1987 08/1986 750.000 Bolu / Abant Hotel Automatic Control Design & Built Taksim Otelcilik A.Ş. 06/1987 01/1989 1.150.000 Tokat Grand Hotel Automatic Control Design & Built Tokat Özel İdare 02/1987 04/1989 800.000 İzmir Hilton Hotel Automatic Control Design & Built İzmir Entern. Otelcilik A.Ş. 10/1987 12/1991 5.800.000 Göynük Sultan Sarayı Hotel (1000 beds) Automatic Control Design & Built Vakıflar Turizm A.Ş. 11/1988 05/1990 1.750.000 Göynük Hotel (500 beds) Automatic Control Design & Built Göynük Entern. Otelcilik 10/1988 12/1989 1.500.000 İstanbul Sheraton Hotel Fire Fighting System Desing & Built Sheraton Otel MNG 04/1990 03/1992 1.024.000 Magic Life Der Club World Hotel (1000 beds) Automatic Control Design & Built Mega Turizm AŞ 11/1990 05/1994 7.500.000 Hotel Aldino / Ankara Automatic Control Design & Built Arslan Turizm MNG 05/1992 12/1992 750.000 Magic Life Der Club Kiriş Resort Hotel (2000 beds) Automatic Control Design & Built Totaş A.Ş. 06/1993 06/1994 1.800.000 MEGA-TEK LTD.ŞTİ. Hoşdere caddesi 170/5 Y.Ayrancı / Ankara Tel : (0312) 440 25 90-440 85 62 Faks : (0312) 440 73 15 e-mail: info@mega-tek.com.tr
REFERENCES Işık Yaramış PROJECT NAME DESCRIPTION CLIENT MAIN CONTRACTOR DURATION OF PROJECT VALUE IN USD REMARKS İstanbul Mega Hotel Totaş Holiday Village 2. Stage Additional Works Magic Life Der Club Kiriş (additional 1000 beds & Public Spaces) Bodrum/Gümbet WOW Halikarnas Resort Hotel (1000 beds) Antalya / Aksu WOW Topkapı Palace Resort Hotel (2000 beds) Automatic Control Design, Built & Operation Automatic Control, Kitchen & Laundry Design, Built & Operation Automatic Control, Kitchen & Laundry Design, Built & Operation Automatic Control, Kitchen & Laundry Design, Built & Operation MNG Group of Companies MNG Group of Companies MNG Group of Companies MNG Group of Companies 01/1995 04/1997 550.000 10/1997 05/1998 3.250.000 06/1997 04/1999 4.760.000 06/1997 04/1999 8.150.000 Four Season Hotel in First Residence in Cairo / EGYPT Automatic Control Design, Built & Operation First Arabian Real Estate & tourism Investment Co. Laing - CRC / MNG 07/1997 06/2000 9.500.000 İstanbul World Trade Center (Congress Center, Hotel and Shoping Mall Complex) WOW Kremlin Palace Resort Hotel AKSU, Antalya (2000 beds) Erzincan Millitary Hospital Ankara Emergency & Traumatology Hospital Automatic Control Design, Built & Operation Automatic Control, Kitchen & Laundry Design, Built & Operation Automatic Control, Medical Gas System Design & Built Civil and E/M Works İDTM A.Ş. MNG Group of Companies Toplu Konutİdaresi Bşk. T.C. Ministry of Health 01/1999 erteleme 6.500.000 04/2000 erteleme 9.000.000 03/1994 12/1995 2.500.000 Oyak İnşaat / Atlas 04/2002 04/2003 22.000.000 SSK Erzurum Hospital Civil and E/M Works S.S.K. Oyak İnşaat 02/1999 12/2004 6.000.000 SSK Çaycuma Hospital Civil and E/M Works S.S.K. Oyak İnşaat 09/1998 09/2002 3.500.000 SSK Süreyyapaşa Hospital Repairment Works S.S.K. Oyak İnşaat 01/2002 11/2003 2.000.000 All Construction Works All Construction Works All Construction Works All Construction Works MEGA-TEK LTD.ŞTİ. Hoşdere caddesi 170/5 Y.Ayrancı / Ankara Tel : (0312) 440 25 90-440 85 62 Faks : (0312) 440 73 15 e-mail: info@mega-tek.com.tr
REFERENCES Işık Yaramış PROJECT NAME DESCRIPTION CLIENT MAIN CONTRACTOR DURATION OF PROJECT VALUE IN USD SSK Denizli Hospital Civil and E/M Works S.S.K. Oyak İnşaat 10/1998 07/2004 6.000.000 SSK Kütahya Hospital Civil and E/M Works S.S.K. Oyak İnşaat 12/1998 12/2004 10.000.000 SSK Halkalı Hospital Civil and E/M Works S.S.K. Oyak İnşaat 02/1999 12/2003 20.000.000 SSK Düzce Hospital Civil and E/M Works S.S.K. Oyak İnşaat 11/2003 06/2004 7.500.000 G.Antep Jewelleries Mall Automatic Control Design, Built & Operation KuyumcularKooper atifi 01/1996 02/1999 1.190.000 REMARKS All Construction Works All Construction Works All Construction Works All Construction Works First Residence At Giza Residence in Cairo / EGYPT Automatic Control Design & Built First Arabian Real Estate & tourism Investment Co. Laing - CRC / MNG 03/1994 12/1999 14.500.000 Halk Bank General Managment Building (115.000 m2 Construction area) Automatic Control Design & Built Halk Bankası 03/1994 12/2000 11.000.000 Ankara Business Center Automatic Control Design & Built MNG Group of Companies 12/1997 08/1999 650.000 SPK-İMKB Managment Building Repairment Works Project Civil and E/M Works İMKB Oyak İnşaat 08/2002 06/2003 6.500.000 Repair & Modification Works Dikmen Valley Cultural Bridge & Residence Towers Automatic Control Design & Built AnkaraBüyükşehir Belediyesi 09/1992 06/1996 7.600.000 MNG Sapanca Residences Automatic Control Design & Built MNG Group of Companies 01/1996 12/1997 1.500.000 MNG Residence Automatic Control Design & Built MNG Group of Companies 08/1998 12/2000 650.000 MEGA-TEK LTD.ŞTİ. Hoşdere caddesi 170/5 Y.Ayrancı / Ankara Tel : (0312) 440 25 90-440 85 62 Faks : (0312) 440 73 15 e-mail: info@mega-tek.com.tr
REFERENCES Işık Yaramış PROJECT NAME DESCRIPTION CLIENT MAIN CONTRACTOR DURATION OF PROJECT VALUE IN USD REMARKS Hoşdere Dikmen Gate Residences Heating, Plumbing, Fire Fighting, Automatic Control Design & Built AnkaraBüyükşehir Belediyesi 01/1996 12/2000 444.000 Zirvekent Residence (2. Stage) Civil and E/M Works Oyak İnşaat Oyak İnşaat 8.000.000 All Construction Works Günal Trade Center Automatic Control Design & Built MNG Group of Companies 12/1986 12/1989 1.750.000 Çayırhan Thermic Plant Staff Houses Heating, Plumbing Design & Built T.E.K. 04/1986 11/1988 1.000.000 MEPAŞ Prefabric Wooden Elements Factory / MAKON Stell Construction Factory Heating, Plumbing, Fire Fighting, Compressed Air, Automatic Control Design & Built Mepaş A.Ş. Makon A.Ş. MNG 1986 250.000 Oran Site Logistic Support Heating, Plumbing Design & Built MNG Group of Companies 1986/1987 150.000 Gölbaşı Transformer Center Heating, Plumbing Design & Built T.E.K. 1986 450.000 TEK Gölbaşı Transformer & Power Center Heating, Plumbing Design & Built T.E.K. 1986/1987 250.000 Medplast Disposable Injection Factory TEK Gölbaşı Transformer & Power Plant Boiler Room Heating, Plumbing, Fire Fighting, Compressed Air, Automatic Control Design & Built Heating, Plumbing, Fire Fighting, Compressed Air, Automatic Control Design & Built Medplast T.E.K. Mapa A.Ş. / MNG 04/1989 11/1989 500.000 09/1988 07/1989 200.000 President of Turkish Republic Residence Kitchen Desing & Built Emek İnşaat A.Ş. MNG 03/1990 01/1992 280.000 Erzincan Municipality Warehouse & Goverment Building Heating, Plumbing, Fire Fighting, Compressed Air, Automatic Control Design & Built Toplu Konutİdaresi Bşk. 03/1994 12/1995 202.000 MEGA-TEK LTD.ŞTİ. Hoşdere caddesi 170/5 Y.Ayrancı / Ankara Tel : (0312) 440 25 90-440 85 62 Faks : (0312) 440 73 15 e-mail: info@mega-tek.com.tr
REFERENCES Işık Yaramış PROJECT NAME DESCRIPTION CLIENT MAIN CONTRACTOR DURATION OF PROJECT VALUE IN USD REMARKS Dikmen Vadisi Kültür Parkı ve Çevre Düzenlemesi Irrigation, Fire Fighting and Fountains Design & Built AnkaraBüyükşehir Belediyesi 04/1995 12/1997 140.000 İzmir/Tahtalı Potable WaterProject (Water Intake Structure and Water Distribution Line) Automatic Control, Pumping Station and Water Transmission Line Built MNG Group of Companies Mapa A.Ş. / MNG 01/1993 12/1997 7.500.000 MNG Bank Branches (12 ea) Automatic Control Design & Built MNG Group of Companies 08/1997 08/1998 250.000 Oyakbank Branch Repairments (220 ea) Civil and E/M Works Oyakbank Oyak İnşaat 2001 / 2003 Various among 150-200.000 usd/each All Construction Works TV 8/ İstanbul Automatic Control Design & Built MNG Group of Companies 05/1997 12/1997 500.000 Ü.Ç.S. Precalsination construction Adana Cement Factory Railway and Managment Building Project Civil and E/M Works Civil and E/M Works + Railway Works Ünye Çimento Sanayi ve Ticaret A.Ş. Adana Çimento Sanayi Oyak İnşaat 01/2000 12/2002 2.000.000 Oyak İnşaat 06/2001 12/2002 5.000.000 All Construction Works All Construction Works TAJIKISTAN SHKEV ZIGAR 38,5 km Main Road Construction 38,5 km distance main road construction (including 7 bridges) Tajikistan Ministry of Transportation Oyak İnşaat 02/2003 06/2005 23.000.000 All Construction Works MEGA-TEK LTD.ŞTİ. Hoşdere caddesi 170/5 Y.Ayrancı / Ankara Tel : (0312) 440 25 90-440 85 62 Faks : (0312) 440 73 15 e-mail: info@mega-tek.com.tr
REFERENCE Mehmet CEYLAN PROJECT NAME and DESCRIPTION - MECHANICAL DESIGN WORKS A-AIRPORTS Esenboğa New International Airport Terminal Building Ankara-Turkey Cairo New International Airport Terminal Building Cairo-Egypt Prime Minister and DHMI Airplane and Helicopter Warehouse Building Medinah International Airport Terminal Building Medinah-South Arabia B-HOUSING Loft-2 Residence Building İstanbul-Turkey City Star Shopping Center Offices and Residence Towers Building Baku-Azerbaijan C-OFFICE BUILDINGS MNG Holding Headquarter Building 9 and 10 Floors Reconstruction Project Suryapı Headquarter Building İstanbul-Turkey White Garden Office Building Moscow-Russia D-INDUSTRIAL Domodedova Cold Storage Social Building Russia Manga Automobile Factory Saint Petersburg-Russia Establishment of a Common Use Facility (Furniture and Auto Mechanics) and Small Business Advisory Services Unit in Amasya Project, Amasya Establishment of Cereals Exchange and Licensed Warehouse Project, Şanlıurfa Hand-"Made in Hatay" Project, Hatay Big Partnership of Small Industrialists Project,Tokat Strengthening the Infrastructure for Furniture Production Project, Kayseri Increasing Competitiveness of Middle Black Sea Region (TR83)Project, Samsun Establishment of Manufacturing Support and Service Centre at the Yeniçam Shipyard Project, Trabzon Samsun Tekkeköy Logistics Center Project, Samsun E-HOTELS MEGA-TEK LTD.ŞTİ. Hoşdere caddesi 170/5 Y.Ayrancı / Ankara Tel : (0312) 440 25 90-440 85 62 Faks : (0312) 440 73 15 e-mail: info@mega-tek.com.tr
REFERENCE Mehmet CEYLAN PROJECT NAME and DESCRIPTION - MECHANICAL DESIGN WORKS E-HOTELS Wow-World and Wow-Kiriş Hotels -Reconstruction Project F- SPORT CENTERS & FACILITIES Ankara City Club Reconstruction Project Khanty Mansiysk Ice Hockey Building Russia Khanty Mansiysk Governorship Building Russia Mersin Sports International Mersin-Turkey G- SHOPPING MALL Minchurisky Shopping Center Project Minchurisky -Russia City Star Shopping Center Offices and Residence Towers Building Baku-Azerbaijan Voronezh Shopping Center Building Voronezh-Russia Voronezh Shopping Center Extension Building Voronezh-Russia H- MARINA Mersin Marina Project Mersin-Turkey I- TOURISM Winter Tourism Corridor in Erzurum Project, Erzincan-Kars Revitalization of History in Şanlıurfa Project, Şanlıurfa Revitalization of the Tourism Sector in Siirt Project, Siirt MEGA-TEK LTD.ŞTİ. Hoşdere caddesi 170/5 Y.Ayrancı / Ankara Tel : (0312) 440 25 90-440 85 62 Faks : (0312) 440 73 15 e-mail: info@mega-tek.com.tr
PICTURES FROM COMPLETED AND CONTINUED WORKS
ETLİK INTEGRATED HEALTH CAMPUS -ANKARA, TURKEY KAYSERİ INTEGRATED HEALTH CAMPUS -KAYSERİ, TURKEY
BİLKENT INTEGRATED HEALTH CAMPUS -ANKARA, TURKEY İKİTELLİ INTEGRATED HEALTH CAMPUS -İSTANBUL, TURKEY
AL FATEH UNIVERSTY DENTAL AND TECHNICAL MEDICINE FACULTY BUILDING LİBYA TRIPOLI
ATV HILL PLAZZA AZERBEYCAN / BAKÜ SHARK PLAZZA AZERBEYCAN / BAKÜ
FENERBAHÇE SPORT CLUB SOCIAL BUILDING - ANKARA NUROL BATUM HOTEL
BELLUNA GOLF RESORT HOTEL WOW GUMBET HOTEL, BODRUM
WOW GUMBET HOTEL, BODRUM DIKMEN VALLEY LAND SCAPING
DIKMEN VALLEY CULTURAL BRIDGE & RESIDENCE TOWERS HALK BANK GENERAL MANAGEMENT BUILDING
HALK BANK GENERAL MANAGEMENT BUILDING IZMIR HILTON
ANKARA HILTON
WOW TOPKAPI PALACE RESORT HOTEL
WOW KIRIS WORLD CLUB
WOW KIRIS WORLD RESORT HOTEL
WOW KREMLIN PALACE RESORT HOTEL
WOW KREMLIN PALACE RESORT HOTEL
WOW KREMLIN AND TOPKAPI PALACE RESORT HOTELS MNG HEAD OFFICE BUILDING (GUNAL TRADE CENTER) WOW ULUDAG HOTEL
TV8 AND MNG BANK BUILDING
AKSU (Antalya) 50 APARTMENTS HOUSING
PERSONAL REFERENCES MEHMET CEYLAN
MEHMET CEYLAN REFERANCE AIRPORT PROJECT Esenboğa International Airport - Terminal Building - 183.000 m2, Car park - 110.000 m2-4 pcs 3750 kw Chiller, 4 pcs 4500 kw Water Cooling Tower - 4 pcs 4500 kw Heating Boiler - 145 pcs air handling unit, 230 pcs exhaust fan - 4.500 point control automation system - 2800 m3 fire and domestic water tank, 300 m3 irrigation water tank and 1600 m3 cooling tower tank - TAV AKINISI / EKİN.
Cairo International Airport (TB3) - Terminal Building- 160.000 m2-7 pcs 3.500 KW Chiller, 7 pcs 4.200 KW Water Cooling Tower - 2 pcs 6023 KW Water Cooling Tower - 152 pcs AHU, 181 pcs exhaust fan - 15.000 point control automation system - TAV AKINISI / EKİN.
MEHMET CEYLAN REFERANCE SHOPPING CENTER PROJECT ARAL City Star, Baku / Azerbaijan. - 70.000 m 2 shopping center - 45.000 m 2 car park - 80.000 m 2 40 floors office tower - 19 27 floor 65.000 m 2 residence tower - 6 pcs 1.190 KW, 4 pcs 275 KW, 4 pcs 550 KW Chiller - 6 pcs 1500 KW Heating Boiler - 60 pcs AHU, 120 pcs exhaust fan - 17 pcs pressurization fan, 25 pcs smoke exhaust fan
Voronezh Shopping Center, Voronezh / Russia. - 120.000 m 2 shopping center - 23 floor 15.000 m 2 office building - 3 pcs 2.400 KW, 1 pcs 600 KW Chiller - 3 pcs 3.230 KW Cooling Tower - 8 pcs 1000 KW Heating Boiler - 33 pcs AHU, 50 pcs exhaust fan
MEHMET CEYLAN REFERANCE RESIDENCE PROJECT Loft-2 Residence / Levent-İstanbul - 22.000 m 2 residence - 5.000 m 2 underground car park
MEHMET CEYLAN REFERANCE PROJECT SPORT COMPLEX Khanty Mansysk Ice Hockey Rink, Khanty Mansysk / Russia. 30.000 m2 closed area, tribune for 7000 person concert area for 12.000 person,
HANGAR BUILDING Prime Minister and DHM Aircraft and Helicopter Hangar Building Esenboğa-Ankara 40.000 m 2 Hangar Building Governor's Office Building / Khanty Mansysk / Russia. 60.450 m 2 administration building