300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO



Similar documents
Clad Direct Glaze Window Installation Instructions

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

WINDOW INSTALLATION GUIDE

Barewood Octagon and Elongated Windows Installation Instructions

Window Installation Instructions

How To Repair A Boat Landing Deck With A Boat Bed

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Sun Windows General Information Sun New Construction Window Installation Instructions

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

Superform Products Ltd.

Tundra Series Windows January 2016

HfHMD uses LP SmartSide siding and trim.

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

The WANZ Guide to Window Installation

Important Information for Installer & Homeowner

AC-3200 ALUMINUM PLATE SYSTEM (DRY JOINT)

INSTALLATION OF A BAY WINDOW

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

GreenGuard Housewrap Installation Guide

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Residential Single Family Houses Using Vinyl, Brick and Stone Claddings VERSION 10/13

4 5/16 Subframe Installation

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings

March 14, Installation of Bay, Bow and Garden Windows

Screw Patterns Roof & Walls TR-36 MD-36 TSM-32. PBR-Panel

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Stone Veneer or Lap Siding, e.g. Fiber Cement and Wood/Cedar

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg

The WANZ Guide to Window Installation

Installation Instructions For Slider Casement Air Conditioners

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006)

DE Frame with C Series Sidelight

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

WINDOW PANNING AND TRIMS

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details

Asphalt Shingle Application Requirements

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Installing Window and Door Mouldings

INSTALLATION INSTRUCTIONS for Swinging French and Patio Doors (JII105)

Mark Cramer Inspection Services, Inc.

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

application instructions

Brick Veneer Construction

Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions

AAMA Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 8 DOORS AND WINDOWS WINDOWS

Chapter 9: INSTALLING ROOFING

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

Installation Instructions

450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

Window Sill Details for Effective Drainage of Water

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

Best Practices Manual

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

Directions For Applying Malarkey Laminate Shingles

Classic Products, Inc. ClickLock Standing Seam Installation Manual

Stormproof Your Roof. I ve done enough roof repairs to know that storm water that gets past the shingles

How to Replace Windows in Stucco-Clad Walls

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

DuPont Flashing Systems Installation Guidelines

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

G VYCOR DECK PROTECTOR

Information Technology Solutions

PANELIZED HOME INSTALLATION GUIDELINE

SUPER SHED. Indoor shelter for your outdoor tools.

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

Although we do a fair amount of residential roofing, my family s breadand-butter. Installing a. Sealants aren t universal

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

Premier & Deluxe 3-Season Room Sliding Glass Door

Installation Window Building In Details

SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

AAMA (Formerly CAWM ) Standard Practice for Installation of Windows with a Mounting Flange in Stud Frame Construction

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors without Nailing Fin (JII015) IMPORTANT INFORMATION AND GLOSSARY

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

SHINGLE APPLICATION GUIDE

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application

PART 1 GENERAL 1.1 SECTION INCLUDES

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Installation Guide for Andersen Architectural Wood Inswing Entry Doors

Housewrap Errors. By Steve Easley

WINDOW REPAIR MANUAL & REFERENCE GUIDE

Installation Guide for Andersen Architectural Clad Outswing Commercial Doors

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

Replacement Installation Instructions

Packaged Terminal Air Conditioner Wall Sleeve Installation

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

Installation Instructions

Vinyl Siding Estimating and Installation Guide

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

Transcription:

INSTALL PEEL & STICK (P&S) GUSSETS WITH PRIMER AS PER MANUFACTURERS INSTRUCTIONS 2mm MIN GAP IN SHEATHING STEP 1 PLACE 100mm X 100mm PIECE OF P&S IN CORNER SO THAT IT IS 38mm INTO THE OPENING EACH WAY STEP 2 FOLD THE TAB TIGHTLY INTO THE CORNER 300mm 300mm 300mm STRIP OF STARTER PAPER STAPLE TOP EDGE ONLY SO BUILDING PAPER CAN BE INSTALLED UNDERNEATH LATER

EXTEND UP THE JAMBS BY 100MM Min. SEAL CORNER WITH CAULK APPLY P&S WITH PRIMER AS PER MANUFACTURERS REQUIREMENTS FROM INSIDE OF SILL EXTEND DOWN THE PAPER AND UP THE JAMBS BY 100MM Min.

OVERLAP ALL FLASHING PAPER SHINGLE STYLE (AS SHOWN) 300MM RETURN BUILDING PAPER INTO ROUGH OPENING 300MM Place plastic horseshoe shims or doubled up strips of P&S or P.T. blocking on sill spaced as per window manufacturers specifications. Ensure that the shims do not extend past the inside of the window frame. 300MM STARTER STRIP OF BUILDING PAPER

APPLY A BEAD OF POLYURETHANE CAULK(or alternate) TO THE PAPER 19mm OUT FROM THE OPENING TO JAMB AND HEAD ONLY DO NOT CAULK THE SILL TO ALLOW FOR DRAINAGE FASTEN WINDOW AS PER MANUFACTURER'S INSTRUCTIONS To allow for drainage 10mm holes may be drilled in the bottom flange. Obtain permission from the window manufacturer

ALL VERTICAL LAPS TO BE 100mm Min. AND STAGGERED THE INSIDE OF THE FRAME IS TO BE SEALED TO THE AIR/VAPOUR BARRIER (A.B & V.B.) ON ALL FOUR SIDES WITH POLYURETHANE CAULK AT THE SILL AND ROD & CAULK AT THE JAMBS & HEAD (See details 3.0 to 3.2) SEAL FIELD PAPER TO FLANGE AT JAMB WITH MASTIC OR POLYURETHANE CAULK (or alternate) HEAD FLASHING WITH END DAMS AS PER 9.27.3.8 ENSURE FIELD PAPER LAPS UNDER STARTER PAPER AT SILL INSTALL PAPER WITH FULL HALF LAPS + 50MM START WITH HALF ROLL OF BUILDING PAPER The code minimum is one layer of building paper but 2 layers is good practice and the industry standard

STRAPPING MUST BE INSTALLED OVER STUDS UNLESS SHEATHING IS A MIN OF 12.5mm THICK (BCBC 9.27.5.1.2) 8 SEAL BUILDING PAPER TO HEAD FLASHING AND TO FLANGE OF WINDOW AT JAMB WITH POLYURETHANE CAULK (or alternate) 7 6 HEAD FLASHING WITH END DAM 5 10MM GAP BETWEEN STRAPPING AND WINDOW 5 4 CLADDING SILL PEEL & STICK 1. HALF ROLL STARTER STRIP UNDER 3 SILL STARTER PAPER BUG SCREEN 2 10MM. Min. STRAPPING AS PER 9.27.2.2 @ 400mm O/C Max. PRESSURE TREATED MATERIAL IS RECOMMENDED VERIFY THAT THE FASTENERS USED ARE SUITABLE FOR THE TYPE OF PRESSURE TREATMENT CHEMICALS USED (PARTICULARLY WITH ACQ)

The code requires a min of 6 % slope after settlement / shrinkage. Using a flashing with a 110 degree angle is good practice DO NOT CUT HERE MINIMUM 75MM 110 NOTCH OUT FRONT FACE Step 1 MINIMUM BY CODE 10MM 25MM IS RECOMMENDED FOLDED SAFETY EDGE 50MM DO NOT CRIMP BACK FOLD TIGHT SO POSITIVE SLOPE IS MAINTAINED END DAM MUST EXTEND TO FACE OF CLADDING FOLD UP EDGE 25MM MIN 75MM Step 2 FOLD OVER OUTER CORNER TO CREATE A SAFETY EDGE Step 3

REQUIRED FLASHING

STARTER PAPER 2 LAYERS OF BUILDING PAPER BOTH LAYERS OF BLDG PAPER TO OVERLAP BACK LEG OF HEAD FLASHING P.T. STRAPPING AT 400mm O/C MAX. CLADDING TRIM FLASHING WITH END DAMS SEAL POLY HERE 1X6 WOOD TRIM BUG SCREEN BACK CAULK WINDOW FLANGE MIN. 10MM AIR SPACE FOR VENTILATION AND DRAINAGE SLOPED HEAD FLASHING WITH END DAMS ROD & CAULK FRAME TO POLY (A.B & V.B.)

BUILDING PAPER TO EXTEND OVER WINDOW FLANGE SEAL TO FLANGE WITH CAULKING WINDOW JAMB WITH 2 x 6 TRIM WOOD TRIM CLADDING CAULKED TO WOOD TRIM 2 LAYERS BUILDING PAPER STARTER PAPER POLYURETHANE CAULK ROD AND CAULK FRAME TO (A.B. & V.B.) POLY (A.B. & V.B.) BACK CAULK FLANGE AT HEAD AND JAMB ONLY WITH CAULKING SEAL POLY HERE WINDOW JAMB WITH 1 x 6 TRIM WOOD TRIM POLYURETHANE CAULK CLADDING CAULKED TO WOOD TRIM ROD AND CAULK FRAME TO (A.B. & V.B.) POLY (A.B. & V.B.) SEAL POLY HERE