INSTALLATION INSTRUCTIONS for Vinyl Patio Doors without Nailing Fin (JII015) IMPORTANT INFORMATION AND GLOSSARY
|
|
|
- Grace Kelley
- 9 years ago
- Views:
Transcription
1 Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl patio doors without nailing fin, including flush fin. Read these instructions thoroughly before beginning. They are designed to work in most existing applications, however; existing conditions may require changes to these instructions. If changes are needed, they are made at the installer's risk. For installations other than indicated in these instructions, contact a building professional. Areas such as Florida and the Texas TDI region have different anchoring requirements based on product certification. For information on specific products, visit or and follow the anchoring schedule given in the drawings for the product instead of the anchoring schedule in this document. Newer construction methods have led to an increase in air and water tightness in buildings. This frequently leads to negative air pressure inside the home, which can draw water through very small openings. Our installation method seals the patio door in a weather-tight manner and uses a sill pan to capture and drain incidental storm water from under the patio door. IMPORTANT INFORMATION AND GLOSSARY Not all patio door types may be installed into every wall condition in all areas. Consult your local building code official for applicable building codes and regulations. Local building code requirements supersede recommended installation instructions. Please Note! Any patio door installation where the sill is higher than 35 feet above ground level or into a wall condition not specifically addressed in these instructions must be designed by an architect or structural engineer. Failure to install square, level and plumb and on a flat surface (without twist or warp) could result in denial of warranty claims for operational or performance problems. Note to Installer: Provide a copy of these instructions to the building owner. By installing this product, you acknowledge the terms and conditions of the limited warranty as part of the terms of the sale. LANDINGS These instructions cover two patio door sill conditions: the step-down landing and the continuous slab landing. The installation methods vary slightly between landing types. Step-Down Landing GLOSSARY Backer Rod (backing material) A material (e.g. foam rod), placed into a joint primarily to control the depth of the sealant. Buck A wood framework attached to the masonry inside a window or patio door rough opening. Continuous Air Seal Backer rod and sealant or low expansion foam applied to the interior gap between the product and the building in a continuous fashion used to block air flow between the interior and exterior of the building envelope. Pilot Hole A drilled hole that is no larger than the body of the (minus the threads). Score Make a cut mark in the same location multiple times. Shiplap The layering method in which each layer overlaps the layer below it so that water runs down the outside. Sill Pan A flashing component installed in the sill of the rough opening underneath the door. Sill pans have upturned walls along the interior edge and at both ends, creating a three sided box. This component serves as a collection device to drain incidental water to the exterior of the building and should be properly sealed to the opening. The best sill pan design has a positive slope to the exterior and offers continuous support to the door s sill. Weep Hole (weep channel) The visible exit or entry part of a water drainage system used to drain water out of a door frame. REVERSE PATIO DOOR HANDING Estimated Install Time for New Construction Continuous Slab Landing Only pre-installed 6'8" and 6'10" Builders sliding patio doors without blinds between the glass that have weep holes on the top and bottom are reversible (specially designed to be converted to be opened either from the left or the right). Patio doors that are set up for left hand operation (door opens from the left on the exterior) or vice versa, can be converted to open from the opposite side by following the instructions in our document SVC001, available at Do not install the patio door until after completion of the reversing instructions and the fixed panel is on the desired side. Please contact us with questions: [email protected] Phone: (800)-JELD-WEN/(800) Please allow sufficient time to properly prepare the rough opening, install the patio door and ensure its proper operation. First Time: 1.5 hr. Experienced: 1.25 hr. Professional: 0.5 hr
2 ROUGH OPENINGS This installation guide specifically addresses masonry/block wall, sheathed wall and open-stud construction. MASONRY/BLOCK WALL CONSTRUCTION This installation assumes that a framework of 2x studs (often called a buck) has already been properly fastened and sealed to the concrete/ masonry wall by a building professional. Buck FULLY SHEATHED / OPEN-STUD WALL CONSTRUCTION Fully sheathed wall framing is covered by sheathing. This installation assumes building wrap is properly installed prior to patio door installation. Open-Stud walls are not covered by sheathing. King stud Trimmer studs Sill area Header Sheathing SAFETY AND HANDLING SAFETY Read and fully understand ALL manufacturers instructions before beginning. Failure to follow proper installation instructions may result in the denial of warranty claims for operational or performance problems. Do not work alone. Two or more people are required. Use safe lifting techniques. Use caution when handling glass. Broken or cracked glass can cause serious injury. Wear protective gear (e.g. safety glasses, gloves, ear protection, etc.). Operate hand/power tools safely and follow manufacturer s operating instructions. Use caution when working at elevated heights. If disturbing existing paint, take proper precautions if lead paint is suspected (commonly used before 199). Your regional EPA ( or Consumer Product Safety Commission offices provide information regarding regulations and lead protection. MATERIALS AND PATIO DOOR HANDLING Make sure the operating panel is secured prior to installation. Heed material manufacturers handling and application instructions. Protect adhesive surfaces from dirt, moisture, direct sunlight and folding over onto themselves. Handle in vertical position; do not drag. Do not put stress on joints, corners or frames. Store patio door in dry, well-ventilated area in vertical, leaning position to allow air circulation; do not stack horizontally. Protect from exposure to direct sunlight during storage. Install only into vertical walls and when conditions and sheathing are dry. Never use solvent-based sealants on vinyl products. IF INJURY OCCURS, IMMEDIATELY SEEK MEDICAL ATTENTION! MATERIALS AND TOOLS PROVIDED MATERIALS 4 - #10 x 2 1/2" s (to secure the strike plate). Vinyl caps to cover holes. NEEDED MATERIALS Note! Follow all material manufacturers instructions for proper use and compatibility. When using flashing, spray adhesive/primer, sealant and foam products, we recommend using the same manufacturer and verifying compatibility. It is the End User s responsibility to determine if dissimilar materials are compatible to the substrates in the application. #8 x 1 1/4" (minimum) washer head or pan head corrosion-resistant s (stainless steel recommended). Fasteners must penetrate at least 1" into framing. 3/1 x 2 1/2" self-tapping concrete s (if required to secure the sill into concrete/masonry). Non compressible or water degradable shims. Sill pan: It is best practice to use a pre-formed, rigid, positively sloped, pvc pan that provides continuous support. We recommend using SureSill Sloped Sill Pan, manufactured by SureSill, Ltd. An alternative would be a non-sloped pre-formed sill pan or one can be fabricated on site from metal or vinyl sheet material with the proper tools. Sealant: We recommend OSI QUAD Max Sealant or equivalent. This can be used in any application and can be painted or ordered in a color matched product, if desired. Backer rod 1/8" larger than the widest portion of the gap (used in conjunction with sealant bead). Polyurethane low expansion Window and Door foam: We recommend OSI QUAD Foam or equivalent. 4",, or 9" (as required by local code and window configuration) wide self-adhesive flashing: We recommend OSI Butyl Flash Tape or equivalent. Drip cap if required because of door location and exposure. Doors with an adequate overhang (see our Appropriate Protection document at may not need a drip cap. In addition to sill pans, SureSill also offers types of head flashing. For installations into a Buck: Liquid applied flashing (Protecto Wrap LWM 200 or equivalent). NEEDED TOOLS Hacksaw (SureSill sill pan) Cutting shears (fabricated sill pan) Tape measure Utility knife Level (4' minimum recommended) J-roller Caulking gun Drill with bits Clean rags Screwdrivers 2
3 1 REMOVE PACKAGING AND INSPECT PATIO DOOR REMOVE PACKAGING Remove shipping materials such as corner covers, shipping blocks or pads. Remove any temporary handles just prior to installation into the rough opening. Flush fin doors will have a wood or cardboard support on the sill. Remove the support and then remove the nailing fin if present. To remove the nailing fin, score the nailing fin with a utility knife as close to the frame as possible, then bend back and forth until it snaps off. INSPECT PATIO DOOR Cosmetic damage. Product squareness (diagonal measurements must be within 1/4" difference). Correct product (size, color, grid pattern, handing, glazing, energyefficiency requirements, etc.). For side-by-side mulled units, a drip cap that extends the length of the frame plus 1/8" overhang on each end is required. Included parts (See Parts List above). If any of the above conditions represent a concern, or if you expect environmental conditions to exceed the patio door s performance rating, do not install the patio door. Contact your dealer or distributor for recommendations. 2 INSPECT ROUGH OPENING FOR RETROFIT INSTALLATIONS For finless/block frame doors, remove the entire old patio door. Removing the exterior wall surface is not necessary if the opening has been evaluated to be structurally sound and water tight. Repair any problems before continuing. For flush fin doors, remove the old door panels and the sill. Remove enough of the bottom of both side jambs to allow for a sill pan to be installed - details in following section. Contact your local waste management entities for proper disposal or recycling of products being removed. ALL INSTALLATIONS Verify the width and height of the patio door are each 1/2"- 3/4" smaller than the rough opening width/height. Mulled units should be 3/4" smaller. Verify the rough opening is square. The (A) and (B) measurements should be the same. Maximum allowable deviation from square is 1/4". Verify the rough opening is level and plumb (C) and (D). The maximum allowable deviation is 1/8". Verify Square, Level, and Plumb A The rough opening sill must not be crowned or sagged (D), but rather be level or sloped (positive slope) to the exterior. The exterior face of the rough opening must be in a single plane (E) with less than 1/8" twist from corner to corner. Minimum double studs should be used at all wood framed rough openings. The header must be supported by trimmer studs. B D C E 3
4 3 INSTALL SILL PAN The sill can be prepared using one of two methods: We recommend SureSill Sloped Sill Pan available from SureSill at building supply stores, and some manufacturing locations. As an alternative, a sill pan can be fabricated on site. If installing a SureSill sill pan, follow SureSill s instructions for installation and skip to section 4 PREPARE BUCK, or to section 5, PREPARE STUD-FRAMED WALL as it applies to your situation. If fabricating a sill pan on the job site, follow the instructions below. JOBSITE FABRICATED SILL PAN 1. Cut a piece of sheet material to the length shown. 2. Lightly crease folding lines 1/2" in from the two short sides and one long side. 3. Measure the width of the frame and add 9/1. 4. Take this distance from the back edge and lightly crease a folding line across the sheet material. 5. For step-down landings, cut 1/2" in at this line on both sides of the sheet material. Length of rough opening sill plus 1" 1/2" Frame width +9/1 Folding Line Fold sides and back up Fold corner forward 6. For continuous slab, cut across the folding line. Fold front flap down 1/2". Fold the three back sides up to make a 3-sided box, and, for step-down landings, fold the front flap down. INSTALL SILL PAN Remove for continuous slab 1. If installing a metal sill pan on concrete, cut a piece of selfadhesive flashing the length of the sill pan and adhere it to the entire bottom surface where the pan will sit on the concrete. 2. Set the sill pan in the rough opening, aligning the front edge (for continuous slab) or folded down edge (for step down) with the exterior of the rough opening. 3. Mark a line across the front and back of the sill pan. Sealant 4. Apply three 3/8" beads of sealant between the lines. 5. Place the sill pan in the rough opening. Firmly press the sill pan into the sealant with a J-roller. 4 PREPARE BUCK Note! This section applies to installations into a buck only. For installations into a stud-framed wall, begin with section 5, PREPARE STUD-FRAMED WALL. 1. Seal any joint larger than 1/1 in the buck and between the buck and the concrete/masonry with sealant. 2. Cover the buck and the surrounding concrete/masonry at the head and jambs (apply over sill pan if installing a job site fabricated sill pan) with liquid applied flashing per manufacture s instructions as shown. END of Buck Instructions, SKIP to section 6, INSTALL DOOR. Liquid applied flashing Sealant joints 4
5 5 PREPARE STUD-FRAMED WALL PREPARE BUILDING WRAP Check with the building wrap manufacturer to verify the following steps will not void their product warranty. Note! Steps 1 and 2 apply only to new construction. 1. Trim building wrap flush with the edges of the rough opening. 2. If the door extends beyond the exterior plain of the building and a drip cap is 45 desired, at the head, slit building wrap at 45. Tape up as shown. We recommend installing a drip cap because this integrates the building wrap and drip cap to protect the structure and the product from incidental water. INSTALL JOBSITE FABRICATED SILL PAN Note! The rest of the steps in this section only apply to a job site fabricated sill pan. If installing a sill pan that you have purchased, follow manufacturer's instructions for installation and skip to section 6, INSTALL DOOR. 1. If installing a metal sill pan on concrete, cut a piece of self-adhesive flashing the length of the sill pan and adhere it to the entire bottom surface where the pan will sit on the concrete. 2. Apply spray adhesive/ primer to the sill pan and surrounding area. Follow manufacturer s instructions for application methods. 3. If fasteners are required through the sill, cut a piece of self-adhesive flashing the length of the sill and apply over the entire sill pan. For step down landings, fold flashing down as shown. For continuous slabs, trim flush with rough opening. Spray Adhesive 4. Cut two pieces of self-adhesive flashing 9" wide by the sill pan width + 3" long. a. For continuous slab landings only, cut out the inside corner. b. Adhere the pieces of flashing to the inside corners. Stretch flashing as needed to cover corners and lay flat. 5. Smooth gaps or bubbles beneath self-adhesive flashing with a J-roller (remove and replace if necessary). 6. Seal back corners of sill pan with sealant. Sill pan width. For step-down landings only, allow for the drainage and Sealant drying of incidental moisture out of the rough opening. Do not apply sealant to the face of the sill and/or trim pieces so that they block water drainage. End of Stud-Framed Wall Instructions, continue with section 6, INSTALL DOOR. 3" Sill pan width 9" Discard (for continuous slab only) Continuous Slab Landing 3" Step-Down Landing 3" Sill pan width 5
6 6 INSTALL PATIO DOOR Warning! To avoid injury, use at least two people to install. Adequately support the door until fully installed. IF INSTALLING A FLUSH FIN PATIO DOOR If installing a door with a flush fin, apply at least one continuous 3/8" bead of sealant to the exterior face of the side jambs and head. Continue with the instructions. ALL INSTALLATIONS 1. If installing a pre-formed sill pan, follow manufacturer s instructions and skip this step. If installing a job site fabricated sill pan, run a continuous 3/8" bead of sealant along the sill pan back dam. When the frame is installed, make sure the frame makes solid contact with the sealant. Add more sealant if necessary. Sealant Sealant 2. Tilt the frame into the rough opening. Adequately support the frame until fully installed. 3. Align the exterior of the frame, or flush fin, with the most exterior surface of the structure (the exterior face of the concrete wall, framing or sheathing). Areas such as Florida and the Texas TDI region have different anchoring requirements based on product certification. For information on specific products, visit or and follow the anchoring schedule given in the drawings for the product instead of the anchoring schedule in this document. Patio doors will be fastened according to Performance Grade (PG) rating. This rating is located on the gold AAMA label fixed somewhere on the frame. Look for something like this example: R-PG X2426 (144X96)-SD. Mark fastener locations in the interior frame track of the side jambs and head as follows: PG20 4" from each corner and every 24". PG35 4" from each corner and every 18". PG50 and above 4" from each corner and every 12". 5. At each fastener location, insert shims and only through the first wall of the jamb, drill a 3/8" clearance hole. Then, drill a 1/8" pilot hole through the jamb wall, shim and into the framing. 6. Drive a washer or pan head through the shim located 4" from one upper corner.. Confirm the patio door is square, level, and plumb. SECURE PATIO DOOR Framing Screw Opposing shims 3/8" Clearance Hole Exterior Jamb Note! Do not over tighten fasteners and do not allow fasteners to deform the vinyl frame, it must be kept flat and straight. 1. At each remaining corner, fasten patio door through shims in the same manner above. Test for proper operation (remove and reinstall if necessary). 2. Drive s through each of the remaining fastener locations. SHIM THE JAMBS Note! Secure all shims with sealant. 4. From the interior, shim the head and side jambs 4" from the corners and at the strike plate so that strike plate s (installed later) will each penetrate a shim. Shim so the door is square, level and plumb. Strike plate 4" 4" 4" 6
7 COMPLETE INSTALLATION 1. For continuous slab landings, apply a 1/4" bead of sealant around the sill where it meets the slab. Leave 1" gaps at the weep holes as shown. 2. Ensure sealant on back dam of the sill pan fully seals to the inside face of the sill. Apply more sealant as necessary to ensure an airtight seal. INSTALL BUMPER INSTALL DRIP CAP - OPTIONAL UNLESS REQUIRED BY LOCAL CODE We recommend as a best practice to install a drip cap. For finless doors, use z flashing and integrate into the weather barrier. For doors with a flush fin, cut a groove in stucco, fill with sealant and insert horizontal leg of drip cap. Components shown after installation is complete Stucco For Builders vinyl series doors, install the bumper in the stationary panel side jamb at vertical center using the 1" selftapping provided. Builders Patio Door Bumper Strike plate Head flashing Flush fin Interior
8 COMPLETE INSTALLATION - CONTINUED PATIO DOOR ADJUSTMENT Roller Adjustment Note! Adjusting door too high may allow water and air leakage. Adjust rollers just high enough to clear sill track and still roll smoothly. 1. Builders vinyl doors have an adjustment on each lower end of the operating panel(s), and Premium vinyl doors have access holes on the face of each lower end of the operating panel(s). Remove small vinyl plugs from each hole if present. 2. Open operating panel enough to compare with frame jamb. Note! Builders vinyl roller adjustment s on the end of the panel are in close proximity to the attachment. Adjust only the lower as shown because loosening the attachment will detach the roller from the operating panel. 3. Using a #2 Phillips head driver, turn the adjustment clockwise to raise the panel, and counterclockwise to lower the panel. 4. Premium vinyl doors may have different types of rollers. To identify the roller, look inside the adjustment hole. If the roller has a plus (+) sign, clockwise rotations will lower the panel and counterclockwise will raise the panel. If the roller has a minus (-) sign, the operations are reversed. 5. Adjust as needed until interlocks, grid patterns and jambs line up. 6. Test the operating panel for proper operation.. Re-apply the small vinyl caps over the roller adjustment holes if applicable. Builders Patio Door Premium Patio Door Builders Roller Raise panel Attachment Lower panel Lock Adjustment Note! If the strike plate was not previously installed, line up the holes with the dimples in the operating panel side jamb and drive s through the two slotted holes. If the lock does not properly engage the strike plate: Loosen the strike plate s and move up or down until the latch engages properly. If the door does not lock or is loose when locked: Turn the latch adjustment (s) in 1/2 turn increments: clockwise to loosen or counterclockwise to tighten. Premium vinyl doors have a double latch and two adjustment s. Builders Patio Door Strike plate Lock hook adjustment Premium Patio Door Lock hook adjustment Lock hook adjustment Adjustment 8
9 COMPLETE INSTALLATION - CONTINUED FINISH INSTALLATION Drive two #10 x 2 1/2" s (included in hardware pack) through the open holes in the strike plate. Remove the preinstalled s from the strike plate and replace them with the remaining #10 x 2 1/2" s from the hardware pack. This will increase security by attaching the patio door to the structure. Builders Patio Door Pre-installed Replacement Pre-installed Premium Patio Door Pre-installed Replacement Pre-installed CONTINUOUS AIR SEAL Create a continuous air seal on the interior between the rough opening and the door frame with backer rod and sealant or low expansion foam. Allow the foam to fully cure and cut flush with a sharp knife. Make sure the foam cuts cleanly and doesn t tear. AFTER INSTALLATION 1. Cover the holes in the frame with the provided vinyl caps. 2. Seal any gaps or openings at end of horizontal mull joints with sealant. 3. For flush fin doors, apply sealant on the exterior where the flush fin meets the wall. For finless doors, seal the gap between the door frame and rough opening (or as wall detail dictates) with backer rod and sealant. 4. Install exterior wall surface (if applicable) per manufactures guidelines. 5. Protect recently installed units from damage from plaster, paint, etc. by covering the unit with plastic. Gap Rough opening Sealant joint Gap Door frame Backer rod 6. Remove labels or other materials adhered to glass within 30 days after installation. Please visit jeld-wen.com for warranty and care and maintenance information. Thank you for choosing 2014 JELD-WEN, inc.; This publication and its contents are owned by JELD-WEN, inc. and are protected under the U.S. Copyright Act and other intellectual property laws. All trademarks, service marks, logos and the like (whether registered or unregistered) are owned or controlled by JELD-WEN, inc. or others. Unauthorized use or duplication of JELD-WEN intellectual property is prohibited. JELD-WEN reserves the right to change product specifications without notice. Please check our website, jeld-wen.com, for current information. (08/14) 9
INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl Patio Doors with nailing fin. Any local building code requirements supersede the recommended
INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nail fin. Not all window types may be installed into every wall
INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl windows without a nailing fin (including finless, flush fin and flange). Read these instructions
INSTALLATION INSTRUCTIONS for Swinging French and Patio Doors (JII105)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Steel, Fiberglass, Vinyl, and Wood French and Patio Doors. Read these instructions thoroughly
Window Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg
Thank you for selecting JeLd-weN products. Attached are JeLd-weN s recommended installation instructions for pocket (replacement) double-hung, casement, awning, picture or transom windows, designed to
INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product
WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING
WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read
Sun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
Basement Window Installation Guide Hopper and Sliding
Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant
Tundra Series Windows January 2016
Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing
SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS
Vinyl Windows and Doors Manufactured by Pella Corporation Part Number: V984528 2012 Pella Corporation SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS Installation Instructions for Typical
Clad Direct Glaze Window Installation Instructions
Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully
INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS
2009 Pella Corporation INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Part Number: 80WH0100 Installation Instructions for Typical Wood Frame Construction.
INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW
Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.
We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
Brick Veneer Construction
Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power
IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1:
IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Thank you for purchasing your new replacement windows from Great Lakes Window. The following instructions will help remove the old windows
DE Frame with C Series Sidelight
TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder
We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
March 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
Installation Guide for Andersen Architectural Wood Inswing Entry Doors
Installation Guide for Andersen Architectural Wood Inswing Entry Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are
New Construction Stud Frame Vinyl Window Installation Guide
New Construction Stud Frame Vinyl Window Installation Guide This manual contains procedures based on ASTM E2112 and Installation Masters Installer Training & Certification Program Manual RLC-1 The procedures
Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows
Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows Viewed from the exterior. IMPORTANT: Please read before you begin installation. TABLE OF CONTENTS AND TOOL / MATERIAL
Replacement Installation Instructions
Sliding Door Replacement Installation Instructions Please make sure you have: Fixed 1 - Operating (X) Panel (Glazing Bead Inside, Roller Adjustment Holes Outside) 1 - Fixed (O) Panel (For 3-Panel doors,
Installation Guide for Andersen Architectural Clad Outswing Commercial Doors
Installation Guide for Andersen Architectural Clad Outswing Commercial Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance
PANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
Active and Passive Sash Replacement
for Andersen Gliding Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete the procedure, call Andersen at 1-888-888-7020 for
PRODUCT GUIDE Vinyl Patio Doors (JPG008)
This guide contains procedures for common user serviceable repair tasks found on vinyl patio doors. If a condition arises that is not covered in this guide, please contact us for professional help. This
Barewood Octagon and Elongated Windows Installation Instructions
Step-by-step instructions to a beautiful window. Measuring and Installation of your new window from Century Specialty Windows couldn't be easier with our step-by-step instructions. Quality, function and
AAMA 2400-10. Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure
A M E R I C A N A R C H I T E C T U R A L AAMA 2400-10 Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure M A N U F A C T U
All-Season Sunroom Sliding Glass Door Installation Instructions
ASRESGD-08 All-Season Sunroom Sliding Glass Door Installation Instructions Panel Frame Door Frame Left Side Foam Insulator IE241 H Bar Assembly Door Frame Top Track Panel Frame Door Frame Right Side Stationary
K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11
K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins
IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION
INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Not supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray.
HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL
HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL Please read these instructions carefully and completely before attempting to install Hale Pet Doors; they will guide you through the steps
The WANZ Guide to Window Installation
The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check
GreenGuard Housewrap Installation Guide
000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be
WHI 90-Minute Rated Veneered Door Frame Installation Instructions
No. 940-03-10 INSTALLATION INSTRUCTIONS 90 MINUTE RATED VENEERED DOOR FRAME DOOR REQUIREMENTS: Consult the door manufacturer to make sure that the doors are qualified for the hardware to be installed,
Sash Replacement Guide
for Andersen 200/400 Series Awning Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete this procedure, call Andersen at 1-888-888-7020
INSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry
WELCOME Recommended Window 1.5 credits Minnesota Department of Labor and Industry In accordance with the Department of Labor and Industry s statute 326.0981, Subd. 11, This educational offering is recognized
Important Information for Installer & Homeowner
Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side
450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS
450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS Effective 2/12/11 Revised 7/7/15 TACOMA, WA (253) 922-6030 PORTLAND, OR (503) 682-3270 MARYSVILLE, WA (360) 659-0836 SACRAMENTO, CA
Hinge, Blocker, and Tab Adjustment Guide
Hinge, Blocker, and Guide for Andersen A-Series Hinged Outswing; 400 Series Frenchwood Hinged Outswing Patio Doors and 400 Series Frenchwood Hinged Outswing Patio Doors with Stormwatch Protection Hinge,
How to Install UnderDeck The Original.
How to Install UnderDeck The Original. TOOLS: Chalk Line Caulk Gun Garden hose or water bucket Gloves Hammer or Screw Gun Power Mitre Saw with OSB Blade Pencil Pliers Safety Glasses Straight Edge / Carpenter
Therma-Tru Slim-Line Sliding Patio Door. Assembly and Installation
Therma-Tru Slim-Line Sliding Patio Door Assembly and Installation Read all instructions before starting. Builder or subcontractor, please forward these instructions to the homeowner. The applicable standards
Premier & Deluxe 3-Season Room Sliding Glass Door
DTSSGD-11 Premier & Deluxe 3-Season Room Sliding Glass Door Installation Instructions Screen Door Seal Left Side Track Top Track Assembly Right Side Track Right Side Trim Sliding Glass Door Sliding Screen
PRODUCT GUIDE Aluminum Single-Hung Windows (JPG002)
This guide contains procedures for common user serviceable repair tasks found on aluminum single-hung windows. If a condition arises that is not covered in this guide, please contact us for professional
DIY CABINET REFACING INSTALLATION GUIDE
DIY CABINET REFACING INSTALLATION GUIDE CABINET REFACING INSTALLATION Are you ready to reface your outdated cabinets? This guide will show you how to install your new Facelifters Cabinet Refacing Products
WINDOW INSTALLATION GUIDE
WINDOW INSTALLATION GUIDE is not responsible for or liable for any use or misuse of the information contained in this window installation guide. Window Installation Guide This guide provides basic information
WINDOW REPAIR MANUAL & REFERENCE GUIDE
WINDOW REPAIR MANUAL & REFERENCE GUIDE TABLE OF CONTENTS DOUBLE HUNG & SINGLE HUNG PARTS 4-5 CASEMENT PARTS 6 SCREEN PARTS 7-8 HOW TO REMOVE TILT-IN SASH 9 HOW TO REMOVE A BALANCE 10 HOW TO INSTALL BALANCE
The WANZ Guide to Window Installation
The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 2 of 60 Contents Overview 5 Objective 5 Scope 5 Opening Preparation 7 Step P1 Preliminary Check 8 Step P2 Cut the Underlay 9 Step
SERIES 238 WINDOWS. NOTE: Read instructions completely before attempting any installation.
1 Installation Instructions SERIES 238 WINDOWS Page 2: Page 3-4: Page 5: Page 6: Page 7: Opening Preparation and Wood Buck Installation Installation Instructions for Series 238 WINDOWS Figure 1: Buck preparation
Information Technology Solutions
Information Technology Solutions Aluminum Sliding Door Assembly Instructions Shield Doors & Windows Bi-fold Door Assembly Instructions For Support Please Call 03 8339 2252 Aluminum Sliding Door Assembly
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 8 DOORS AND WINDOWS 08 50 00 WINDOWS
SECTION INCLUDES Metal Windows Vinyl/Aluminum Clad Wood Windows Solid Fiberglass and Vinyl Windows Wood Windows (Historic Preservation only) RELATED SECTIONS 02 83 00 Lead Paint Remediation 06 10 00 Rough
Hinge Replacement & Hinge and Hardware Adjustment Guide for Andersen Frenchwood Hinged Patio Doors Manufactured Before November 2005
Hinge Replacement & Hinge and Hardware Adjustment Guide for Andersen Frenchwood Hinged Patio Doors Manufactured Before November 2005 For ease of installation and continued enjoyment of your Andersen product,
7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME
7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved
Installation Instructions
READ BEFORE INSTALLING UNIT For Through-the-Wall Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:
PRODUCT GUIDE Vinyl Single and Double-Hung Windows (JPG006)
This guide contains procedures for common user serviceable repair tasks found on vinyl single and double-hung windows. If a condition arises that is not covered in this guide, please contact us for professional
4 5/16 Subframe Installation
4 5/16 Subframe Installation The subframe system is a great installation tool for installing windows in masonry conditions. Typically subframes are used in masonry openings so that windows can be anchored
300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO
INSTALL PEEL & STICK (P&S) GUSSETS WITH PRIMER AS PER MANUFACTURERS INSTRUCTIONS 2mm MIN GAP IN SHEATHING STEP 1 PLACE 100mm X 100mm PIECE OF P&S IN CORNER SO THAT IT IS 38mm INTO THE OPENING EACH WAY
Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units
for Andersen Bow, Bay, and Box Projecting Window Units Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are essential if the
InsulView Window Installation Instructions
InsulView Window Installation Instructions 1. The entire building is normally sheeted with the 2" 2 ½ OR 3 wall panel and the windows installed at a later time. A window retrofit of an existing building
Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions
New Construction Installation Instructions EPLACEMENT Installation Instructions Page 2 of 6 New Contruction Installation Instructions 1. Frame rough opening equal to window call out size. ough opening
QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS
QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine TM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
Basic Spring Motor Roller Shades
Comprehensive Roller Shade Installation Guide Basic Spring Motor Roller Shades ATTENTION!!! READ CAREFULLY! This shade has a reliable long-lasting Spring Motor. The Spring Motor must have proper tension
Combination Unit 5'6" Windows a i o P t
for Andersen 5'6" Double-Hung Venting s Windows a i o P t o rs D o Congratulations You have just purchased one of the many fine Andersen products. For ease of assembly and installation and continued enjoyment
Entry Door System Installation Instructions
Entry Door System Installation Instructions IMPORTANT Read these instructions completely before beginning installation. Please use caution when completing any building project. Safety glasses Phillips
FAQs. 19. Does the sub floor need to be level before I install my new direct-to-stud bathtub or shower base?
1. Where is the serial number of my tub located? 2. What can I use to clean my tub or shower? 3. What is an Above Floor Rough-in? 4. Can I replace my towel bar? 5. What are grommets? 6. Why do some bathing
REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES
REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES Tools Required Tape Measure Hammer Slotted Screw Driver #2 & #3 Philips Screw Driver 3-4 Foot Level 12 Pry Bar Cold Chisel
Composite Stone Veneer
Composite Stone Veneer Installation Guide Ver 1 Jun 2015 www.compstone.com Composite Stone Veneer Installation Guide Contents Introduction & Overview 3 Required Tools 4 Optional Tools 4 Attachment Guidelines:
DuPont Flashing Systems Installation Guidelines
Installation Instructions for Integral Flanged Door FTER Water-Resistive Barrier (WRB) is Installed DuPont Flashing Systems Installation Guidelines INSTLLTION INSTRUCTIONS FOR INTEGRL FLNGED DOOR FTER
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
ILLUSION FRAMELESS SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS
PREPARATION Approximate Installation Time: Tools Required for Installation: 60 minutes Hacksaw Electric Drill 3/16 Masonry Bit Pencil/Felt tip pen Safety Glasses Measuring Tape Masking Tape Standard Screw
PRODUCT GUIDE Vinyl Casement & Awning Windows (JPG005)
This guide contains procedures for common user serviceable repair tasks found on vinyl casement and awning windows. If a condition arises that is not covered in this guide, please contact us for professional
Best Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE
DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings
Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings VERSION 1/16 FOR SINGLE FAMILY HOMES AND LOW RISE MULTI-FAMILY BUILDINGS LESS THAN 4 STORIES Tyvek
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
Residential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
Installation Instructions For Slider Casement Air Conditioners
Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT
THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150
THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 SECTION ONE A. Objective The objective of this guide is to provide Owners and General Contractors/Construction
PART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
MGB Chrome Bumper Conversion
MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different
Installation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step
Ceiling Mounted Folding Attic Ladders Installation Instructions
Ceiling Mounted Folding Attic Ladders Installation Instructions WARNING Before you start installing your new Louisville Ceiling Mounted Folding Attic Ladder, you must read and understand the following:
Guidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
Introduction...COMB-2 Design Considerations and Examples...COMB-3
SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant
Reachout Lock Replacement for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors
for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors Thank you for choosing Andersen. For questions call 1-888-888-7020. For more information
Installing the Sno-free Standing Seam System for Metal Roofs
Installing the Sno-free Standing Seam System for Metal Roofs SFP SSP CLIP SSP STANDING SEAM SFP EXTRUSION SFP RAMP PANEL Step # 1 Mark the location and Install Extrusion Mark the area on the roof to receive
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.
Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.
INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS
INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS Introduction This inspection guide is organized to follow the EIF System's Installation Guide.
VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation
CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. North America Version
CEILING SYSTEMS Between us, ideas become reality Installing Suspended Ceilings North America Version 1 Installing Armstrong Suspended Ceilings An Armstrong suspended mineral fiber ceiling is functional,
