Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

Similar documents
How To Amend A Stormwater Ordinance

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

A Developer s Guide: Watershed-Wise Development

Individual Residential Property Credit

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

CASFM Stormwater Quality Field Trip June 23rd, 2011

Funding the Long-Term Operation and Maintenance of Stormwater Best Management Practices

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction

Operations and Maintenance

CITY UTILITIES DESIGN STANDARDS MANUAL

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

GENESEE COUNTY DRAIN COMMISSIONER S OFFICE

Quantifying LID Triple Bottom Line Benefits Milwaukee Case Study Kimberly Brewer, A.I.C.P. Tetra Tech

Toronto s Wet Weather Flow Master Plan

DRAINAGE SERVICE CHARGES

Haynes Recreation Center, Laredo, TX. Data Matrix and Sustainability Benchmarks

Guidelines for. Permeable Pavement

Burnsville Stormwater Retrofit Study

Underground Injection Control Storm Water Information

Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012

Costs for Green Infrastructure and Stormwater Retention Practices

Waukesha County. Municipal Separate Storm Sewer System (MS4) Permit Annual Report to the Land Use Parks & Environment Committee

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

Green Infrastructure in Action: Examples, Lessons Learned & Strategies for the Future December 2014

Permeable Interlocking Concrete Pavements

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Green Spaces to Improve Waterways and Communities

Porous Pavement Alternatives Cost Analysis

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Permeable Paving System with StormAbsorb Technology

Best Management Practice Fact Sheet 7: Permeable Pavement

Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation. Presenters:

Implementing Community-Driven Stormwater Solutions. Josh Ellis Abby Crisostomo

ELMER AVENUE. Water Augmentation Study NEIGHBORHOOD RETROFIT DEMONSTRATION PROJECT

SUSTAINABLE URBAN DRAINAGE SYSTEMS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Field Performance of Two Stormwater Bioretention Filtration Design Configurations

The Clean Water Project What Is The Stormwater Impact?

Implementing Green Infrastructure in Atlanta

Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey


Multi-purpose Drainage Management (MDM) Plans

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

10/4/ slide sample of Presentation. Key Principles to Current Stormwater Management

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Costs for Green Infrastructure and Stormwater Controls

GreenPlanIT LID Site Suitability Tool. Patty Frontiera, Pete Kauhanen, Marshall Kunze,

Lansdowne Stormwater UPDATE

Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Shooks Run Drainage Study Basic Terminology

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

Figure 3 Pipe Cracking

Basic Elements of Reading Plans

Green Alley. Handbook. The Chicago. Richard M. Daley, Mayor City of Chicago. An Action Guide to Create a Greener, Environmentally Sustainable Chicago

Low Impact Development Permeable Paving

How to Build a Rain Garden at Your Home

User s Manual for the BMPTRAINS Model

Outlet stabilization structure

Green Infrastructure in Schools: Challenges and Opportunities

Gettysburg Adams Chamber of Commerce Storm Water Management

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Soakage Trenches. A better way to manage stormwater. Thinking Globally and Acting Locally

Homeowner s Guide to Drainage

LOW IMPACT DEVELOPMENT TOOLKIT. prepared for the city of mesa, arizona

Transcription:

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org

Chagrin River Watershed Partners Formed in 1996 by watershed communities. Supported by member dues and grants. Comprised of 36 cities, villages, counties, townships, and park districts Improve development practices and site design to reduce long term infrastructure costs. Majority of members required to comply with Ohio EPA s Phase II requirements.

CRWP Sponsoring M embers Western Reserve Federation of Conservationists

Member Services: What Does CRWP Do? Grants for open space and stormwater management. Development plan review and technical testimony. Model regulation adoption and implementation. Landowner assistance. Watershed Initiatives: Activities to support the public health and safety basis for member planning and zoning. Chagrin River Watershed Balanced Growth Plan: Local planning framework to coordinate decisions about how growth and conservation should be promoted by State and local policies and investments. Low Impact Development: Provide guidance on model regulations, site design assistance, construction of four demonstration projects. Chagrin River Watershed Action Plan: Continue to implement the Plan and provide revisions as appropriate. Dam Removal and Stream Restoration Projects: Various projects across watershed.

CRWP M ember Recommendations Comprehensive planning Open space acquisition Riparian & wetland setbacks Erosion & sediment control Comprehensive storm water management Conservation development Alternative energy Flood damage reduction Off Street parking Model codes, case studies, and adoption and implementation assistance available for each. In partnership with Planning Commission, Soil & Water Conservation District, Engineer, Water Resources, others.

Data from: Cost of LID BM Ps CRWP s Low Impact Development Demonstration Project Funded by USEPA Stormwater Retrofits under Ohio EPA Section 319 and Surface Water Improvement Grants Details from bids from 8 projects in Chagrin River watershed communities Photo: GPD Group: Summit County Veterans Building

O hio EPA SWIF/ 319: LID Cost Summary Bioswale per sq. ft. Range $2.75 - $41.95 Average $16.25 Green Roof per sq. ft. Range $15.18 - $18.87 Average $17.03 Permeable Pavement per sq. ft. Range $3.80-$26.00 Average $13.53 Rain Garden per sq. ft. Range $4.66 - $29.00 Average $14.35

Chagrin River Watershed: LID Cost Summary Bioretention per sq. ft. Range $2.22 - $30.00 Average $13.19 Bioswale per linear ft. Range $24.70 - $385.00 Average $89.52 Pervious Concrete per sq. ft. Range $9.89 - $16.00 Average $12.36 Pervious Pavers per sq. ft. Range $8.86 - $18.30 Average $11.19 Tree Vault Range $501.75 - $3,200.00 Average $1,317.08 Rain Garden per sq. ft. Range $6.50 - $130.00 Average $46.32 Subsurface Gravel Wetland per sq. ft. Average $2.0

Low Impact Development Demonstration Project CRWP received US EPA grant Demonstrate Innovative Approaches to Distributed Storm Water Management in Northeast Ohio Funded by: US EPA National Community Decentralized Demonstration Project

Cawrse and Associates

2009: Runoff reduction = 33% 2010: Runoff reduction = 60% Parking Lot and Drive: $72,000 Paver system, earthwork, excavation, curb, soil borings Pavers: $7-8/SF - product, stone and labor

Vegetated Swale

Swale - $21,000: $42 LF Cost includes vegetation, planting, soil mix, soil stabilization, rock and earthwork

Rain Garden Rain Garden: $8,600 $26.87/SF Vegetation, planting, earthwork, and soil mix

Pepper Pike Retrofit Project Modify existing drainage swale and install bioretention in residential & public areas. Fox Hollow Drive Residential Subdivision Chagrin Boulevard Orange Campus High School Fox Hollow Drive Chagrin Blvd. Goal: Provide an option to culverting roadside ditches and swales.

Pepper Pike Retrofit Project City approached homeowners for involvement Maintained by City for 3 years Landscaping becomes responsibility of homeowner Develop a planting plan for installers and homeowners Cost to Install: $57/LF 800 LF of Bioretention Installed by City Service Department Project total $45,000

Moreland Hills provided additional funding. Orange Village Sterncrest Retrofit Replace existing storm system with bioswale system along the north and south sides of Sterncrest Road to fix flooding problems.

Sterncrest Bioretention

Sterncrest Bioretention Cost to Install: $115/LF 1100 LF of Bio-Swale 1100 LF storm sewer pipe 9 Bioretention Areas Sod installation for swales immediate stabilization Project total $126,000 Can save on cost by having the service department install plants

M ayfield Heights SWIF Grant Project BMPs: Bioswales 6 parking islands Porous Concrete 3,380 sq.ft. Tree Vaults 9 vaults OEPA Grant Award Amount: $231,900 Project Design: Completed by URS Project Status: Completed July 2011 Featured on NEOSWTC Tour for stormwater retrofits

Eastlake SWIF Grant Project BMPs: 2 Bioretention Cells 2,700 ft 2 OEPA Grant Award Amount: $64,479 for $19.59/square foot Project Design: Completed by CT Consultants Project Status: Completed September 2011

Wiley Park 319 M ayfield Village Project BMPs: Bioretention Cell 650 square feet Pervious Pavers Parking Area 8,000 square feet OEPA Grant Award: $184,429 Local Share: $46,108 Total: $230,537 Project Design: Completed by Stephen Hovancsek & Associates, Inc. Project Construction: September October 2011 Bioretention Cell: Bids from $19.91 to $7.67/Square foot Pervious Pavers: Bids from $8.86- $18.30/square foot

October 25, 2011 ODOT #57 gravel Bioretention Cell ODOT #1 & #2 Stone 4 PVC underdrain pipe backfilled with pea gravel

November 7, 2011 Rolled curb cuts

Top Gun Supply Chester Township Approximately 15,000 square feet of pavers Installed for approximately $5.00 square foot.

Chester Township SWIF Grant Project BMPs: 3 Bioretention Cells 1,300 sq. ft. Pervious Paver Parking Area 3,806 sq. ft. West Geauga H.S. Rain Garden 1,000 sq. ft. OEPA Grant Award Amount: $77,250 Project Design: Completed by Land Design Consultants, Inc. Project Status: Scheduled construction Spring 2012

Concord Township: Gravel Wetland First gravel wetland constructed in Northeast Ohio Followed design from University of New Hampshire Only 2 contractors bid on project

What Affects Cost? Under drains and catch basins Edge Treatments curbs Soil media in bioretention and bioswales Regrading/Excavation Installation methodology Contractor Experience Size Bioretention Permeable pavements

N ext Steps? CRWP is still collecting information Possible Analysis Additional data on BMPs Compare different pavement treatments Compare costs based on size, features, year constructed

N ational Estuarine Research Reserve System Science Collaborative NOAA Funds administered by the University of New Hampshire Program supports science-based projects that address local coastal management problems. Ensure researchers and intended users work together to describe science and technology needs related to specific problems, define research questions, design and implement projects using appropriate approaches and methodology, and apply the results. Proposals must incorporate collaboration and applied science to address a coastal management problem that has been identified as a priority.

Project Partners Chagrin River Watershed Partners, Inc. Old Woman Creek National Estuarine Research Reserve Ohio Department of Natural Resources, Division of Soil and Water Resources Firelands Area Coastal Tributaries/Erie SWCD

CRWP NERR Science Collaborative Project Modeling peak discharge and runoff reduction using local case studies and provide training on methods and results. Quantify BMP specific and site level hydrology for local soil and climate characteristics. Monitor 6 LID BMPs Test in situ soil conditions Build Capacity among Design and Community Engineers Develop Implementation Tools Technical Guidance Revisions for local codes Recommendations for stormwater utility credit programs and watershed specific permits Explore the role of LID as a climate adaptation strategy

Questions?