Green Infrastructure in Action: Examples, Lessons Learned & Strategies for the Future December 2014
|
|
|
- Eleanore Hampton
- 10 years ago
- Views:
Transcription
1 Green Infrastructure in Action: Examples, Lessons Learned & Strategies for the Future December 2014 New York City s Green Infrastructure Plan: Compliance Through Adaptive Management
2 Presentation Overview Genesis of NYC s Green Infrastructure Program Consent Order Obligations for G.I. & Phase I Implementation Lessons Learned & Emerging Issues
3 Dense, Efficient Settlement is Impervious
4 Stormwater Planning: PlaNYC Initiatives 2007 Citywide PlaNYC sustainability initiative included plan to expand use of stormwater BMPs 2008 Stormwater Management Plan Continued focus on source controls Proposed regulatory controls
5 Stormwater Planning: NYC Green Infrastructure Plan Announced September 2010 Proposed controlling first inch of runoff on 10 percent of impervious surfaces in combined areas Incorporated hybrid grey-green approach focused on costeffective projects to control combined sewer overflows (CSOs)
6 G.I. Program Focuses on Combined System Two-thirds of NYC served by combined sewers 216,000 acres of CSO drainage area 7,400 miles of sewers 422 CSO outfalls 27 billion gallons of CSO per year
7 72 % of NYC is covered by impermeable surfaces = Impermeable surfaces = Permeable surfaces
8 G.I. Plan: Opportunities for Green Infrastructure Land Use % of Combined Sewer Watershed New development and redevelopment 5.0% Streets and sidewalks 26.6% Multi-family residential complexes 3.4% Parking lots 0.5% Parks 11.6% Schools 1.9% Vacant lots 1.9% Other public properties 1.1% Expect that 10% capture goal will be met by: - 1/3 New development standards - 1/3 Right-of-way projects - 1/3 Public facilities, parks, and other existing development
9 Consent Order Obligations for G.I CSO Consent Order modification incorporates G.I. targets (10% over 20 yrs) Requires implementation of new stormwater performance standard LTCPs will include baseline credit for CSO volume reductions from G.I. Requires financial commitment for first 5 years of G.I. program ($187M) Adaptive management approach for G.I.
10 G.I. Phased Implementation Timeline Final 3.0% Additional 3.0% Additional 2.5% Initial 1.5%
11 Stormwater Performance Standard Adopted in July 2012 Accompanying guidance issued at same time Intended to reduce peak flow to City sewers during rain events Applies to new development and alterations in combined areas
12 Order Includes Contingency Plan Option G.I. targets spaced every 5 years (first deadline is 2015) If any target is missed, DEP can submit contingency plan within 6 months Plan must specify grey and/or green projects to address shortfall, with schedule
13 Implementation in Phase I First phase ( ) requires 1.5% penetration rate Provides for program development and slow initial ramp-up DEP s Office of Green Infrastructure & interagency partnerships DEP works closely with Departments of Parks, Design & Construction, and Economic Development to execute and maintain projects Design standards
14 G.I. Design Standards Detailed engineering designs for several types of G.I. installations available on DEP website Streamlined designs facilitate efficient contracting and implementation Received Excellence in Design Award from NYC Public Design Commission in July 2013
15 Pilot Projects 30+ G.I. source controls constructed and monitored since 2010 Tree pits, blue & green roofs, subsurface detention, porous pavement, bioretention facilities Remote monitoring equipment measures flows at regular intervals Collect data on runoff rates & volume, water & soil quality, typical maintenance requirements 3 neighborhood-scale projects studied under Consent Order, covering 63 acres of tributary area
16 Priority Areas
17 Priority Areas Area-wide contracts for Priority CSO Tributary Areas Criteria include: CSO volume & frequency; outfalls in proximity to public access locations; presence of other CSO-reduction projects Allows saturation of G.I. practices & realization of efficiencies in design and construction Standardized designs and procedures facilitate area-wide strategy
18 Right-of-Way Bioswales Placed in publicly owned ROW installations bid out at a time, with 6 month construction timeline
19 Public On-Site Retrofits DEP works with other City agencies to identify sites for G.I. retrofits that meet the agencies program goals Sites must have suitable infiltration conditions and be free of hazardous materials, underground vaults, and existing stormwater systems
20 Public-Private Partnerships DEP funding up to $5M for construction of 10 G.I. playgrounds per year over 4 yrs At P.S. 261, Trust for Public Land engaged 4 th graders on conceptual design Completed project manages 23,000 square feet of impervious area & 500,000 gal stormwater per year
21 G.I. Grant Program DEP initiated grant program in 2011 to strengthen public-private partnerships & public engagement Online application process Extensive public outreach to interested stakeholders Consent Order requires commitment of additional $3M in G.I. grants by 2015 By end of 2013, DEP had committed $11.5M to 29 private property owners for G.I. projects
22 Implementation: Tracking Compliance Annual report describes completed projects and action plan for following year DEP also launching web-based GIS Project Map to track all projects, public & private Stormwater performance standard tracked through sewer connection certifications Total area managed through G.I. as of 2013: 28.9 acres Total area planned through the end of 2014: acres 1.5% target requires estimated 1180 acres
23 Lessons Learned Implementation challenges Existing urban street conditions Geologic and soil conditions (e.g. high bedrock, clay soils) High groundwater tables Utility conflicts Contaminated soils Importance of design standards Interagency coordination strategy is effective G.I. is generally popular
24 Emerging Issues Translation to LTCP volume goals & long-term monitoring Contingency plan process Documentation of G.I. cobenefits Application in MS4 areas O&M
25 Paerdegat Detention Facility Staten Island Bluebelt Catch Basins Enhanced Tree Pit
26 Questions? The NYC Green Infrastructure Plan and other documents referenced today can be viewed at and downloaded from :
27 Carrie Noteboom, Senior Counsel Environmental Law Division New York City Law Department 100 Church Street New York, NY
New York City, facing one of the nation s largest sewage overflow
New York, New York A Case Study of How Green Infrastructure is Helping Manage Urban Stormwater Challenges Types of green infrastructure used: Green roofs, blue roofs, rain barrels/cisterns, permeable pavement,
Green Infrastructure in Action: Examples, Lessons Learned, and Strategies for the Future
D I A L O G U E Green Infrastructure in Action: Examples, Lessons Learned, and Strategies for the Future Summary Municipal wastewater and stormwater utilities are increasingly incorporating green infrastructure
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
Costs for Green Infrastructure and Stormwater Retention Practices
Costs for Green Infrastructure and Stormwater Retention Practices Bob Newport U.S. EPA December 9, 2014 Topics to be Covered EPA data collection and cost analysis focused on postconstruction stormwater
Costs for Green Infrastructure and Stormwater Controls
Costs for Green Infrastructure and Stormwater Controls August 5, 2015 Bob Newport U.S. EPA Region 5 (Chicago Office) Topics to be Covered EPA data collection and cost analysis focused on postconstruction
Green Streets, Places, and Spaces
Thursday October 23, 2014 Green Streets, Places, and Spaces Green Streets reduce stormwater runoff and improve a street s ecological performance. Often, strategies for sustainable stormwater management
Implementing Green Infrastructure in Atlanta
City of Atlanta Mayor Kasim Reed Department of Watershed Management Implementing Green Infrastructure in Atlanta SESWA Southeast Regional Stormwater Seminar April 9, 2014 Jo Ann J. Macrina, P.E. Commissioner
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended
Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)
Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious
City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions
City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager [email protected] Stormwater
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org [email protected] Chagrin River Watershed Partners Formed
CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers
United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,
Partnerships in Achieving Green Infrastructure Goals
Partnerships in Achieving Green Infrastructure Goals Debra Mitchell, FASLA, LEED AP SmithGroupJJR Patrick Brawley, ASLA SmithGroupJJR Aaron Durnbaugh, Director of Sustainability Loyola University Chicago
Bolton s Flood Risk Management Strategy
Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk
1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
Quantifying LID Triple Bottom Line Benefits Milwaukee Case Study Kimberly Brewer, A.I.C.P. Tetra Tech
Quantifying LID Triple Bottom Line Benefits Milwaukee Case Study Kimberly Brewer, A.I.C.P. Tetra Tech Karen Sands, Manager of Sustainability, MMSD Heather Fisher, AICP, Tetra Tech 1 Background MMSD provides
Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007
Use of Green Roofs to Meet New Development Runoff Requirements Greg Davis Nov. 8, 2007 Why green roof? Absorption of precipitation Increased insulation Reduced urban heat island effect Pollutant removal
URBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer
Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer Novatech 2010, the 7th international conference on sustainable techniques and strategies in urban
Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding
New York State Water Resources Institute Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding Emily Vail Hudson River Estuary Program NYS Department of Environmental Conservation
DRAINAGE SERVICE CHARGES
DRAINAGE SERVICE CHARGES Louisville and Jefferson County Metropolitan Sewer District 700 West Liberty Street Louisville, Kentucky 40203-1913 EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2013 A
STAFF REPORT TO COMMITTEE OF THE WHOLE
STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None
Kennedy Greened: A DC Water Green Infrastructure Challenge Finalist MON-B07 Monday, November 24, 2014 10:00 AM - 11:30 AM
2014 ASLA Annual Meeting - Denver, Colorado Kennedy Greened: A DC Water Green Infrastructure Challenge Finalist MON-B07 Monday, November 24, 2014 10:00 AM - 11:30 AM DC Water Nitsch Engineering Urban Rain
Stormwater Design Guidelines 2015 Proposed Regulatory Update Urban Watershed Management Program WWE October 2015
Stormwater Design Guidelines 2015 Proposed Regulatory Update Urban Watershed Management Program WWE October 2015 PRESENTATION OUTLINE 1. Urban Watershed Management Program 2. Stormwater Management Ordinance:
Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs. Tom Schueler Chesapeake Stormwater Network
Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs Tom Schueler Chesapeake Stormwater Network Recent Expert Panels 1. Stormwater Retrofit Practices 2. New State Performance Standards
Implementation of the New York City Wastewater Resiliency Plan: Opportunities And Lessons Learned
Implementation of the New York City Wastewater Resiliency Plan: Opportunities And Lessons Learned Pinar Balci, Ph.D. Director, Bureau of Environmental Planning and Analysis NYC Department of Environmental
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for
Green Infrastructure:
Spring 2014 Green Infrastructure: Sustainable Solutions in 11 Cities across the United States Author: Christopher Economides Advisors: Tess Russo and Upmanu Lall COLUMBIA UNIVERSITY WATER CENTER Table
Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program
Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Eric Loucks, P.E., D.WRE Kumar Gali, P.E. June 4, 2015 Outline MMSD Service Area Problem and Challenges Solution
ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS
(408) 761 5882 http://www.sewerlock.net ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS 1. `The United States and various State Environmental Protection Agency regulations require elimination
A Green Vision for CSO Long-Term Control Planning: How Green Can One City Get??
A Green Vision for CSO Long-Term Control Planning: How Green Can One City Get?? Marc Cammarata, PE - Manager, Office of Watersheds - Philadelphia Water & Ted Brown, PE Water Resources Engineer Biohabitats,
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
ELMER AVENUE. Water Augmentation Study NEIGHBORHOOD RETROFIT DEMONSTRATION PROJECT
ELMER AVENUE Water Augmentation Study NEIGHBORHOOD RETROFIT DEMONSTRATION PROJECT STAGG STREET ELMER AVENUE KESWICK STREET PASEO NOTE: Photo taken before retrofit WHAT IS THE NEIGHBORHOOD RETROFIT PROJECT?
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: [email protected]
Triple Bottom Line (TBL) Analysis Favors Green Infrastructure Over Offline Storages to Mitigate the Upper Olentangy CSOs
Triple Bottom Line (TBL) Analysis Favors Green Infrastructure Over Offline Storages to Mitigate the Upper Olentangy CSOs Hunter Kelly, PE, Columbus DPU Kwasi Amoah, PE, Dynotec, Inc. Hazem Gheith, PhD,
Toronto s Wet Weather Flow Master Plan
Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,
SUSTAINABLE STORMWATER MANAGEMENT PLAN 2008
SUSTAINABLE STORMWATER MANAGEMENT PLAN 2008 A GREENER, GREATER NEW YORK The City of New York Mayor Michael R. Bloomberg 110 This page SUSTAINABLE left blank STORMWATER intentionally. MANAGEMENT PLAN SUSTAINABLE
HOBOKEN GREEN INFRASTRUCTURE STRATEGIC PLAN
CONNECTING PEOPLE, PLACES, AND POTENTIAL. HOBOKEN GREEN INFRASTRUCTURE STRATEGIC PLAN HOBOKEN, NJ OCTOBER 2013 FINAL REPORT Clarke Caton Hintz Architecture Planning Landscape Architecture i Hoboken Green
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
How To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH
Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH Project Background In November of 2013 the Green Infrastructure for Sustainable Coastal Communities (GISCC) project
GreenPlanIT LID Site Suitability Tool. Patty Frontiera, [email protected] Pete Kauhanen, [email protected] Marshall Kunze, marshallk@sfei.
GreenPlanIT LID Site Suitability Tool Patty Frontiera, [email protected] Pete Kauhanen, [email protected] Marshall Kunze, [email protected] GreenPlanIT TAC Meeting, 06/17/2014 LID Site Suitability Tool Talk
Guidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
Stormwater Design Guidelines Frequently Asked Questions:
525 Golden Gate, 11th Floor San Francisco, CA 94102 T 415.551.4694 F 415.934.5728 TTY 415.554.3488 Stormwater Design Guidelines Frequently Asked Questions: A. GENERAL INQUIRIES... 2 1. What projects are
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
Guidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
Omaha Combined Sewer Overflow (CSO) Control Program
Omaha Combined Sewer Overflow (CSO) Control Program Service Disabled Veteran Owned Small Business Outreach, Training, Industry Forum Marty Grate - City of Omaha May 28, 2009 Challenges Facing Omaha Meeting
ROADWAY DRAINAGE & MAINTENANCE
ROADWAY DRAINAGE & MAINTENANCE Street flooding has significant impacts on the city s transportation infrastructure. Road flooding slows traffic and increases the risk of accidents. Standing water on streets
Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses
Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause
DRAFT. White Paper. Green Solutions for the. City of Omaha. City of Omaha Department of Public Works
DRAFT White Paper Green Solutions for the City of Omaha City of Omaha Department of Public Works August 2007 DRAFT Green Solutions for the City of Omaha Background The purposes of this White Paper is to
Operations and Maintenance
Seattle Public Utilities Green Stormwater Infrastructure: O&M Program Operations and Maintenance O&M Maintenance Took Kit 1. Landscape Maintenance Manual 2. GSI/LID Maintenance Manual for ROW 3. Identifiable
San Francisco s Non-potable Water Programs
San Francisco s Non-potable Water Programs Technologies and Innovative Solutions for Harvesting and Non-Potable Use of Rain and Stormwater in Urban Settings April 24-25, 2013 Paula Kehoe Director of Water
The Economic Benefits of Green Infrastructure
The Economic Benefits of Green Infrastructure A Case Study of Lancaster, PA Map of Lancaster, PA provided by CH2M Hill, Inc. February 2014 EPA 800-R-14-007 About the Green Infrastructure Technical Assistance
Green Alley. Handbook. The Chicago. Richard M. Daley, Mayor City of Chicago. An Action Guide to Create a Greener, Environmentally Sustainable Chicago
The Chicago Green Alley Handbook An Action Guide to Create a Greener, Environmentally Sustainable Chicago Printed on recycled paper, 30% post-consumer waste Richard M. Daley, Mayor City of Chicago Cheri
The Clean Water Project What Is The Stormwater Impact?
The Clean Water Project What Is The Stormwater Impact? Presentation To: Seminar On Water Issues Bob Weimar, PE, BCEE Chief of Program Management The Metropolitan District Sewage Overflows Have Become More
Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction
Pervious Pavement Options and Design Guidelines (with LID example projects) SYSTEMS THINKING Need to think differently about the problem Whole System Design Site & Project Relationships Integrated Design
CASFM Stormwater Quality Field Trip June 23rd, 2011
CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined
10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management
40 slide sample of Presentation Please contact [email protected] if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)
Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation. Presenters:
Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation Presenters: Environment, Health & Safety (EH&S) Kimberly O Connell, UC San Diego April 2014 (draft) Charlotte
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the
Sustainable Drainage Systems (SUDS) A guide for developers
Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your
Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply
Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are
Implementing Community-Driven Stormwater Solutions. Josh Ellis ([email protected]) Abby Crisostomo (acrisostomo@metroplanning.
Implementing Community-Driven Stormwater Solutions Josh Ellis ([email protected]) Abby Crisostomo ([email protected]) Overview Introduction Getting the community involved o Milwaukee
Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012
Updates on Pervious Pavement Design and Construction Jason T. Peterein, P.E. June 19, 2012 Program Outline Pervious Pavement Basics Pervious Pavement Construction Maintenance MSD Regulations Update Permeable
RE-GREENING WASHINGTON, DC: A Green Roof Vision Based on Quantifying Storm Water and Air Quality Benefits
RE-GREENING WASHINGTON, DC: A Green Roof Vision Based on Quantifying Storm Water and Air Quality Benefits Washington, DC: 2002 Washington, DC: 2025 Casey Trees Endowment Fund Barbara Deutsch, ASLA, ISA,
Shooks Run Drainage Study Basic Terminology
Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Selection of Stormwater Treatment Facilities For Maximum Extent Practicable Treatment Effectiveness in Compliance with NPDES Provision C.
Donald P. Freitas Program Manager Selection of Stormwater Treatment Facilities For Maximum Extent Practicable Treatment Effectiveness in Compliance with NPDES Provision C.3 The following types of facilities,