C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures
|
|
|
- Chad Perkins
- 10 years ago
- Views:
Transcription
1 C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program
2 Presentation Overview Determining Water Quality Design Flow and Volume ( Q BMP and V BMP ) Sizing Bioretention and Flow-Through Planters Sizing Pervious Paving and Infiltration Trenches Sizing Rainwater Harvesting Cisterns Sizing Non-LID Components
3 C.3.d Sizing Criteria Volume-based sizing criteria: URQM Method - use formula and volume capture coefficients in Urban Runoff Quality Management, WEF/ASCE MOP No. 23 (1998), pages CASQA BMP Handbook Method - Determine volume equal to 80% of the annual runoff, using methodology in Appendix D of the CASQA BMP Handbook (2003) using local rainfall data Sizing curves specific to Santa Clara Valley provided in Appendix B of C.3 Handbook
4 Unit Basin Storage Volume for 80% Capture (inches) San Jose Rain Gage, 1% Slope Percent Imperviousness
5 C.3.d Sizing Criteria Flow-based sizing criteria: Factored Flood Flow - 10% of the 50-year peak flow rate, determined using Intensity-Duration-Frequency curves published by the local flood control agency Percentile Rainfall Intensity - Flow of runoff produced by a rain event equal to two times the 85th percentile hourly rainfall intensity Data for Santa Clara Valley rain gages in Sizing Worksheets (Appendix B of C.3 Handbook) Uniform Intensity - Flow of runoff resulting from a rain event equal to 0.2 inches per hour intensity
6 Intensity-Duration-Frequency Curve (50-Year Return Period)
7 C.3.d Sizing Criteria 85 th Percentile Rainfall Intensity Data: Reference Rain Gages 85 th Percentile Hourly Rainfall Intensity (in/hr) Design Rainfall Intensity (in/hr)* San Jose Airport Palo Alto Morgan Hill *Design rainfall intensity = 2 X 85 th percentile hourly rainfall intensity By comparison, Uniform Intensity = 0.2 in/hr
8 C.3.d Sizing Criteria Flow-based sizing criteria: Simplified Sizing Approach Variation of Uniform Intensity Method (0.2 in/hr) The surface area of a biotreatment measure is sized to be 4% of the contributing impervious area Based on a runoff inflow of 0.2 in/hr (assume equal to the rainfall intensity), with an infiltration rate through the biotreatment soil of 5 in/hr (0.2 in/hr 5 in/hr = 0.04) Conservative approach because does not account for surface ponding good for planning purposes
9 C.3.d Sizing Criteria Combination Flow & Volume Design Basis: Treatment systems can be sized to treat at least 80% of total runoff over the life of the project Option 1: Use a continuous simulation hydrologic model (typically not done for treatment measures) Option 2: Show how treatment measure sizing meets both flow and volume-based criteria Used for bioretention and flow-through planters Appropriate where drainage area is mostly impervious
10 Flow- or Volume-Based Sizing for Treatment Measures? Table 5-1 Flow and Volume Based Treatment Measure Sizing Criteria Type of Treatment Measure LID? Hydraulic Sizing Criteria Bioretention area Yes Flow- or volume-based or combination Flow-through planter box Yes Flow- or volume-based or combination Tree well filter Yes Flow-based Infiltration trench Yes Volume-based Subsurface infiltration system Yes Volume-based Rainwater harvesting and use Yes Volume-based Media filter No Flow-based Extended detention basin No Volume-based
11 Sizing Criteria Worksheets Appendix B of SCVURPPP C.3 Handbook Worksheets for determining water quality design flow and volume Figure B-1: Soil Texture and Mean Annual Precipitation (MAP) Depths Figures B-2 B-7: Unit Basin Storage Volume for 80% Capture (3 gages, 1% and 15% slopes) Figure B-8: Intensity-Duration-Frequency Curves for 50-year Return Period (4 gages)
12 Figure B-1: Soil Texture and Mean Annual Precipitation (MAP) Depth
13 Sizing Example #1 Parking lot in Santa Clara Area = 35,000 sq. ft. (0.80 acres) 100% impervious Slope = 1% Mean annual precipitation (MAP) = 15 inches 35,000 sq. ft. Use the sizing worksheets to determine Q BMP and V BMP Answer: V BMP = 1,819 cu. ft.; Q BMP = cfs
14 Sizing Bioretention Facilities Simplified Sizing Approach Surface area is 4% of contributing impervious area Does not consider storage in surface ponding area Volume Based Approach Store V BMP in just surface ponding area Store V BMP in ponding area, soil media & drain rock Combination Flow and Volume Approach Compute both Q BMP and V BMP Route through facility, allowing ponding
15 Sizing Bioretention Facilities: Volume-Based Approach V 1 V 2 V 3
16 Sizing Bioretention Facilities: Volume-Based Approach Method 1: Store entire volume in surface ponding area V 1 Depth (ft) Porosity Volume per sq. ft. (cubic feet) Surface Area = V BMP (cu.ft.) 0.5 cu.ft./sq.ft.
17 Sizing Bioretention Facilities: Volume-Based Approach Method 2: Store volume in ponding area and media V 1 V 2 Depth (ft) Porosity Volume per sq. ft. (cubic feet) V 3 0.5* Total 1.15 *Depth below bottom of underdrain Surface Area = V BMP (cu.ft.) 1.15 cu.ft./sq.ft.
18 Sizing Bioretention Facilities: Flow & Volume Approach Hydrograph Approach Runoff is routed through the treatment measure Assume rectangular hydrograph that meets both flow and volume criteria
19 Sizing Bioretention Facilities: Flow & Volume Approach 5 in/hr Determine V BMP Assume constant rainfall intensity of 0.2 in/hr continues throughout the storm (rectangular hydrograph) Calculate the duration of the storm by dividing the Unit Basin Storage by the rainfall intensity Calculate the volume of runoff that filters through the biotreatment soil at a rate of 5 in/hr over the duration of the storm and the volume that remains on the surface
20 Sizing Bioretention Facilities: Flow & Volume Approach 5 in/hr To start the calculation, you have to assume a surface area A S -- use 3% of the contributing impervious area as a first guess Determine volume of treated water V T during storm: V T = A S x 5 in/hr x duration (hrs) x 1 in/12 ft Determine volume remaining on the surface V S : V S = V BMP V T Determine depth D of ponding on the surface: D = V S A S Repeat until depth is approximately 6 inches
21 Sizing Example #1, continued Parking lot in Santa Clara Area = 35,000 sq. ft. (0.8 acres) 100% impervious V BMP = 1,819 cu. ft. UBS Volume = 0.63 in. 35,000 sq. ft. Use the combination flow and volume sizing worksheet to determine the bioretention surface area Answer: 1,000 sq. ft. (depth of 0.5 ft.)
22 Sizing Bioretention Facilities: Comparison of Methods Example: 35,000 sq. ft. parking lot in Santa Clara MAP= 15 inches, 100% impervious V BMP = 1,819 cu. ft. (80% of annual runoff) Sizing Method Surface Area (sq. ft.) Simplified Method (flow-based) 1,400 Volume ponded on surface 3,638 Volume stored in unit (V 1 +V 2 +V 3 ) 1,580 Combination flow & volume 1,000
23 Sizing Pervious Paving and Infiltration Trenches General Principles Store the WQD Volume in void space of stone base/subbase and infiltrate into subgrade Surface allows water to infiltrate at a high rate Any underdrains must be placed above the void space needed to store and infiltrate the WQD volume
24 Sizing Pervious Paving and Pervious Paving Infiltration Trenches May be self-treating area or self-retaining area (accept runoff from other areas) Can only be considered a pervious area if stone base/subbase sized to store the WQD volume Can work where native soils have low infiltration rates (stored water depths are relatively small) Surface area is usually predetermined Base and subbase thickness usually determined by expected traffic load and saturated soil strength Slope should be 1% (or use cutoff trenches)
25 Pervious Paving Typical Section Paving surface Bedding No. 8 stone 4 in. Base No. 57 stone Thickness varies Subbase No. 2 stone Base and subbase layers available for water storage Both typically have 40% void space
26 Pervious Paving Approach to Sizing Pervious Paving Self-Treating Check the depth of the WQD volume in base/subbase: UBS volume (in.) 0.40 = Depth (in.) Example: UBS volume = 1.0 in., depth = 2.5 in. (Minimum depth for vehicular traffic is 10 in.) Check the time required for stored water to drain: UBS Vol. (in.) Infiltration rate (in/hr) = Drain time (hrs) ( recommend < 48 hrs)
27 Pervious Paving Approach to Sizing Pervious Paving Self-Retaining Check the depth of the WQD volume in base/subbase: UBS volume (in.) 0.40 = Depth (in.) Example: UBS volume = 1.0 in., depth = 2.5 in. (Minimum depth for vehicular traffic is 10 in.) Check the time required for stored water to drain: UBS Vol. (in.) Infiltration rate (in/hr) = Drain time (hrs) ( recommend < 48 hrs)
28 Sizing Rainwater Harvesting Cisterns Rainwater Harvesting and Use Types of Demands Irrigation Toilet flushing Other non-potable Volume based sized criteria in C.3.d is 80% capture of the annual runoff Key concept is drawdown time Barriers: lack of plumbing codes, treatment, recycled water preference
29 Storage values are per one acre of impervious surface
30 Estimate Actual Demand Daily Use Rates for Toilets and Urinals 1 Land Use Type User Unit User Unit Factor 2 Residential Resident 2.9 residents per dwelling unit Daily Use/Unit (gal/day/unit) 8.6 Office or Retail Employee (non-visitor) 200 SF per employee 6.9 Schools Employee (not including students) 50 SF per employee References: CCCWP Stormwater C.3 Guidebook, 6 th edition, 2012; BASMAA LID Feasibility Report, 2011; California Plumbing Code, Use project-specific data if available
31 Example: 2-story Office Building 3,000 SF 10,000 SF (Interior floor area = 20,000 SF) 4,000 SF
32 Screening Worksheet Results Potential rainwater capture area = area of one building roof = 10,000 SF Convert to acres: 10,000 SF 43,560 SF/acre = 0.23 acres Demand for commercial building: Interior floor area = 20,000 SF Minimum floor area to meet toilet flushing demand = 70,000 SF per acre of impervious surface Minimum floor area for this project to meet demand = 70,000 SF/ac X 0.23 acres = 16,100 SF 20,000 SF > 16,100 SF Building will have minimum toilet flushing demand
33 Determine Building Toilet Flushing Demand Building interior floor area = 20,000 SF Estimate no. of employees: 200,000 SF 200 SF/employee = 100 employees 100 employees 6.9 gpd/employee = 690 gpd Convert to equivalent demand per impervious acre (to allow use of sizing curves): 10,000 SF roof area 43,560 SF/ac = 0.23 ac. 690 gpd 0.23 = 3,000 gpd per impervious acre
34 Determine Required Cistern Size From sizing curves, find right combination of drawdown time, tank size and required demand: 480-hr (20-day) drawdown 49,000 gallon tank 2,450 gpd 360-hr (15-day) drawdown 40,000 gallon tank 2,667 gpd 240-hr (10-day) drawdown 32,000 gallon tank 3,200 gpd 288-hr (12-day) drawdown 36,000 gallon tank 3,000 gpd Adjust tank size back to actual impervious area: 36,000-gallon tank per 1 acre impervious area 36, acres = 8,300-gallon tank
35 Sizing Non-LID Components Media Filters (cartridge type) Flow-based Treatment Measure Determine Q BMP From manufacturer s specifications, determine the design flow rate per cartridge Divide Q BMP by the cartridge flow rate to calculate the number of cartridges required (round up)
36 Sizing Non-LID Components High Flow Rate Tree Box Filters Flow-based Treatment Measure Determine Q BMP From manufacturer s specifications, determine the appropriate size of unit or combination of units A tree box filter that uses biotreatment soil can be sized like a bioretention area or flow-through planter
37 Sizing Non-LID Components Detention Basin Volume-based Treatment Measure (can only be used in treatment train) Determine V BMP Design outlet for 48-hour detention time If sizing for hydromodification management, use Bay Area Hydrology Model to determine size to meet HM standards
38 ??? Questions??? Contact Information: Jill Bicknell , X 1 [email protected]
APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS
APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS PLANTER BOXES 1. Determine the impervious area contributing flow to the planter box (see Chapter 4.2). 2. Assumption: Typical soil infiltration
Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)
Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious
Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012
Updates on Pervious Pavement Design and Construction Jason T. Peterein, P.E. June 19, 2012 Program Outline Pervious Pavement Basics Pervious Pavement Construction Maintenance MSD Regulations Update Permeable
10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management
40 slide sample of Presentation Please contact [email protected] if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated
Stormwater Design Guidelines Frequently Asked Questions:
525 Golden Gate, 11th Floor San Francisco, CA 94102 T 415.551.4694 F 415.934.5728 TTY 415.554.3488 Stormwater Design Guidelines Frequently Asked Questions: A. GENERAL INQUIRIES... 2 1. What projects are
Costs for Green Infrastructure and Stormwater Retention Practices
Costs for Green Infrastructure and Stormwater Retention Practices Bob Newport U.S. EPA December 9, 2014 Topics to be Covered EPA data collection and cost analysis focused on postconstruction stormwater
URBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
Costs for Green Infrastructure and Stormwater Controls
Costs for Green Infrastructure and Stormwater Controls August 5, 2015 Bob Newport U.S. EPA Region 5 (Chicago Office) Topics to be Covered EPA data collection and cost analysis focused on postconstruction
Selection of Stormwater Treatment Facilities For Maximum Extent Practicable Treatment Effectiveness in Compliance with NPDES Provision C.
Donald P. Freitas Program Manager Selection of Stormwater Treatment Facilities For Maximum Extent Practicable Treatment Effectiveness in Compliance with NPDES Provision C.3 The following types of facilities,
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for
AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers
F.P.O. Need SF-Rima THE TREMRON GROUP Permeable Paver Guide AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers MIAMI 11321 NW 112th Court Medley, FL 33178 800.567.1480 or 305.825.9000 Fax 305.823.6614
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
Stanford Graduate School of Business Knight Management Center Campus
Stanford Graduate School of Business Knight Management Center Campus Mathew Bamm, P.E. LEED AP courtesy: boora architects Overview Introductions Design Team and Project Overview Regulatory Framework and
Computing Stormwater Runoff Rates and Volumes
New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff
Operation & Maintenance Document Templates
Appendix G Operation & Maintenance Document Templates The following templates are provided to assist project applicants in preparing stormwater treatment measure maintenance plans, which municipalities
1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Program 000003 Revised 1-29-08 Permeable Interlocking Concrete Pavements This program is registered with the AIA/CES and ASLA CPE for continuing education professional
MODULE 2 RULES RELATING RULES RELA
MODULE 2 RULES RELATING TO STORM DRAINAGE STANDARDS MODULE 2 RULES RELATING TO STORM DRAINAGE STANDARDS 1 RULES RELATING TO STORM DRAINAGE STANDARDS Sections that underwent revision 1-11 PURPOSE 1-2 MODIFICATIONS
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:
Rational Method Hydrologic Calculations with Excel, Course #508 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com Calculation of peak storm water runoff rate from a drainage
Permeable Pavement Treatment Capacity
Permeable Pavement Treatment Capacity April 20 2011 This investigation will analyze the pollutant removal capacity of various types of permeable paving techniques. Daniel Sullivan Joseph Fleury Contents
City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions
City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager [email protected] Stormwater
Guidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities
Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities Presented by: Interlocking Concrete Pavement Institute The Low Impact Development Center,
Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007
Use of Green Roofs to Meet New Development Runoff Requirements Greg Davis Nov. 8, 2007 Why green roof? Absorption of precipitation Increased insulation Reduced urban heat island effect Pollutant removal
Planning, Health and Environment Division
18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority
PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply
Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are
CASFM Stormwater Quality Field Trip June 23rd, 2011
CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined
Chapter 5.0. Stormwater Credits for Innovative Site Planning
Chapter 5.0 Stormwater Credits for Innovative Site Planning Chapter 5. Stormwater Credits...Introduction 5.0 Stormwater Credits In Maryland, there are many programs at both the State and local level that
Commercial Rainwater and
Commercial Rainwater and AC Condensate Collection Systems Uses Landscape irrigation *** Cooling tower make-up water Toilet flushing Commercial and industrial processes Other non-potable uses Benefits Reduction
Riprap-lined Swale (RS)
Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This
CITY OF ESCONDIDO SUSMP Standard Urban Stormwater Mitigation Plan Requirements for Development Projects
CITY OF ESCONDIDO SUSMP Standard Urban Stormwater Mitigation Plan Requirements for Development Projects January 2011 Adopted from the Countywide Model SUSMP This page intentionally left blank. City of
Dave Laurie, CTR. Sales Manager, Commercial Sales DESIGNED TO CONNECT
Dave Laurie, CTR Sales Manager, Commercial Sales DESIGNED TO CONNECT Permeable Pavements For Sustainable Development Agenda Unit paver technology Permeable Interlocking Concrete Paver - research, technical
Stormwater Best Management Practices (BMP) Performance Analysis
Stormwater Best Management Practices (BMP) Performance Analysis Revised Document: March 2010 (Original Document: December 2008) Prepared for: United States Environmental Protection Agency Region 1 5 Post
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
Permeable Interlocking Concrete Pavements. The Stormwater Problem
Permeable Interlocking Concrete Pavements The Stormwater Problem 1 Stormwater Management Objectives Water Quantity Accommodate water volumes & peak flows Water Quality Control pollutant levels A Low Impact
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)
Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects
Description Retention/irrigation refers to the capture of stormwater runoff in a holding pond and subsequent use of the captured volume for irrigation of landscape of natural pervious areas. This technology
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
Caltrans non-standard Special Provisions Pervious Concrete. David Akers Feb 28, 2012
Caltrans non-standard Special Provisions Pervious Concrete David Akers Feb 28, 2012 Section Paragraph Content 19 RSS 19-5.03B Changes title of the section 19-5.03B USAGE NOTES FOR PERVIOUS CONCRETE AND
Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation. Presenters:
Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation Presenters: Environment, Health & Safety (EH&S) Kimberly O Connell, UC San Diego April 2014 (draft) Charlotte
Augmenting Rainwater Harvesting to Offset Potable Water for Irrigation and Indoor Use within the Tampa Bay Region A Best Management Practice
Augmenting Rainwater Harvesting to Offset Potable Water for Irrigation and Indoor Use within the Tampa Bay Region A Best Management Practice Tampa Bay Water May 23, 2011 1 Table of Contents Section 1:
Introduction to Rainwater Harvesting. Department of Biological and Agricultural Engineering Texas A&M University
Introduction to Rainwater Harvesting Department of Biological and Agricultural Engineering Texas A&M University Rainfall in your watershed What is a watershed? An area of land that drains to a common point
Individual Residential Property Credit
NORTHEAST OHIO REGIONAL SEWER DISTRICT Stormwater Management Program Individual Residential Property Credit Revised 12/11/12 why stormwater management? flooding POLLUTION EROSION The inability to effectively
Green Infrastructure for Single Family Residences
Green Infrastructure for Single Family Residences CITY OF ATLANTA STORMWATER GUIDELINES Prepared for CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT NOVEMBER 2012 Prepared by AMEC Environment
Permeable Paving System with StormAbsorb Technology
Permeable Paving System with StormAbsorb Technology The water management solution. ideal for LEED projects 2 a better way to solve water management issues Increasingly, water management is an important
6-1 Introduction. 1. Storm drain that does not require pressure testing. 2. Lateral that does not require pressure testing.
Chapter 6 Storm Drains 6-1 Introduction A storm drain (storm sewer) is a network of pipes that conveys surface drainage from a surface inlet or through a manhole, to an outfall. Storm drains are defined
Stormwater Drainage Design for Parking Lots
PDHonline Course C201 (4 PDH) Stormwater Drainage Design for Parking Lots 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org www.pdhcenter.com
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
BMP 6.4.6: Dry Well / Seepage Pit
BMP 6.4.6: Dry Well / Seepage Pit A Dry Well, or Seepage Pit, is a variation on an Infiltration system that is designed to temporarily store and infiltrate rooftop runoff. Key Design Elements Fllow Infiltration
Basic Hydrology. Time of Concentration Methodology
Basic Hydrology Time of Concentration Methodology By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District What is the Time of Concentration? The time it takes for runoff to travel from
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended
User s Manual for the BMPTRAINS Model
User s Manual for the BMPTRAINS Model Prepared By: Marty Wanielista, Mike Hardin, Przemyslaw Kuzlo, and Ikiensinma Gogo-Abite STORMWATER TREATMENT ANALYSIS: STEP 1: Specify pre- and post-development watershed
STORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE
ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE This page is intentionally left blank Contents 1 Introduction 1 11 Background 1 12 Requirements for Managing Peak Runoff at Source 1 13 On-site
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
Pervious Concrete Pavements: How to Reduce Demand on Your Stormwater System
Pervious Concrete Pavements: How to Reduce Demand on Your Stormwater System Jason Wimberly, EI, MCE Director of Technical Services Carolinas Ready Mixed Concrete Association Disclaimer This presentation
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org [email protected] Chagrin River Watershed Partners Formed
Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness
3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component
City of Beverly Hills Construction Stormwater Requirement Checklist
City of Beverly Hills Construction Stormwater Requirement Checklist Construction activities are required to retain sediments, non-stormwater runoff and all constructionrelated materials, wastes, spills,
Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction
Pervious Pavement Options and Design Guidelines (with LID example projects) SYSTEMS THINKING Need to think differently about the problem Whole System Design Site & Project Relationships Integrated Design
CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL
CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL March 2008 A note to recipients of the Charlotte-Mecklenburg Storm Water Services Credit Application Manual: This is the second
Making San Francisco a Water Sensitive City. Sarah Minick SFPUC Urban Watershed Management Program June 2009
Making San Francisco a Water Sensitive City Sarah Minick SFPUC Urban Watershed Management Program June 2009 OUTLINE Stormwater in San Francisco Water Sensitive Cities Low Impact Design Policies and Programs
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH JULY 2015 BIOSWALE/HYBRID DITCH SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure
Appendix A: BMP Fact Sheets
San Francisco Stormwater Design Guidelines Appendix A: BMP Fact Sheets Introduction 2 Dry Well 6 Infiltration Basin 12 Infiltration Trench 18 Permeable Pavement 24 Detention Pond 32 Detention Vault 38
UNIFIED FACILITIES CRITERIA (UFC) LOW IMPACT DEVELOPMENT
UNIFIED FACILITIES CRITERIA (UFC) LOW IMPACT DEVELOPMENT APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED UNIFIED FACILITIES CRITERIA (UFC) LOW IMPACT DEVELOPMENT Any copyrighted material included in
Shooks Run Drainage Study Basic Terminology
Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs
BMP #: Dry Wells / French Drains
Structural BMP Criteria BMP #: Dry Wells / French Drains A Dry Well, or French Drain, is a variation on an Infiltration Trench that is designed to temporarily stores and infiltrate rooftop runoff. Key
Appendix A: BMP Fact Sheets
Appendix A: BMP Fact Sheets INTRODUCTION (under development) 1 Dry Well 2 Infiltration Basin 8 Infiltration Trench 14 Permeable Pavement 20 Detention Pond 28 Detention Vault 34 We t Pon d 3 8 Ve g e t
Field Performance of Two Stormwater Bioretention Filtration Design Configurations
Field Performance of Two Stormwater Bioretention Filtration Design Configurations Andrew Anderson, E.I.T. North Carolina State University Department of Biological & Agricultural Engineering 2013 Annual
Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS
Triple Bottom Line Analysis for Green Infrastructure A Case Study Imagine 1 25 June the 2013 result Learning Objectives Explain Green Infrastructure (GI) as a strategy for stormwater management Describe
Water Conservation and the State s New Green Building Code for Residential Construction
Water Conservation and the State s New Green Building Code for Residential Construction Silver Sponsors Media Sponsors Certified Sponsors Solano County Water Agency Zone 7 Water Agency Founding Partners
H. Khalid Jamil 9367 Verain Street San Diego, CA, 92129 (858) 663-9200
OFFSITE DRAINAGE REPORT Ramona Assisted Living 1236 "D" Street Ramona, CA 92065 re~*7lb3 Prepared for H. Khalid Jamil 9367 Verain Street San Diego, CA, 92129 (858) 663-9200 July 1 1, 2008 Daniel Tobar,
Water LA. capture conserve reuse. California Adaptation Forum 2014 From Watershed to Coast: Adapting to Rising Seas & Prolonged Drought
California Adaptation Forum 2014 From Watershed to Coast: Adapting to Rising Seas & Prolonged Drought A residence based urban acupuncture project, funded by the California Coastal Conservancy and LADWP
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Rick Crooks, Director of Business Development Mutual Materials Co. Bellevue, WA 1-800-477-3008 [email protected] Stormwater Management Approaches: Restrict
Burnsville Stormwater Retrofit Study
Burnsville Stormwater Retrofit Study Prepared for City of Burnsville June 2006 4700 West 77 th Street Minneapolis, MN 55435-4803 Phone: (952) 832-2600 Fax: (952) 832-2601 Burnsville Stormwater Retrofit
Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng.
Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng. Source: CH2M Hill The Presenter Robert Bowers, P.Eng., LEED GA [email protected] Director
The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006
The David B. Thompson Civil Engineering Deptartment Texas Tech University Draft: 20 September 2006 1. Introduction For hydraulic designs on very small watersheds, a complete hydrograph of runoff is not
Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12
CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the
PP-1. Introduction. 4.2.4. Permeable Pavement (PP) 4.2.4. Permeable Pavement (PP)
PP-1. Introduction Permeable Pavements are alternative paving surfaces that capture and temporarily store the Target Treatment Volume (Tv) by filtering runoff through voids in the pavement surface into
DRAFT. 2.11 Pervious Pavement. Description
2.11 Pervious Pavement Figure 1 Porous Concrete at Indian Run Park in Dublin, Ohio. Description Pervious pavement systems consist of a permeable pavement surface layer and one or more underlying aggregate
Post Construction Stormwater Management Checklist Program
Post Construction Stormwater Management Checklist Program Anahid Damerau, CPESC, CPSWQ Christopher Smith, P.E. Department of Environmental Protection Stormwater Section Watershed Management Program The
GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT
SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT GREEN ROOFS A green roof is a system consisting of waterproofing material, growing medium, and vegetation, and is used
SECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Rick Crooks, Director of Business Development Mutual Materials Co. Bellevue, WA 1-800-477-3008 [email protected] Stormwater Management Approaches: Restrict
Green Infrastructure in Arid and Semi-Arid Climates
Green Reserve The American Recovery and Reinvestment Act (ARRA), Green Project Reserve of 2009, through the State Revolving Fund, provided funding for a wide variety of qualifying projects in the categories
CHAPTER 2 HYDRAULICS OF SEWERS
CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination
Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.
Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage
Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)
Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone
Sustainable Site Pavement Systems
Sustainable Site Pavement Systems Permeable Interlocking Concrete Pavement Training for Design Professionals ICPI Presentation #003 Presented by: Brent Davis - Design Consultant Belgard Engineered Solutions