DRAFT SOUTH FORK SKYKOMISH RIVER



Similar documents
Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

Flood Risk Management

Flood Risk Management

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Appendix C. Project Opportunities. Middle Twisp River (RM )

FLOOD PROTECTION BENEFITS

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

ESRI_UC_2015_No843_Integrating Flood Risk Management and Salmon Habitat Restoration_CampbellSW

Floodplain Connectivity in Restoration Design

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

Gold Ray Dam Interagency Technical Team Meeting

AN INITIATIVE TO IMPROVE

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May Prepared by. for the by Earth Economics

Why does Kittitas County want to form a Flood Control Zone District?

March Prepared by: Irvine Ranch Water District Sand Canyon Avenue. Irvine, CA Contact: Natalie Likens (949)

The answers to some of the following questions are separated into two major categories:

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

1.7.0 Floodplain Modification Criteria

Swannanoa River Flood Risk Management Study

A. Flood Management in Nevada

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

Post-Flood Assessment

Angora Fire Restoration Activities June 24, Presented by: Judy Clot Forest Health Enhancement Program

SKAGIT COUNTY HABITAT IMPROVEMENT PLAN

Sims Bayou Federal Flood Damage Reduction Project

How To Manage Water Resources In The Yakima Basin

The Teton Creek Restoration Project Summary:

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Living with flooding, pt. 3: Learning to coexist alongside the river

Neversink River East Branch

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

PUBLIC NOTICE Application for Permit

Building Olive s Flood Resiliency

Assessing Rivers for Restoration Purposes. Ann L. Riley Waterways Restoration Institute

HCP Team Meeting. November 18, icfi.com

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California

Protecting Floodplain. While Reducing Flood Losses

Lower Dungeness River Estuarine & Floodplain Restoration

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

Catchment Scale Processes and River Restoration. Dr Jenny Mant The River Restoration Centre therrc.co.uk

7.0 Stream Restoration

A Stream Restoration Case Study in the California Central Coast

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Prattsville Berm Removal Project. 1.0 Project Location

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

Chapter 6: Mitigation Strategies

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

Background Information: The Mamquam River Floodplain Restoration Project

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G

Tracking Progress in Restoring the Willamette River Floodplain

Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners

UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

Napa River Restoration Projects

Green Spaces to Improve Waterways and Communities

Section 19. Basin-wide Mitigation Action Plans

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Small Dam Hazard Assessment Inventory

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas

Why should communities invest in resiliency? What are the steps communities can take to become more resilient?

PROJECT INFORMATION REPORT REHABILITATION OF FLOOD CONTROL WORKS ROCK CREEK LEVEE NAC Table of Contents

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Hydrologic Engineering Techniques for Regional Water Resources Planning

Saving Constituents Money on Flood Insurance Under FEMA s Community Rating System (CRS)

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.

Appendix F Benefit-Cost Analysis of Flood Protection Measures

JOB DESCRIPTION. GS-11 $46,006 - $59,801 Annual/Full Benefits GS-12 $55,138 - $71,679 Annual/Full Benefits

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

Arkansas River Corridor Vision & Master Plan

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Appendix H Dredging and Stream Channel Restoration

US Army Corps of Engineers Los Angeles District. Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY

Transcription:

DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly repairs Risks of channel migration and erosion are high Several alluvial fans with dynamic channels and ample sediment supply Homes threatened in several neighborhoods Miller River avulsion closed Old Cascade Highway Homes along the Skykomish River Proposed 6-Year Actions Basin Wide Efforts South Fork Skykomish River Channel Migration Zone - Complete South Fork Skykomish River Channel Migration Zone Mapping. Priority Acquisitions Acquire high priority properties. Restoration Feasibility Study - Work with US Forest Service and other stakeholders to develop recommended actions to reduce flood hazards and improve salmon habitat. South Fork Skykomish Timber Lane Village Home Acquisitions - Purchase homes and property subject to extreme erosion and flooding in this neighborhood. Town of Skykomish Home Acquisitions - Purchase homes and property subject to flooding risk in the Town of Skykomish. Skykomish West River Drive Flood Reduction Study - Identify and evaluate alternatives to reduce frequency and severity of flood risks to residential area on West River Drive in the Town of Skykomish (near Maloney Creek confluence). Miller River Miller River Alluvial Fan - Road Protection - Develop and implement a strategy for maintenance or removal of flood protection facilities on the Miller River alluvial fan. Channel Migration Mapping Map CMZ hazards in the Foss, Tye, Beckler, and Miller Rivers and Money Creek. Miller River Home Demolition - Demolish structures on monastery property flood buyout. The vision for the South Fork Skykomish is to manage flood hazards in a costeffective way, consistent with protection of natural riverine processes, the scenic designation, forested conditions, and King County s environmental goals. The strategy for achieving this vision is to: Implement a combination of structural and non-structural projects to address the most significant flood risks, Map flooding and channel migration hazards and risks to limit development in at-risk areas, Work in partnership with the US Forest Service to better define high priority needs in the basin. Acquired five parcels comprising 1.14 acres and three residences in Timber Lane Village Acquired four parcels comprising 28 acres and a monastery on the Miller River alluvial fan. Repair of McKnight Revetment on the right bank in Baring damaged in the 2009 flood event Teamed with King County Roads to assess options for addressing damages to the Old Cascade Highway from the Jan. 2011 Miller River avulsion. Donated a parcel to the Town of Skykomish to enable the Town to implement its Maloney Creek project. Miller River Alluvial Fan

DRAFT SOUTH FORK SNOQUALMIE RIVER Proposed Six Year Actions Heart of South Fork is leveed reach through North Bend s commercial area Private residences also impacted by flooding Levees provide about 30-year flood protection, but adversely impact habitat Levees have geotechnical and seepage problems 28 levees or revetments /approximately 9 miles of armored river bank Flood hazard management objectives for the South Fork corridor are focused on: Reducing flood risks in and around the Cities of North Bend and unincorporated King County Plan actions at a corridor scale rather than stand alone projects one at a time Forming and maintaining collaborative relationships with property owners, cities and other partners Support habitat restoration through water quality management Consider recreation user risks while formulating and implementing flood hazard management projects Basin Wide Upper Snoqualmie Valley Residential Flood Mitigation Project - Prioritize and implement residential home relocation and acquisitions and home elevations Leveed Segment South Fork Levee Improvement Project - Determine and implement an effective suite of actions to repair, relocate and/or strengthen key portions of the existing levee system to maintain or increases flood hazard protection to surrounding areas. Implement early actions as appropriate and in response to flood events. North Bend Area Residential Flood Mitigation - Elevate residential structures in the Shamrock Park Snoqualmie Valley Trail to Confluence segment Circle River Ranch Alternatives Analysis and Implementation Develop and analyze alternatives to address geomorphic risks to residential development in Circle River Ranch neighborhood Levee Overtopping January 2009 Repaired seven facilities including emergency repair during flood events Elevated ten homes in the Shamrock Park neighborhood along the left bank of the Leveed segment Acquired One property in Shamrock Park neighborhood / all structures have been demolished Three additional home elevations, (pending /funded but not completed) in Shamrock Park and four home elevations in the Clough Creek neighborhood Completed a Geomorphic Hazards and Risk assessment for the Circle River Ranch neighborhood Completed South Fork Gravel study in 2011, quantified impacts of gravel accumulation on flood levels, as well as potential effectiveness of any gravel management actions Completed preliminary geotechnical and hydraulic analysis for South Fork Levee Improvement project Preliminary design work including development of a suite of alternative actions to be developed and analyzed is underway for South Fork Levee Improvement project Seepage through levee

DRAFT MIDDLE FORK AND NORTH FORK SNOQUALMIE RIVER Alluvial fan with dynamic channels and ample sediment supply Risks of channel migration and erosion are high Revetments provide limited, localized erosion protection, but impact habitat Homes and public infrastructure at risk from flooding and erosion Frequent and costly repairs There are 23 levees and revetments, approximately 3.4 miles of river bank are armored The multi-objective approach for the Middle Fork and North Fork Corridors is to: Promote public safety by reducing flood and channel migration risks Reducing flood risks to residences and infrastructure in unincorporated King County and the City of North Bend. Plan actions at a corridor scale rather than stand alone projects one at a time Provide for long term cost effective floodplain management Promote aquatic habitat and riparian restoration Consider recreational safety impacts Proposed Actions Basin Wide Recreational Use Study - Conduct a study of type and extent of recreational use to insure project impacts on recreational safety can be addressed Large Wood Study - Conduct a study of amount, distribution and effects of large wood on flooding and channel migration Upper Snoqualmie Valley Residential Flood Mitigation Project Prioritize and implement residential home relocation and acquisitions Middle Fork Specific Middle Fork Corridor Management Project - analyze flood, erosion, and channel migration risks and develop suite of management actions to effectively address flooding and geomorphic hazards in a cost effective manner while optimizing environmental benefits North Fork Specific North Fork Geomorphic Hazards Assessment - Develop geomorphic assessment of lower 2.5 river miles of the North Fork to identify geomorphic processes, hazards and related risks to residential development, infrastructure and flood protection facilities Acquisition negotiations underway at Shake Mill Left on the North Fork Completed five repairs on Mason Thorson Extension and Mason Thorson Ells levees on the Middle Fork Completed three hazard tree relocations on the Middle Fork Completed early planning of comprehensive strategy for flood hazard management along the Middle Fork Ongoing monitoring of the Mason Thorson Extension levee Developed an emergency action plan be used in response to potentially rapid changes at Mason Thorson Extension Initiated assessments to characterize geomorphology, hydraulics, hydrology, habitat conditions, and land use influences on the Middle Fork

DRAFT UPPER MAINSTEM SNOQUALMIE RIVER Proposed Six Year Actions Broad deep floodplain More than 300 inundated homes and businesses Infrastructure also at risk Highest number of flood damage claims in Washington State 19 levees or revetments, approximately 2.6 miles of armored river bank (6 facilities on Kimball Creek 13 on the upper Snoqualmie) The strategy for all segments in the upper Snoqualmie is to; Focus on reducing flood risks in and around the City of Snoqualmie Focus on reducing erosion risks along S.E. Reinig Road Promote cost-effective floodplain management Promote aquatic and riparian habitat protection and restoration Implement actions at a reach scale rather than one stand alone project at a time Implement a combination of structural and non-structural solutions Collaborate and partner with property owners and City of Snoqualmie Basin Wide Upper Snoqualmie Valley Residential Flood Mitigation Project Prioritize and implement residential home relocation and Acquisitions and elevations Reinig Road Segment Reinig Road Revetment - Conduct alternatives analysis to address erosion and facility deficiencies Snoqualmie Valley Trail to Kimball Creek Segment Record Office Alternatives Analysis - Conduct alternatives analysis to address erosion and facility deficiencies resulting in multiple damages to the Record Office Facility Mill Pond Feasibility & Technical Analysis - Conduct technical investigation to determine effectiveness of various flood mitigation actions Repaired two facilities including emergency repair during flood events Elevated 39 homes with FEMA grant funding, 23 through the City of Snoqualmie s program and 17 by King County Contributing 12.5% matching funds for an additional 39 of the City of Snoqualmie s home elevations Acquired 3 properties, including Riverside Mobile Home Park / all structures have been demolished Completed mitigation needs assessment for residences in the Upper Snoqualmie Valley Developed programmatic strategy to prioritize home elevations and acquisitions

DRAFT LOWER SNOQUALMIE RIVER Proposed 6-Year Actions Deep, broad floodplain; levees limit bank erosion, not inundation Homes, farms, businesses impacted Several locations with eroding or unstable facilities protecting roads or other infrastructure Steeper gradient, more gravel downstream of Tolt and Raging Rivers increase risks of channel migration, fast/erosive flows Important salmon habitat (Chinook, coho, steelhead) Valley wide, work with partners to balance flood and erosion goals with agriculture and habitat needs Tolt and Raging alluvial fan segments: In channel migration areas, allow more room for natural channel processes, increase flood/sediment capacity; potential actions include levee setback projects, voluntary acquisitions; critical to coordinate with affected landowners In broader valley where flows are slower, continue to work with farmers to reduce flooding impacts Outside Tolt and Raging alluvial fan areas: Reduce impacts of flooding on farm operations, while protecting floodplain functions Potential actions include house and barn elevations, farm pads Basinwide Flood-Farm Task Force Implementation farm pads, barn elevations; potential study of recent modifications at Snoqualmie Falls; ongoing fish/farm/flood collaboration Lower Snoqualmie Residential and Agricultural Flood Mitigation - house and agricultural structure elevations, acquisitions of homes in high risk locations Large Wood Study and Recreational Use Study - studies to better understand how flood/erosion reduction actions might affect wood accumulation in the river, where river recreation is occurring, and how projects and wood accumulation could affect recreational safety Tolt and Raging Alluvial Fans Aldair/Fall City Acquisitions - acquisitions of at risk structures; potential support for levee setback projects in Snoqualmie at Fall City segment, and related benefits to ag Snoqualmie at Carnation support monitoring and adaptive management of restoration projects in this segment Chinook Bend to Snohomish County Line Sinnema Quaale Upper Revetment Repair Snoqualmie Valley Trail and SR203 (car body curve) Winkelman Revetment Repair Tolt water supply pipeline Dutchman Road Revetment Repair W. Snoqualmie River Rd. 24 farm pads constructed since 2008 Technical and permitting assistance for 34 farm pads 2 barn elevations in 2012 as pilot project 12 home elevations, through FEMA, Army Corps, and Flood Control District funding 5 acquisitions in Fall City area representing 15 residences and 36 acres 2 levees repaired after November 2006 flood event Ongoing channel monitoring efforts in two lower Snoqualmie segments below Raging and Tolt Rivers; these are two study reaches in Snoqualmie gravel study currently underway Draft FEMA flood insurance study for the entire lower Snoqualmie River, submitted to FEMA in 2006 and awaiting formal adoption

DRAFT TOLT RIVER Steep, dynamic river; high sediment load High channel migration/erosion risk; homes and roads can be undermined and cut off Lower two miles leveed except Tolt-MacDonald Park City of Carnation located on alluvial fan; flood and erosion risks Important salmon habitat (Chinook, coho, steelhead) Basinwide: Plan and implement actions consistent with Tolt River Corridor Action Plan, to be completed in 2013 Upstream of Carnation segment: Restore natural river processes to reduce long term costs of flood/erosion management and restore salmon habitat Acquire at risk properties and remove flood facilities to allow river to migrate naturally and reconnect to floodplain Protect important public infrastructure, e.g., Tolt River Rd. Carnation segment: Maintain existing level of flood protection to City of Carnation and unincorporated King County Pursue levee setback projects to expand channel capacity and sediment storage; partner with City of Carnation and habitat recovery proponents on these multi-objective projects Work with KC Roads, WSDOT to improve flood conveyance through alterations to roads and bridges Proposed 6-Year Actions Basinwide Tolt River Corridor Study - study underway to update technical information on flood/erosion risk and habitat restoration; will recommend priority actions Priority acquisitions recommended by Tolt Corridor Study - high priority acquisitions recommended by updated risk assessment Priority modifications to flood facilities or other infrastructure recommended by Tolt Corridor Study high priority projects to remove or setback levees or alter roads/infrastructure recommended by updated risk assessment Recreational Use Study - study to determine reaches used for recreation and how flood/erosion actions could affect recreational safety Upstream of Carnation San Souci Neighborhood Acquisitions acquisitions in high flood and erosion hazard area Tolt River Natural Area Floodplain Reconnection Acquisitions acquisitions in high flood and erosion hazard areas associated with Tolt Natural Area (could allow for future setback of Edenholm levee) Acquisitions at San Souci (12 properties, representing 12 residences and 40 acres), Tolt River Mile 1.1 (10 properties, representing 8 residences, 7 acres), and at Tolt Natural Area Floodplain Reconnection Site (1 residence, 1 acre) Emergency repairs to Hwy to RR Bridge and Frew levees during January 2009 flood Repair and partial setback of Tolt River Road Protection revetment Completion of Lower Tolt River Floodplain Reconnection Project Partnered on Tolt River Trail Bridge Approach project to facilitate future levee setback Tolt River Corridor Action Plan initiated; includes technical update, alternatives analysis, action recommendations to reduce flood/erosion risk and restore habitat, and public outreach (effort underway) Ongoing channel monitoring of lower 1.72 river miles of Tolt River, to quantify sediment deposition, its influence on flood elevations, and potential reduction in flood elevations that could be accomplished with gravel removal Carnation Lower Tolt R. Acquisition - purchase Swiftwater property to allow for future setback of Upper Frew levee (right bank) Tolt River SR 203 to Trail Bridge Floodplain Reconnection - setback Frew levee (right bank) to improve conveyance and allow habitat enhancement Tolt R. Mile 1.1 Levee Setback - setback Highway to RR Bridge levee (left bank) to improve conveyance and allow habitat enhancement; includes ongoing purchase and removal of homes

DRAFT RAGING RIVER Narrow, steep tributary; some of highest channel migration rates in all King County rivers Homes/mobile home park above I-90 at risk for channel migration Toe of slope at Preston-Fall City Road at risk At confluence (Fall City), levees limit channel migration and provide limited flood protection to commercial and residential uses; levees subject to damage Important salmon habitat (Chinook, coho, steelhead) Segments above Fall City: Restore natural river processes to reduce long term costs of flood/erosion management and restore salmon habitat Acquire at risk properties Where no houses or roads are at risk, remove facilities allowing river to migrate and reconnect to its floodplain Protect important public transportation infrastructure, e.g., Preston-Fall City Road Fall City segment: Maintain existing level of flood protection for Fall City Explore long term options to set back levees to allow more room for natural channel processes and sediment deposition and storage, and to reduce overbank flooding Partner with habitat recovery proponents on these multiobjective projects Work with KC Roads, WSDOT to improve flood conveyance and reduce erosion risk through alterations to roads/bridges Proposed Actions Basinwide Priority acquisitions - purchase and remove homes from high flood and erosion hazard areas and allow habitat restoration Upstream of I-90 Alpine Mobile Manor Neighborhood Acquisitions - Purchase and remove homes and mobile home park from high flood and erosion hazard area; in long term, remove bank armoring and restore habitat Abandoned Bridge Abutment and Waring Revetment Removal - remove old bridge abutment and Waring revetment once affected properties are purchased and demolished Fall City Fall City Levee Setback Feasibility Study - analyze potential levee setback projects in leveed segment to improve channel flood and sediment capacity, and to address flood/erosion risks in Fall City vicinity 6 acquisitions in Alpine Mobile Manor neighborhood, representing 5 residences and 8 acres 7 repairs to the following facilities; Arruda, Bryce, Bridge to Bridge Left (two repairs), Bridge to Bridge Right, Bridge to Mouth Right, and Preston Fall City Lower Removal of Carlin levee in I-90 to Fall City segment (more than 1,000 linear feet removed) Ongoing channel monitoring of the lower 1.5 river miles of Raging River, to quantify sediment deposition, its influence on flood elevations, and potential reduction in flood elevations that could be accomplished with gravel removal