Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013
|
|
|
- Dorcas Andrews
- 10 years ago
- Views:
Transcription
1 Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June Design alternatives for large capital flood projects (basinlevel water retention and Interstate 5 protection) 2. Construct priority local flood protection projects 3. Construct local multipurpose projects that reduce flood damage and benefit fish 4. Reduce damages to residential and other structures in the floodplain $9,200,000 $10,742,000 $4,350,000 $1,750, State agency technical assistance and project permitting $950, Basin program and project management $1,210,000 TOTAL $28,202, Design alternatives for large scale capital flood projects (basin-level water retention and Interstate 5 protection) ($9,200,000) ($5,600,000) Design alternatives to determine permit feasibility, engineering safety and mitigation requirements for an optimum upstream water retention facility. By December 2014, the work will support a final policy decision on whether to proceed to permitting a water retention facility as a preferred alternative. Planned work will include: Engineering analysis of alternatives, including fish passage requirements. Hydrology and hydraulic analyses to define inundation and protection levels. Quantified environmental impacts to, and mitigation requirements for, fish, water quality and sediment transport. Updated costs and benefits of the alternative designs. ($3,350,000) Design and engineering analysis on four alternatives for protecting Interstate 5, the airport and key urban areas of Centralia and Chehalis. The work will identify a recommended I-5 flood protection alternative for budgetary purposes (one step short of a final NEPA/SEPA preferred alternative). Planned work will include: Preferred designs, and scope, schedule and estimated costs, provided for both with and without upstream water retention. Preferred designs evaluated in relation to the State s plan to add capacity to I-5 on the same five mile stretch of the Interstate by looking at three timing scenarios: I-5 flood project completed before, concurrent with, and after I-5 widening.
2 ($250,000) Evaluate the extent of flood damage reduction that could be achieved through a Basin-wide program of smaller-scale projects, as required for the alternative analysis of the large capital flood projects. Describe the relative contribution to flood damage reduction from channel dredging, riparian wetland restoration, forest practices, flood easements on farm lands, road maintenance, removing bridges and constrictions, and removing, protecting, or avoiding floodplain development. 2. Construct priority local flood protection projects ($10,742,000) Local flood protection projects to protect key infrastructure, and priority commercial and residential areas, were initially identify, evaluated and prioritized by the Chehalis River Basin Flood Authority. Their list included a balance of projects throughout the Basin, with both Tier 1 (highest priority) and Tier 2 (other important projects) lists. The Authority s Tier 1 list of priority projects was modified by the Governor s work group, prior to submittal to the Governor, and then further amended by the Governor s Office. The following priority projects are proposed for the biennium: LOCATION PROJECT ACTION Grays Harbor County Satsop River Floodplain Restoration (Jobs Act proviso d project) Complete permitting, remove artificial barriers to meandering river, stop shoreline erosion BENEFIT Protects 8 agricultural landowners / businesses, and restores floodplain habitat COST $510,000 Grays Harbor County Elma-Porter flood mitigation project Design and permit of overflow bridge on Wakefield Road; and installation of culvert in Porter Creek. Protects 12 homes from flooding. Provides safe passage to hundreds of workers from the Satsop Business Park, commercial farms and Briggs Nursery $584,000 Grays Harbor County Wishkah Road (Kersh) flood levee Final design, permitting, construction, land acquisition, and home elevation Provides safe passage, and emergency service access, to 60 homes. Provides flood storage and $2,642,000
3 floodplain restoration Aberdeen Market Street Dike Preliminary engineering design, costing, final design and dike improvements 80 residences 5 businesses Local adjacent streets $670,000 Aberdeen Wishkah River East Bank Dike and Dike Behind Burger King (Jobs Act project) Final design and dike improvements 30 residences 30 businesses State Highway 101 and local streets $410,000 City of Cosmopolis Mill Creek Dam Improvements Design, engineering and construction to repair damaged dam 325 residents and 130 homes in Cosmopolis 200 residents in South Aberdeen $2,250,000 2 significant businesses (Western Peterbuilt /25 employees, and D4 Sports / 7 employees Montesano Mary s River Lumber Bank Protection (Jobs Act project) Final design, permitting and flood water passage, shoreline protection 120 jobs at Mary s River Lumber Mill State Highway 107 (bridge) $2,000,000 Montesano Municipal Waste Water Treatment Plant. Bucoda Bucoda Levee Improvement Project (Phase II) Phase II -- Final design and flood wall and Bucoda wellhead and drinking water system $305,000
4 (Jobs Act proviso d project) levee (sole source of Town's water for drinking and firefighting) Town of Pe Ell Pe Ell wastewater treatment plant Flood dike to protect wastewater treatment plant Prevent raw sewage from entering the river during flooding $521,000 WA Conservation Commission and Basin conservation districts Livestock and farm equipment pads and safe evacuation routes Design, permitting, construction of pads and escape routes Farm livestock and equipment Public health as a result of fewer dead animals in the event of a major flood $850,000 * TOTAL $10,742,000 (* NOTE: This funding includes a geomorphic analysis to help site the evacuation routes and critter pads away from the migration zones of the river. The analysis will help site other floodplain, multipurpose projects.) 3. Construct local multipurpose projects that reduce flood damage and benefit fish ($4,350,000) Projects that would provide benefits for flood damage reduction and for environmental enhancement were also evaluated and prioritized. These multipurpose projects were further sorted by the Governor s work group, with three projects recommended for initial implementation. Concurrently, the group recommended the development of a coordinated Basin-wide salmon recovery strategy, to guide selection of future multipurpose projects, and to identify mitigation options for other flood projects, where needed.
5 The following projects were prioritized for implementation: PROJECT DESCRIPTION ACTION BENEFIT COST Allen Creek Restoration - along Case Road, just south of 113th Ave. SW, between Littlerock and Maytown Restore natural functions to the Allen Creek floodplain. Slow the creek down and restore more natural flood flow paths and flood storage. Improve 2100 feet of salmon habitat in the Scatter Creek Watershed. Design and construct Environmental benefits for fish and wildlife. Channel reconnection and riparian restoration can store and attenuate flood flows. $990,000 Near RM 78 on the Chehalis River Oxbow reconnection with mainstem of the Chehalis River, with side channel and floodplain storage enhancement. Enhance low elevation areas, side channels, and floodplain habitat with vegetated benches and large woody vegetation. Design and construct Riparian cover and off-channel storage store and attenuate flood flows. $861,000 Oxbow Lake Reconnection Oxbow reconnection, riparian restoration of 75 acres, install large woody debris Design and construct Increased flood storage and attenuation in floodplain. Winter rearing for fish. $1,149,000 Chehalis River Basin Basin-wide salmon enhancement strategy, with objectives, targets and priority projects Identify multipurpose projects List of priority projects for flood mitigation and fish enhancement work in the Basin $1,350,000 TOTAL $4,350,000
6 4. Reduce damages to residential and other structures in the floodplain ($1,750,000) Implement a strategic program of buyouts and flood proofing for structures that have recurring damage requiring frequent public and private expenditures for repairs after flood events, including development of local damage curves for structures in the floodplain. (Match funding will be requested from the federal government.) 5. State agency technical assistance and project permitting ($950,000) The following agencies have substantive roles in the above work: Transportation (I-5 protection) Ecology (dam safety, water quality, wetlands, floodplain management) Fish and Wildlife (fish impacts/enhancement) Commerce (land use/local buyout projects) Natural Resources (geomorphic analysis) 6. Basin Program and Project Management ($1,210,000) Managing the design and construction work listed above Facilitating the Governor s work group Convening and facilitating the dam and fish technical committees Facilitating the Flood Authority (including the local buyout/floodproofing projects) Ongoing intergovernmental coordination
DRAFT SOUTH FORK SKYKOMISH RIVER
DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly
FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics
FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN May 2010 Prepared by for the Execubve Summary The Chehalis Basin experienced catastrophic flooding in 2007 and 2009. In response, the
Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower
Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12)
Appendix C Project Opportunities Middle Twisp River (RM 7.8 18.12) This table describes project opportunities by project area. Locator maps of the project opportunities are included below the table. Reach
King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction
King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction Introduction Eminent domain refers to the power possessed by the state over all property within the
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
3. The submittal shall include a proposed scope of work to confirm the provided project description;
QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding
Post-Flood Assessment
Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of
Habitat Opportunities in the Duwamish Transition Zone
Duwamish Blueprint: Habitat Opportunities in the Duwamish Transition Zone November 13, 2014 Presentation to the WRIA 9 Watershed Ecosystem Forum Elissa Ostergaard, Planning and Stewardship Coordinator
Proactive Flood and Drought Management: A Selection of Applied Strategies & Lessons Learned from around the United States
Proactive Flood and Drought Management: A Selection of Applied Strategies & Lessons Learned from around the United States American Water Resources Association Policy Committee September 2013 Proactive
Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners
Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners In recent years, multiple flood events in the New York City
Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County
Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing
How To Manage Water Resources In The Yakima Basin
Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:
Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT
UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: [email protected]
SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM
SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental
Assessing Rivers for Restoration Purposes. Ann L. Riley Waterways Restoration Institute
Assessing Rivers for Restoration Purposes Ann L. Riley Waterways Restoration Institute Assessing Rivers for Restoration Purposes Ann L. Riley Waterways Restoration Institute Assessing Rivers for Restoration
Section 4 General Strategies and Tools
Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General
ALTERNATIVE SOURCES OF FUNDING FOR
November 2015 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by
Floodplain Connectivity in Restoration Design
Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,
Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
FLOOD PROTECTION BENEFITS
IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the
Arkansas River Corridor Vision & Master Plan
A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
HCP Team Meeting. November 18, 2015. icfi.com
HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B
A. Flood Management in Nevada
Nevada Division of Water Planning A. Flood Management in Nevada Introduction Flooding has been a concern for Nevada communities since the first settlers moved to the territory in the mid-1800 s. Fourteen
Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy [email protected]
Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy [email protected] Wetland study slide Water Quality NRE goals in watershed plans Protect habitat that remains.
Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets
SUPPORTING INFORMATION ASSOCIATED WITH THE ALLOCATION PRIORITIES FOR CLEAN WATER FUND BOARD Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets 1 Agriculture AAFM On-Farm Implementation
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
Oregon. Climate Change Adaptation Framework
Oregon Climate Change Adaptation Framework Oregon Environmental Quality Commission Climate Change Adaptation Framework Presentation at a glance: Purposes of the framework Participating agencies Climate
Napa River Restoration Projects
Napa River Restoration Projects Shaun Horne, Napa County, [email protected] Jeremy Sarrow, Napa County, [email protected] The Napa River flows though one of the most scenic landscapes
Lower Dungeness River Estuarine & Floodplain Restoration
PARTNERS: Clallam County; Jamestown S Klallam Tribe; WA Department of Fish & Wildlife; US Army Corps of Engineers; US Fish & Wildlife Service; WA Department of Transportation; WA Department of Ecology;
2012 Program Report. Agricultural Group Drainage Program
2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout
Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016
Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 James L. McIntire Washington State Treasurer Summary The State of Washington offered green bonds to investors in September 2015, with approximately
AN INITIATIVE TO IMPROVE
L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
SKAGIT COUNTY HABITAT IMPROVEMENT PLAN
SKAGIT COUNTY HABITAT IMPROVEMENT PLAN Public Works Department Natural Resources Division August 2012 Mission To create and advance restoration strategies that support Skagit County goals for promoting
GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold
CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study
San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits
Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.
Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).
Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall
Floodplain Development Land Use Review
COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review
LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
Rural Flooding: The Potential Role of Forestry
Rural Flooding: The Potential Role of Forestry Nadeem Shah, Tom Nisbet, & Huw Thomas Centre for Forestry and Climate Change Structure Background Woodland and Flood Alleviation The Theory. Studies on Woodland
House Research Department General Fund Appropriations in Flood Relief Bills
House Research Department General Fund Appropriations in Flood Relief Bills These tables included state funding from the major disaster bills enacted to respond to a disaster. Appropriations may have been
Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.
Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,
Barre City City-wide Policy and Program Options
Barre City (VERI Land Use Regulations Update policies allowing fill in flood hazard areas. RPC, DEC River Management, VLCT, Allowing landowners to elevate buildings using fill may help protect an individual
United States Army Corps of Engineers, Civil Works
United States Army Corps of Engineers, Civil Works Fiscal Year 2013 Federal Program Inventory May 2013 Table of Contents Introduction... 2 Program Inventory... 3 1. Navigation... 3 2. Flood Risk Management...
1. INTRODUCTION 5. THE PERMIT PROCESS
1. INTRODUCTION Laws of the United States and the State of Iowa have assigned the US Army Corps of Engineers and the Iowa Department of Natural Resources with specific and different regulatory roles designed
1 Introduction. 1.1 Key objective. 1.2 Why the South Esk
1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping
Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization
Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
The Teton Creek Restoration Project Summary:
The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens
Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town
Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town MEETING NOTES April 16, 2015 6:00 8:00 PM VERI Project Overview With funding from the US Economic Development Administration
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people
5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
Section 19. Basin-wide Mitigation Action Plans
Section 19. Basin-wide Mitigation Action Plans This Mitigation Plan identifies twelve specific hazards that could affect the Basin. Section 20 of this Plan set forth mitigation action plans to be carried
Experience in Wetlands restoration and conservation concerning natural water retention measures. Ministry of Environment and Water, Bulgaria
Experience in Wetlands restoration and conservation concerning natural water retention measures Ministry of Environment and Water, Bulgaria Water management in Bulgaria - Water management in Bulgaria national
Michigan Wetlands. Department of Environmental Quality
Department of Environmental Quality Wetlands are a significant component of Michigan s landscape, covering roughly 5.5 million acres, or 15 percent of the land area of the state. This represents about
Appendix H Dredging and Stream Channel Restoration
Appendix H Dredging and Stream Channel Restoration Mankind s intrusion into the natural environment in West Virginia began in earnest following the Civil War when extractive industries and settlement all
FOUR RIVERS RESTORATION PROJECT
MLTM Republic of Korea Making Every Drop Count International Workshop on Integrated Urban Water Management WATER & GREEN GROWTH FOUR RIVERS RESTORATION PROJECT Office of National River Restoration, Korea
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration
PUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested
COMMUNITY CERTIFICATIONS
National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden
Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration
Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria
FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012
FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...
Thank you to all of our 2015 sponsors: Media Partner
Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context
Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.
Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved
JOB DESCRIPTION. GS-11 $46,006 - $59,801 Annual/Full Benefits GS-12 $55,138 - $71,679 Annual/Full Benefits
OPEN: CLOSE: OR UNTIL FILLED EXEMPT NON-EXEMPT_X_ JOB DESCRIPTION POSITION: RESPONSIBLE TO: SALARY: FLUVIAL GEOMORPHOLOGIST Senior Aquatics Biologist GS-11 $46,006 - $59,801 Annual/Full Benefits GS-12
- POLICY - Disaster Recovery Assistance Program
August 29, 2013 - POLICY - Disaster Recovery Assistance Program Overview Disasters and emergency legislative funding occur frequently and usually unpredictably. These characteristics require a standard
GENERAL OBLIGATION BONDS
DESCRIPTIONS GENERAL OBLIGATION BONDS Appendix C, page 2 GENERAL OBLIGATION BONDS State Transportation Bonds --- 1968 An amount of $640,000,000 was authorized to improve the public transportation system.
Public Law 84-99 and Non-Structural Alternatives to Levee Repairs
Public Law 84-99 and Non-Structural Alternatives to Levee Repairs Presented by: Mr. Jerry A. Skalak, CFM U.S. Army Corps of Engineers Rock Island District and Mr. Tom Oswald Iowa Homeland Security and
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G1400656.
Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report Department of Ecology Grant No. G1400656 Submitted by: Walla Walla Watershed Management Partnership Walla Walla, WA Walla Walla
Background Information: The Mamquam River Floodplain Restoration Project
Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries
Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.
6.0 Mitigation Strategy Introduction A mitigation strategy provides participating counties and municipalities in the H-GAC planning area with the basis for action. Based on the findings of the Risk Assessment
Restoration Planning and Development of a Restoration Bank
Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration
4. Environmental Impacts Assessment and Remediation Targets
4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are