1 Section 19. Basin-wide Mitigation Action Plans This Mitigation Plan identifies twelve specific hazards that could affect the Basin. Section 20 of this Plan set forth mitigation action plans to be carried out by individual jurisdictions to reduce the risks to these hazards. This section includes twelve mitigation actions to be taken collectively by the jurisdictions in concert with the. These are followed by actions to be undertaken specifically by the. Basin-wide actions are those that have been or will be taken by, or will affect, all Guadalupe River Basin communities rather than just a single jurisdiction. Section 20 includes mitigation actions and mitigation action plans of the individual jurisdictions that are participating in the planning process. Some of the basin-wide actions in this section are directed at reducing the risk from a single hazard, such as flooding. Other actions pertain to multiple hazards or all twelve hazards. These twelve hazards differ in important ways, such as in their predictability, length of warning time, speed of onset, magnitude, scope, duration of impact, and the possibilities of secondary impacts. Many of the demands on the emergency management infrastructure they generate, however, arise not from their differences but from their commonalities. The basin-wide mitigation actions are identified below, in priority order, with the highest priority actions appearing first. These are followed by the GBRA actions, which are not in priority order. Appendix B contains detailed information about grant funds that may be available to support implementation of the mitigation actions. Collective Actions Listed below are basin-wide hazard mitigation actions to be undertaken collectively by the jurisdictions and GBRA. These are intended to be actions for all jurisdictions to consider pursuing collectively and may be dependent upon the availability of funds. 1. Pursue GIS-based hazard information, including: flood hazard areas; the location of low-water crossings; and, Mitigation in the Guadalupe River Basin -- Page 19-1 Protecting the Region Against All s
2 National Insurance Program policies, claims and losses, including repetitive losses. 2. Explore the feasibility of the serving as a Cooperating Technical Partner of the Federal Emergency Management Agency in flood mapping. 3. Develop criteria to identify and prioritize basin-wide flood hazard mapping needs. 4. Educate the public on the risks they face from natural and man-caused hazards and steps they can take to protect themselves, their families and their livelihoods. 5. As funding becomes available and with the assistance of the U.S. Army Corp of Engineers, undertake a feasibility study to thoroughly assess the needs, problems and opportunities for flood damage reduction in the Guadalupe River Basin. 6. Initiate a campaign to increase the awareness and level of participation in the National Insurance Program. 7. Establish a mechanism through which local governments can share common basin-wide concerns regarding flooding and other hazards in the Guadalupe River Basin. 8. Encourage communities to participate in the Community Rating System. 9. Promote disaster-resistant building, for example: tornado safe rooms; hail resistant roofs; steel connectors; and consideration of the 2003 International Building Code. 10. Make available model floodplain management ordinances and permitting systems developed by outside s as samples for consideration by local governments. 11. Identify sites where stream gages need to be added or upgraded, explore funding options and coordinate installation requests with GBRA and the U.S.G.S. 12. Explore the potential for formal adoption of mutual aid agreements between jurisdictions for all-hazards assistance. Mitigation in the Guadalupe River Basin -- Page 19-2 Protecting the Region Against All s
3 GBRA Mitigation Actions Conduct an annual workshop with the National Weather Service (NWS) for the County EMCs and plain Administrators within the GBRA tencounty district The Guadalupe River basin has experienced numerous flooding since the 1930 s. On an average, the Guadalupe River records a flood event every 5 years. The annual workshop will allow an exchange of information and help improve the understanding of the hydrology within the Guadalupe River basin. The workshop will also foster better communications between counties and the NWS. Estimated cost Responsible Funding sources $1000/per year GBRA and NWS Ongoing General Funds 1.1, 1.2, 2.1 and 2.3 Continue to participate in the funding of Phase 2 and Phase 3 of the COE Cibolo Watershed Study The COE completed a reconnaissance study in 2001 for the Guadalupe River Basin. The Cibolo Creek Watershed study was one of several studies recommended for further analysis. Study participants include GBRA, San Antonio River Authority (SARA) and the San Antonio Water Systems Mitigation in the Guadalupe River Basin -- Page 19-3 Protecting the Region Against All s
4 (SAWS). Phase 1 of the study has been completed. The Study goals are to examine ways to reduce flooding in the upper watershed as well as examine recharge and ecosystem restoration potential. Estimated cost $300,000 Responsible COE, GBRA, SARA and SAWS 2007 Funding sources General Funds 2.2, 3.1 Estimated cost Responsible Funding sources Continue Weather-Net Program with the National Weather Service (NWS) Communication problems are common during major flood events. In the last few years, GBRA has worked with the NWS to develop alternate methods of sending out river forecasts. Today GBRA gathers flood stage forecasts from the NWS and provides a river summary to the EMC s and other emergency management personnel within the Guadalupe River Basin. The program is called the Weather-Net Program. The GBRA river summary provides the EMC s with an overview of river flooding. $10,000/year GBRA Engineering Department Ongoing General Funds 4.1, 4.2 Mitigation in the Guadalupe River Basin -- Page 19-4 Protecting the Region Against All s
5 Outfit a portable emergency electric generator to provide temporary electric power at water and wastewater treatment plants All hazards GBRA has recently purchased a used 700 Kwatt generator. The unit needs to be refurbished and mounted on a trailer. During a power outage, the generator can be driven to the site and temporarily tied into the plant electric grid until normal service is restored. Very Estimated cost $15,000 Responsible GBRA Operation Department 2005 Funding sources General Funds 4.4 Work with FEMA s Engineering consultant to upgrade river models within Guadalupe County FEMA is presently updating the floodplain models in Guadalupe County. Halff Associates has been hired by FEMA to develop the models for the area between New Braunfels and Seguin. The Guadalupe River in this area includes four small lakes. GBRA has acquired an instrument that can be attached to a boat and will provide accurate cross sectional data on the lakes. The lake sounding data will help the FEMA contractor provide a more accurate hydraulic model. Estimated cost $5,000 Responsible GBRA Engineering Department 2004 completion Mitigation date in the Guadalupe River Basin -- Page 19-5 Protecting the Region Against All s
6 Funding sources General Funds 3.1 Participate with the Corps of Engineers (COE) on a Feasibility Study in the lower Guadalupe River Basin The lower reach of the Guadalupe River experiences extended periods of flooding. The COE in their reconnaissance study identified the lower Guadalupe river as an area for further study. The study will examine potential flood reduction projects. Estimated cost $350,000 Responsible GBRA Engineering Department 2004 Funding sources General Funds 5.2 Conduct an biennial review of the GBRA Heavy Rainfall and Response Manual During flood events in the Seguin/New Braunfels area, GBRA activates a flood response team to handle the hundreds of calls that come from the general public. The Authority has developed a manual that contains data on past floods and other relevant information to assist team members. The Mitigation in the Guadalupe River Basin -- Page 19-6 Protecting the Region Against All s
7 document is reviewed at least every two years. Estimated cost Responsible Funding sources The manual allows GBRA to respond in a professional manner and provides needed information to the public. A biennial review is a necessary component to ensure the document is up to date. $5,000/year GBRA Engineering Department and Project Development Dept General Funds 3.2, 4.1 Conduct an annual review of the Hurricane Preparedness Plan for GBRA s lower basin operations /Hurricane During a hurricane event, keeping water and wasterwater facilities in operation is critical. Developing a hurricane preparedness plan and maintaining the plan is an important part of the process. GBRA has developed plans for its lower basin operations An annual review will ensure the plan is kept up to date. Estimated cost $2,000/year Responsible GBRA Operations Division Each year Funding sources Plant Operating Budget obj. 1.2 Mitigation in the Guadalupe River Basin -- Page 19-7 Protecting the Region Against All s
8 Work with Texas Department of Transportation to stabilize erosion upstream of Hwy 59 Bridge over the Guadalupe River /Hurricane The Guadalupe River at the Hwy 59 bridge near Victoria has experienced severe erosion on the eastern bank. Continued erosion may jeopardize the bridge in the next 5 to 10 years. If the erosion is not checked in the next 30 to 40 years, the Victoria Wastewater Treatment plant may also experience problems since the plant is not far from the bridge. way 59 is a major transportation route for South Texas and must be keep open. Estimated cost $20,000 Responsible GBRA Operations Division 2008 Funding sources Plant Operating Budget 5.2 Mitigation in the Guadalupe River Basin -- Page 19-8 Protecting the Region Against All s
9 Evaluate alternatives and implement modifications to the spillgates at the TP-4 Dam in Seguin, in order to prevent recurring damage during severe floods. During the past five years, three major floods have caused damage to the spillgates at the TP-4 dam. The total cost of repairs for the first two floods was $990,140. The repairs from the 2004 flood are estimated to be approximately $390,000. During severe floods, the operational reliability of the TP-4 dam will be improved and repair costs will be eliminated. Estimated cost $1,000,000. Responsible GBRA Operations Department 2008 Funding sources General Funds and grant funds 4.4 Mitigation in the Guadalupe River Basin -- Page 19-9 Protecting the Region Against All s
TROPICAL STORM ALLISON. Prepared by: John P. Ivey, PE, CFM Halff Associates, Inc. ASCE
TROPICAL STORM ALLISON June 5-9, 5 2001 Prepared by: John P. Ivey, PE, CFM Halff Associates, Inc. ASCE Spring 2002 Meeting Arlington, Texas March 27-30, 2002 Tropical Storm Allison (TSA) The most extensive
Why does Kittitas County want to form a Flood Control Zone District?
KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS Kirk Holmes, Director What is a Flood Control Zone District (FCZD)? A Kittitas County Flood Control Zone District (FCZD) would be a special-purpose government
Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
The answers to some of the following questions are separated into two major categories:
Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
Post-Flood Assessment
Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of
Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.
6.0 Mitigation Strategy Introduction A mitigation strategy provides participating counties and municipalities in the H-GAC planning area with the basis for action. Based on the findings of the Risk Assessment
Hydrologic Engineering Techniques for Regional Water Resources Planning
US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Engineering Techniques for Regional Water Resources Planning October 1969 Approved for Public Release. Distribution Unlimited. TP-17
Anchorage All-Hazard Mitigation Plan October 2004
EXECUTIVE SUMMARY The Municipality of Anchorage (MOA) is vulnerable to a wide range of natural, technological, and human/societal hazards including earthquakes, avalanches, and hazardous material accidents.
Table of Contents ESF-3-1 034-00-13
Table of Contents Primary Coordinating Agency... 2 Local Supporting Agencies... 2 State, Regional, and Federal Agencies and Organizations... 3 Purpose... 3 Situations and Assumptions... 4 Direction and
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
CRS 610 Ventura County Flood Warning System Website
CRS 610 Ventura County Flood Warning System Website Purpose This document gives instructions and a description of the information available via the Ventura County Watershed Protection District s (VCWPD)
ANNEX P HAZARD MITIGATION
ANNEX P HAZARD MITIGATION CITY OF HOUSTON TABLE OF CONTENTS ANNEX P MITIGATION COVER... i AUTHORITY & IMPLEMENTATION... ii TABLE OF CONTENTS... iii 1. AUTHORITY...1 2 PURPOSE...1 3. EXPLANATION OF TERMS...1
FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics
FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN May 2010 Prepared by for the Execubve Summary The Chehalis Basin experienced catastrophic flooding in 2007 and 2009. In response, the
Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT
UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the
ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND
ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning
5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
Chapter 6: Mitigation Strategies
Chapter 6: Mitigation Strategies This section of the Plan describes the most challenging part of any such planning effort the development of a Mitigation Strategy. It is a process of: 1. Setting mitigation
Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations.
CITY OF HOUSTON Office of Emergency Management October 2004 Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations. Houston is exposed
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events May 29, 2014 Presented by: Berta Krichker M.Eng., FEC, P.Eng. Manager of Stormwater Unit Environmental and Engineering
Standard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town
Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town MEETING NOTES April 16, 2015 6:00 8:00 PM VERI Project Overview With funding from the US Economic Development Administration
Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting
Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth
Harris County Flood Control District. Policy, Criteria, and Procedure Manual
Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD
TABLE OF CONTENTS. This document was prepared by. URS Group, Inc. 200 Orchard Ridge Drive, Suite 101 Gaithersburg, MD 20878. In Association with:
Delaware and Susquehanna River Basin Flood Data Assessment Pennsylvania May 2008 Federal Emergency Management Agency Department of Homeland Security 500 C Street, SW Washington, DC 20472 TABLE OF CONTENTS
Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs
US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.
The City of Ottawa Flood Hazards
The City of Ottawa Flood Hazards The City of Ottawa is located in North Central LaSalle County, approximately 45 miles West of Joliet and 90 miles South of Rockford. The primary water course and sources
Section 6: Mitigation Strategy
Section 6: Mitigation Strategy The Mitigation Strategy section provides the blueprint for the participating jurisdictions in the Unifour Region to follow to become less vulnerable to the negative effects
Section 6: Mitigation Strategy
Section 6: Mitigation Strategy The Mitigation Strategy section provides the blueprint for the participating jurisdictions in the Eno- Haw Region to follow to become less vulnerable to the negative effects
Community RiskMAP Questionnaire
Community RiskMAP Questionnaire Please provide the following information County Date: Community Name/Organization: Your Your E-mail: Contact Preference: E-mail Phone Mail The Federal Emergency Management
Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005
Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives
7.0 Stream Restoration
7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational
DRAFT SOUTH FORK SKYKOMISH RIVER
DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly
LR 314 Working Group 5 Final Report
LR 314 Working Group 5 Final Report I. Nebraska Department of Natural Resources Table 1. NDNR and NATURAL RESOURCES COMMISSION WATER/INTEGRATED MANAGEMENT PLANNING RELATED RESEARCH, STUDIES AND RELATED
Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún
Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
Probability Magnitude/Severity Warning Time Duration CPRI Flood 3.25 2.88 2.50 3.13 3.01
3.7.8 FLOOD Probability Magnitude/Severity Warning Time Duration CPRI Flood 3.25 2.88 2.50 3.13 3.01 Description Flooding is the most frequent and costly natural hazard in the United States. During the
DISTRICT VALUES STATEMENTS, GOALS, ACTION ITEMS, AND ONGOING TASKS FOR 2015 Adopted by the Board of Directors December 10, 2014. Values Statements.
DISTRICT VALUES STATEMENTS, GOALS, ACTION ITEMS, AND ONGOING TASKS FOR 2015 Adopted by the Board of Directors December 10, 2014 Values Statements. The Board opposes any new transfers of water from the
St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m.
St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m. City Council Study Session Room City of Longmont Civic Center, 350 Kimbark Street, Longmont Minutes 1. Introductions a. Jeff Crane
Cabarrus County Floodplain Information TABLE OF CONTENTS
Cabarrus County Floodplain Information TABLE OF CONTENTS Flood Hazard What is 100-year flood? Does Cabarrus County flood? Flood Safety How do I protect my property from flood damage? Is there anything
HAZARD VULNERABILITY & RISK ASSESSMENT
Hazard Vulnerability Analysis Purpose and Scope A Hazard Vulnerability Analysis (HVA) evaluates risk associated with a specific hazard. During this analysis, the hazard is evaluated for its probability
Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia
Liquid Capital Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Basic Bank Permitting Process Submit Prospectus to IRT. If approved then: Conduct site visit with IRT. If approved then:
9.1. Adequacy of Available Data and Monitoring Efforts
9. DATA MANAGEMENT Data management is a crucial aspect of successful implementation of the ARB IRWMP and its component projects. This section discusses the adequacy of available data and monitoring efforts,
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
Norfolk Flooding Strategy Update. Presentation to Norfolk City Council March 27, 2012
Norfolk Flooding Strategy Update Presentation to Norfolk City Council March 27, 2012 Presentation Overview The purpose of this presentation is to provide City Council an update on activities carried out
Association of State Flood Managers Annual Conference Wednesday, June 4, 2014
Association of State Flood Managers Annual Conference Wednesday, June 4, 2014 Hillsborough County, In the Trenches Local Mitigation Eugene Henry, CFM, AICP Hazard Mitigation Manager Floodplain Administrator
Chapter 6. Emergency Services
Chapter 6. Emergency Services Most communities appoint an emergency manager or emergency services coordinator. This person is usually part time, although many communities make it an extra duty for a full-time
National Dam Safety Program Technical Seminar #22. When is Flood Inundation Mapping Not Applicable for Forecasting
National Dam Safety Program Technical Seminar #22 Thursday February 19 th 2015 Emmittsburg, MD When is Flood Inundation Mapping Not Applicable for Forecasting Victor Hom Hydrologic Services Division National
Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON
Flood Checklist The following may serve as a checklist when preparing for a flood. This checklist should be tailored to processes/operations, flood protection equipment and flood potentials at your specific
Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners
Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners In recent years, multiple flood events in the New York City
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
PUASES013A Undertake storm and water damage operations performed at heights
PUASES013A Undertake storm and water damage operations performed at heights Revision Number: 2 PUASES013A Undertake storm and water damage operations performed at heights Modification History Release TP
Appendix F Benefit-Cost Analysis of Flood Protection Measures
Appendix F Benefit-Cost Analysis of Flood Protection Measures Acronyms used in Appendix F: AA B AA C AA D BC BFE EAD FEMA NED O&M PV RED USACE Average Annual Benefits Average Annual Cost Average Annual
The Hydrologic Engineering Center Training Course on
The Hydrologic Engineering Center Training Course on SEDIMENT TRANSPORT ANALYSIS WITH HEC-RAS Davis, California Course Objectives This course is intended to prepare engineers to perform studies using various
Town of Amherst Flood Plan Annex
Town of Amherst Flood Plan Annex The following document is an annex to the Town of Amherst Disaster Plan and is specifically used as a guideline for Flooding events Flood Plans can enable a flexible response
A Flood Warning System for City of Findlay, Ohio
A Flood Warning System for City of Findlay, Ohio Matt Whitehead US Geological Survey, Ohio Water Science Center 6480 Doubletree Avenue Columbus, Ohio 43229 Abstract The U.S. Geological Survey (USGS) and
Town of Ocean City, Maryland
Town of Ocean City, Maryland Community Hurricane Preparedness May 13, 2009 Websites http://www.fema.gov/hazard/hurricane/index.shtm hurricanes http://www.fema.gov/plan/prevent/floodins/infocon.shtm National
Challenges. Estimated Damages from 100-Year Flood
Suffield Suffield is a rural community located along the Massachusetts border. It encompasses about 42.2 square miles and has a population of about 15,735. Suffield s terrain rises from an elevation of
Presentation Program Outline
Presentation Program Outline IRWM Program Background San Diego IRWM Planning 2013 IRWM Update Integrated Flood Management Flood Management Planning Study IRWM Program Background What is IRWM? Collaborative
San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits
Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.
Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,
Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework
INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction
ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)
(Adopted July 26, 2005 Resolution No. 05-24) Prepared by: Kevin Marstall, PE, Senior Civil Engineer, CRS Coordinator
On The Floodplain Management Components Of The Association of Bay Area Governments (ABAG) Multi-Jurisdictional Hazard Mitigation Plan Including The Annex to the Plan as the City s Local Hazard Mitigation
Emergency Support Function 14. Recovery
Emergency Support Function 14 Recovery ESF COORDINATOR: PRIMARY AGENCY: SUPPORT AGENCIES: Iowa County Emergency Management Agency Iowa County Emergency Management Agency Chief Elected Officials County
Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants
Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants I. Introduction and Purpose This document provides
Management of flooding downstream of dams
Management of flooding downstream of dams Attachment to Victoria State Flood Emergency Plan Version 1.0 (6 February 2013) This plan is produced by the Victoria State Emergency Service and Department of
El Nino in the OC. Orange County Sheriff s Department Emergency Management Division
El Nino in the OC Orange County Sheriff s Department Emergency Management Division The mission of the Orange County Sheriff s Department s Emergency Management Division is to promote, facilitate, and support
King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction
King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction Introduction Eminent domain refers to the power possessed by the state over all property within the
Emergency Support Function 14 Long-Term Community Recovery and Mitigation
ESF Coordinator: Grant County Emergency Management Primary Agencies: Grant County Emergency Management Grant County Assessor s Office Grant County Public Works Grant County Building Department Support
Section 6 Benefit-Cost Analysis
6.1 Introduction For the preferred storage alternatives, a benefit-cost analysis (BCA) was conducted to evaluate the economic feasibility of implementation. The economic evaluation was conducted using
Pennsylvania Flood Safety Awareness Week March 6-10th, 2015
Pennsylvania Flood Safety Awareness Week March 6-10th, 2015 David J. Nicosia Warning Coordination Meteorologist National Weather Service Binghamton, NY Flooding is a coast to coast threat to the United
Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).
Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall
John Keel, CPA State Auditor. An Audit Report on The Dam Safety Program at the Commission on Environmental Quality. May 2008 Report No.
John Keel, CPA State Auditor An Audit Report on The Dam Safety Program at the Commission on Environmental Quality Report No. 08-032 An Audit Report on The Dam Safety Program at the Commission on Environmental
Animals in Disasters
MODULE B UNIT 6 Animals in Disasters Recovering from a Disaster Overview Federal, State, and local governments work together in any major emergency. Emergency assistance funding is based on the concept
MEMORANDUM OF UNDERSTANDING BETWEEN THE DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY AND
MEMORANDUM OF UNDERSTANDING BETWEEN THE DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY AND THE NORTH AMERICAN MISSION BOARD SOUTHERN BAPTIST CONVENTION DISASTER RELIEF 1. PARTIES The
Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program
Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Field Inspection Notes 27 29 September 2012 Introduction The U.S. Army Corps of Engineers (Corps), in
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
BASIC PLAN: Appendix 7 Disaster Recovery
Recovery activities involve the restoration of services to the public and returning the affected area(s) to pre-emergency conditions. A disaster may strike quickly, leaving the need for recovery operations