BIO-DATA OF SHRI SUBODH JAIN



Similar documents
Alstom in India & South Asia

Government of India (Bharat Sarkar) Ministry of Railways (Rail Mantralaya) (Railway Board) No. E(MPP)96/1/15Pt.II Dated:

CONTENTS Introduction Policy guidance at the ministerial level in Myanmar Railway Vision of National Transport Development Plan (Rail Sector) Rail

PROJECT REPORT On ROLE OF PROJECT MANAGEMENT CONSULTANT AND MODEL TENDER DOCUMENT

CENTRAL INFORMATION COMMISSION Club Building (Near Post Office) Old JNU Campus, New Delhi Tel: File No.CIC/DS/A/2011/001995/RM

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 7/MP/2013

Railway Development in Ethiopia

Metro Link Express for Gandhinagar and Ahmedabad (MEGA) Company Limited (50:50 SPV of GOI and GOG)

CEMENT BUSINESS. Sub: Domestic Travel Policy for Management Cadre employees at Job Band 10 & below and Staff Cadre employees of Cement Business

STUDY TOUR TO CHINESE RAILWAY Presentation by Geetha Thoopal, Addl. Member (Finance), Ministry of Railways, Head of Delegation

Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009

RESUME. Dr. Rudra Prakash Maheshwari. Indian Institute of Technology Roorkee , India. 25th June, 1960

SYSTEMWIDE REQUIREMENTS

China Railways Development, Financing and Challenges

FAQS FOR MEMBERS OF COMMODITY DERIVATIVES EXCHANGES

'Fly on the wings of belief.'

1. Senior / Executive Project Engineer (Civil)

PLANNING RAIL BASED TRANSIT FOR BETTER LIVING. S.K.GUPTA DIRECTOR(PROJECTS), Mumbai Metro Rail Corp. Ltd Mumbai

WIPO LIST OF NEUTRALS BIOGRAPHICAL DATA. Telephone: Fax:

PERFORMANCE EVALUATION OF MARUTI SUZUKI INDIA LIMITED: AN OVERVIEW

Department of Transportation, Rail Division Records Retention Schedule Effective Date: June 2003 Table of Contents. Rail Safety...

Short Term Training Courses

PRO - ACTIVE DISCLOSURES OF UNDER SEC 4 (1) OF THE RIGHT TO INFORMATION ACT 2005 OFFICE OF THE DIRECTOR GENERAL OF POLICE, CHENNAI-4.

Partnership with Industry New Business Model and Service Delivery

Maintenance and Management of JR East Civil Engineering Structures

Sponsored by. (New Delhi) Organised by

Chapter 5. Report No.17 of 2007

Member Nation Report 2010 from Denmark.

India Central Europe Business Forum Investment Opportunities in India: Emerging Perspective

Holman Fenwick Willan CONSTRUCTION CAPABILITY

PGDM Construction Management Offered By Ramanujan College of Management Approved By AICTE, affiliated to MDU, Rohtak Palwal (Haryana)

Telecom Regulatory Authority of India. Engagement of Consultant for conducting a market survey of consumers of Cable and Television services

Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com

Owner s Procurement Forum

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

ICAI Diamond Jubilee. National Sports Competition

History of the Interurban Railway System and Monroe Shops. Dallas Area Rapid Transit

CONCEPT. Sr No. Center/Village District Region Area of Plot 1 Alipura/Sayajipura Baroda Baroda

PROCEEDINGS OF THE NATIONAL CONFERENCE ON EFFECTIVE FUNCTIONING OF CONSUMER FORA

Ex-Ante Evaluation (for Japanese ODA Loan)

a) Whether there is a need to revisit the existing approach for debt: equity ratio or to continue with the existing composition?

ETIHAD RAIL. Corporate Presentation

Freight Transport Industry in India

Freight Transport : Indian Scenario

R E S U M E : NITIN BALKRISHNA CHAPALKAR

BONATTI: COMPANY OVERVIEW

Passenger Rail System: Spain s experience

High Speed Rail in India

LIGHT RAIL ON RING 3 NOVEMBER 19 TH Supplier Workshop. Islevbro station (Rødov

main type of locomotive in use, but over half of those had surpassed their durable lifespan. China Afghanistan Project Sites Nepal

Impact analysis: Supreme Court s order on overloading

India Metros: A High Value Opportunity for the UK Rail Sector

Farshad Jalali. Hojat Behrooz

USING THE ROAD MAINTENANCE AGREEMENT TEMPLATE

MOST URGENT. Ref: 227/A/ dated August 12, 2015 To: All Managing Committee and General Council Members of BAI All Office Bearers of BAI Centres

Seoul Metro line 9 O&M Contract

Walk-in Interviews. Dy. General Manager (P&A)

No.E(MPP)2006/3/18 New Delhi, dated The General Manager. Railway Electrification/Allahabad

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

PROJECT PREPARATORY TECHNICAL ASSISTANCE

DOCUMENT FOR EXPRESSION OF INTEREST FOR EMPANELMENT OF ADVERTISING AGENCIES

Mineral Exploration Corporation Limited (A Govt. of India Enterprise) A Miniratna PSE. Engagement of ERP Consultant on Contract Basis

CURRICULUM VITAE 3. SERVICE : INDIAN INFORMATION SERVICE

Non Destructive Testing of Existing Bridges

Availability Payment Mechanisms For Transit Projects ADVISORY

The Follo Line Project

ALL INDIA COUNCIL FOR TECHNICAL EDUCATION NEW DELHI

Dr. Abhay Kumar Shrivastava Date of Birth:

Multi-Modal Logistics Hub (MMLH) in Yanbu

Financing of Smart Cities. Kumar V Pratap Economic Adviser Ministry of Urban Development Government of India

HUMAN RESOURCES DEPARTMENT. HR-TAD/M2/Rec/ th September 2013 RECRUITMENT OF CLERKS AND OFFICERS

1. Transport challenges in subnational entities and related GHG emissions

Professor Dimitrios Tsamboulas National Technical University of Athens, Greece Expert

Appendix-I TRAIN ACCIDENTS ON INDIAN RAILWAYS SINCE

FINANCE (PAY CELL) DEPARTMENT G.O. Ms. No. 236, DATED: 1 ST JUNE, 2009 ( Vaikasi--18, Thiruvalluvar Aandu 2040)

The electric multiple unit services and the Wairarapa services are currently provided under contract to Greater Wellington Regional Council.

SVKM s Narsee Monjee Institute of Management Studies (NMIMS)

RISK MANAGEMENT POLICY

Indian Railways IT Interface. Infrastructure Development and Financing Course

How to reach Training School Hostel, BARC

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS

FLEXURAL PERFORMANCE REQUIREMENTS FOR PRESTRESSED CONCRETE TIES BY FACTORING * * *

Pragati Maidan, New Delhi May, Smarter Solutions for a Better Tomorrow. Organiser. Exhibitions India Group

ADVERTISEMENT. Sarfaesi Valuers who are already empanelled with the Bank need to apply afresh for continuing their empanelment.

TfL Corporate Archives Research Guides

DEVELOPMENT OF NATIONAL WASTE MANAGEMENT STRATEGIES IN SRI LANKA

LIST OF GENERAL MANAGERS OF BANKS

Dr. Ambedkar Medical Aid Scheme (Revised 2013)

Sensitivity Analysis of Railway Projects. Effect on Financial Viability. Project submitted by. Dr. Surya Lakshmi Chellapilla. Dy.

10,000. The leading security and fire event of India. The complete security, civil protection and fire safety event. Over. visitors from 35 countries

ICAN Air Services Negotiation Event BIOGRAPHIES November 2014, Bali Indonesia

Proforma-X APPLICATION FORM FOR CAREER ADVANCEMENT SCHEME-6 TH PAY ASSISTANT LIBRARIAN (AGP Rs. 7000) TO ASSISTANT LIBRARIAN (AGP Rs.

Transcription:

BIO-DATA OF SHRI SUBODH JAIN 1. Name SUBODH KUMAR JAIN 2. Date of Birth 23.04.1954 3. Educational Qualification BE (Civil) from University of Roorkee (now IIT/ Roorkee) in 1974 4. Designation of last Post held Member Engineering, Railway Board, Ministry of Railways, Ex-Officio Secretary to the Government of India 5. Residential Address (along with Mobile No. and E-Mail ID) R.B. Bungalow 5, Hospital Road, Moti Bagh-1, New Delhi-110021 Mobile No. 9717649700 E Mail ID subodhjain38@gmail.com 6. Details of Posts held since joining service, in descending order: S. No. 1. i) Member Engineering, Railway and Railway Board, Ministry of Railways, Ex- Officio Secretary to the Government of India: and (ii) Member (Staff) Railway and Railway Board, Ministry of Railways, Ex-Officio Secretary to the Government of India: 2. General Manager Central Railway 3. Chief Administrative officer (Con), Western Railway 4. Chief Administrative officer (Con), East Central Railway 5. Principal Chief Engineer, Central Railway Post held Period Level April 2013 to April 2014 May 2013 to November 2013 November 2011 to April 2013 June 2009 to November 2011 September 2007 to March 2009 January 2005 to August 2007 6. SGDM, South Western Railway May 2004 to January 2005 7. Divisional Railway Manager, West May 2002 to Central Railway, Bhopal May 2004 8. Executive Director, DMRC, Railway September 1998 to Board May 2002 9. Chief Track Manager, NFR June 1996 to August 1998 10. Chief Bridge Engineer, NFR February 1995 to June 1996 11. Chief Bridge Engineer, NFR September 1994 to January 1995 12. Deputy Chief Engineer (Bridges), November 1990 to Secretary (Apex Level) Secretary (Apex Level) Special Secretary HAG+ Special Secretary HAG+ Special Secretary HAG+ Additional Secretary Joint Secretary Joint Secretary Joint Secretary

Eastern Railway September 1994 13. Deputy Chief Engineer (M), Eastern Railway August 1990 to November 1990 14 Deputy Chief Engineer (Spl), Eastern July 1989 to August 1990 Railway 15 Deputy Chief Engineer (Con), CLW June 1986 to July 1989 16 Deputy General Manager CLW December 1984 to June 1986 17. Deputation, IRCON November 1982 to December 1984 18. SEN(C), Central Railway, Mumbai September 1982, to November 1982 19. SEN(C), Central Railway, Mumbai July 1981 to August 1982 20. SEN(C), Central Railway, Mumbai September 1980 to July 1981 21. AEN(C), Central Railway, Mumbai June 1978 to September 1980 KEY AREA S OF SPECIALISATION Metro Rail Systems: All aspects of Metro Systems viz. planning, feasibility, funding options, route selection, legal, institutional and contractual framework, selection of technology, IRR and FIRR, fare fixation etc. Have been associated with all Metro Rails in country, whether commissioned or under construction, in some capacity or the other. At the moment also working as honorary Expert Civil Engg, of Hyderabad Metro Rail. CONTRACT MANAGEMENT: All types of contracts viz. works, supply and service contracts, item rate, design & build, EPC contracts, FIDIC conditions, arbitrations and dispute resolutions etc. International Project: Preparation of bid documents, tendering, negotiations, mobilization of manpower, machines and materials on the project site. NOTABLE AWARDS & FACILITATIONS Best Innovation of The Year Award 06 07 by Railway Board for the special high speed Diamond Xing. The innovation has been recommended by Railway Board for National award. Facilitation by Madhya Pradesh Legislative Assembly and presentation of silver plaque by speaker for improvement in Railway services in MP.

INTERNATIONAL EXPOSURE Three months training in JAPAN on the subject Construction & Maintenance of High speed track, sponsored by JICA Two months training on the subject of Rail Wheel Interaction for Higher Axle Load and Heavy Haul Operation in Canada and USA, sponsored by UNDP. Visited Europe and North Africa in connection with International tendering and machinery and material mobilization for Algerian projects. World Heavy Haul Conference at Moscow. International Bridge Conference in Netherlands. Visit to Plasser track machines manufacturing facility in Austria. Study and inspection visit to Europe for Mobile Hydraulic Bridge Inspection & maintenance Unit. PUBLISHED TECHNICAL PAPERS Polaris An Innovative Design of Special Diamond published in International Railway Conference, LONDON and Permanent Way Bulletin IRICEN, India. (2007) Track structure for High Speed Passenger Corridor Techno economic issues Railway Equipment Exhibition, New Delhi(2007) Life Cycle Costing of Rail infrastructure International Seminar of UIC at New Delhi (2001) Rail Grinding Vs Rail Lubrication issues to be considered IPWE INDIA seminar (1998) Track Safety Under CASNUB Bogie IPWE INDIA (1997) North American Railroads An Overview Technical Bulletin of RDSO Lucknow(1998) Guest Lecturer at Indian Railway Institute of Civil Engg (IRICEN) PUNE and Railway Staff College (RSC) VADODARA. External pre-stressing of open web girder to make it fit for heavier axle load Presented in International Heavy Haul Conference, 2013 Optimization of concrete sleepers for heavier axle load for International Heavy Haul Conference, 2013 PROFESSIONAL AFFILIATIONS: Member, Institution of Permanent Way Engineers (India) Member, Indian National Group of the International Association for Bridge & Structural Engineering Member, Indian Buildings Congress Member, The Institution of Engineers (India) Member, American Railway Engineering and Maintenance of Way Association, USA Member, The Institution of Civil Engineers, United Kingdom

. DETAILED WORK EXPERIENCE MEMBER ENGINEERING & EX. OFFICIO SECRETARY TO THE GOVERNMENT OF INDIA (APRIL, 2013 TO APRIL, 2014 ) Head of the entire Engineering activities of all Indian Railways, involving projects worth Rs.12,000 crores. Development of Land and Amenities; Maintenance of Buildings, tracks and bridges involving huge manpower of over 400 thousand people. In addition, advising Hon ble Minister of Railways in public policy and Parliamentary Business. New Line Gauge Conversion, Mega Bridges and Doubling Projects, annual outlay Rs. 12,000 crores. Commissioning of Flag Ship Projects, Rail Link between Quazigund-Banihal involving longest transportation tunnel across Peer-Panjal Range. First Rail Link to the Capital of Arunachal Pradesh from Rangia-Rangapara-Harmuti- Naharlagun; First Rail Link to Meghalya from Dudhnoi to Mendhipathar; Land Management Successful exploitation of land resource by way of multi-functional complex and commercial development ; Substantial technical advancement in track and bridge maintenance to bring down the cost. As Administrative Secretary of IRCON International Ltd., (IRCON) Railway Vikas Nigam Ltd.(RVNL), Konkan Railway Corporation Ltd. (KRCL), Mumbai Rail Vikas Corporation (MRVC), Chairman of Rail Land Development Authority (RLDA), performance substantially improved. Konkan Railway turned around to make net profit for the first time since its inception. RLDA contributed Rs.1,000 crores to the Railways about 700% jump; GENERAL MANGER, CENTRAL RAILWAY (NOVEMBER, 2011 TO APRIL, 2013) In charge of all aspects of train operation and development of Rail infrastructure over Central Railway, i.e. involving almost entire Maharashtra. Operation, maintenance and development of most intense sub-urban sections of Mumbai, mainline, Harbour Line and trans-harbor line, handling the daily commuter traffic of 4.1 million commuters. Introduction of first 15 car train on the Mumbai Sub-urban. Thane yard remodeling to facilitate AC/DC conversion. Introduction of Shuttle service between Neral and Matheran. Completion of Long Pending Projects of Kopri Bridge, Vitawa Sub-Way and Santa Cruz Chembur Link Road (SCLR).

Pioneering the first private freight terminal on Indian Railway, Implementing the novel concept of single line mega block for asset maintenance in a double line section on a major trunk route. CHIEF ADMINISTRATIVE OFFICER (CONS.), WESTERN RAILWAY (JULY, 2009 TO NOVEMBER, 2011) In-charge of all infrastructure works on Western Railway including Gauge Conversion, New Line, Doubling, Yard remodelling. Yard remodelling and redevelopment of Borivali Station in record time. Yard remodelling and extension of roof cover of iconic Chruchgate Station; Yard remodelling and development of additional platforms at Bandra Terminus Station; CHIEF ADMM. OFFICER (CONST.), EAST CENTRAL RAILWAY, HAJIPUR (SEPTEMBER, 2007 TO MARCH,2009) Gauge conversion, New lines, Doubling & Mega bridges projects worth approx. 6000 Cr. (annual outlay approx 600 crores). 204 Km gauge conversion opened for traffic involving panel interlocking of 12 stations and NI of major yard. 56 Km of doubling already opened and 27 Km is ready for opening. 36 Km New Line opened for traffic. Six Nos. of crossing stations opened for traffic. New General Manager s Administrative Building completed and occupied. External pre-stressing of long and multiple span METER Gauge girder bridge to make it fit for BROAD gauge loading, for the first time in world. PRINCIPAL CHIEF ENGINEER, CENTRAL RAILWAY, MUMBAI (FEBRUARY, 2005 TO AUGUST, 2007) Maintenance of fixed infrastructure i.e. Track, Bridges, service & residential buildings over entire central railway. Management of Engg. Workshop Manmad (annual turnover worth 50 crores) & Track machines maintenance workshops. Restoration of infrastructure, damaged during Mumbai floods of July 05. All lines restored within short period of 10 days even by building temporary bridges. Implemented several innovations to reduce manpower requirement and cost of maintenance. Reduction in asset failure Sustained yearly improvement of 40%.

Introduced higher axle loads & multiple loco operation by improved maintenance practices, at least cost. 20% improvement in production of girders, fabricated 122M span open web girder. CHIEF ADMN. OFFICER (CONST.), CENTRAL RAILWAY, MUMBAI (APRIL, 2006 TO APRIL, 2006) & (JANUARY, 2007 TO MARCH, 2007 Construction of new lines, doubling and yard remodeling projects. Complete review of alignment & specifications of Puntamba Shirdi new line project to avoid cost overrun and time overrun. Commissioning of Panvel Jasai JNPT doubling project. Commissioning of CSTM yard remodeling with additional and 24 coach long platforms. SENIOR DEPUTY GENERAL MANAGER, SOUTH WESTERN RAILWAY, HUBLI. (JULY, 2004 TO JANUARY, 2005) Overall co ordination, setting up of zonal infrastructure, publicity & public relations, complaints and prevention of corruption, co ordination with CBI & Special Police Establishment. DIVISIONAL RAILWAY MANAGER, BHOPAL (MAY, 2002 TO JUNE, 2004) Head of a Multi disciplinary team to ensure operation & maintenance of railway services in Bhopal Division to the best satisfaction of customers, ensuring safe passage of cross country traffic as per relative priority, co ordination between Railways and State Government. ISO certification of Train Service and Railway Station for the first time. First call centre for Railway Enquiry. Introduced scheduled Freight train services on experimental basis. Improved the average speed of freight trains and brought down the traction tariff. Accident free, casualty free record of train operation. Implementation of crew management system resulted in 10% saving. EXECUTIVE DIRECTOR (DELHI METRO), RAILWAY BOARD, NEW DELHI. (OCTOBER, 1998 MAY, 2002) Single window clearance of proposals concerning technical, legal and institutional framework of DMRC. Developing rail based urban transport policy coordination with Ministry of Urban Development. Preparing agenda papers for MOR for BOD, Empowered committee and committee of secretaries meetings. Development of different models for funding of Urban Transport Infrastructure on the concept of non user beneficiary to also pay. Preparation and notification of Metro Railway (Construction of works) and Metro Railway (Operation & maintenance) Acts for Metro City of Delhi, as DMRC is the first Non Government Metro Rail of country.\

Scrutiny and approval of technical schemes of Crossings of New Delhi and Delhi Main yards for North South underground corridor of DMRC including co ordination with Northern Railway. Selection of alternative appropriate alignment for third corridor of Delhi Metro. Technical and legal clearances including assistance in finalizing technical specifications. Development of various participatory models like Andhra & Karnataka. Integrated Rail cum Bus transport model for extension of urban transport to NCR. SPECIAL ASSIGNMENTS Member of the high level committee to study, review and formulate implementation strategy of Railway Re structuring as recommended by Expert Group (Dr. Rakesh Mohan Committee). Member of Steering committee for Delhi Metro. Member of Planning Committee of NCRPB (National Capitol Region Planning Board) and its committee for Master Plan 2020 of NCR. Represented Railways in Northern Zonal Council. Committee Member of Delhi Master Plan 2020. PREVIOUS ASSIGNMENTS 1994 1998 Northeast Frontier Railways, Guwahati as Chief Track Engineer & Chief Bridge Engineer. 1989 1994 Eastern Railway, Kolkata in Track design, Bridge design, Track monitoring & Computerization. 1985 1989 Chittaranjan Loco Works, Chittaranjan as in charge of township management, maintenance and development of civil infrastructure, Public relations & security. IRCON INTERNATIONAL LTD. AS PROJECT MANAGER (ALGERIA) (NOVEMBER, 1982- DECEMBER, 1984) Structural design and costing of Diesel Loco Maintenance workshop in Saudi Arabia. Preparation of tender documents for Rly siding project at BENISAF, ALGERIA. Procurement & mobilization of construction machinery, spare parts, Rails and wooden sleepers, skilled and un skilled manpower for IRCON project at Algeria including shipping arrangements, international documentation etc. Market survey, pre qualification documents and fixing of local agents for Railway project in Sfax, TUNISIA and road project in NEPAL. 1980 1982 Central Railway, Mumbai as Sr. Engg. (Planning and Design) in Construction Deptt. 1978 1980 Central Railway, Mumbai as Asst. Engg., Lonavala, in charge of 3rd Ghat line construction. 1976 1978 Institutional and field training in Railways. 1975 1976 Engg. India Ltd. as Jr Engr. At IPCL Vadodara project. 1974 1975 BHEL at Jhansi as JR. Ex. at transformer factory project.

Dated : 12 th june 2014 New Delhi (SUBODH JAIN)