1 Sensitivity Analysis of Railway Projects Effect on Financial Viability Project submitted by Dr. Surya Lakshmi Chellapilla Dy. FA & CAO/SR In connection with the Training on Project Appraisal with Latest Cost and Financial Analysis C- TARA, Secunderabad July 7 August 14, 2014

2 1.0 Introduction: Financial appraisal of Railway projects is one of the most difficult to make (201-F). The various techniques available for appraisal and the methodology for evaluation are available in Chapter 2 of the Indian Railway Finance Code and its annexures. The Railways follow the Internal Rate of Return technique to evaluate their projects, with some exceptions. In this study, an effort has been made to put three ongoing projects through the Sensitivity Analysis. 2.0 Background: The current benchmark of remunerativeness of a project is 14% (in 204- F, an illustrative rate of 10% is mentioned). The types of projects which need to pass the test of remunerativeness are New Lines, Line Capacity Works including Gauge Conversion, Doubling, etc. Others include Yard Remodelling and Terminal Facilities, Microwave and other Telecommunication Works, Change of Traction (Electrification and Dieselisation) and provision of Loco Sheds therefor, Introduction of new services and setting up of Workshops(205-F). However, in case of major projects like New Lines, the costs/ benefits accrued to the society are

3 assessed, but only by the Economic Adviser to the Railway Board (235- F, Annexure- F). As can be seen above, Railway Projects are evaluated only by the rate of remunerativeness and not by any measure of risk associated with it. Sensitivity Analysis is a measure of standalone risk, specific to the project (Chandra, 2014, p. 11.2), and can i. Show the robustness/ vulnerability of a project to changes in underlying variables ii. Highlight area of further analysis, like containment in the variability of the critical factor iii. Articulate the concern of evaluators, and is intuitively appealing (p. 11.6). This analysis is done by varying one variable at a time to understand the project s sensitivity to a change in that variable. 3.0 Selection Criteria/ Sampling/ Assumptions and Others: While applying Sensitivity Analysis to railway projects, the following criteria have been kept in mind: i. The sample size is too small to make any generalization, the idea being the application of an additional tool for financial appraisal. ii. The sampling is judgmental.

4 iii. The sample is confined to one each from new lines, gauge conversion and doubling. iv. The project should have figured in the Works- in- Progress section of the Pink Book (List of Capital Works) for the year v. The project should have incurred a substantial portion of its projected cost already. It was, however, realised that this criterion was not purposeful inasmuch as the projections were not updated at all. vi. Needless to state, the projects are being executed on Southern Railway. vii. This has been done purely for an academic purpose and simply to understand sensitivity analysis. Hence the ultimate sensitivity test (presuming that the costs would go up by 20%, and the revenues would be less by 20%) was not done. viii. The minimum rate of return is 14% as per extant guidelines, but this may not have been a pre requisite in project selection at the apex level. ix. A word on referencing: It is to point out that the APA guidelines have been invoked for citing books and reports, while official documents were referenced by the regular pattern in the Railways.

5 x. While referring to the cost of a project, it was mentioned in Rupees lakhs and crores in different locations. Calculations were done in lakhs of Rupees only. 4.0 Methodology: This student took the data pertaining to Initial Cost and Cost of Renewal and Replacement, Gross/ Total Earnings and Operational Savings, as the case may be, Credit for Released Railway Materials, as given in the survey report and as projected in the financial appraisal. Since none of the projects cleared the benchmark rate of 14%, their present values have been calculated by discounting at a rate nearer to the IRR. For example, in 5.1, the cash flows were discounted at 2%, in 5.2, at 8% and in 5.3, at 9%, which are close to their IRR. Likewise, in deference to 231-F, initial cost incurred before the zeroeth year (the year of starting operations) has been appreciated by the same factor. After working out the NPV (Total Inflows- Total Outflows), the same was analysed for sensitivity with reference to Initial Cost, Maintenance (Gross/ Total Working Expenses) and Renewal and Replacement and Gross/ Total Earnings including Operational Savings, wherever applicable. 5.0 The Analysis:

6 5.1 Tindivanam- Nagari New Line (179.2 km)- No.5 of SR Pink Book : Facts: The survey for this line was estimated at a gross cost of Rs crore, and an IRR of 1.291% in November, 2005 (CAO/C lr. No. C 221/TS/TMV- NG/2005(II) dt. 14/11/2005) It was included in the Supplementary Grants for (No. 22) The sanctioned cost of this project was Rs crores in Till , Rs crore had been spent Sensitivity: The analysis has thrown up the following results: Table Tindivanam- Nagari New Line (179.2 km)- No.5 of SR Pink Book Discount Factor: 2% Srl. No Description Value (in Rs. Lakhs) 1 Present Value of Initial Investment (231- F) Present Value of Replacement and Renewal

7 Fro m th e ab 3 Present Value of Gross Working Expenses Present Value of Total Outflows (1+2+3) Present Value of Gross Earnings Present Value of Credit for Released Railway Materials (CRRM) Present Value of Total Inflows (5+6) Net Present Value (7-4) Sensitivity w.r.t Initial Investment (8/1) 5.74% 10 Sensitivity w.r.t Maintenance, Replacement and Renewal 5.71% (8/(2+3)) 11 Sensitivity w.r.t Gross Earnings (8/5) 2.78% ove table, it is clear that the project is more sensitive to gross earnings than either initial cost or the cost of maintenance and replacement and renewal. A mere 2.78% fall in gross earnings could make project unviable, whereas initial investment (5.74%) and maintenance, replacement and renewal costs (5.71%) had to rise at relatively higher levels to make the project unviable. However, despite the relative differences, it can be said that all the variables are highly sensitive. 5.2 Dindigul- Pollachi- Palghat/ Coimbatore Gauge Conversion ( km)- No.19 of SR Pink Book : Facts: This project was taken up despite it having an IRR of 8.097% mainly because the metre gauge in the project section would become isolated in view of

8 gauge conversion in connected sections and its growth potential Its survey cost was Rs lakh with an annual savings of Rs lakhs The sanctioned cost of the project was Rs crore in February, At present, it is expected to cost Rs crores, with an incurred cost of Rs crores till Sensitivity: In this project, there is a Savings component. The results of analysis are as follows: Table Dindigul- Pollachi- Palghat/ Coimbatore Gauge Conversion ( km)- No.19 of SR Pink Book Discount Factor: 8% Srl. No Description Value (in Rs. Lakhs) 1 Present Value of Initial Investment (231- F) Present Value of Replacement and Renewal Present Value of Total Working Expenses Present Value of Total Outflows (1+2+3) Present Value of Total Earnings Present Value of Operational Savings Present Value of Credit for Released Railway Materials (CRRM)

9 Thi s pr oje 8 Present Value of Total Inflows (5+6+7) Net Present Value (8-4) Sensitivity w.r.t Initial Investment (9/1) 7.85% 11 Sensitivity w.r.t Maintenance, Replacement and Renewal (9/(2+3)) 12 Sensitivity w.r.t Total Earnings and Operational Savings(8/(5+6)) 13.32% 5.17% ct also shows that the NPV is more sensitive to earnings and savings (5.17%), than to initial cost (7.85%) and even lesser to maintenance, replacement and renewal (13.32%). 5.3 Thanjavur- Ponmalai Doubling (46.93 km) with Bye- Pass line before GOC (1.13km)- No.19 of SR Pink Book : Facts: The project was surveyed to cost Rs lakhs in August, 2010, with an IRR of 9.189% (CAO/C lr. No W337/I/170/CN dt. 04/08/2010) It was sanctioned on 16/04/2014 for a total cost of Rs crore (RB letter no. 2009/W1/DL/SR/TP/1 DT. 16/04/2014) Till , an amount of Rs. 40 crore has been spent on this project Sensitivity:

10 The project was tested for its sensitivity despite its negative NPV. The conclusion would mean that costs should go down, or earnings, go up by a specified percentage to make the project viable. The results of the analysis are as follows: Table Thanjavur- Ponmalai Doubling (46.93 km) with Bye- Pass line before GOC (1.13km)- No.19 of SR Pink Book Discount Factor: 9% Srl. No Description Value (in Rs. Lakhs) 1 Present Value of Initial Investment (231- F) Present Value of Replacement and Renewal Present Value of Gross Working Expenses Present Value of Total Outflows (1+2+3) Present Value of Gross Earnings Present Value of Operational Savings Present Value of Credit for Released Railway Materials (CRRM) 8 Present Value of Total Inflows (5+6+7) Net Present Value (8-4) Sensitivity w.r.t Initial Investment (9/1) -0.02% 11 Sensitivity w.r.t Maintenance, Replacement and Renewal (9/(2+3)) 12 Sensitivity w.r.t Gross Earnings and Operational Savings (9/(5+6)) -0.01% -0.01% From the above table, it is clear that the very small value of negative NPV makes the project viable with very minor decreases in initial investment (0.02%) and maintenance replacement and renewal cost (0.01%), and with very marginal increase in gross earnings and operational savings (0.01%). Of the three projects analysed, this is the most sensitive one.

11 6.0 Conclusion: From the above discussion, the following have been observed: 6.1 It is noted that two of the projects selected, i.e., New Line and Gauge Conversion, are relatively more sensitive to earnings and savings, while the doubling project was, in general, highly sensitive to all the three variables. 6.2 If sensitivity analysis is to be done for Railway projects, additional formats need to be designed to facilitate a quick analysis. Updating of survey particulars (including cost and earnings projections and factoring in of inflation) at the time of inclusion in Pink Book and detailed estimation may help in verifying the viability of the project at that stage. Provision also needs to be made to additionally inflate/ discount costs / inflows respectively for every year of delay in completion (time over- run). 6.3 The benchmark IRR has not been met in all the three projects, so PV could not be calculated at a common benchmark rate, thereby depriving the student of additional insight. *** References: Assets-Acquisition, Construction and Replacement for (Pink Book for Southern Railway ). (n.d.). Ministry of Railways. Chandra, P. (2014). Projects: Planning, Analysis, Selection, Financing, Implementation, and Review. New Delhi: McGraw Hill Education (India) Private Limited.

12 Indian Railway Financial Code (Vol. I). (1998 (corrected upto )). New Delhi: Ministry of Railways. (January 2006). Preliminary Survey for Gauge Conversion between Dindigul- Pollachi- Palghat and Pollachi- Coimbatore. (November, 2005). Reconnaissance Engineering cum Traffic Survey for a New BG Line from Tindivanam to Nagari. (August, 2010). Updating of Preliminary Engineering cum Traffic Survey for for Doubling of Track between Thanjavur and Ponmalai with Bye- pass Line before GOC. ***********

2.1 MEANING AND BUSINESS ENTITY CONCEPT

2.1 MEANING AND BUSINESS ENTITY CONCEPT Accounting Concepts MODULE - 1 2 ACCOUNTING CONCEPTS In the previous lesson, you have studied the meaning and nature of business transactions and objectives of financial accounting. In order to maintain

More information

Project Cost Management

Project Cost Management Project Cost Management Guide to Mathematical Questions PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Present

More information

MODULE 2. Capital Budgeting

MODULE 2. Capital Budgeting MODULE 2 Capital Budgeting Capital Budgeting is a project selection exercise performed by the business enterprise. Capital budgeting uses the concept of present value to select the projects. Capital budgeting

More information

Course No.: PPM 124. Number of credits: 2 Number of lectures-tutorial-practicals: 28(18-10-0) Introduction

Course No.: PPM 124. Number of credits: 2 Number of lectures-tutorial-practicals: 28(18-10-0) Introduction Course No.: PPM 124 Course title: Project Appraisal & Finance Number of credits: 2 Number of lectures-tutorial-practicals: 28(18-10-0) Course coordinator: Prof Samir Bajpai Introduction Capital budgeting

More information

CHAPTER 25. P.25.16 The following data are furnished by the Hypothetical Leasing Ltd (HLL):

CHAPTER 25. P.25.16 The following data are furnished by the Hypothetical Leasing Ltd (HLL): CHAPTER 25 Solved Problems P.25.16 The following data are furnished by the Hypothetical Leasing Ltd (HLL): Investment cost Rs 500 lakh Primary lease term 5 years Estimated residual value after the primary

More information

5:25 Flexible Structuring Scheme: Aligning Benefits

5:25 Flexible Structuring Scheme: Aligning Benefits June 02, 2015 Ratings I. Genesis 5:25 Flexible Structuring Scheme: Aligning Benefits The development of core industries and infrastructure sector is pivotal for developing countries like India. Development

More information

INDIAN INSTITUTE OF BANKING & FINANCE, MUMBAI

INDIAN INSTITUTE OF BANKING & FINANCE, MUMBAI INDIAN INSTITUTE OF BANKING & FINANCE, MUMBAI EXAMINATION: CAIIB Question paper pattern for the December 2005 examination and onwards: The examination will be conducted purely on objective mode/multiple

More information

ICASL - Business School Programme

ICASL - Business School Programme ICASL - Business School Programme Quantitative Techniques for Business (Module 3) Financial Mathematics TUTORIAL 2A This chapter deals with problems related to investing money or capital in a business

More information

Table of Fees (pursuant to rule 12 of the Companies (Registration of Offices and Fees) Rules, 2014)

Table of Fees (pursuant to rule 12 of the Companies (Registration of Offices and Fees) Rules, 2014) Annexure Table of Fees (pursuant to rule 12 of the Companies (Registration of Offices and Fees) Rules, 2014) I. Fee for filings etc. under section 403 of the Companies Act, 2013 Table of fees for the documents

More information

Financial Analysis of Infrastructure Project - A Case Study on Built-Operate-Transfer Project in India

Financial Analysis of Infrastructure Project - A Case Study on Built-Operate-Transfer Project in India International Journal of Engineering and Advanced Technology (IJEAT) ISSN: 2249 8958, Volume-1, Issue-5, June Financial Analysis of Infrastructure Project - A Case Study on Built-Operate-Transfer Project

More information

Net Present Value (NPV)

Net Present Value (NPV) Investment Criteria 208 Net Present Value (NPV) What: NPV is a measure of how much value is created or added today by undertaking an investment (the difference between the investment s market value and

More information

MBA (3rd Sem) 2013-14 MBA/29/FM-302/T/ODD/13-14

MBA (3rd Sem) 2013-14 MBA/29/FM-302/T/ODD/13-14 Full Marks : 70 MBA/29/FM-302/T/ODD/13-14 2013-14 MBA (3rd Sem) Paper Name : Corporate Finance Paper Code : FM-302 Time : 3 Hours The figures in the right-hand margin indicate marks. Candidates are required

More information

How To Write An Audit On Jet Airways Training Academy

How To Write An Audit On Jet Airways Training Academy INDEPENDENT AUDITOR'S REPORT TO THE MEMBERS OF JET AIRWAYS TRAINING ACADEMY PRIVATE LIMITED Report on the Standalone Financial Statements We have audited the accompanying financial statements of JET AIRWAYS

More information

6. FINANCIAL MANAGEMENT

6. FINANCIAL MANAGEMENT 6. FINANCIAL MANAGEMENT Syllabus Financial Management: Investment-need, Appraisal and criteria, Financial analysis techniques-simple pay back period, Return on investment, Net present value, Internal rate

More information

IREDA-NCEF REFINANCE SCHEME REFINANCE SCHEME FOR PROMOTION OF RENEWABLE ENERGY SUPPORTED BY THE NATIONAL CLEAN ENERGY FUND

IREDA-NCEF REFINANCE SCHEME REFINANCE SCHEME FOR PROMOTION OF RENEWABLE ENERGY SUPPORTED BY THE NATIONAL CLEAN ENERGY FUND IREDA-NCEF REFINANCE SCHEME REFINANCE SCHEME FOR PROMOTION OF RENEWABLE ENERGY SUPPORTED BY THE NATIONAL CLEAN ENERGY FUND IREDA NCEF REFINANCE SCHEME REFINANCE SCHEME FOR PROMOTION OF RENEWABLE ENERGY

More information

Infrastructure Finance Prof. A. Thillai Rajan Department of Management Studies Indian Institute of Technology, Madras

Infrastructure Finance Prof. A. Thillai Rajan Department of Management Studies Indian Institute of Technology, Madras Infrastructure Finance Prof. A. Thillai Rajan Department of Management Studies Indian Institute of Technology, Madras Lecture - 6 Basic Financial Management - Part IV Hi welcome back to this course on

More information

IREDA-NCEF REFINANCE SCHEME

IREDA-NCEF REFINANCE SCHEME IREDA-NCEF REFINANCE SCHEME REVIVAL OF THE OPERATIONS OF EXISTING BIOMASS POWER & SMALL HYDRO POWER PROJECTS AFFECTED DUE TO UNFORSEEN CIRCUMSTANCES SUPPORTED BY THE NATIONAL CLEAN ENERGY FUND IREDA NCEF

More information

CHAPTER 29. Capital Budgeting

CHAPTER 29. Capital Budgeting CHAPTER 9 Capital Budgeting Meaning The term Capital Budgeting refers to the long-term planning for proposed capital outlays or expenditure for the purpose of maximizing return on investments. The capital

More information

Module 10: Assessing the Business Case

Module 10: Assessing the Business Case Module 10: Assessing the Business Case Learning Objectives After completing this section, you will be able to: Do preliminary assessment of proposed energy management investments. The measures recommended

More information

Chapter 4.11: Financial Management

Chapter 4.11: Financial Management Chapter 4.11: Financial Management Short type questions 1. What s the need for performing financial analysis of an energy saving proposal? Plant managements invest in capital which will yield the greatest

More information

Why Use Net Present Value? The Payback Period Method The Discounted Payback Period Method The Average Accounting Return Method The Internal Rate of

Why Use Net Present Value? The Payback Period Method The Discounted Payback Period Method The Average Accounting Return Method The Internal Rate of 1 Why Use Net Present Value? The Payback Period Method The Discounted Payback Period Method The Average Accounting Return Method The Internal Rate of Return Problems with the IRR Approach The Profitability

More information

FINANCIAL AND RISK ANALYSIS WITH RETSCREEN SOFTWARE. SLIDE 1: Financial and Risk Analysis with RETScreen Software

FINANCIAL AND RISK ANALYSIS WITH RETSCREEN SOFTWARE. SLIDE 1: Financial and Risk Analysis with RETScreen Software Training Module SPEAKER S NOTES FINANCIAL AND RISK ANALYSIS WITH RETSCREEN SOFTWARE CLEAN ENERGY PROJECT ANALYSIS COURSE This document provides a transcription of the oral presentation (Voice & Slides)

More information

Budget 2007-08 - Financial Inclusion - Guidelines for Financial Inclusion Promotion Fund and Financial Inclusion Technology Fund

Budget 2007-08 - Financial Inclusion - Guidelines for Financial Inclusion Promotion Fund and Financial Inclusion Technology Fund DO.No. NB.MCID. 309 / FI-01 / 2008-09 Circular No. 88 A/ mcid - 6 / 2008 02 June 2008 (CMD, PSU Banks) Budget 2007-08 - Financial Inclusion - Guidelines for Financial Inclusion Promotion Fund and Financial

More information

A chapter on Valuation basis covering the following minimum criteria should also be displayed on the web-site of the Insurers.

A chapter on Valuation basis covering the following minimum criteria should also be displayed on the web-site of the Insurers. L-42 42- Valuation Basis (Life Insurance) A chapter on Valuation basis covering the following minimum criteria should also be displayed on the web-site of the Insurers. Data The company maintains the Policy

More information

Chapter 5. Report No.17 of 2007

Chapter 5. Report No.17 of 2007 Chapter 5 Passenger Facilities Infrastructure 5.1 ICAO has laid down standards and recommended practices on Facilitation. From an airport administration s point of view, the two important areas of facilitation

More information

CHAPTER 8 CAPITAL BUDGETING DECISIONS

CHAPTER 8 CAPITAL BUDGETING DECISIONS CHAPTER 8 CAPITAL BUDGETING DECISIONS Q1. What is capital budgeting? Why is it significant for a firm? A1 A capital budgeting decision may be defined as the firm s decision to invest its current funds

More information

Based on the suggestion received from IBA, our Board has approved the following methodology of Calculation of Drawing Power (DP) under MPBF.

Based on the suggestion received from IBA, our Board has approved the following methodology of Calculation of Drawing Power (DP) under MPBF. MAIN : ADV-138/2014-15 DT. 11-12-2014 a SUB : CONV-26 CO/CREDIT DIVISION FILE M-2 S-205 SUB : Revised method of arriving Drawing Power (DP) and other issues as advised by Indian Banks Association (IBA)

More information

Schneps, Leila; Colmez, Coralie. Math on Trial : How Numbers Get Used and Abused in the Courtroom. New York, NY, USA: Basic Books, 2013. p i.

Schneps, Leila; Colmez, Coralie. Math on Trial : How Numbers Get Used and Abused in the Courtroom. New York, NY, USA: Basic Books, 2013. p i. New York, NY, USA: Basic Books, 2013. p i. http://site.ebrary.com/lib/mcgill/doc?id=10665296&ppg=2 New York, NY, USA: Basic Books, 2013. p ii. http://site.ebrary.com/lib/mcgill/doc?id=10665296&ppg=3 New

More information

Application of Modified Internal Rate of Return Method for Watershed Evaluation 1

Application of Modified Internal Rate of Return Method for Watershed Evaluation 1 Agricultural Economics Research Review Vol. 22 (Conference Number) 2009 pp 401-406 Application of Modified Internal Rate of Return Method for Watershed Evaluation 1 K.J.S. Satyasai * Department of Economic

More information

Cost and benefit of investment in integrated broiler farming study

Cost and benefit of investment in integrated broiler farming study ISSN: 2347-3215 Volume 2 Number 4 (April-2014) pp. 114-123 www.ijcrar.com Cost and benefit of investment in integrated broiler farming study A case V.Balamurugan* and M.Manoharan Full Time Research Scholar,

More information

Development Discussion Papers

Development Discussion Papers Development Discussion Papers Return to Equity in Project Finance for Infrastructure Joseph Tham Development Discussion Paper No. 756 February 2000 Copyright 2000 Joseph Tham and President and Fellows

More information

Application for financial assistance from Sugar Development Fund towards promoters' contribution for financing modernization/rehabilitation scheme:

Application for financial assistance from Sugar Development Fund towards promoters' contribution for financing modernization/rehabilitation scheme: FORM II [See Rule 16(2)] Application for financial assistance from Sugar Development Fund towards promoters' contribution for financing modernization/rehabilitation scheme: I. Name of applicant II Address:

More information

Mantas India Private Limited. Directors Report

Mantas India Private Limited. Directors Report Mantas India Private Limited Directors Report Dear Members, Your Directors take pleasure in bringing you the Annual Report of your Company along with the Audited Accounts for the financial year from April

More information

Performing Net Present Value (NPV) Calculations

Performing Net Present Value (NPV) Calculations Strategies and Mechanisms For Promoting Cleaner Production Investments In Developing Countries Profiting From Cleaner Production Performing Net Present Value (NPV) Calculations Cleaner Production Profiting

More information

Oracle (OFSS) Processing Services Limited. Directors Report

Oracle (OFSS) Processing Services Limited. Directors Report Directors Report Dear Members, Your Directors take pleasure in bringing you the Sixth Annual Report of your Company along with the Audited Accounts of the Company for the financial year from April 01,

More information

FINANCIAL AND ECONOMIC ANALYSES

FINANCIAL AND ECONOMIC ANALYSES Tonga-Fiji Submarine Cable Project (RRP TON 44172) FINANCIAL AND ECONOMIC ANALYSES A. Introduction 1. The Tonga Fiji Submarine Cable Project will support the Government of Tonga to establish an 827 kilometer

More information

Problems on Time value of money January 22, 2015

Problems on Time value of money January 22, 2015 Investment Planning Problems on Time value of money January 22, 2015 Vandana Srivastava SENSEX closing value on Tuesday: closing value on Wednesday: opening value on Thursday: Top news of any financial

More information

CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS

CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS 122 HANDBOOK FOR THE ECONOMIC ANALYSIS OF WATER SUPPLY PROJECTS CONTENTS 5.1 Introduction...123 5.2 Financial Revenues...124 5.3 Project Costs...126 5.3.1 Investments...127

More information

Financial and Cash Flow Analysis Methods. www.project-finance.com

Financial and Cash Flow Analysis Methods. www.project-finance.com Financial and Cash Flow Analysis Methods Financial analysis Historic analysis (BS, ratios, CF analysis, management strategy) Current position (environment, industry, products, management) Future (competitiveness,

More information

F No 142/26/2015-TPL. 11UB: Fair market value of assets in certain cases

F No 142/26/2015-TPL. 11UB: Fair market value of assets in certain cases F No 142/26/2015-TPL Government of India Ministry of Finance Department of Revenue Central Board of Direct Taxes ******* New Delhi, Dated 23 rd May, 2016 Subject: Manner of determination of fair market

More information

Regulations for Determination of Pipeline Tariff for Natural Gas Pipelines

Regulations for Determination of Pipeline Tariff for Natural Gas Pipelines Draft Regulations for Determination of Pipeline Tariff for Natural Gas Pipelines Petroleum & Natural Gas Regulatory Board, New Delhi November 29, 2007 Reader may please note that this document is the property

More information

APPLICATION FOR SETTING-UP UNIT UNDER SOFTWARE TECHNOLOGY PARK (STP) SCHEME FOR 100% EXPORT OF COMPUTER SOFTWARE

APPLICATION FOR SETTING-UP UNIT UNDER SOFTWARE TECHNOLOGY PARK (STP) SCHEME FOR 100% EXPORT OF COMPUTER SOFTWARE APPLICATION FOR SETTING-UP UNIT UNDER SOFTWARE TECHNOLOGY PARK (STP) SCHEME FOR 100% EXPORT OF COMPUTER SOFTWARE Instructions: 1. The Application should be duly signed by the Competent Authority with initials

More information

FINAL EXAMINATION (REVISED SYLLABUS - 2008) GROUP - III INTERNATIONAL FINANCE

FINAL EXAMINATION (REVISED SYLLABUS - 2008) GROUP - III INTERNATIONAL FINANCE [ December 2011 ] FINAL EXAMINATION (REVISED SYLLABUS - 2008) GROUP - III Paper-12 : FINANCIAL MANAGEMENT & INTERNATIONAL FINANCE Q. 1. For each of the questions given below, one out of four answers is

More information

1. These regulations may be called the Securities and Exchange Board of India (Stock Brokers and Sub-Brokers) (Amendment) Regulations, 2015.

1. These regulations may be called the Securities and Exchange Board of India (Stock Brokers and Sub-Brokers) (Amendment) Regulations, 2015. THE GAZETTE OF INDIA EXTRAORDINARY PART III SECTION 4 PUBLISHED BY AUTHORITY NEW DELHI, SEPTEMBER 08, 2015 SECURITIES AND EXCHANGE BOARD OF INDIA NOTIFICATION Mumbai, the 8th September, 2015 SECURITIES

More information

Part 7. Capital Budgeting

Part 7. Capital Budgeting Part 7. Capital Budgeting What is Capital Budgeting? Nancy Garcia and Digital Solutions Digital Solutions, a software development house, is considering a number of new projects, including a joint venture

More information

[\rrw. No iltlgslsri.2012-13 GIRCULAR. g7b

[\rrw. No iltlgslsri.2012-13 GIRCULAR. g7b g7b No iltlgslsri.2012-13 GOVERNMENT OF INIDA GEOLOGICAL SURVEY OF INDIA GIRCULAR Accounts-l Southern Region Hyderabad - 500 068 Dated. 6"t September 2012 sub. calculation lncome Tax for the financial

More information

The table for the present value of annuities (Appendix A, Table 4) shows: 10 periods at 14% = 5.216. = 3.93 years

The table for the present value of annuities (Appendix A, Table 4) shows: 10 periods at 14% = 5.216. = 3.93 years 21-18 Capital budgeting methods, no income taxes. The table for the present value of annuities (Appendix A, Table 4) shows: 10 periods at 14% 5.216 1a. Net present value $28,000 (5.216) $146,048 $36,048

More information

URBAN GAS SUPPLIERS LIMITED Regd. Office: 11B, Mittal Towers, Nariman Point, Mumbai 400 021 DIRECTORS REPORT

URBAN GAS SUPPLIERS LIMITED Regd. Office: 11B, Mittal Towers, Nariman Point, Mumbai 400 021 DIRECTORS REPORT URBAN GAS SUPPLIERS LIMITED Regd. Office: 11B, Mittal Towers, Nariman Point, Mumbai 400 021 DIRECTORS REPORT The Directors of your Company are pleased to present the Fourth Annual Report together with

More information

Most Important Terms and Conditions ( MITC) ( For individual housing loan)

Most Important Terms and Conditions ( MITC) ( For individual housing loan) Most Important Terms and Conditions ( MITC) ( For individual housing loan) Major Terms and Conditions of the housing loan agreed to between ( the borrower) and Can Fin Homes Ltd ( CFHL) are as under :

More information

Financial Control System of the Volkswagen Group

Financial Control System of the Volkswagen Group ƒ Financial Control System of the Volkswagen Group Financial Control System of the Volkswagen Group Third Edition Publisher VOLKSWAGEN AG Group Controlling Letter box 1846 D-38436 Wolfsburg, Germany 3rd

More information

The life insurance sector

The life insurance sector BY: DR A. MUTHUSAMY AND A. MEERA WINDS OF CHANGE MARK LIFE INSURANCE MARKET IN INDIA India is still an under-insured country and holds the 18th position in the life insurance market of the world. The life

More information

Chapter 9. Year Revenue COGS Depreciation S&A Taxable Income After-tax Operating Income 1 $20.60 $12.36 $1.00 $2.06 $5.18 $3.11

Chapter 9. Year Revenue COGS Depreciation S&A Taxable Income After-tax Operating Income 1 $20.60 $12.36 $1.00 $2.06 $5.18 $3.11 Chapter 9 9-1 We assume that revenues and selling & administrative expenses will increase at the rate of inflation. Year Revenue COGS Depreciation S&A Taxable Income After-tax Operating Income 1 $20.60

More information

Poultry Layer Farming

Poultry Layer Farming Poultry Layer Farming 1. Introduction Poultry egg and meat are important sources of high quality proteins, minerals and vitamins to balance the human diet. Commercial layer strains are now available with

More information

The levy of VAT is administered by the Goa Value Added Tax Act, 2005 and the rules made thereunder.

The levy of VAT is administered by the Goa Value Added Tax Act, 2005 and the rules made thereunder. Frequently Asked Questions 1. What is VAT? VAT is the short form of Value Added Tax. VAT is the tax that has replaced the earlier levy of Sales Tax. Under the earlier first point system of levy of tax,

More information

Accounting for Branches Including Foreign Branch Accounts

Accounting for Branches Including Foreign Branch Accounts 9 Accounting for Branches Including Foreign Branch Accounts BASIC CONCEPTS Types of branches Dependent branches Independent branches Based on accounting point of view, branches may be classified as follows:

More information

Course No.: PPM 122. Number of credits: 3 (2-1-0) Number of lectures-tutorial practicals: 31-11-0. Introduction

Course No.: PPM 122. Number of credits: 3 (2-1-0) Number of lectures-tutorial practicals: 31-11-0. Introduction Course No.: PPM Course title: Corporate Finance Number of credits: 3 (--0) Number of lectures-tutorial practicals: 3--0 Course coordinator: Dr Rajiv Seth Introduction In this course the students are exposed

More information

1.1 Introduction. Chapter 1: Feasibility Studies: An Overview

1.1 Introduction. Chapter 1: Feasibility Studies: An Overview Chapter 1: Introduction 1.1 Introduction Every long term decision the firm makes is a capital budgeting decision whenever it changes the company s cash flows. Consider launching a new product. This involves

More information

DRAFT DISTRICT MINERAL FOUNDATION TRUST DEED THIS DEED OF TRUST EXECUTED AT ------------ONTHIS THE ------DAY OF IN THE YEAR TWO THOUSAND FIFTEEN.

DRAFT DISTRICT MINERAL FOUNDATION TRUST DEED THIS DEED OF TRUST EXECUTED AT ------------ONTHIS THE ------DAY OF IN THE YEAR TWO THOUSAND FIFTEEN. DRAFT DISTRICT MINERAL FOUNDATION TRUST DEED THIS DEED OF TRUST EXECUTED AT ------------ONTHIS THE ------DAY OF IN THE YEAR TWO THOUSAND FIFTEEN. BY THE STATE GOVERNMENT OF -------------, represented by

More information

How To Calculate An Ots

How To Calculate An Ots I N D E X Sl. No. Particulars Page Nos. Index 2 One Time Settlement Policy 3 1. Base Amount 3 2. Calculation of Indicative OTS Amount 3 3. Indicative OTS Amount Parameters for Calculation 4 3.1 Status

More information

( ) ( )( ) ( ) 2 ( ) 3. n n = 100 000 1+ 0.10 = 100 000 1.331 = 133100

( ) ( )( ) ( ) 2 ( ) 3. n n = 100 000 1+ 0.10 = 100 000 1.331 = 133100 Mariusz Próchniak Chair of Economics II Warsaw School of Economics CAPITAL BUDGETING Managerial Economics 1 2 1 Future value (FV) r annual interest rate B the amount of money held today Interest is compounded

More information

NATIONAL INSTITUTE OF OCEAN TECHNOLOGY, CHENNAI

NATIONAL INSTITUTE OF OCEAN TECHNOLOGY, CHENNAI NATIONAL INSTITUTE OF OCEAN TECHNOLOGY, CHENNAI NOTICE INVITING OFFERS FROM CHARTERED ACCOUNTANT FIRMS FOR APPOINTMENT OF STATUTORY AUDITORS OF THE INSTITUTE National Institute of Ocean Technology (NIOT)

More information

Project Management Seminars. Financial Management of Projects

Project Management Seminars. Financial Management of Projects Project Management Seminars Financial Management of Projects.inproject managementandsystems engineering, is a deliverable-oriented decomposition of a project into smaller components. (source: Wikipedia)

More information

Planning & Financing of Working Capital

Planning & Financing of Working Capital Planning & Financing of Working Capital Objectives of Working Capital Elements of Working Capital Sources of Working Capital Working Capital Control and Banking Policy Tondon Committees Recommendations

More information

CHAPTER 7 MAKING CAPITAL INVESTMENT DECISIONS

CHAPTER 7 MAKING CAPITAL INVESTMENT DECISIONS CHAPTER 7 MAKING CAPITAL INVESTMENT DECISIONS Answers to Concepts Review and Critical Thinking Questions 1. In this context, an opportunity cost refers to the value of an asset or other input that will

More information

TREASURER S DIRECTIONS ACCOUNTING LIABILITIES Section A3.2 : Accounts Payable and Accrued Expenses

TREASURER S DIRECTIONS ACCOUNTING LIABILITIES Section A3.2 : Accounts Payable and Accrued Expenses TREASURER S DIRECTIONS ACCOUNTING LIABILITIES Section A3.2 : Accounts Payable and Accrued Expenses STATEMENT OF INTENT Complete and accurate information on accounts payable and accrued expenses enables

More information

Financial Analysis of Solar Photovoltaic Power plant in India

Financial Analysis of Solar Photovoltaic Power plant in India Financial Analysis of Solar Photovoltaic Power plant in India M. Ganga Prasanna, S. Mahammed Sameer, G. Hemavathi Department of Management Studies MadanapalleInstitute of Technology& Science Post Box No:

More information

REPORT OF THE DIRECTORS FOR THE FINANCIAL YEAR ENDED 31ST MARCH, 2014 1. Your Directors hereby submit their Report and Accounts for the financial year ended 31st March, 2014. 2. COMPANY PERFORMANCE Your

More information

Agricultural Machinery Custom Hiring Centres (CHC) Model Scheme

Agricultural Machinery Custom Hiring Centres (CHC) Model Scheme Agricultural Machinery Custom Hiring Centres (CHC) Model Scheme 1. Indian agriculture is undergoing a gradual shift from dependence on human power and animal power to mechanical power because increasing

More information

DESIGNIT OSLO A/S STANDALONE FINANCIAL STATEMENTS AS OF AND FOR THE YEAR ENDED MARCH 31, 2016

DESIGNIT OSLO A/S STANDALONE FINANCIAL STATEMENTS AS OF AND FOR THE YEAR ENDED MARCH 31, 2016 DESIGNIT OSLO A/S STANDALONE FINANCIAL STATEMENTS AS OF AND FOR THE YEAR ENDED MARCH 31, 2016 Payables include balances due to Micro & Small Enterprises ` NIL as on 31 st March 2016. *Trade 1. Company

More information

CHAPTER V: MINISTRY OF EXTERNAL AFFAIRS

CHAPTER V: MINISTRY OF EXTERNAL AFFAIRS CHAPTER V: MINISTRY OF EXTERNAL AFFAIRS 5.1 Failure to purchase Chancery building in Rome The Mission and the Ministry failed to purchase building for Chancery in Rome despite requisite permission by the

More information

Note: The paid up value would be payable only on due maturity of the policy.

Note: The paid up value would be payable only on due maturity of the policy. Section II Question 6 The earning member of a family aged 35 years expects to earn till next 25 years. He expects an annual growth of 8% in his existing net income of Rs. 5 lakh p.a. If he considers an

More information

november 2013 Three Simple investment options for ShorTerm

november 2013 Three Simple investment options for ShorTerm november 2013 Three Simple investment options for ShorTerm short term investing contents Three simple investment options... 2 Matching funds to needs... 6 Liquid funds... 8 Fixed maturity plans... 18

More information

Scheme and Guidelines for India Infrastructure Project Development Fund

Scheme and Guidelines for India Infrastructure Project Development Fund Scheme and Guidelines for India Infrastructure Project Development Fund Department of Economic Affairs Ministry of Finance Government of India Contents Preamble. iii Acronyms and definitions vii 1. The

More information

How To Understand Factoring

How To Understand Factoring LESSON 13: FACTORING THEORETICAL FRAMEWORK Lesson Objectives To understand the Concept of Factoring. Methodology of Factoring and Forfeiting. Types of factoring. Introduction Receivables constitute a significant

More information

GOVERNMENT OF ODISHA FINANCE DEPARTMENT

GOVERNMENT OF ODISHA FINANCE DEPARTMENT GOVERNMENT OF ODISHA FINANCE DEPARTMENT NOTIFICATION The 1 st May, 2012 S.R.O. No. 220/12 In exercise of the powers conferred by sub-section (1) of section 15 of the Odisha Sales Tax (Settlement of Arrears)

More information

Audit of General Insurance Companies

Audit of General Insurance Companies 12 Audit of General Insurance Companies Question 1 Write a short note on - Incoming and Outgoing Co-insurance. Incoming and Outgoing Co-insurance: In cases of large risks, the business is shared between

More information

SIGNIFICANT ACCOUNTING POLICIES

SIGNIFICANT ACCOUNTING POLICIES 1.0 Accounting Convention: SIGNIFICANT ACCOUNTING POLICIES Financial statements are prepared under the historical cost convention and on accrual basis of accounting and going concern concept, in accordance

More information

Service Charges (applicable wef April 1 2015) 1 Minimum monthlyaverage balance requirement and monthly maintenance charges in SB accounts

Service Charges (applicable wef April 1 2015) 1 Minimum monthlyaverage balance requirement and monthly maintenance charges in SB accounts Service Charges (applicable wef April 1 2015) 1 Minimum monthlyaverage balance requirement and monthly maintenance charges in SB accounts 1.1 Where a debit card has been issued (other than CUB-card) to

More information

Subject. PAPER No. : Financial Management MODULE No. : Factoring services

Subject. PAPER No. : Financial Management MODULE No. : Factoring services Subject Paper No. and Title Module No. and Title Module Tag Paper No.8: Financial Management Module No. 36: Factoring services COM_P8_M36 TABLE OF CONTENTS 1. Learning outcomes 2. Introduction 3. Mode

More information

Expression of Interest. Scanning of Documents

Expression of Interest. Scanning of Documents 1 Expression of Interest Scanning of Documents Directorate of Secondary Education, Haryana Shiksha Sadan, Sector-5, Panchkula (India) Tel: 0172-2560269, Fax: 0172-2560264 Email: edusecondaryhry@gmail.com

More information

7 Management of Working Capital

7 Management of Working Capital 7 Management of Working Capital BASIC CONCEPTS AND FORMULAE 1. Working Capital Management Working Capital Management involves managing the balance between firm s shortterm assets and its short-term liabilities.

More information

11 PERFORMING FINANCIAL ANALYSIS

11 PERFORMING FINANCIAL ANALYSIS 11 PERFORMING FINANCIAL ANALYSIS 11.1 Introduction When planning an energy efficiency or energy management project, the costs involved should always be considered. Therefore, as with any other type of

More information

Rajya Sabha Secretariat Rajya Sabha Television 12 A, Gurudwara Rakab Ganj Road, New Delhi 110001 TENDER NOTICE FOR INTERNET CONNECTIVITY

Rajya Sabha Secretariat Rajya Sabha Television 12 A, Gurudwara Rakab Ganj Road, New Delhi 110001 TENDER NOTICE FOR INTERNET CONNECTIVITY Rajya Sabha Secretariat Rajya Sabha Television 12 A, Gurudwara Rakab Ganj Road, New Delhi 110001 No. RSTV/TKSA/Technical/2014 Admn 07 April, 2014 TENDER NOTICE FOR INTERNET CONNECTIVITY Sealed tenders

More information

Policy for serving and lending to Micro, small and medium enterprises of India

Policy for serving and lending to Micro, small and medium enterprises of India Policy for serving and lending to Micro, small and medium enterprises of India 1. Background Worldwide, the micro small and medium enterprises (MSMEs) have been accepted as the engine of economic growth

More information

(iv) Bank may extend finance to a person who proposes to buy an old house where he is presently residing as a tenant.

(iv) Bank may extend finance to a person who proposes to buy an old house where he is presently residing as a tenant. Master Circular Housing Finance A. Purpose To consolidate framework of rules/regulations and clarification on Housing Finance issued by Reserve Bank of India from time to time. B. Classification A statutory

More information

Introduction to Real Estate Investment Appraisal

Introduction to Real Estate Investment Appraisal Introduction to Real Estate Investment Appraisal NPV and IRR Pat McAllister INVESTMENT APPRAISAL DISCOUNTED CASFLOW ANALYSIS Investment Mathematics Discounted cash flow to calculate Gross present value

More information

Accounting for Taxes on Income

Accounting for Taxes on Income 347 Accounting Standard (AS) 22 Accounting for Taxes on Income Contents OBJECTIVE SCOPE Paragraphs 1-3 DEFINITIONS 4-8 RECOGNITION 9-19 Re-assessment of Unrecognised Deferred Tax Assets 19 MEASUREMENT

More information

Applicability of Cost Records in Real Estate/Construction Industry. Statutory Auditors of Construction/Real Estate Companies to exercise caution

Applicability of Cost Records in Real Estate/Construction Industry. Statutory Auditors of Construction/Real Estate Companies to exercise caution Applicability of Cost Records in Real Estate/Construction Industry Statutory Auditors of Construction/Real Estate Companies to exercise caution By Navneet Kumar Jain, Practising Cost Accountant, Delhi

More information

ADVANCED INVESTMENT APPRAISAL

ADVANCED INVESTMENT APPRAISAL RELEVANT TO ACCA QUALIFICATION PAPER F9 Studying Paper F9? Performance objectives 15 and 16 are relevant to this exam Investment appraisal is one of the eight core topics within Paper F9, Financial Management

More information

23 BUSINESS ACCOUNTING STANDARD IMPAIRMENT OF ASSETS I. GENERAL PROVISIONS II. KEY DEFINITIONS

23 BUSINESS ACCOUNTING STANDARD IMPAIRMENT OF ASSETS I. GENERAL PROVISIONS II. KEY DEFINITIONS APPROVED by Resolution No. 12 of 8 December 2004 of the Standards Board of the Public Establishment the Institute of Accounting of the Republic of Lithuania 23 BUSINESS ACCOUNTING STANDARD IMPAIRMENT OF

More information

Sub: Modifications in the provisions of CPWD Works Manual 2007 regarding Two/Three envelope system, mobilization advance, specialized works, etc.

Sub: Modifications in the provisions of CPWD Works Manual 2007 regarding Two/Three envelope system, mobilization advance, specialized works, etc. OFFICE MEMORANDUM No.DGW/MAN/160 ISSUED BY AUTHORITY OF DIRECTOR GENERAL OF WORKS NIRMAN BHAWAN, NEW DELHI DATED:31.07.08 Sub: Modifications in the provisions of CPWD Works Manual 2007 regarding Two/Three

More information

GOVERNMENT ACCOUNTING RULES, 1990. Chapter I - INTRODUCTORY

GOVERNMENT ACCOUNTING RULES, 1990. Chapter I - INTRODUCTORY GOVERNMENT ACCOUNTING RULES, 1990 Preamble - In exercise of the powers conferred by Article 150 of the Constitution, the President on the advice of the Comptroller and Auditor General, hereby makes the

More information

Questions 1, 3 and 4 gained reasonable average marks, whereas Question 2 was poorly answered, especially parts (b),(c) and (f).

Questions 1, 3 and 4 gained reasonable average marks, whereas Question 2 was poorly answered, especially parts (b),(c) and (f). General Comments This sitting produced a reasonable pass rate for a resit paper although there was a large variation in pass rates between centres. It was clear that well-prepared candidates did not have

More information

G. No. 184 New Delhi, 3 December 2004 NOTIFICATION. Act, 1963 (38 of 1963), the Tariff Authority for Major Ports hereby disposes of the

G. No. 184 New Delhi, 3 December 2004 NOTIFICATION. Act, 1963 (38 of 1963), the Tariff Authority for Major Ports hereby disposes of the (Published in Part - III Section 4 of the Gazette of India, Extraordinary) TARIFF AUTHORITY FOR MAJOR PORTS G. No. 184 New Delhi, 3 December 2004 NOTIFICATION In exercise of the powers conferred by Section

More information

PROFILE ON THE PRODUCTION OF STEEL TUBES

PROFILE ON THE PRODUCTION OF STEEL TUBES PROFILE ON THE PRODUCTION OF STEEL TUBES Table of Contents I. SUMMARY... 2 II. PRODUCT DESCRIPTION AND APPLICATION... 2 III. MARKET STUDY AND PLANT CAPACITY... 3 IV. MATERIALS AND INPUTS... 6 V. TECHNOLOGY

More information

$1,300 + 1,500 + 1,900 = $4,700. in cash flows. The project still needs to create another: $5,500 4,700 = $800

$1,300 + 1,500 + 1,900 = $4,700. in cash flows. The project still needs to create another: $5,500 4,700 = $800 1. To calculate the payback period, we need to find the time that the project has recovered its initial investment. After three years, the project has created: $1,300 + 1,500 + 1,900 = $4,700 in cash flows.

More information

Accounting Basics. Prepared for First Year MBA

Accounting Basics. Prepared for First Year MBA Accounting Basics Prepared for First Year MBA Overview S No Particulars 01 Introduction to Accounting 02 Accounting Equation 03 Types of Transactions 04 Purchase and Sales 05 Types of Accounts 06 Golden

More information

Promotional initiatives

Promotional initiatives Promotional initiatives 8. The Ministry of Tourism may consider, on being approached, one time Central Financial Assistance not exceeding Rs. 200 lakhs to a governmental institute, such as ITI, polytechnic

More information

PINEAPPLE AND ORANGE PRODUCTS

PINEAPPLE AND ORANGE PRODUCTS PINEAPPLE AND ORANGE PRODUCTS 1.0 INTRODUCTION Fruits are an important source of energy. However their availability is seasonal and they are perishable. Hence, they need to be processed and preserved which

More information

International Valuation Guidance Note No. 9 Discounted Cash Flow Analysis for Market and Non-Market Based Valuations

International Valuation Guidance Note No. 9 Discounted Cash Flow Analysis for Market and Non-Market Based Valuations International Valuation Guidance Note No. 9 Discounted Cash Flow Analysis for Market and Non-Market Based Valuations 1.0 Introduction 1.1 Discounted cash flow (DCF) analysis is a financial modelling technique

More information