FLEXURAL PERFORMANCE REQUIREMENTS FOR PRESTRESSED CONCRETE TIES BY FACTORING * * *
|
|
|
- Diane Bell
- 10 years ago
- Views:
Transcription
1 FLEXURAL PERFORMANCE REQUIREMENTS FOR PRESTRESSED CONCRETE TIES BY FACTORING By P. Jeffrey McQueen, P.E., Consulting Engineer Abstract The AREMA Manual for Railway Engineering, Chapter 30, Part 4, gives recommendations for the design, production and use of prestressed concrete ties in North America railroad tracks. This paper summarizes the results, conclusions and recommendations reached by AREA Committee 10, Concrete ties, subsequently by AREMA Committee 30, Part 4, Concrete Ties of the AREMA Manual. The Committees, through investigation over an extended period of time considered the track service loading as well as laboratory testing and material performance. A simplified method for the calculation of concrete tie flexural requirements is presented in order to aid the engineer in the determination of such values. Introduction * * * Since the first railway technical committees were formed in the United States in the late 1960's for the purpose of making recommendations covering the design and use of prestressed concrete ties under American railway operating conditions, a dilemma existed in respect to the appropriate loading values to be used in the determination of concrete tie structural design. From the onset, the basis for the design flexural capacity of concrete ties was approached rationally using the parameters of maximum axle load, impact factor, tie length, tie spacing and distribution factor in the calculations. By assuming the eventual ballast reaction as uniform, bending moments were calculated and tables prepared for four different tie lengths and four different tie spacings. As had been the practice in the United States, concrete ties were produced to meet the criteria and installed in numerous locations across the country. In the early days of concrete tie development, data derived from instrumented ties was used to verify the assumptions used for the determination of flexural capacity. Although the figures used for flexural capacity calculations should have produced crack-free ties, inspection of ties installed in test installations revealed that this was not the case and most ties exhibited positive moment railseat cracks within a very short span of time after installation.
2 Strain gauges used for data collection apparently did not give an accurate representation of the loading spectrum and it was postulated that the initial designation of an impact factor of 50% was too low and therefore it was increased, firstly to 100%, then to 150%, then to the current figure of 200%. There was usually a five-year period which elapsed between discovery of railseat positive cracking, reporting to the committees, discussion of possible causes, arrival at a consensus for increased design values and eventual approval and publishing in the American Railway Engineering s Manual for Railway Engineering, Chapter 10, now AREMA, Chapter 30, Part 4. The ten years between 1970 and 1980 saw many test installations and with the advent of Amtrak s decision to use prestressed concrete ties in the upgrading of their track in the Northeast Corridor between Washington, New York and Boston, an important stage was reached in United States concrete tie development as a definitive investigation into the cracking in the NEC was initiated by the Federal Railway Administration in conjunction with Amtrak. The study, conducted by Battelle s Columbus Laboratories, positively identified for the first time in the United States the nature and magnitude of high-amplitude impact loads resulting from a small percentage of wheel defects. In addition to the NEC study, FRA-Battelle conducted an investigation of concrete tie flexural strains and bending moments in four revenue railroads; namely, the Atchison Topeka and Santa Fe at Streator, Illinois, Amtrak and Conrail at Aberdeen, Maryland, the Chessie System at Richmond, Virginia, the Norfolk and Western at Roanoke, Virginia, and the FAST test track at the Transportation Test Center at Pueblo, Colorado. Figure 21 shows plots of railseat bending moments in concrete ties at all sites. The investigation generally involved data collection for 40,000 axle loads of traffic and showed a wide variation in railseat bending moments, related directly to vehicle wheel tread condition and, in some cases, bad bearings. In many cases, the cracking threshold of the ties, designed to meet the then current AREA recommendations, was exceeded but in the less than 0.1 percent frequency of occurrence level. Even at this low frequency of occurrence, each tie in the southern section of the NEC was subjected to loads in excess of the cracking threshold once every 1 to 2 days while in the coal-haul Norfolk and Western railroad, with its predominance of 100 ton cars, exceedance would occur as often as five times each day. It is generally well known that the FRA-Amtrak-Battelle investigations and recommendations produced criteria for strain-attenuating railseat pads having the ability to reduce railseat impacts by at least 25 percent thus reducing railseat bending moments to below the cracking threshold. In addition, the use of track side impact detectors enabled the defective wheels to be captured and corrected in the NEC. Although there has been a general move by the freight railroads toward better wheel and bearing maintenance necessitated by the destructive forces derived from ton cars having wheel tread irregularities, high impact loads can still be expected. In the period , AREA Committee 10 revised the recommendations of Chapter 10 in respect to flexural performance for concrete ties. Values were then shown only for one tie spacing, 24 inches and three tie lengths, 8'-3", 8'-6" and 9'-0". The reasoning behind this change was that ties of these lengths and spaced at 24 inches has been shown to perform satisfactorily if their flexural
3 strength met the requirements given previously by Chapter 10 of the AREA Manual for ties spaced at 30 inches. In 1982, AREA Committee 10 assigned the investigation of the influence of tie spacing and axle loads on tie design to a subcommittee. The recommendations of this subcommittee were subsequently approved by Committee 10 and published in Chapter 10 of the AREA Manual. The Factoring Method The United States operates approximately 240,000 miles of railroad track to which can be added 45,000 miles in Canada and 13,000 miles in Mexico. Thus, the main North American railway system, not including transit properties, comprises approximately 300,000 miles of standard gauge railroad track in a wide variety of terrain and environmental conditions ranging from desert to the sub-arctic. The traffic is predominantly freight with speeds up to 79 mph, but Amtrak now runs passenger trains at speeds of 150 mph in the NEC and both Canada and Mexico run passenger trains at lesser speeds. In 1982, there were upwards of 8 million concrete ties in service in North America and as their use was predicated on economic justification, they were generally chosen to be installed in heavy traffic lines most often in hill-curve territory. Thus a performance base could be established by comparing the ties subjected to the loading resulting from trains operating under a wide range of service conditions. Furthermore, as the criteria for tie performance had successively been upgraded over a 15-year period, it was possible to relate tie performance to design parameters and service conditions. The first approach of the sub-committee was to use the standard published criteria given by AREA Chapter 10 for ties of the three lengths spaced at 24 inch centers and apply factors as follows: 1. Distribution factor related to tie spacing. 2. Impact factor 200%. 3. Speed factor. 4. Wheel tread defect factor ton car factor. 6. Rail condition factor. 7. Support condition track modulus factor. Each of factors 3 through 7 were assigned values of 0.9, 1.0, or 1.1. with the three values reflecting conditions of lesser influence (0.9) general influence (1.0), i.e., the conditions under which the majority of railroads operate and greater influence (1.1), due to more severe conditions. While the choice of the values appears to be somewhat simplistic, it should be noted that the general influence factor (1.0) is derived from the satisfactory performance of ties designed to meet AREA criteria under the severe North American railroad operating conditions. As there were five factors which required a choice by judgment on the part of the engineer, a selection of one factor low (or high) would only have a marginal effect on the design criteria. Moreover, estimates generally would be expected to be on the high side due to the trend toward increasing car loads. After much discussion, Committee 10 rejected the five factors as being too subjective and
4 requested further study by the sub-committee. On reflection it was decided to limit the factors to the two conditions which the railroad engineer knows well. They are simply, annual gross tonnage and speed. As previously noted, the FRA-Battelle correlation study recorded strains from instrumented ties in four revenue service railroads and the FAST track at Pueblo and, therefore, gave a good representation of the loading spectrum. The strain readings enabled the calculation of tie bending moments. The sub-committee then proposed that the collected data be used as a guide for the preparation of a factoring chart, see Figures and of the current AREMA Manual, Chapter 30, Part 4. While it may be argued that speed and tonnage factors probably are not linear, sample values taken directly from concrete ties in service in the United States, Canada and Mexico were used to validate the charts which are used as follows. From Figure , the positive bending moment at the railseat is read directly for a particular tie length and spacing, for example, an 8'-6" tie spaced at 24 inches would have a 300 inch kip positive moment flexural performance requirement. Then, by the use of Figure , speed and tonnage factors are obtained. As an example, for a maximum speed of 40 mph, the speed factor is 0.8 and a maximum tonnage of 60 MGT, the tonnage factor would be 1.0. The resulting design positive moment flexural capacity would then be: 300 x 0.8 x 1.0 = 240 inch kips. For the other tie flexural requirements, railseat negative and tie center, positive and negative, ratios related to the positive railseat moment are used, based on previously recorded data to calculate the required values. Why use factors? As an approximation, for every 50 inch kips of positive moment flexural capacity under or over 300 inch kips, the cost of a concrete tie in the United States will vary by about 10% of the base cost not including hardware components, i.e., about $4.00 per tie. The economic justification is therefore apparent. Under U.S. operating conditions which will include transient loading peaks, some cracking at the railseat must be expected. On the other hand, many thousands of ties installed in U.S. railroads designed to lower loading criteria, are performing in a satisfactory manner with some having over 1,000 million gross tons of traffic Even though cracked, the reason that they perform satisfactorily was the requirement in Chapter 10 of the AREA manual and now Chapter 30 of the AREMA Manual, that all designs to be qualified must be subjected to three million cycles of test loading in a laboratory at a 10% overload in the cracked condition. Ties meeting this requirement, therefore, demonstrate specific fatigue strength and tendon bond capacity. It should be noted that the Figures quoted in the AREMA Manual already have had some factors exceeded by the heavy-haul railroads and Amtrak. If deemed appropriate, i.e., by service investigations which employ strain gauges/wheel impact detectors, the speed and tonnages factors may easily be adjusted. In a like manner, many transit properties are using the figures to arrive at their own flexural design criteria by proportioning their axle loads, tonnages and speeds. It is not to be assumed that the AREMA Committee is giving approval for the use of cracked
5 ties, but rather to accept the fact that some cracking may occur under peak loads due to wheel and rail anomalies. These cracks need not be detrimental to tie performance and life so long as they are recognized and accommodated within the concrete-tendon-bond system and peak moments reduced by a strain attenuating, flexible rail fastening system. The factoring method allows savings to be applied to tie design due to variations in the site-specific loading spectrum, rather than having only one tie design based on the maximum loading conditions for the whole country. MCQ
Chapter 3. Track and Wheel Load Testing
Chapter 3 Track and Wheel Load Testing This chapter describes the track, truck, and testing equipment that were used by the Transportation Technology Center, Inc. (TTCI) for collecting the data that was
Reducing Rail Surface Defect Service Failures on the CSXT Railroad
Reducing Rail Surface Defect Service Failures on the CSXT Railroad Bill Bell Manager Rail Services; CSX Transportation Ron Bright Direcr Track Testing; CSX Transportation Dennis Witt, PE Engineer Standards
RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE
RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE By: William G. Byers, P.E. Burlington Northern and Santa Fe Railway 4515 Kansas Avenue Kansas City, Kansas 66106 Phone (913) 551-4070 Fax
Wayside Defect Detector Data Mining to Predict Potential WILD Train Stops
Wayside Defect Detector Data Mining to Predict Potential WILD Train Stops Leila Hajibabai a, M. Rapik Saat a, Yanfeng Ouyang a, Christopher P.L. Barkan a, Zengyi Yang a, Kim Bowling b, Kamalesh Somani
Railway Track Design
Chapter Railway Track Design Basic considerations and guidelines to be used in the establishment of railway horizontal and vertical alignments. The route upon which a train travels and the track is constructed
PRESTRESSED CONCRETE. Introduction REINFORCED CONCRETE CHAPTER SPRING 2004. Reinforced Concrete Design. Fifth Edition. By Dr. Ibrahim.
CHAPTER REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition Fifth Edition PRESTRESSED CONCRETE A. J. Clark School of Engineering Department of Civil and Environmental
AREMA Annual Conference & Exposition October 5-8, 2003 Chicago, Illinois
AREMA Annual Conference & Exposition October 5-8, 2003 Chicago, Illinois Laboratory Test Results and Field Test Status Of Heavy Axle Loads On Concrete Slab Track Designed for Shared High-Speed Passenger
Some Examples of Big Data in Railroad Engineering
2014 IEEE International Conference on Big Data Some Examples of Big Data in Railroad Engineering Allan M Zarembski Department of Civil and Environmental Engineering University of Delaware Newark, DE, USA
NATIONWIDE WAYSIDE DETECTOR SYSTEM
Nationwide Wayside Detector System Keeps Rail s Record Safety Performance on Track Freight railroads make safety their #1 priority and continually look to improve on their record safety performance through
Big Data in Railroad Engineering
Big Data in Railroad Engineering Dr. Allan M Zarembski Director of Railroad Engineering and Safety Program Department of Civil and Environmental Engineering University of Delaware Newark, Delaware [email protected]
Introduction to Railroad Track Structural Design
BCR2A 09 Railroad Track Design Including Asphalt Trackbeds Pre-Conference Workshop Introduction to Railroad Track Structural Design Don Uzarski, Ph.D., P.E. [email protected] Interaction, Vertical Load
Measuring the Condition of Prestressed Concrete Cylinder Pipe
Measuring the Condition of Prestressed Concrete Cylinder Pipe John Marshall, P.E.I, I J.W. Marshall and Associates, and Paul S. Fisk, President NDT Corporation Introduction Prestressed Concrete Cylinder
Session 5D: Benefits of Live Load Testing and Finite Element Modeling in Rating Bridges
Session 5D: Benefits of Live Load Testing and Finite Element Modeling in Rating Bridges Douglas R. Heath P.E., Structural Engineer Corey Richard P.E., Project Manager AECOM Overview Bridge Testing/Rating
Amtrak s s Vehicle/Track Interaction Measuring System Integrating the Control Strategies of Engineering, Mechanical and Operations
Amtrak s s Vehicle/Track Interaction Measuring System Integrating the Control Strategies of Engineering, Mechanical and Operations John Cunningham Willem Ebersöhn Valerie Marcolongo Mike Tomas Mike Trosino
HYDRAULIC MECHANISMS OF CONCRETE-TIE RAIL SEAT DETERIORATION JOHN C. ZEMAN THESIS
HYDRAULIC MECHANISMS OF CONCRETE-TIE RAIL SEAT DETERIORATION BY JOHN C. ZEMAN THESIS Submitted in partial fulfillment of the requirements for the degree of Master of Science in Civil Engineering in the
Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents. Rail Safety...
Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents Crossing Safety... 4 Rail Planning, Projects, and Operations... 5 Rail Safety...
Aleš Žnidarič, ZAG Ljubljana
BRIDGE-WIM AS AN EFFICIENT TOOL FOR OPTIMISED BRIDGE ASSESSMENT Aleš Žnidarič, ZAG Ljubljana Content What is Bridge WIM? Structural parameters in BWIM Influence lines Load distribution factors Soft load
RISK ANALYSIS BASED CWR TRACK BUCKLING SAFETY EVALUATIONS
Page 1 of 19 RISK ANALYSIS BASED CWR TRACK BUCKLING SAFETY EVALUATIONS Andrew Kish Manager, Guideways and Structures USDOT/Volpe Center, Cambridge, MA Gopal Samavedam Director, Structures & Transportation
HEAVY DUTY CROSSINGS TRANSIT CROSSINGS DRIP TRACK TANK CAR SPILL CONTAINMENT VEHICLE INSPECTION PITS CONVEYOR/UNLOADING PITS
HEAVY DUTY CROSSINGS TRANSIT CROSSINGS DRIP TRACK TANK CAR SPILL CONTAINMENT VEHICLE INSPECTION PITS CONVEYOR/UNLOADING PITS RAIL SCALE APPROACHES & FOUNDATIONS SLAB TRACK TUNNEL TRACK SUPPORT WASH BAY
In-situ Load Testing to Evaluate New Repair Techniques
In-situ Load Testing to Evaluate New Repair Techniques W.J. Gold 1 and A. Nanni 2 1 Assistant Research Engineer, Univ. of Missouri Rolla, Dept. of Civil Engineering 2 V&M Jones Professor, Univ. of Missouri
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's
LOAD TESTING FOR BRIDGE RATING: DEAN S MILL OVER HANNACROIS CREEK
REPORT FHWA/NY/SR-06/147 LOAD TESTING FOR BRIDGE RATING: DEAN S MILL OVER HANNACROIS CREEK OSMAN HAG-ELSAFI JONATHAN KUNIN SPECIAL REPORT 147 TRANSPORTATION RESEARCH AND DEVELOPMENT BUREAU New York State
CSX Track Chart and Engineering Information System
Roy Anderson (CSX Transportation), David Maas (CSX Transportation), Brian Mack (Optram, Inc.), Ted Selig (Optram, Inc.) September 10, 2000 ABSTRACT Railroads have made a considerable investment in information
Integration of PTC and Ride Quality Data. Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier. and
Integration of PTC and Ride Quality Data Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier and dfuzion, Inc., rmetrix Ride Performance Assessment System Supplier The FRA mandate to implement
Framework for Short-Line Railroad Track Asset Management and Condition Reporting
Framework for Short-Line Railroad Track Asset Management and Condition Reporting Michael N. Grussing 1, and Donald R.Uzarski, Ph.D., RE. 2, 1. Research Civil Engineer, Engineer Research and Development
Reinforced Concrete Design
FALL 2013 C C Reinforced Concrete Design CIVL 4135 ii 1 Chapter 1. Introduction 1.1. Reading Assignment Chapter 1 Sections 1.1 through 1.8 of text. 1.2. Introduction In the design and analysis of reinforced
A Case Study Comparing Two Approaches for Applying Area Loads: Tributary Area Loads vs Shell Pressure Loads
1 A Case Study Comparing Two Approaches for Applying Area Loads: Tributary Area Loads vs Shell Pressure Loads By Dr. Siriwut Sasibut (Application Engineer) S-FRAME Software Inc. #1158 13351 Commerce Parkway
The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma
The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma Bart B. Barrett, B.S., P.E.1 Kerry S. Lee, M.B.A., P.E., M. ASCE2 Erik L. Nelson, Ph.D., P.E., M. ASCE3
2.1 Prior Richmond to South Hampton Roads Rail Service
2.0 BACKGROUND 2.1 Prior Richmond to South Hampton Roads Rail Service The Norfolk and Western (N&W), now NS, the Seaboard Air Line (SAL) and the Atlantic Coast Line (ACL), both now CSXT, previously operated
Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES
Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge
Turnout Geometry Optimization with Dynamic Simulation of Track and Vehicle
Turnout Geometry Optimization with Dynamic Simulation of Track and Vehicle J. Rainer Oswald VAE Aktiengesellschaft, PO Box 1, 874 Zeltweg, Austria Abstract This paper describes a new method for turnout
BEE LINE COMPANY TOTAL VEHICLE WHEEL ALIGNMENT AND THE BENEFITS OF CAMBER CORRECTION
BEE LINE COMPANY TOTAL VEHICLE WHEEL ALIGNMENT AND THE BENEFITS OF CAMBER CORRECTION 2700 62nd Street Court, P.O. Box 130 Bettendorf, Iowa 52722 Phone: 800-728-7828 Fax: 563-332-6517 Website: www.beeline-co.com
Virginia s Approach to Intercity Passenger Rail Development
Virginia s Approach to Intercity Passenger Rail Development Kevin B. Page Chief Operating Officer Virginia Department of Rail and Public Transportation June 14, 2013 www.drpt.virginia.gov High Speed Rail
Evaluation of Bridge Performance and Rating through Nondestructive
Evaluation of Bridge Performance and Rating through Nondestructive Load Testing Final Report Prepared by: Andrew Jeffrey, Sergio F. Breña, and Scott A.Civjan University of Massachusetts Amherst Department
Technical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
Evaluation and Field Load Testing of Timber Railroad Bridge
Transportation Research Record 1696 Paper No. 5B0112 323 Evaluation and Field Load Testing of Timber Railroad Bridge Terry J. Wipf, Michael A. Ritter, and Douglas L. Wood Several spans of a 60-year-old
Relevant parameters for a reference test track Deliverable D1.7
RIVAS Railway Induced Vibration Abatement Solutions Collaborative project Relevant parameters for a reference test track Deliverable D1.7 Submission date: 20/08/2012 Project Coordinator: Bernd Asmussen
Introduction- Joe Conner, Founder/ President
1 Introduction- Joe Conner, Founder/ President 2 High Profile Derailments July 2013 Lac Megantic, Canada A train carrying crude oil derailed and exploded, resulting in 47 deaths October 2013, Alberta,
SLAB DESIGN EXAMPLE. Deck Design (AASHTO LRFD 9.7.1) TYPICAL SECTION. County: Any Hwy: Any Design: BRG Date: 7/2010
County: Any Hwy: Any Design: BRG Date: 7/2010 SLAB DESIGN EXAMPLE Design example is in accordance with the AASHTO LRFD Bridge Design Specifications, 5th Ed. (2010) as prescribed by TxDOT Bridge Design
The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).
Página 1 de 12 AASHO Road Test The AASHO Road Test, a $27 million (1960 dollars) investment and the largest road experiment of its time, was conceived and sponsored by the American Association of State
A transverse strip of the deck is assumed to support the truck axle loads. Shear and fatigue of the reinforcement need not be investigated.
Design Step 4 Design Step 4.1 DECK SLAB DESIGN In addition to designing the deck for dead and live loads at the strength limit state, the AASHTO-LRFD specifications require checking the deck for vehicular
Legislative Council Panel on Transport Subcommittee on matters relating to railways
LC Paper No. CB(1)1023/04-05(01) Legislative Council Panel on Transport Subcommittee on matters relating to railways MTR Performance and Asset Management - Follow up measures to Lloyd's Report by MTRCL
Maintenance and Management of JR East Civil Engineering Structures
Maintenance and Management of JR East Civil Engineering Structures Tadayoshi Niitsu Introduction Japan s problem of aging population and declining birth-rate has been known for years and the labour force,
Table 10-1 Travel Times Between Stations 1 10. OPERATING & MAINTENANCE PLAN
10. OPERATING & MAINTENANCE PLAN This section describes an operating plan that responds directly to anticipated commuter ridership patterns. Train schedules, type and capacity of rolling stock, and likely
Wilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
VEHICLE POSTMORTEM AND DATA ANALYSIS OF A PASSENGER RAIL CAR COLLISION TEST
Proceedings of: JRC2002 The 2002 ASME/IEEE Joint Rail Conference April 23-25, 2002, Washington D.C. VEHICLE POSTMORTEM AND DATA ANALYSIS OF A PASSENGER RAIL CAR COLLISION TEST Robert A. MacNeill and Steven
21ST CENTURY RAILROADS: SAFETY THROUGH TECHNOLOGY
MONITORING ASSET HEALTH THROUGH ADVANCED TECHNOLOGY With 28,000 locomotives, more than 1.4 million rail cars and enough rail to circle the earth more than thirteen times, railroads rely on advanced technologies
Risk - Based Inspection Frequencies
Risk - Based Inspection Frequencies Glenn A. Washer, PhD University of Missouri Columbia, MO April 23, 2013 Northwest Bridge Inspector s Conference 1 NCHRP 12-82 Developing Reliability Based Bridge Inspection
5 G R A TINGS ENGINEERING DESIGN MANUAL. MBG Metal Bar Grating METAL BAR GRATING MANUAL MBG 534-12 METAL BAR GRATING NAAMM
METAL BAR NAAMM GRATNG MANUAL MBG 534-12 5 G R A TNG NAAMM MBG 534-12 November 4, 2012 METAL BAR GRATNG ENGNEERNG DEGN MANUAL NAAMM MBG 534-12 November 4, 2012 5 G R A TNG MBG Metal Bar Grating A Division
DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS
8601 North Black Canyon Highway Suite 103 Phoenix, AZ 8501 For Professionals Engaged in Post-Tensioning Design Issue 14 December 004 DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS by James D. Rogers 1 1.0
Modern condition-based railway infrastructure asset management
Modern condition-based railway infrastructure asset management Stasha Jovanovic 1, Arjen Zoeteman 2 1 MER MEC Group, Italy 2 Delft University of Technology, The Netherlands Abstract Complexity of today
USA: INFRASTRUCTURES DAY
USA: INFRASTRUCTURES DAY Business Opportunities for Infrastructures in the US Market Business Conference 21th November 2014 Auditório do Banco Popular Rua Ramalho Ortigão, 51 Lisboa Organização: Patrocinadores:
Risk Assessment / Risk Management Protocol
1 Canadian Pacific Railway Risk Assessment / Risk Management Protocol Overview / Outline At Canadian Pacific Railway, we conduct risk assessments of our activities and operations for a number of different
Preventive Grinding Moves into the 21 st Century on Canadian Pacific Railway
Preventive Grinding Moves into the 21 st Century on Canadian Pacific Railway Robert devries Canadian Pacific Railway Suite 700 Gulf Canada Square 401-9 th Avenue Calgary, Alberta, Canada T2P 4Z4 Telephone:
Passenger Rail Service
Passenger Rail Service Bill Sproule Michigan Tech University REES Module #5 - Transit, Commuter and Intercity Passenger Rail 1 Passenger Rail Service Intercity Passenger Rail trains that move passengers
Roads. Nebraska railroad crossing, 1920s. Copyright National Council on Economic Education. Photo: Nebraska Department of Roads
Roads By 1912, most large cities had decent roads, some were even paved. Property owners were taxed to help pay for the improvements. Outside the cities, however, was a very different story. Less than
ESI Consultants, Ltd. PROJECT EXPERIENCE
CRAWFORD COUNTY, ILLINOIS NBIS Program Manager and Bridge Inspection services provided for 123 structures throughout Crawford County. Routine Maintenance/Safety Inspection of existing bridges was performed
SYSTEMS OF TRACK INFRASTRUCTURE SAFETY at AMTRAK
SYSTEMS OF TRACK INFRASTRUCTURE SAFETY at AMTRAK John Parola, (formerly Chief Engr.Track, Amtrak) currently VP, HNTB Inc., Philadelphia, PA Conrad Ruppert, Jr. Division Engineer, Amtrak, Boston, MA INTRODUCTION:
IDOT Chicago - St. Louis High-Speed Rail Program Management
1 www.idothsr.org www.connectthemidwest.com IDOT Chicago - St. Louis High-Speed Rail Program Management Lessons Learned: Sealing the Corridor For 110 MPH Operations Thomas W. Hunter Parsons Brinckerhoff
(lie Chicago, Milwaukee and St. Paul Railway
(lie Chicago, Milwaukee and St. Paul Railway The Largest and Most Powerful High-Speed Passenger Locomotive Built jointly by the Baldwin Locomotive Works and Westinghouse Electric & Mfg. Company The Milwaukee
Figure A. Maximum load testing of new precast concrete floor plank system
Load Testing of Precast Concrete Plank By Peter Gorgas, E.I.T. Figure A. Maximum load testing of new precast concrete floor plank system Overview Testing was performed in July 2012 at Northeast Precast
Report on the Lapse and Mortality Experience of Post-Level Premium Period Term Plans (2014)
Report on the Lapse and Mortality Experience of Post-Level Premium Period Term Plans (2014) REVISED MAY 2014 SPONSORED BY Society of Actuaries PREPARED BY Derek Kueker, FSA Tim Rozar, FSA, CERA, MAAA Michael
American Fast Freight
Shipping Terms American Fast Freight Ad Valorem Tax A charge levied on persons or organizations based on the value of transaction. It is normally a given percentage of the price of the retail or manufacturing
WMATA S Automated Track Analysis Technology & Data Leveraging for Maintenance Decisions
WMATA S Automated Track Analysis Technology & Data Leveraging for Maintenance Decisions 1 WMATA System 6 Lines: 5 radial and 1 spur 234 mainline track miles and 91 stations Crew of 54 Track Inspectors
Product Overview. voestalpine Nortrak Inc. www.voestalpine.com/nortrak
Product Overview voestalpine Nortrak Inc. www.voestalpine.com/nortrak NORTRAK NORTH AMERICA S TRACKWORK MANUFACTURER Nortrak designs and manufactures trackwork for Class I railroads, mass transit systems,
March 2015 Prepared by the Department of Finance & Performance Management. 2013 Regional Peer Review PERFORMANCE MEASURES
March 2015 Prepared by the Department of Finance & Performance Management 2013 Regional Peer Review PERFORMANCE MEASURES CONTENTS CONTENTS... 1 EXECUTIVE SUMMARY... 2 SNAPSHOT... 4 PEER SELECTION... 5
Mexico Shipments Made Simple. Third-party logistics providers help streamline the U.S. Mexico cross-border process WHITE PAPER
Mexico Shipments Made Simple Third-party logistics providers help streamline the U.S. Mexico cross-border process WHITE PAPER Introduction With the cost of manufacturing rising in Asia, many companies
Process Compensated Resonant Testing
Process Compensated Resonant Testing Lessons Learned about a New, but Maturing NDT Method that Detects Structural Degradation of Parts Prepared By: Lemna Hunter Vibrant Corporation (505) 314 1511 & Robert
Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain
Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37
Part II Management Accounting Decision-Making Tools
Part II Management Accounting Decision-Making Tools Chapter 7 Chapter 8 Chapter 9 Cost-Volume-Profit Analysis Comprehensive Business Budgeting Incremental Analysis and Decision-making Costs Chapter 10
Class I Railroad Statistics
Class I Railroad Statistics U.S. Class I Railroads U.S. Class I Railroads are line haul freight railroads with 2011 operating revenue of $433.2 million or more. Two Canadian railroads, CN and Canadian
Institute of Railway Technology
Advancing the Railway Industry through Technology Institute of Railway Technology An Institute of Monash University The Institute of Railway Technology (IRT) at Monash University is the premier track and
VIII. TRANSPORTATION
VIII. TRANSPORTATION Railroad Railroads came to Vermont and Mount Holly in the late 1840s and early 1850s. The Rutland and Burlington Railroad was originally built through Mount Holly to Bellows Falls.
Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
Chapter 3 HEAVY TRUCKS
Chapter 3 HEAVY TRUCKS Contents Page What Types of Trucks Are in Each Truck Class?... 99 Heaviest Trucks Consume an Average of 6.5 Gallons per Thousand Ton-Miles... 100 Medium and Heavy Truck Assembly
www.tuv.com TUV Rheinland Rail Sciences, Inc.
www.tuv.com TUV Rheinland Rail Sciences, Inc. TUV Rheinland Rail Sciences, Inc. (TUV-RSI) Since 1987, TUV-RSI has been providing specialized consulting, testing, engineering and training services in the
GEOMETRIC DESIGN CIVL 3161
GEOMETRIC DESIGN CIVL 3161 Reading Assignment: p. 45-72 (4 th ed.) p.45-75 (previous ed.) in Mannering textbook. Geometric design of highway facilities deals with the proportion of physical elements of
By Registered Mail. June 13, 2008
Transport Canada Transports Canada 427 Laurier Avenue, 14th Floor Ottawa, Ontario K1A ON5 Your file Our file Votre référence Notre référence June 13, 2008 By Registered Mail Mr. Keith Creel Executive Vice-President,
AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment to improve reliability, efficiency and mobility
FOR IMMEDIATE RELEASE: May 13, 2013, 5 AM ET ATK-13-039 Media Contact: Amtrak: 202 906.3860 Siemens: 917 622.2413 AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment
SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE
SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: TREY HAMILTON, UNIVERSITY OF FLORIDA NOTE: MOMENT DIAGRAM CONVENTION In PT design,
Outline MICROPILES SUBJECT TO LATERAL LOADING. Dr. Jesús Gómez, P.E.
MICROPILES SUBJECT TO LATERAL LOADING Dr. Jesús Gómez, P.E. Micropile Design and Construction Seminar Las Vegas, NV April 3-4, 2008 Outline When are micropiles subject to lateral load? How do we analyze
WESTCO Rail Development Plan
WESTCO Rail Development Plan Five Year Outlook T he West Central Ohio Port Authority has developed a plan to serve as a guide for the future of the WESTCO rail system over the next five years. The plan
VRE SYSTEM PLAN SUMMARY
VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial
Design of a Weather- Normalization Forecasting Model
Design of a Weather- Normalization Forecasting Model Project Proposal Abram Gross Yafeng Peng Jedidiah Shirey 2/11/2014 Table of Contents 1.0 CONTEXT... 3 2.0 PROBLEM STATEMENT... 4 3.0 SCOPE... 4 4.0
Measurement and Metrics Fundamentals. SE 350 Software Process & Product Quality
Measurement and Metrics Fundamentals Lecture Objectives Provide some basic concepts of metrics Quality attribute metrics and measurements Reliability, validity, error Correlation and causation Discuss
Railway Demand Forecasting and Service Planning Processes. Prepared for: Rail Freight Service Review
Railway Demand Forecasting and Service Planning Processes Prepared for: Rail Freight Service Review March 2010 Table of Contents 1. Purpose of the Project... 4 2. General Approach... 5 3. Demand Forecasting...
Overview of Requirements for Using Overweight Vehicles to Ship Spent Nuclear Fuel 8472
Overview of Requirements for Using Overweight Vehicles to Ship Spent Nuclear Fuel 8472 A. W. Thrower U.S. Department of Energy, Office of Civilian Radioactive Waste Management 1000 Independence Ave., SW,