Clear Fork Valley Local School District. Roofing Repairs Spring/Summer 2015



Similar documents
INVITATION TO BID. Contractor Services Associated with:

INDIAN HEAD ELEMENTARY SCHOOL

Maintenance & Inspection Guide

ADDENDUM #2 November 4, 2015 IFB

SELF-INSPECTION CHECKLIST Maintain Your Roof and Identify Potential Issues With Bloom s Comprehensive Self-Inspection Guide

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION

Big Stone County Courthouse Slate Roof Shingle Replacement. Request For Proposals

REQUEST FOR PROPOSALS

!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof!

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

Roof Repair Project Report. Fairbank Complex 40 Fairbank Road Sudbury, Massachusetts. February 14, RBA Project No

Crescent Valley High School Roof Investigation

Smooth cap sheet SQ $ Smooth cap sheet SQ $ Smooth cap sheet SQ $ Smooth cap sheet SQ $ 36.

Presentation Agenda. Introduction. Types of Flooding Identifying Flood Risks Property Improvements Additional Resources.

Solving Persistent Moisture Problems and Moisture Damage

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

RECOATING AND RENEWING SPF ROOFING SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS

Quality You Can Trust Since From North America s Largest Roofing Manufacturer

SECTION STANDING SEAM METAL ROOFING

FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS

Maintenance & repair Solutions

How to repair your existing low slope flat roof.

TABLE OF CONTENTS" SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7"

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER

THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS

Insured: John Smith Home: (555) Property: 1234 Avenue D Wapakoneta, OH 45895

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

REQUEST FOR QUOTATION RFQ-FH ROOF REPAIR

Bituminous Sheet Flat Roofs: Their repair and maintenance

ROOFS - Guidance for Repair, Maintenance and Replacement

Commercial Roof Management

Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, Sauer-Danfoss Building

The Harold J. Becker Company, Inc.

Vision Home Inspection

RDH Building Sciences Inc.

Asphalt Shingle Application Requirements

EPDM System Repair and Cleaning

Commercial Roof Inspection Form

REPLACE ROOFING DENVER CENTRAL LIBRARY PHASE I CITY & COUNTY OF DENVER DENVER, COLORADO

Colorado State University. Durrell Center Roof Repair

City of Somersworth, New Hampshire OFFICE OF THE FINANCE DIRECTOR

Roof Inspection and Evaluation

Roof. Walking on roofs

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

Home Inspection Report

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

Delving into drains. Reprinted with permission from PROFESSIONAL ROOFING magazine. December 2012 by the National Roofing Contractors Association.

MODULAR EPDM ROOFING SYSTEMS

ROOF INSPECTION & MAINTENANCE

Solicitation DTFACN-11-R Attachment #9

October 5, 2015 Dear Client,

Roofing Signs that Your Roof Needs Repair/Replacement

T R A N S F E R A B L E F U L LY

The Perfect Fit For Metal Retrofit

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

Prestige Home Inspection LLC

Roof Restoration System. For building owners, property management firms and facility managers. seamless possibilities

TARRANT COUNTY DETAIL STANDARDS

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

BASEMENT FLOODING PART II: Reducing Flooding Risks on Your Property HISTORIC CHICAGO BUNGALOW ASSOCIATION

February 4, Estimate

Larry Haight's Residential Roofing Co, Inc NE 95th Street Redmond, Washington Phone: (425) Fax: (425)

Materials and Colors

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

A0 SHEET 1 OF LOCUST STREET FRANKFORT, KANSAS FRANKFORT, KANSAS ROOF REPAIR OF THE 400 LOCUST STREET

State of Connecticut Department of Public Health RADON PROGRAM

SECTION SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.

From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES AND DEVELOPMENT RECREATION

Building Owners Guide to a Duro-Last System!

Nuiqsut - City Building Roof Repair

SPECIFICATIONS & CONTRACT DOCUMENTS FOR MEMBRANE ROOF REPAIR

Rooftop Matters Benchmark Report. Executive Summary

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Inspecting to a higher standard.

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

Sun Windows General Information Sun New Construction Window Installation Instructions

Firestone Warranty Program

SECTION STORM DRAINAGE SYSTEM

Shingle Roofing: What s below the surface is important

HISTORIC PRESERVATION COMMISSION ADMINISTRATIVE APPROVAL ISSUED JULY - SEPTEMBER 2014 DATE PROJECT ADDRESS PROJECT DESCRIPTION

CREEK Technical Services, LLC

Exterior Repair Project. By: Kami Farahmandpour, PE, RRC, RWC, CCS, CCCA Alex Szatanek. Building Technology Consultants, PC BTC

Delaney-Vogel School

Prelease Schedule of Condition and Want of Repairs at Milton Keynes for May

ITEM THERMOPLASTIC MEMBRANE ROOFING

Please read the entire document before purchasing and installing any of these products

GUIDELINE SPECIFICATIONS

THERMAL AND MOISTURE PROTECTION WATERPROOFING

SchoolRoof Repair - Cost For Replacement of a Student Roof, Part 2

Thank You! Owner Aaron Perry! Clifty Drive! Madison IN 47250! (855) ! (812) !

SECTION THERMOPLASTIC MEMBRANE ROOFING

THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center

Transcription:

Clear Fork Valley Local School District Roofing Repairs Spring/Summer 2015 Instructions to Bidders: Public Notice To Bidders (ORC 3313.46) Notice is hereby given that sealed bids will be received at the office of the Treasurer, Clear Fork Valley Local School District, 92 Hines Avenue, Bellville, Ohio 44813 until 9:00 am local time, on Friday, March 6, 2015, and will be publicly opened and read aloud immediately thereafter for furnishing all material and performing all labor necessary for the 2015 Roofing Repairs project according to the scope of work included on the following pages. Any prospective bidder may also view the site of the work by calling 419-886-4805 during regular business hours. The project consists of the following Scope of Work: Roofing repairs at the Butler Elementary Building, the High School Building, and the Bellville Elementary Building as identified on the following pages. Total Cost Estimate: $25,000 not including options Both a bid bond and performance bond are required on this project. The Board of Education reserves the right to reject any and all bids or parts of any or all bids to wave any irregularities in the bids received which do not impair the competitive nature of the bidding process. The Board reserves the right to choose among alternative bids for different materials, methods, and systems if within local state and federal requirements. The Board also reserves the right to seek clarification of bids after opening. By Order of the Board of Education of the Clear Fork Valley Local School District Larry W. Lifer, Treasurer

Clear Fork Schools Scope of Work Butler School: Start by doing a very detailed inspection of the library roof that currently has a Garland White Knight coating over an EPDM roof system. Any areas that are found to be peeling or loose will get cleaned and then re-coated with new Elastomeric White coating. Estimated to be 115 Sq. Ft that will need 2 coats at a coverage rate of 2 gallons per square. The course brick wall above the library roof will get 2 coats of Garland Seal A PORE masonry sealer to help with any moisture that may be getting through the brick. Any deteriorated caulking along the wall flashing will need to be replaced. The new Garland BUR roof over the classroom wing will need inspected and any blisters will be cut out and new patches installed. The new material will match the existing. Estimated to be 1 Roll of Garland White Granulated Torch Cap Sheet. Over the Gym inspect and make any EPDM repairs to ensure that the Gym floor stays dry for as long as possible until replacement is needed. The old Vo-Ag wing will need the same scope as the library. Estimated that 100 sq. Ft. of White Knight will need to be repaired at a rate of 2 gallon per square. High School: Like Butler the High School has many White Knight roofs. Inspect all of the White Knight areas and clean the areas that need repaired. New Elastomeric coating will need to be installed in these areas. There is estimated to be 1300 sq. ft. of repairs needed at a rate of 2 gallon per square. Inspect and make any repairs on the metal roof sections. This includes inspecting the caulking around all of the units, valleys, hip and ridge caps, and pipe penetrations. If any of the gutter seams are leaking they will need to be sealed with new polyurethane caulking. All of the older EPDM seams on the original Gym roof will need to be cleaned and stripped in using 6 EPDM tape. All of the butt edges will need to be caulked using EPDM lap caulking per industry specifications. On the east edge of the south upper elevated flat roof the existing raised edge detail that currently has water lying against it will need to be torn off and disposed of. Install a new 24ga. box style gutter system with new downspouts along that entire roof edge. This will help remove the water that lies on that edge all year long. Make any necessary repairs to the EPDM roof to ensure the roof edge stays watertight. Do a complete inspection of the existing EPDM roofs and make any necessary repairs to ensure the roof stays as dry as possible.

Option 1: New TPO Roof on the South Upper Elevation Tear off the existing EPDM roof and dispose of offsite. The drains will have 8 tapered sumps and new Aluminum Hercules inserts installed in place of the old cast iron drains. New.060 White TPO will need to be installed. New edge metal will be installed around the perimeter of the roof per manufacturer specifications and match the existing metal. At the end of the project issue to the school a 20 Year No Dollar Limit Warranty and a 2 year Contractors Warranty. White Knight Repairs EPDM Cover Tape New gutter New Membrane Inspect new caulking as required

Bellville School On the front roof section tear out a 4 x 4 area around each drain locations so a sump can be installed to help drain the water. New Aluminum Hercules Drain Inserts will be installed at each drain location. New EPDM will need to be installed and flashed into the existing roof per industry standards. After the areas have been sealed with new EPDM, the roof will need to be pressure washed and the drain valley across the entire roof will need new white elastomeric coating installed at a rate of 2 gallon per square. Inspect the back flat roofs to make sure there are no repairs needed. Inspect the Hines Ave. building and making any repairs needed on that building. Option 1: North Canopy along the Gym Give an option to tear down the canopy on the north side of the school and replace with a new metal canopy. Tear down and dispose of the old. The school will be responsible for disconnecting the electric. Repair any mortar seams after the old copper flashing has been removed. The new canopy will need to be made of 22ga. steel. Any necessary framing to help attach the canopy to the wall will be the responsibility of the roofer. The new canopy will need to be as wide as the doors with a drainage gutter that will drain downhill so kids stay dry as they walk out of the building.

Clear Fork Valley Local Schools 2015 Roofing Repairs Bid Submission Form Name of Contractor: _ Address: City, State, Zip: Name of Owner/ Principle Telephone: Bidding Amount: Butler Elementary: High School: High School Option 1: Bellville School: Bellville Option 1: Provide a unit price For additional work EPDM tape: Elastomeric Coating two gallon per square. per roll containing lf $ per 5 gallon pail applied at a rate of