HCP Team Meeting. November 18, 2015. icfi.com

Similar documents
San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Gold Ray Dam Interagency Technical Team Meeting

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

Floodplain Connectivity in Restoration Design

Prattsville Berm Removal Project. 1.0 Project Location

4.2 Buena Vista Creek Watershed

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

Earth Science. River Systems and Landforms GEOGRAPHY The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Background Information: The Mamquam River Floodplain Restoration Project

NID statement Agreement Disagreement Auburn Ravine: During irrigation and nonirrigation

Climate Change. Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA

CITY UTILITIES DESIGN STANDARDS MANUAL

EFB / Online Wetland Restoration Techniques Class Syllabus

AN INITIATIVE TO IMPROVE

3. The submittal shall include a proposed scope of work to confirm the provided project description;

Greater Los Angeles County Region

Development of Technical Data For Long Term Flood Solutions For the Red River Basin

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Year Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco.

Hawlings River Watershed Restoration Action Plan December 2003

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study

Napa River Restoration Projects

COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N

Sims Bayou Federal Flood Damage Reduction Project

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

DRAFT SOUTH FORK SKYKOMISH RIVER

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

4. Environmental Impacts Assessment and Remediation Targets

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

Waterway Technote Planning

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California

Appendix C. Project Opportunities. Middle Twisp River (RM )

OWOW Proposition 84, Round 2 Master Project List

1.7.0 Floodplain Modification Criteria

Plumas Watershed Forum. Review of Ongoing Projects. Updated 10/1/008

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

URBAN DRAINAGE CRITERIA

Post-Flood Assessment

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

Restoration Planning and Development of a Restoration Bank

The Teton Creek Restoration Project Summary:

Outlet stabilization structure

ANGORA FIRE RESTORATION PROJECT

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

US Army Corps of Engineers BUILDING STRONG

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Carlton Fields Memorandum

Determination of NEPA Adequacy (DNA)

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia

UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION

CLIFTY CREEK PLANT MADISON, INDIANA

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Basic Hydrology. Time of Concentration Methodology

Protecting Floodplain. While Reducing Flood Losses

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

IMPROVING SOUTH FORK PEACHTREE CREEK WATERSHED USING THE TRIPLE BOTTOM LINE DEKALB COUNTY, GEORGIA

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA

A Flood Warning System for City of Findlay, Ohio


DISTRICT VALUES STATEMENTS, GOALS, ACTION ITEMS, AND ONGOING TASKS FOR 2015 Adopted by the Board of Directors December 10, Values Statements.

Peters Canyon Channel (OCFCD Facility No. F06) from Confluence with San Diego Creek Channel (F05) to downstream Barranca Parkway

Flood Risk Management

Flood Risk Management

Hydrologic Engineering Techniques for Regional Water Resources Planning


Proposed General Plan Update Goals, Policies, and Implementation Actions

Addendum. Use Attainability Analysis for Site Specific Selenium Criteria: Alkali Creek. February 23, 2009

Tres Rios del Norte Feasibility Study

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Monitoring at Credit Valley Conservation. Presented by Jackie Thomas and Luke Harvey

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT

Peace River Basin Resource Management Plan - Action Items Status Report for the Peace River Basin Management Advisory Committee Meeting

Transcription:

HCP Team Meeting November 18, 2015 icfi.com 1

Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next phase restoration design and mitigation bank development Cost sharing for restoration/mitigation bank/mitigation credits Next Steps Agenda icfi.com 2

1st Stage Upper SAR HCP Planning Process Where are we now? 1 st Stage: 2 nd Stage Planning the HCP, Key Issues, and Preparing the Data We are here 2 nd Stage: Preparing the HCP and Environmental Documents 3 rd Stage 3 rd Stage: Application package and permits icfi.com 3

Parallel and Coordinated Regulatory Processes Credit: Mike Thomas, USFWS

ANTICIPATED UPPER SANTA ANA RIVER HCP TEAM APPROXIMATE TIMELINE HCP Preparation SAS Translocation Plan Restoration Site Final Design Mitigation "Bank" Development & Restoration Site Permitting RCRCD Expansion & SAS Propagation Aquatics Resources (404/401/1602) Permitting for Covered Activities Restoration Construction SAS Translocation Habitat Conservation Plan Complete 404/401/1602 Permits Issued for Covered Activities Mitigation "Bank" Approved and Credits Available for Covered Activities Apr Sep 2015 Jul Dec 2016 Oct 2017 Aug Today Dec 2017 icfi.com 5

Hydrology Modeling Update Hydrologic analysis was performed on gage and model data (Geoscience, Wildermuth) for HCP reaches Comparison of With and Without Covered Activity hydrographs, exceedance analysis, total acre-ft diversions Results showed need to revise model Geocience data Adjust points of diversion Change diversion rates into recharge basins Combine Enhanced Recharge model with Active Recharge Extend model downstream to account for Rubber Dam ~ 3 months - New results will be reevaluated along with gage and Wildermuth data for effects analysis icfi.com 6

Potential Effects Approach Overview and Examples Hydrology Verification Best available information Modeling Tool with Comparable Results Monthly Exceedance Flows 5%,25%,50%,75%,95% Without Covered Activities With Covered Activities Estimate Wetted Perimeter ( Surface Area) Lidar HEC-RAS Habitat Quantity (Next Steps) Estimate Effects of Covered Activities icfi.com 7

Hydrologic Modeling Sources of Information Reach Source Baseline Condition SAR Tributaries Upstream of the Rubber Dam Geoscience Active Recharge Model Proposed Condition Scenario 4 Scenario 5 Santa Ana River Downstream of Cuttle Weir Santa Ana River Downstream of Warm Creek/Lytle Creek to Prado Geoscience/Leidos New Conservation Model Wildermuth Wasteload Allocation Model 195 cfs Cuttle Weir Diversion 500 cfs Cuttle Weir Diversion Available Models and assumptions weren t compatible and consistent enough Scenario for integration 7 Scenario into HCP 7 Effects Analysis Tributaries Not Specifically Included in Existing Models USGS Data as appropriate Potentially Wildermuth icfi.com 8

Hydrology Model Source Data icfi.com 9

Native Fish Survey Update Photo: RCRCD icfi.com 10

icfi.com 11

Santa Ana Sucker Translocation Project icfi.com 12

Finalize Covered Activities icfi.com 13

Finalize Covered Activities Step 1: Review Covered Activities Information Evaluate and confirm the Covered Activity information you have provided to date. GIS data text describing qualitatively and quantitatively the construction, operations, and maintenance of each covered activity points of diversion or discharge current and proposed future diversion flow rates current and proposed future basin capacities Step 2: Online Meeting with ICF Review Covered Activities information with ICF in online meeting Provide all corrections to text, GIS, and potential hydrologic effects Email the corrected covered activity document to ICF prior to this online meeting. Step 3: In Person Meeting with Valley District Meet with Valley District in Early December to confirm final Covered Activity information Final covered activity information must be confirmed by each participating water agency during the first week of December. icfi.com 14

Finalize Covered Activities icfi.com 15

Preliminary Restoration Design Report Describes site characteristics and opportunities and constraints Presents analysis performed to develop preliminary restoration designs and cost estimates for Prop 84 grant icfi.com 16

Restoration for HCP and Aquatic Resources Mitigation

Evans Lake Drain

Evans Lake Drain Create 280 ft of channel to connect with mainstem Install Fish Ladder through the levee Enhance ~3,400 ft of habitat upstream of the levee Woody debris, gravel augmentation, remove non-native vegetation

Evans Lake Drain 2 culvert barrels, 80 long with 1% grade 9 to concrete apron from barrels 14-200 wide concrete apron 7 drop from apron to Riverbed ~ 4% slope needed (feasible for SAS) \

Anza Drain / Old Farm Road

Anza Drain / Old Farm Road Construct 3,750 ft of new channel Re-contour to direct existing flow into channel Substrate augmentation Removal 516 Palms, 600+ other non-native trees Construct 5,900 ft of new channel at Old Farm Road

Anza Drain Downstream

Anza Drain - Downstream Enhance existing 3,100 ft of channel Narrow channel and fill deep pools Stabilize eroding banks and revegetate Replace Non-native vegetation with native Reconfigure channel to contain water

Hidden Valley Wetlands

Hidden Valley Wetlands Construct 3,320 ft of new channel 6.6 acres Native Riparian Habitat Grade floodplain to meet Riverbed Substrate augmentation Riparian habitat management Reestablish water source to wetlands

TOTAL HABITAT RESTORATION Location Channel Restoration Feet Old Farm Road New Creation 5,900 Anza Drain New Creation 3,750 Anza Drain Existing Enhancement 3,100 Evans Lake Drain New Creation 280 Evans Lake Drain Existing Enhancement 3,400 Hidden Valley New Creation 3,320 Hole Creek - DS Jurupa Existing Enhancement 2,180 Hole Creek - US Jurupa Existing Enhancement 2,485 Total 24,415 Feet 4.62 Stream Miles 5 Newly Functional Tributaries 79 Acres Native Riparian Habitat

Cost Sharing for Restoration, Mitigation Bank, and Mitigation credits icfi.com 30

HCP Preparation & Advanced Mitigation $1,944,726 Impact-based split between 10 Partners (Relative Proportion) TOTAL COST SHARE INCLUDES: HCP Preparation USFWS Employee 10% Contingency

Est. COST: VALUE to HCP: Conceptual Design Tributaries $384,182 Advanced Mitigation, Conservation Measures HCP Team Mitigation Bank - Full Design Tributaries - Letters of Permission - Bank Development - CEQA & Permits for Construction of Tribs Construction of Tributaries - Anza (Stream focus) - Old Farm Road - Lower Hole Creek - Hidden Valley Wetlands Construction of Tributaries - Evans Lake Drain - Anza Full Revegetation - Upper Hole Creek Water Source for Tributaries - Riverside Recycled Water - Well water Advanced Mitigation, Conservation Measures, Improve Baseline SAS $9,044,656 Advanced Mitigation, Conservation Measures, Improve Baseline SAS $7,115,115 Advanced Mitigation, Conservation Measures, Improve Baseline SAS? Advanced Mitigation, Conservation Measures, Improve Baseline SAS FUNDS ADVANCED BY: SARCUP: (Eastern, Western, IEUA, OCWD, SBVMWD) Valley District $5,022,00 SARCUP $4, 022,00 Prop 84 Local Partner Match & Prop 1 Grant (?) Local Partner Match & Prop 1 grant (?) ULTIMATELY FUNDED BY: Incorporated into Cost/Unit Mitigation Credit. Sold to HCP partners based on project impacts analyzed in HCP SAR HCP Partners based on HCP Planning Total Cost Share Percentage $5 million advance from SARCUP will be incorporated into the Cost/Unit for mitigation. Local Partner Match would be incorporated into Cost/Unit Mitigation Cost of Local Partner match and ongoing cost of supplying water would be incorporated into Cost/Unit Mitigation

Est. COST: VALUE TO HCP: FUNDS ADVANCED BY: USGS Native Fish Survey Year 1 $109,000 Understanding Baseline Condition of SAS, Development of Habitat Suitability Model, Testing Monitoring Methods for long term implementation USGS Native Fish Survey Year 2 $148,444 Understanding Baseline Condition of SAS, Testing Habitat Suitability Model Supplemental Water Supply During RIX shutdowns (3 wells) SAR Woolley-star, Drainage A property (adjacent to Riverside rubber dam project) SAS Translocation - Plan Preparation & 3 Sites Fieldwork - Increase capacity to breed fish @ RCRCD - Actual Translocation, Monitoring, Management $450,000 Improving Baseline condition of SAS population Could potentially be used to improve substrate conditions following storm season (Conservation Measure in HCP)? Waters of State, US, RAFSS habitat, Woolley-star credits $140,138 $300,000? Conservation Measure in HCP, Establish additional populations in upper watershed, make more fish & habitat, create redundancy in the population Valley District/HCP USFWS Section 6 Planning Grant Valley District/HCP (pending) Valley/HCP Valley/HCP ULTIMATELY FUNDED BY: HCP Planning Contingency Fund ($41,000 contingency and $68,000 covered by extra funds available with addition of Rialto (added to contingency fund) The costs associated with using wells as a Conservation Measure would be incorporated into a Cost per Unit that could be distributed based on partners project based mitigation needs Costs to acquire, restore, manage and monitor would be incorporated into Cost per Unit to be available as credits in HCP Mitigation Bank. All costs of this activity would be incorporated into a Cost per Unit that would be distributed to Partners based on impacts.

Next Steps icfi.com 35

Next Steps Finalize covered activities Complete New Hydrology Modeling Initiate Effects Analysis Develop Conservation Strategy Biological Goals and Objectives Mitigation strategy based on results of effects analysis