1 Monitoring at Credit Valley Conservation Presented by Jackie Thomas and Luke Harvey
2 Where are we?
3 WHAT IS MONITORING? Long-term sampling of the same point or reach to track changes over time/space
4 Short Term Sampling vs Long Term Monitoring a) Long Term Monitoring: repeated sampling to look at trends/changes e.g. Integrated Watershed Monitoring Program, Effectiveness Monitoring, Impact Monitoring b) Short Term Sampling: sampling to characterize an area or determine baseline conditions e.g. Subwatershed studies, Erin SSMP, In these studies, we sample typically for only 1-2 years
5 Basic Questions WATERSHED HEALTH WHAT IS THE CURRENT CONDITION? i.e. what state are we in now? IS THERE A TREND? i.e. improving? degrading? stable?
6 WHY DO WE MONITOR? To measure progress in our watershed corporate goal of ensuring an environmentally healthy river for economically and socially healthy communities To provide an early warning system To effect change
7 Importance of Monitoring Permits to Take Water Studies and Strategies (subwatershed, SSMPs, Fish Management Plans, Terrestrial Ecosystem Enhancement Model) Flood Forecasting Modelling (water quality and quantity, terrestrial) Certificates of Approval (sewage works and waste management) Plan Review Plan Input Municipal EAs Report Cards
8 Parameters we measure Discipline Area of Focus Indicator Meteorology Weather Air Temperature, Precipitation Hydrogeology Baseflow and groundwater levels Recharge rates Hydrology Flow regimes Temporal trends Terrestrial Fluvial Geomorphology Water Quality Biology Forests and their flora and fauna Wetlands and riparian communities Stream form and channel shape Water and sediment chemistry Benthic macroinvertebrates species, populations and communities Fish species, populations and communities Forest Health Species Health Wetland and riparian health Stream stability Parameters of Concern Community composition Index of Biotic Integrity
9 Key indicators are air temperature and precipitation Four weather stations throughout watershed plus an additional 5 Environment Canada weather stations in and around the watershed An additional 16 tipping bucket rain gauges and 1 Geonor T- 200B weighing precipitation gauge Six additional air temperature sensors Meteorology
10 Key indicator is recharge rates Several shallow and deep groundwater monitoring wells in various geology throughout the watershed help determine recharge rates Drive point piezometers and baseflow data also help characterize the groundwater Hydrogeology
11 Key indicator is temporal trends Continuous levels and discharge rates from 11 stations partnered with WSC Longest active station is Credit at Cataract since 1915, most recent is 2005 Hydrology
12 Terrestrial Monitoring Key indicator is forest health, species health, wetland and riparian health 25 forest plots, 19 wetland plots across Credit watershed Plus 3 forest and 1 wetland effectiveness monitoring plots in NW Brampton Riparian monitoring program initiated in 2009
13 FOREST HEALTH MONITORING Category Indicator Protocol Frequency Years of Data Biotic Indicators Ground Vegetation Annual 2002 (start), Regeneration Annual 2002 (start), Tree Health Annual 2002 (start) Forest Birds Annual 2002 (start) 2009 Salamanders Annual Soil Temperature Annual 2005 (start) 2009 Abiotic Indicators Decomposition Soil Chemistry Annual Every 5 years 2005 (start) (start), 2007
14 Wetland Health Monitoring Category Indicator Protocol Frequency Years of Data Biotic Indicators Wetland Vegetation Anurans (frogs and toads) Annual 2003 (start) 2009 Annual 2003 (start) 2009
15 Fluvial Geomorphology Key indicator is stream stability 6-8 sites assessed per year 10 cross-sections including 3 permanent done at each site Data collected includes longitudinal profile, bank information, substrate type and size, sub-pavement data, Rapid Assessments
16 Key indicators are parameters of concern for water and sediment chemistry, community composition for benthics, mean daily maximums for water temperature Water chemistry grab samples collected monthly for PWQMN. Autosamplers utilized for Effectiveness and Impact programs Stationary kick and sweep method to collect benthics once annually Water Quality
17 Key indicator is the Index of Biotic Integrity (IBI) Looking at fish species, populations and communities Values are assigned to fish depending on tolerance ratings The higher the IBI the better the site condition Utilize active (seine nets, backpack, punt unit and boat electrofishers) and passive (hoop nets) techniques to sample fish communities Biology
18 WHO IS INVOLVED at CVC?
19 Central Services GIS Reception Director, Water Resources Manager, Natural Heritage Water-based Component Hydrogeologists Geomorphology Technicians Water Quality Engineers Benthics Specialist Water Resources Engineers Supervisor, Watershed Monitoring & Reporting 3 Watershed Monitoring Specialists Terrestrial Ecosystem Component Terrestrial Specialist Aquatic Component Terrestrial Monitoring Specialist Fish - Manager, Natural Heritage Terrestrial Monitoring Technician 3 Water Resource Technicians Data Management Technician Summer Staff Volunteers Stewardship
20 Partnerships Municipalities EMAN MNR Landowners Universities PGMN PWQMN OBBN Water Survey of Canada MOE NGOs Volunteers Environment Canada Other Conservation Authorities
21 CVC MONITORING PROGRAMS
22 Integrated Watershed Monitoring Program (IWMP) Purpose: to help determine progress in achieving the Watershed Corporate goal of ensuring an environmentally healthy river for economically and socially healthy communities. Area: watershed-wide Timeframe: ongoing Initiation date: 1999 Funding: Member Municipalities Reports: annual report, every 5 yr trend analysis (incl. watershed report card) Currently working on 10 year data analysis
23 Fletchers Creek Monitoring Purpose: To establish baseline conditions, measure temporal changes and assess the effectiveness of stormwater control measures on a subwatershed basis. Area: Fletchers Creek Timeframe: ongoing Initiation date: 1998 Funding: City of Mississauga, City of Brampton Reports: annual report, 7 yr trend analysis produced 2007
24 Effectiveness Monitoring Strategy Purpose: To monitor the effects of urbanization as they are balanced by BMPs and to demonstrate benefits of current BMPs. Also, to learn the most effective means of mitigating the impact of urbanization and land use changes on the natural systems from past and current activities. Area: Huttonville, Fletchers and Springbrook Creeks Initiation date: 2003 Funding: Initial 5 years was developer funded, currently funded by Region of Peel Timeframe: ongoing for next few years Reports: annual report, 5 yr program review in progress
25 Credit River Trib Monitoring Purpose: To collect background information in order to characterize the current condition of the study area prior to expected development. Area: tributaries north of Credit River between Winston Churchill and Mississauga Rd. Timeframe: , with intentions of continuing next 2+ years Initiation date: 2007 Funding: Developers and Landowners Reports: annual reports and currently working on 3 year analysis
26 Impact Monitoring Purpose: To monitor cause and effect relationships in deteriorated natural systems. Area: currently in Cooksville and Sheridan Creek. Will expand in future to focus on other urban or stressed watersheds. Timeframe: ongoing Initiation date: 2007 Funding: Region of Peel Reports: annual report
27 Summary Monitoring at CVC is important to help answer the questions of the various programs Data from several different disciplines is utilized to help answer these questions This wouldn t be possible without the help and support of the member municipalities.
28 Member Municipalities Region of Halton Region of Peel City of Brampton City of Mississauga Town of Caledon Town of Erin Town of Halton Hills Town of Mono Town of Oakville Town of Orangeville Township of Amaranth Township of East Garafraxa
29 Contact Questions?
Restoration Planning and Development of a Restoration Bank
Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration
More informationThank you to all of our 2015 sponsors: Media Partner
Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context
More informationHydrology & Hydraulics
Hydrology & Hydraulics ADAPTING TO NEW WEATHER REALITIES Presentation to Technical Committee of Lake Ontario Integrated Sub watershed Study March 24, 2014 Neelam Gupta Manager, Hydrology & Hydraulics Credit
More information4. Environmental Impacts Assessment and Remediation Targets
4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are
More informationRegional Watershed Monitoring Program Review 2001-2008
Regional Watershed Monitoring Program Review 2001-2008 November 2008 Watershed Monitoring and Reporting Section Ecology Division Acknowledgments Many TRCA staff helped put together the various sections
More informationBLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT
Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...
More informationLYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT
Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...
More informationReport for 2003PA14B: Spruce Creek Watershed Keystone Project
Report for 2003PA14B: Spruce Creek Watershed Keystone Project There are no reported publications resulting from this project. Report Follows Abstract: This proposal seeks support for a graduate assistant
More informationActon Quarry Extension. Halton Region June 11, 2014
Acton Quarry Extension Halton Region June 11, 2014 1 Background Background Proposed Extraction Area Compliance with Ministry Guidelines Halton Region Official Plan Greenlands System Conveyance of Land
More informationCOMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B
More informationClear Water Projects in Cooksville Creek Watershed
Clear Water Projects in Cooksville Creek Watershed Armstrong Manufacturing Inc. What is a Watershed? No matter where you are, you are in a watershed. A watershed is the area of land that catches rain and
More informationROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND
ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning
More informationWhisky & Soda vs. WISKI & SODA. Eastern CA Collaborative Sharing WISKI with your Neighbours 1
Whisky & Soda vs. WISKI & SODA Eastern CA Collaborative Sharing WISKI with your Neighbours 1 Eastern CA Collaborative Sharing WISKI With Your Neighbours Christine McClure, Quinte Conservation Gord Mountenay,
More informationIntegrated Restoration Prioritization
Integrated Restoration Prioritization Habitat Restoration and Environmental Monitoring Projects Section Restoration Services Division Definition Restoration Prioritization is a process of combining various
More informationHow to Develop a Project Monitoring Program
RED RIVER BASIN FLOOD DAMAGE REDUCTION PROJECT MONITORING PROGRAM RED RIVER BASIN FLOOD DAMAGE REDUCTION WORK GROUP TECHNICAL AND SCIENTIFIC ADVISORY COMMITTEE TECHNICAL PAPER NO. 9 APRIL 2003 INTRODUCTION
More informationSECTION 3.2 CLIMATE AND PRECIPITATION
SECTION 3.2 CLIMATE AND PRECIPITATION Ulster County Climate Data A preliminary analysis of the Preserve s weather data shows that the average temperature has risen about two degrees over the past 114 years.
More informationAvison Management Services Ltd. COMPANY PROFILE
Avison Management Services Ltd. COMPANY PROFILE Providing resource management through environmental leadership. Mission Statement: We are committed to providing high quality, timely, and cost effective
More informationCREDIT VALLEY CONSERVATION. Strategic Plan 2006 Draft Prepared: August, 2006 Final Document: January 2, 2007
CREDIT VALLEY CONSERVATION Strategic Plan 2006 Draft Prepared: August, 2006 Final Document: January 2, 2007 Final January 2, 2007 2 FOREWORD The environmental face of the Credit Valley Watershed has changed
More informationFlood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: obropta@envsci.rutgers.edu
More informationA Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
More informationClean Water Services. Ecosystems Services Case Study: Tualatin River, Washington
Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the
More informationSPA Annual Report for 2002 September, 2003 Montgomery County Department of Environmental Protection Page 125. Evaluation and Recommendations
Montgomery County Department of Environmental Protection Page 125 Evaluation and Recommendations Monitoring efforts in the Special Protection Areas continue to provide the kind of information needed to
More informationSustainability Brief: Water Quality and Watershed Integrity
Sustainability Brief: and Watershed Integrity New Jersey depends on water resources for the health of our people, the strength of our economy, and the vitality of our ecosystems. The quality of our water
More informationWater Budgets and Climate Change Guidance, Web Application CC Training and Case Study
Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study OCCIAR and Northern Conservation Authorities March 26-27, 2012 Mike Garraway, MNR Centre of Excellence for Water Quantity
More informationStream Monitoring at Tumacácori NHP
Stream Monitoring at Tumacácori NHP Santa Cruz River Researcher s Day Tucson Community Service Center March 27 2009 Presented by E.L.Gwilliam Overview why, what, where, when and how Stream Protocol Importance
More information1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
More informationCooksville Creek Flood Evaluation Master Plan EA Final Report
Cooksville Creek Flood Evaluation Final Report A report prepared for: The City of Mississauga Prepared by: Aquafor Beech Ltd. www.aquaforbeech.com In Association with: LimnoTech July 2012 Aquafor Beech
More informationJOB DESCRIPTION. GS-11 $46,006 - $59,801 Annual/Full Benefits GS-12 $55,138 - $71,679 Annual/Full Benefits
OPEN: CLOSE: OR UNTIL FILLED EXEMPT NON-EXEMPT_X_ JOB DESCRIPTION POSITION: RESPONSIBLE TO: SALARY: FLUVIAL GEOMORPHOLOGIST Senior Aquatics Biologist GS-11 $46,006 - $59,801 Annual/Full Benefits GS-12
More informationENVIRONMENTAL ISSUES AND MANAGEMENT FOR HYDROPOWER PEAKING OPERATIONS
ENVIRONMENTAL ISSUES AND MANAGEMENT FOR HYDROPOWER PEAKING OPERATIONS Dr. Helen Locher, Hydro Tasmania 4 Elizabeth St, Hobart, Tasmania, Australia helen.locher@hydro.com.au Abstract Many hydropower plants
More informationBurnt River Black River and Gull River Flood Contingency Plan
Burnt River Black River and Gull River Flood Contingency Plan Objective: The objective of this plan is to preplan and prepare for flooding events in the Burnt River, Black River and Gull River area of
More informationHawlings River Watershed Restoration Action Plan December 2003
Hawlings River Watershed Restoration Action Plan December 2003 MONTGOMERY COUNTY DEPARTMENT OF ENVIRONMENTAL PROTECTION Montgomery County s Water Quality Goals Montgomery County has a rich and diverse
More informationHCP Team Meeting. November 18, 2015. icfi.com
HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next
More informationPioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and
Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background
More information~Pennsylvania Campaign for Clean Water~ Stormwater Workgroup
c/o Liz Deardorff, co-chair 1845 Market Street, Suite 206 Camp Hill, PA 17011 LDeardorff@AmericanRivers.org April 30, 2015 Sally Claggett Chesapeake Bay Program U.S. Environmental Protection Agency 410
More informationVulnerability Assessment of New England Streams: Developing a Monitoring Network to Detect Climate Change Effects
Vulnerability Assessment of New England Streams: Developing a Monitoring Network to Detect Climate Change Effects National Water Quality Monitoring Council 2012 Meeting Britta Bierwagen, National Center
More informationPrioritizing Riparian Restoration at the Watershed, Reach and Site Scales. Richard R. Harris University of California, Berkeley Cooperative Extension
Prioritizing Riparian Restoration at the Watershed, Reach and Site Scales Richard R. Harris University of California, Berkeley Cooperative Extension Issues Riparian communities provide multiple benefits
More informationLower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural
More informationArizona s Large Fires Suppression vs. Restoration. WESTCAS Fall 2011 Meeting Bruce Hallin Manager, Water Rights and Contracts October 27, 2011
Arizona s Large Fires Suppression vs. Restoration WESTCAS Fall 2011 Meeting Bruce Hallin Manager, Water Rights and Contracts October 27, 2011 THE PROBLEM Unhealthy Forests Since 2000, at least 1,501,654
More informationUsing Green Infrastructure to Manage Combined Sewer Overflows and Flooding
New York State Water Resources Institute Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding Emily Vail Hudson River Estuary Program NYS Department of Environmental Conservation
More informationInterim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
More informationEarth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.
Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust
More informationSection 4 General Strategies and Tools
Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General
More informationEcosystems. The two main ecosystem processes: Energy flow and Chemical cycling
Ecosystems THE REALM OF ECOLOGY Biosphere An island ecosystem A desert spring ecosystem Biosphere Ecosystem Ecology: Interactions between the species in a given habitat and their physical environment.
More informationMONITORING THE RECOVERY OF STREAMS IN THE SAN GABRIEL MOUNTAINS (CA) FOLLOWING THE LARGEST WILDFIRE IN LOS ANGELES COUNTY HISTORY: STATION FIRE - 2009
MONITORING THE RECOVERY OF STREAMS IN THE SAN GABRIEL MOUNTAINS (CA) FOLLOWING THE LARGEST WILDFIRE IN LOS ANGELES COUNTY HISTORY: STATION FIRE - 2009 Karin Patrick, Aquatic Bioassay & Consulting, Inc.
More informationCatchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk
Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects
More informationNAPA COUNTY WATERSHED SYMPOSIUM
Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath
More informationLower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
More informationRestoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
More informationProject Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161
Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.
More informationGuide to Writing a Water Quality Monitoring Plan
Guide to Writing a Water Quality Monitoring Plan 2013 Scoping Worksheets and Plan Template This guide has been compiled by the Community-Based Environmental Monitoring Network and CURA H2O to assist stewardship
More information[ THE MUD CREEK SUBWATERSHED EXISTING CONDITIONS REPORT PHASE 1 SUMMARY ]
2011 Land Use and Natural Systems Policy Group [ THE MUD CREEK SUBWATERSHED EXISTING CONDITIONS REPORT PHASE 1 SUMMARY ] Cover photo: Michael Crough 2009 1 M u d C r e e k E x i s t i n g C o n d i t i
More informationCHAD R. GOURLEY SPECIALTY EMPLOYMENT
CHAD R. GOURLEY P.O. Box 919 Verdi, Nevada 89439 phone 775.345.9960 cell 775.250.8140 chad_gourley at att.net SPECIALTY Restoration of riverine, spring, and wetland ecosystems, specializing in a process
More informationWILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10
WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta
More informationRestoring Ecosystems. Ecosystem Restoration Services
Restoring Ecosystems Ecosystem Restoration Services 2 Ecosystem Restoration Services AECOM s integrated approach sciencebased planning, with innovative design and execution delivers sustainable and cost-effective
More informationENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,
More information2016 BES Summer Student Intern Program
2016 BES Summer Student Intern Program Engineering Services Program Management and Controls Position Description: The BES Program Management and Controls section has an opening for a student intern in
More informationLatornell. Experiments in Climate Change Response in a Rapidly Urbanizing Region. November 20, 2008. By Brian Denney Chief Administrative Officer
Latornell Experiments in Climate Change Response in a Rapidly Urbanizing Region November 20, 2008 By Brian Denney Chief Administrative Officer Toronto has an ecological footprint 280 times its Eric Krause
More informationIt s hard to avoid the word green these days.
Going green : Environmental jobs for scientists and engineers Alice Ramey Alice Ramey is an economist in the Office of Occupational Statistics and Employment Projections, BLS. She is available at (202)
More informationRestoration Ecology. A Bank of Tangled Definitions. Chuck Rhoades Rocky Mountain Res. Sta. Ft. Collins, Colorado. Chuck Rhoades
Restoration Ecology A Bank of Tangled Definitions Chuck Rhoades Chuck Rhoades Rocky Mountain Res. Sta. Ft. Collins, Colorado Healthy Forest Restoration Act Provisions to expedite hazardous-fuel Reduction
More informationMiquon Creek STREAM RESTORATION PROJECT WHO WE ARE
Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Introductions Brett Long, PE Project Permitting & Construction Oversight Chris Streb, PE Project Designer & Construction Oversight Assistance WHO WE ARE
More informationGreater Los Angeles County Region
Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this
More informationURBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT
URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT Contacts: Barry Chilibeck (666-3765) or Megan Sterling (666-2322) Revision 4
More informationToronto & Region Remedial Action Plan. Update on Actions 2012-2013
Toronto & Region Remedial Action Plan Update on Actions 2012-2013 For additional copies of this report please contact: TORONTO AND REGION CONSERVATION AUTHORITY 5 Shoreham Drive, Toronto, Ontario, M3N
More informationHalton Region Planning & Public Works Committee Meeting July 8, 2015
Acton Quarry Extension Halton Region Planning & Public Works Committee Meeting July 8, 2015 1 Proposed Extraction Area 50% Reduction The extraction area was reduced by 50% to address comments from the
More informationHenry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org
Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Wetland study slide Water Quality NRE goals in watershed plans Protect habitat that remains.
More informationHow To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
More informationStandards: Human activity has consequences on living organisms and ecosystems. (94412, 94211 )
Minnehaha Creek Restoration Project A Place- Based Environmental Water Study Course: 9 th grade Biology Adapted from Kent Piccott, Minneapolis Public Schools Background: This study was designed with the
More informationGLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold
CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable
More information3. The submittal shall include a proposed scope of work to confirm the provided project description;
QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding
More informationChapter 9. Selected Watershed Initiatives in the Great Basin Region
Chapter 9 Selected Watershed Initiatives in the Great Basin Region The Great Basin contains vast areas of sparsely populated desert lands. Lacking an ocean drainage, the Great Basin is a hydrologic sink
More informationColdwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration
More informationLocal Steps Toward California s Watershed Program
Local Steps Toward California s Watershed Program Presented by Robert Meacher Plumas County Board of Supervisors Creating a Watershed Moment in a Watershed Movement Planning and Conservation League Legislative
More informationHERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto
HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto
More informationE&SC Training & Certification
E&SC Training & Certification 5 Chapter E&SC training involves educating, training and certifying individuals involved with managing stormwater, erosion and sediment on NCDOT construction projects. The
More informationGeorgia Coastal Stormwater Supplement April 2009
9.0 Local Post-Construction Stormwater Management Programs 9.1 Overview Prior to the 1980s, stormwater management was synonymous with flood control. Postconstruction stormwater management systems consisted
More informationANGORA FIRE RESTORATION PROJECT
ANGORA FIRE RESTORATION PROJECT U.S. Forest Service LAKE TAHOE BASIN MANAGEMENT UNIT Duncan Leao Vegetation Management Planner Richard Vacirca Forest Aquatics Biologist 3 PHASES OF FIRE REHAB Phase I Rehab:
More informationAcres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC.
BIBLIOGRAPHY Acres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC. Acres Consulting Services Limited, March 1983, Keating
More informationMonitoring Hydrological Changes Related to Western Juniper Removal: A Paired Watershed Approach
Monitoring Hydrological Changes Related to Western Juniper Removal: A Paired Watershed Approach T.L. Deboodt, M.P. Fisher, J.C. Buckhouse, John Swanson Abstract Since 1934, western juniper has increased
More informationBriefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters
Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Jim Lester, PhD. and Lisa Gonzalez Houston Advanced Research Center Galveston
More informationCommunities, Biomes, and Ecosystems
Communities, Biomes, and Ecosystems Before You Read Before you read the chapter, respond to these statements. 1. Write an A if you agree with the statement. 2. Write a D if you disagree with the statement.
More informationAppendix B: Cost Estimates
Appendix B: Estimates This appendix presents the estimated costs of the monitoring and supplemental research components presented in Section 3 of this document. A 20% quality assurance and quality control
More informationAttachment 1 CARRUTHERS CREEK FLOOD MANAGEMENT and ANALYSIS DRAFT TERMS OF REFERENCE
1.0 INTRODUCTION In early 2010, the Town of Ajax was provided with updated floodplain mapping for Carruthers Creek, based on a Regional Storm event (i.e., Hurricane Hazel), prepared by the Toronto and
More informationAppendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT
UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the
More informationCity of Toronto Wet Weather Flow Monitoring Network: Baseline Conditions 2008 2011
City of Toronto Wet Weather Flow Monitoring Network: Baseline Conditions 2008 2011 Sharing Loading Estimation Experiences Workshop Tuesday, January 20, 2015 Presented By: Derek Smith City of Toronto Flood
More informationUrban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting
Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth
More informationGold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
More informationMULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1
MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1 Mitigation Goals and Objectives o Describe functions lost at impact site o Describe functions to be gained at mitigation site o Describe overall watershed
More informationChapter 3 Communities, Biomes, and Ecosystems
Communities, Biomes, and Ecosystems Section 1: Community Ecology Section 2: Terrestrial Biomes Section 3: Aquatic Ecosystems Click on a lesson name to select. 3.1 Community Ecology Communities A biological
More informationMiCorps 101. Presented by Paul Steen. MiCorps Program Manager
MiCorps 101 Presented by Paul Steen MiCorps Program Manager MiCorps Team Laura Kaminski Katherine Hollins Marcy Knoll Wilmes Gary Kolhepp Dina Klemens Paul Steen, Ph.D. Jason Frenzel Scott Brown Jean Roth
More informationAPPLICATION OF GEOSPATIAL TECHNOLOGIES FOR SUSTAINABLE ENVIRONMENTAL MANAGEMENT
APPLICATION OF GEOSPATIAL TECHNOLOGIES FOR SUSTAINABLE NATURAL RESOURCES AND ENVIRONMENTAL MANAGEMENT IN MALAYSIA By James Dawos Mamit, Ph.D. Deputy Minister Ministry of Natural Resources and Environment,
More informationEffects of Land Cover, Flow, and Restoration on Stream Water Quality in the Portland, OR and Vancouver, WA Metro Area
Effects of Land Cover, Flow, and Restoration on Stream Water Quality in the Portland, OR and Vancouver, WA Metro Area Heejun Chang 1, Alan Yeakley 2 Noelwah Netusil 3, Paul Thiers 4, Gretchen Rollwagon-Bollens
More informationRisk Analysis, GIS and Arc Schematics: California Delta Levees
Page 1 of 7 Author: David T. Hansen Risk Analysis, GIS and Arc Schematics: California Delta Levees Presented by David T. Hansen at the ESRI User Conference, 2008, San Diego California, August 6, 2008 Abstract
More informationFinal Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum
Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
More informationUrban Waters and River Restoration. Pinja Kasvio, Finnish Environment Institute, SYKE RESTORE North Region Closing Seminar 14.8.
Urban Waters and River Restoration Pinja Kasvio, Finnish Environment Institute, SYKE RESTORE North Region Closing Seminar 14.8.2013 Urban Waters Hålland, Gässlösa (Sweden) Characteristics of urban areas:
More informationIUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure
IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure (December 2013) IUCN does not engage in projects which involve the design, construction or rehabilitation
More informationThe Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:
Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be
More informationOregon. Climate Change Adaptation Framework
Oregon Climate Change Adaptation Framework Oregon Environmental Quality Commission Climate Change Adaptation Framework Presentation at a glance: Purposes of the framework Participating agencies Climate
More informationFlood Hazard Area Technical Manual Section 8 Bank Stabilization and Stream Restoration
Flood Hazard Area Technical Manual Section 8 Bank Stabilization and Stream Restoration Prepared by: New Jersey Section American Water Resources Association Stream Restoration Committee FHA Subcommittee
More informationMS4 Municipal Stormwater Compliance: Pollutant Removal through Floodplain Restoration / Reconnection Villanova Urban Stormwater Partnership
MS4 Municipal Stormwater Compliance: Pollutant Removal through Floodplain Restoration / Reconnection Villanova Urban Stormwater Partnership Pennsylvania Stormwater Symposium 2015 Today s Session Municipal
More information