1 DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT OFFICE GRANTS PASS RESOURCE AREA 2164 NE SPALDING AVENUE GRANTS PASS, OR Determination of NEPA Adequacy (DNA) Office: Grants Pass Resource Area Tracking Number: DOI-BLM-OR DNA Environmental Assessment: DOI-BLM-OR-M EA Proposed Action Title/Type: Removal of illegal water features on an unnamed tributary of North Fork Deer Creek Location: T38S-R6W-Section 7 ( Road) A. Description of the Proposed Action and any applicable mitigation measures In April 2013 the Josephine County water master, together with BLM staff identified a possible illegal water diversion. The diversion is fed by water discharging from a culvert on the Road and is associated with a PVC pipe and some garbage. The water feature is located on BLM managed land in T38S, R6W, Section 7, on an unnamed tributary to North Fork Deer Creek. The action is proposed on a non-fish bearing intermittent stream. There is no record of a water right filed with the State of Oregon nor is there a valid easement for the PVC pipeline which crosses BLM land. BLM law enforcement officers were notified and attempted to contact the landowner without success. The stream system is fully allocated and there is no room for an additional water right. The BLM proposes to remove the illegal water diversion features and associated garbage. The pipeline would be removed to the property line. All in-stream work would is anticipated to be accomplished during the in-stream work period (June 15-September 15); however, Oregon Department of Fish and Wildlife (ODFW) has granted an in-stream work period extension through October 31, 2013, in case work would need to extend beyond this time period. The removal would occur by hand and with machinery. There would be removal of ground vegetation, but this would be kept to a minimum. This proposal would not require stream reconstruction or bank stabilization. Access would be kept to minimum to decrease the occurrence of soil compaction. The removal is estimated to be complete within twenty four hours of initiation. ODFW representatives would be notified and sent photos of the completed project via when the work is complete. Best Management Practices (BMPs) and PDFs identified in the Environmental Assessment for Revised Aquatic and Riparian Habitat Enhancement (DOI-BLM-OR-M EA) on 1
2 pages 28 and 30 have been incorporated into the design of this project. Additionally, the BLM would incorporate PDFs put forth by ODFW. The BLM would comply with the Clean Water Act through the use of BMPs to minimize sediment delivery to the stream. Applicable BMPs and PDFs are listed below: The stream is non-fish bearing and presumably dry, however, if flowing water is observed, workers would look for fish and re-locate them to the North Fork of Deer Creek before emptying the trough. Turbidity would be kept to a minimum by keeping equipment out of the stream and avoiding crossing the stream with mechanized equipment if water is present. Refueling or chemical changes for machinery would occur on existing roadways or would occur further than 150 ft from any stream. Removal of riparian vegetation would be minimized, limited to the work area, and ground cover would be replaced by the application of native mulch, weed free straw, or erosion blankets, where appropriate. Actions would occur during low flow or dry conditions when the probability of soil detachment and transport are low. Stored material upstream of the diversion would be partially or completely removed before the diversion is removed. B. Land Use Plan Conformance Medford District Record of Decision and Resource Management Plan (USDI, BLM 1995 (ROD/RMP)) Final Supplemental Environmental Impact Statement: Management of Port-Orford- Cedar in Southwest Oregon (FSEIS 2004 and ROD 2008) Medford District Integrated Weed Management Plan Environmental Assessment (1998) and tiered to the Northwest Area Noxious Weed Control Program (EIS 1985) C. Identify applicable National Environmental Policy Act (NEPA) documents and other related documents the cover the proposed action. The proposed action is expected to have no effect to northern spotted owl sites or to Southern Oregon/Northern California coho salmon or its critical habitat. However, to ensure compliance with the Endangered Species Act the BLM consulted on all actions authorized by the decision with the U.S. Fish and Wildlife Service (USFWS) and National Marine Fisheries Services (NMFS). The proposed project would be consistent the following consultation for Programmatic Consultation on Fish Habitat Restoration Activities in Oregon and Washington with: NMFS: BO # 2008/03506 and NWP USFWS: Wildlife BO # F-0055 and Plant LOC #
3 The proposed action is also consistent with, and/or tier to the following: Aquatic and Riparian Habitat Enhancement Revised Environmental Assessment for (DOI-BLM-OR-M EA) Deer Creek Watershed Analysis (November 1997) Deer Creek Watershed Water Quality Restoration Plan (December 2011) D. NEPA Adequacy Criteria 1. Is the new proposed action a feature of, or essentially similar to, an alternative analyzed in the existing NEPA document(s)? Is the project within the same analysis area, or if the project location is different, are the geographic and resource conditions sufficiently similar to those analyzed in the existing NEPA document(s)? If there are differences, can you explain why they are not substantial? The proposed project is consistent with the watershed enhancement actions described in the Revised Aquatic and Riparian Habitat Enhancement EA under Alternative 2. Riparian and instream habitat treatments are listed as watershed enhancement action covered under this EA (p.11). Small diversion dams used for irrigation may also be removed to restore aquatic connectivity. This action, as defined in the NMFS biological opinion covering restoration projects, includes the removal of diversion structures that are less than 6 feet high, or that impound less than 15 acre-feet of water. Construction would involve use of heavy equipment, such as excavators, backhoes, front-end loaders, dump trucks, and bulldozers. The impacts that are described in the EA refer to removing dam like structures, although the structural feature for removal under this Proposed Action is more like a small stock tank, and the impacts would be well below to the impacts described in the EA. No streambed or stream bank material would be excavated for this Proposed Action. Removal in the stream would be limited to a trough and pipeline. The proposed project is consistent with the Project Design Features of ARBO II which allows equipment such as excavators, bull dozers, dump trucks, front-end loaders, and similar equipment [to] be used to implement projects p Is the range of alternatives analyzed in the existing NEPA document(s) appropriate with respect to the new proposed action, given current environmental concerns, interests, and resource values? The range of alternatives analyzed in the Revised Aquatic and Riparian Habitat Enhancement EA is appropriate because the Grants Pass Resource Area has not received or aware of any new environmental concerns or interest since the decision was signed in
4 3. Is the existing analysis valid in light of any new information or circumstances (such as, rangeland health standard assessment, recent endangered species listings, updated lists of BLM-sensitive species)? Can you reasonably conclude that new information and new circumstances would not substantially change the analysis of the new proposed action? The removal of illegal water features on an unnamed tributary of North Fork Deer Creek is consistent with court orders relating to the Survey and Manage mitigation measure of the Northwest Forest Plan, as incorporated into the Medford District Resource Management Plan. This work applies a 2006 Exemption from a stipulation entered by the court in litigation regarding Survey and Manage species and the 2004 Record of Decision related to Survey and Manage Mitigation Measure in Northwest Ecosystem Alliance v. Rey, No MJP (W.D. Wash., Oct. 10, 2006). The 2012 Crooks Creek Riparian Restoration Project meets Exemption C of the Pechman Exemptions: Riparian and stream improvement projects where the riparian work is riparian planting, obtaining material for placing in-stream, and road or trail decommissioning; and where the stream improvement work is the placement large wood, channel and floodplain reconstruction, or removal of channel diversions. The analysis in the Revised Aquatic and Riparian Habitat Enhancement EA is appropriate because Grants Pass Resource Area has not received or aware of any other new information and new circumstances since the decision was signed in Are the direct, indirect, and cumulative effects that would result from implementation of the new proposed action similar (both quantitatively and qualitatively) to those analyzed in the existing NEPA document? The proposed project is very similar to the proposed action, Alternative 2, (Revised Aquatic and Riparian Habitat Enhancement EA, pp.5-8), which lists riparian vegetation and stream enhancement projects. The removal of illegal water features on an unnamed tributary of North Fork Deer Creek is fully analyzed under the Revised Aquatic and Riparian Habitat Enhancement EA. 5. Are the public involvement and interagency review associated with existing NEPA document(s) adequate for the current proposed action? Public involvement and interagency review for the EA were adequate. The EA was available for public comment for 21 days beginning on April 15, BLM received one comment but determined (Decision Record, p. 6) that their specific concerns were not affected by this project. 4
5 E. Persons/Agencies /BLM Staff Consulted Name Title Resource/Agency Represented Jon Raybourn Fisheries Biologist Fisheries Jonas Parker Hydrologist Hydrology Marlin Pose Wildlife Biologist Wildlife Merry Haydon Archaeologist Cultural Rachel Showalter Botanist Botany/Weeds Sarah Davison Silviculturist Port-Orford-Cedar Note: Refer to the Revised Aquatic and Riparian Habitat Enhancement EA for a complete list of the team members participating in the preparation of the original environmental analysis or planning documents. Conclusion Based on the review documented above, I conclude that this proposal conforms to the applicable land use plan and that the NEPA documentation fully covers the proposed action and constitutes BLM's compliance with the requirements of the NEPA. Project Lead Michelle Calvert NEPA Coordinator Date 1hi I131 Date Allen Bollschweiler Responsible Official Date <r // Note: The signed Conclusion on this Worksheet is part of an interim step in the BLM's internal decision process and does not constitute an appealable decision.
6
U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526
A. Background U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526 Categorical Exclusion Determination and Decision
Gold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
PUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested
Section 4 General Strategies and Tools
Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General
USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions 2013-09-05 Table of Contents
USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions 2013-09-05 Table of Contents What is the Final Rule implemented by the Forest Service?... 2 Why
Worksheet Determination of National Environmental Policy Act (NEPA) Adequacy (DNA) U.S. Department of the Interior Bureau of Land Management
Worksheet Determination of National Environmental Policy Act (NEPA) Adequacy (DNA) U.S. Department of the Interior Bureau of Land Management Office: ORB002 Tracking Number (DNA#): DOI-BLM-OR-B020-2013-0032-DNA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION. United Water Conservation District Project No.
UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION United Water Conservation District Project No. 2153-022 ORDER APPROVING SPOIL MANAGEMENT, EROSION, AND SEDIMENT CONTROL PLAN
ANGORA FIRE RESTORATION PROJECT
ANGORA FIRE RESTORATION PROJECT U.S. Forest Service LAKE TAHOE BASIN MANAGEMENT UNIT Duncan Leao Vegetation Management Planner Richard Vacirca Forest Aquatics Biologist 3 PHASES OF FIRE REHAB Phase I Rehab:
United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado
WCAO-GJ-FONSI -14-01 United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado FINDING OF NO SIGNIFICANT IMPACT SPURLIN MESA LATERAL OF THE CRAWFORD
The Teton Creek Restoration Project Summary:
The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management Stream Restoration Cost Estimates BRIAN BAIR USDA Forest Service Gifford-Pinchot National Forest 1262 Hemlock
A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1
A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1 J. Bonham 2 and K. Stephenson Abstract Recently the US Army Corps of Engineers (the Corps) has increased
How To Manage Water Resources In The Yakima Basin
Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013
NCDA&CS - North Carolina Forest Service Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013 For the N.C. Division of Water Quality
Increasing water availability through juniper control.
Tim Deboodt, OSU Crook County Extension Agent 498 SE Lynn Blvd. Prineville, OR 97754 541-447-6228 [email protected] Increasing water availability through juniper control. Throughout the region
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
DECISION DOCUMENT NATIONWIDE PERMIT 27
DECISION DOCUMENT NATIONWIDE PERMIT 27 This document discusses the factors considered by the Corps of Engineers (Corps) during the issuance process for this Nationwide Permit (NWP). This document contains:
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION)
BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION) CD NO. 1 OF 19 CDS Initial Statement Exhibit A: Description
STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208
STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208 RANGELAND HEALTH STANDARDS - ASSESSMENT SAGEHEN ALLOTMENT #0208 STANDARD 1 - UPLAND WATERSHED This standard is being met on the allotment.
Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B
Wildlife Habitat Conservation and Management Program
Wildlife Habitat Conservation and Management Program Manual for Counties and Cities Oregon Department of Fish and Wildlife 2015 Table of Contents 1. Introduction Purpose of the habitat program Objective
LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
CHAD R. GOURLEY SPECIALTY EMPLOYMENT
CHAD R. GOURLEY P.O. Box 919 Verdi, Nevada 89439 phone 775.345.9960 cell 775.250.8140 chad_gourley at att.net SPECIALTY Restoration of riverine, spring, and wetland ecosystems, specializing in a process
THE SECRETARY OF THE INTERIOR WASHINGTON
THE SECRETARY OF THE INTERIOR WASHINGTON ORDER NO. 3336 Subject: Rangeland Fire Prevention, Management and Restoration Sec. 1 Purpose. This Order sets forth enhanced policies and strategies for preventing
Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural
HCP Team Meeting. November 18, 2015. icfi.com
HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next
REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:
EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,
Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects
City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association
18 voting members 44 stakeholders 114 email list. Senators: Wyden & Merkley Representative DeFazio
18 voting members 44 stakeholders 114 email list Senators: Wyden & Merkley Representative DeFazio State Representative Krieger State Senators: Roblan, Johnson, and Kruse Governor Brown s office County
Restoration Planning and Development of a Restoration Bank
Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration
Prepared By: Tom Parker Geum Environmental Consulting, Inc.
Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs
How To Decide If A Dam Removal Is Safe For Water Quality
Report Issue Paper: Water Quality Certification Procedures for Klamath River Restoration Project By: Steve Kirk and Debra Sturdevant March 2012 Last Updated: 3/14/12 DEQ 11-WQ-047 This report prepared
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION
UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION Joshua A. Israel, Fish Biologist, U.S Bureau of Reclamation, Sacramento, CA. [email protected]; Paul
JOB DESCRIPTION. GS-11 $46,006 - $59,801 Annual/Full Benefits GS-12 $55,138 - $71,679 Annual/Full Benefits
OPEN: CLOSE: OR UNTIL FILLED EXEMPT NON-EXEMPT_X_ JOB DESCRIPTION POSITION: RESPONSIBLE TO: SALARY: FLUVIAL GEOMORPHOLOGIST Senior Aquatics Biologist GS-11 $46,006 - $59,801 Annual/Full Benefits GS-12
Post-Flood Assessment
Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of
Carlton Fields Memorandum
Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed
Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California
IWA Publishing 2011 Water Practice & Technology Vol 6 No 4 doi:10.2166/wpt.2011.074 Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California William
Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum
Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association
Avison Management Services Ltd. COMPANY PROFILE
Avison Management Services Ltd. COMPANY PROFILE Providing resource management through environmental leadership. Mission Statement: We are committed to providing high quality, timely, and cost effective
Wildlife Habitat Conservation and Management Plan
Wildlife Habitat Conservation and Management Plan For [Applicant Name] [Insert photo of property] Developed in Cooperation with Jane Doe Habitat Conservation Biologist Oregon Department of Fish and Wildlife
Using an All lands Framework for Conservation of Ecosystem Services
Using an All lands Framework for Conservation of Ecosystem Services Robert Deal USDA Forest Service - PNW Research Station, Portland, OR Nikola Smith USDA Forest Service - Pacific Northwest Region, Portland,
Sand and Silt Removal from Salmonid Streams
Sand and Silt Removal from Salmonid Streams Stream bank erosion Poor land use practices Sources of Sand and Silt Impacts of Sand and Silt Interstitial spaces infilled Little or no flow through the streambed
STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S
STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE HOUSE APPROPRIATIONS SUBCOMMITTEE ON INTERIOR, ENVIRONMENT AND RELATED AGENCIES
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
RESTORING streams to reduce flood loss
RESTORING streams to reduce flood loss Flood Loss Reduction the Natural Way Flood disasters have become a regular Floods can devastate local occurrence. One in your community may have communities. threatened
Chapter 9. Selected Watershed Initiatives in the Great Basin Region
Chapter 9 Selected Watershed Initiatives in the Great Basin Region The Great Basin contains vast areas of sparsely populated desert lands. Lacking an ocean drainage, the Great Basin is a hydrologic sink
National Environmental Policy Act/ Clean Water Act Section 404 (NEPA/404) Merger Process and Agreement for Transportation Projects in Colorado
Background In a May 12, 2003, letter from Mr. James L. Connaughton, Executive Office of the President, Council on Environmental Quality, to Mr. Norman Y. Minneta, Secretary of Transportation, Mr. Connaughton
STREAMFLOW RESTORATION PRIORITY AREAS
STREAMFLOW RESTORATION PRIORITY AREAS Synopsis The Water Resources Department and the Department of Fish and Wildlife jointly identified priority areas for streamflow restoration in basins throughout the
STIPULATED SETTLEMENT AGREEMENT AND ORDER OF DISMISSAL - 1-
STEPHANIE M. PARENT (OSB #92590) Pacific Environmental Advocacy Center 100 15 SW Terwilliger Blvd. Portland, OR 972 1 9 Phone (503) 768-6736 Fax (503) 768-6642 parentalclark. edu Attorney for Plaintiffs
DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties.
DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties. There were 10 comments received in response to an April 14, 2014
Addendum D. Nomination of Moody Wash ACEC
Addendum D Nomination of Moody Wash ACEC Moody Wash ACEC is hereby nominated by Citizens for Dixie s Future to: BLM St. George Field Office 345 East Riverside Drive St. George, UT 84790 Moody Wash is a
Northern Middlesex Council of Governments
Northern Middlesex Council of Governments The Federal Energy Commission (FERC) is the agency charged with evaluating whether the proposed route should be approved Cooperating agencies generally include
Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington
Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
NPS Burned Area Emergency Response (BAER) and Burned Area Rehabilitation (BAR) in the Southern California Landscape
NPS Burned Area Emergency Response (BAER) and Burned Area Rehabilitation (BAR) in the Southern California Landscape 2005 2007 2013 NPS in non-desert southern California 2007 2005 SMMNRA 154,000 acres May
STATE LEVEL AGREEMENT BETWEEN THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION
STATE LEVEL AGREEMENT BETWEEN THE NATRAL RESORCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION PRPOSE The NRCS, and New Jersey State Historic Preservation Officer (SHPO)
Monitoring Riparian Areas With a Camera
Monitoring Riparian Areas With a Camera By Michael DeLasaux 1, Holly George 2, and Philip Mainwaring 3 Riparian areas are next to streams, springs, rivers, ponds and lakes. Physical characteristics that
ADDENDUM TO THE DRAFT ECONOMIC IMPACT ANALYSIS OF CRITICAL HABITAT DESIGNATION FOR THE OTAY TARPLANT
ADDENDUM TO THE DRAFT ECONOMIC IMPACT ANALYSIS OF CRITICAL HABITAT DESIGNATION FOR THE OTAY TARPLANT November 2002 IEc INDUSTRIAL ECONOMICS, INCORPORATED Prepared for: Division of Economics U.S. Fish and
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus
EFB 496.10/696.03 Wetland Restoration Techniques Online Class Syllabus SUNY-ESF College of Environmental Science and Forestry Summer Session II 2015 Wetland Restoration Techniques is a graduate and undergraduate
Habitat rehabilitation for inland fisheries
Habitat rehabilitation for inland fisheries FAO FISHERIES TECHNICAL PAPER 484 Global review of effectiveness and guidance for rehabilitation of freshwater ecosystems Cover photos : Left: excavation of
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
Chapter 4. Consultation and Coordination
24253 24254 24255 24256 24257 24258 24259 24260 24261 24262 24263 24264 24265 Chapter 4. Consultation and Coordination Preparers and Contributors The following individuals and Forest Service staff groups
U.S. Army Corps of Engineers Tulsa District
U.S. Army Corps of Engineers Tulsa District Mike Abate, PMP. Chief, Civil Works Branch, PPMD April 17, 2015 US Army Corps of Engineers Civil Works Mission Water Supply 50% of Corps water supply contracts
Thank you to all of our 2015 sponsors: Media Partner
Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context
Effects of Land Cover, Flow, and Restoration on Stream Water Quality in the Portland, OR and Vancouver, WA Metro Area
Effects of Land Cover, Flow, and Restoration on Stream Water Quality in the Portland, OR and Vancouver, WA Metro Area Heejun Chang 1, Alan Yeakley 2 Noelwah Netusil 3, Paul Thiers 4, Gretchen Rollwagon-Bollens
Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
Restoring Ecosystems. Ecosystem Restoration Services
Restoring Ecosystems Ecosystem Restoration Services 2 Ecosystem Restoration Services AECOM s integrated approach sciencebased planning, with innovative design and execution delivers sustainable and cost-effective
U.S. Fish & Wildlife Service West Virginia Ecological Services Field Office
Slide 1 West Virginia Ecological Services Field Office Liz Stout Fish and Wildlife Biologist 694 Beverly Pike Elkins, West Virginia 26241 [email protected] 304-636-6586 x 15 Slide 2 Today s Goals
DECLARATION OF ROBIN SILVER
Cliff Levenson Esq. North 1th Avenue, Suite K Phoenix, AZ 01 Phone: (0 - [email protected] Attorney for Plaintiffs IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF ARIZONA CENTER FOR BIOLOGICAL
San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits
Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.
Integrated Restoration Prioritization
Integrated Restoration Prioritization Habitat Restoration and Environmental Monitoring Projects Section Restoration Services Division Definition Restoration Prioritization is a process of combining various