Failure Rate Modeling Using Equipment Inspection Data



Similar documents
Avoiding AC Capacitor Failures in Large UPS Systems

TRANSMISSION BUSINESS PERFORMANCE

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse

Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations

Asset Management and System Reliability Group Review

Risk-Based Resource Allocation for Distribution System Maintenance

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI

When power interruptions happen.

Future of Electric Distribution Dialogue

Optimization of Asset Management in High Voltage Substation Based on Equipment Monitoring and Power System Operation

TAN δ (DELTA) CABLE TESTING OVERVIEW AND ANSWERS TO FREQUENTLY ASKED QUESTIONS. What Is Tan δ, Or Tan Delta?

2014 ELECTRIC SYSTEM RELIABILITY REPORT CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

The electrical energy produced at the gen

DISTRIBUTION RELIABILITY USING RECLOSERS AND SECTIONALISERS

Transmission Network Performance Report

Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA

Study of Lightning Damage Risk Assessment Method for Power Grid

Customer Perception and Reality: Unraveling the Energy Customer Equation

RELIABILITY OF ELECTRIC POWER GENERATION IN POWER SYSTEMS WITH THERMAL AND WIND POWER PLANTS

Comparison of GIS and AIS systems for urban supply networks

Advanced Distribution Grid Management for Smart Cities

Step Voltage Regulators

Conservation Voltage Reduction (CVR)

Electric System Performance Review Trustees Briefing. April 2013

REINVESTMENT STRATEGY MAKING FOR DISTRIBUTION NETWORKS

Phase Balancing of Distribution Systems Using a Heuristic Search Approach

Introduction. Harmonics and IEEE 519 Page 1 of 19

A Regime-Switching Model for Electricity Spot Prices. Gero Schindlmayr EnBW Trading GmbH

Electric Power Distribution

Cost-effective Distribution Reliability Improvement Using Predictive Models

Pennsylvania Summer Reliability

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

On-line PD Monitoring Makes Good Business Sense

Federal Wage System Job Grading Standards for Electric Power Controlling, Table of Contents

Integration of Distributed Generation in the Power System. IEEE Press Series on Power Engineering

Hyperlinks are Inactive

Calculation of Voltage Sag Indices for Distribution Networks

ECE 586b Course Project Report. Auto-Reclosing

Power products and systems. Intelligent solutions for power distribution Zone concept

Short Circuit Current Calculations

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches

Tail-Dependence an Essential Factor for Correctly Measuring the Benefits of Diversification

DISTRIBUTION OPERATIONS AND MAINTENANCE

Pragmatic Peer Review Project Contextual Software Cost Estimation A Novel Approach

PPL Electric Utilities Summer Readiness Overview June 2016

ELECTRICIAN TRADE REGULATION

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China

1/27/2013. PSY 512: Advanced Statistics for Psychological and Behavioral Research 2

Using Excel (Microsoft Office 2007 Version) for Graphical Analysis of Data

Rule Fast Track Analysis for National Life Insurance Co.

Reliability centered asset management tool

Data Mining to Characterize Signatures of Impending System Events or Performance from PMU Measurements

Continuous Time Bayesian Networks for Inferring Users Presence and Activities with Extensions for Modeling and Evaluation

Auburn University s Solar Photovoltaic Array Tilt Angle and Tracking Performance Experiment

Potomac Electric Power Company. Comprehensive Reliability Plan. For. District of Columbia. Including

Acting on the Deluge of Newly Created Automation Data:

The calm after the storm

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

Fairfield Public Schools

Primary and Secondary Electrical Distribution Systems

A Fuzzy Based Solution for Improving Power Quality in Electric Railway Networks

File Size Distribution Model in Enterprise File Server toward Efficient Operational Management

6545(Print), ISSN (Online) Volume 4, Issue 2, March April (2013), IAEME & TECHNOLOGY (IJEET)

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems

Application Note Noise Frequently Asked Questions

A THEORETICAL COMPARISON OF DATA MASKING TECHNIQUES FOR NUMERICAL MICRODATA

Application of Four-Pole Circuit Breakers within Data Centers

AORC Technical meeting 2014

Best Practices for Creating Your Smart Grid Network Model. By John Dirkman, P.E.

REPORT OF THE PUBLIC STAFF TO THE NORTH CAROLINA NATURAL DISASTER PREPAREDNESS TASK FORCE

Journal of Financial and Economic Practice

Developing a Utility/Customer Partnership To Improve Power Quality and Performance

Products reliability assessment using Monte-Carlo simulation

REQUIREMENTS FOR A REAL-TIME RISK MONITORING TOOL TO REDUCE TRANSMISSION GRID NUCLEAR PLANT VULNERABILITIES

17. SIMPLE LINEAR REGRESSION II

An Ethernet Cable Discharge Event (CDE) Test and Measurement System

Q. Why does OG&E clear vegetation away from power lines? A. Trees that grow into power lines can cause problems in multiple ways:

Electrical Predictive and Preventative Maintenance

Part 1 System Modeling & Studies for Existing Systems

Generic Reliability Evaluation Method for Industrial Grids with Variable Frequency Drives

MOBILE SYSTEM FOR DIAGNOSIS OF HIGH VOLTAGE CABLES (132KV/220KV) VLF-200 HVCD

POWER TRANSFORMER LIFE-CYCLE COST REDUCTION

Typical Data Requirements Data Required for Power System Evaluation

Value of Security Assessment - Extensions and Applications

Recall this chart that showed how most of our course would be organized:

Underground vs. Overhead Transmission and Distribution

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

Services. Three Phase Service

Telecommunication Line Protectors

Method for detecting software anomalies based on recurrence plot analysis

12.5: CHI-SQUARE GOODNESS OF FIT TESTS

STOCHASTIC RELIABILITY MODELING OF RENEWABLE ENERGY SOURCES - APPLICATIONS TO ELECTRO-GEOTHERMAL GROUPS

How To Check For Differences In The One Way Anova

Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016

PA PUC AERS & Metropolitan Edison Company Site Visit

Considering UNDERGROUND. tampaelectric.com

Improving Power Quality Through Distribution Design Improvements

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation

The accurate calibration of all detectors is crucial for the subsequent data

Transcription:

Failure Rate Modeling Using Equipment Inspection Data Richard E. Brown (SM)* 1Abstract System reliability models typically use average equipment failure rates. Even if these models are calibrated based on historical reliability indices, all like components within a calibrated region remain homogeneous. This paper presents a new method of customizing failure rates using equipment inspection data. This allows available inspection information to be reflected in system models, and allows for calibration based on interruption distributions rather than mean values. The paper begins by presenting a method to map equipment inspection data to a normalized condition score, and suggests a formula to convert this score into failure probability. The paper concludes by applying this methodology to a test system based on an actual distribution system, and shows that the incorporation of condition data leads to richer reliability models. Keywords predictive reliability assessment, equipment failure rate modeling, inspection-based ranking P I. INTRODUCTION OWER DELIVERY COMPANIES are under increasing pressure to provide higher levels of reliability for lower cost. The best way to pursue these goals is to plan, engineer, and operate power delivery systems based on quantitative models that are able to predict expected levels of reliability for potential capital and operational strategies. Doing so requires both system reliability models and component reliability models. Predictive reliability models are able to compute system reliability based on system topology, operational strategy, and component reliability data. The first distribution reliability model, developed by EPRI in 1978 [1], was not widely used due to conservative design and maintenance standards and, to a lesser extent, a lack of component reliability data. Eventually, certain utilities became interested in predictive reliability modeling and started developing inhouse tools [2-5]. Presently, most major commercial circuit analysis packages offer an integrated reliability module capable of predicting the interruption frequency and duration characteristics of equipment and customers. Advanced tools have extended this basic functionality to include momentary interruptions [6-7] and risk assessment [8-9]. *This paper is based on a paper of the same title to be published in IEEE Transactions on Power Systems. Richard Brown is with KEMA and can be reached at rebrown@ kema.com. The application of predictive reliability models has traditionally assigned average failure rate values to all components. Although simplistic, this approach produces useful results and can substantially reduce capital requirements while providing the same levels of predicted reliability [10]. Advanced tools have attempted to move beyond average failure rates by either calibrating failure rates based on historical system performance [11], or by using multistate weather models [12-13]. A few attempts have been made to compute failure rates as a function of parameters such as age [14], maintenance [15], or combinations of features [16], but these models tend to be system-specific and are not practicable for a majority of utilities at this time. The use of average component failure rates in system reliability models is always limiting and is potentially misleading [17]. Although generally acceptable for capital planning, the use of average values has two major drawbacks. First, average values cannot reflect the impact of relatively unreliable equipment and may overestimate the reliability of customers experiencing the worst levels of service. Second, average values cannot reflect the impact of maintenance activities and, therefore, preclude the use of predictive models for maintenance planning and overall cost optimization. Most utilities perform regular equipment inspections and have tacit knowledge that relates inspection data to the risk of equipment failure. Integration of this information into component reliability models can improve the accuracy of system reliability models and extend their ability to reflect equipment maintenance in results. Ideally, each class of equipment could be characterized by an equation that computes failure rate as a function of critical parameters. For example, power transformers might be characterized as a function of age, manufacturer, voltage, size, through-fault history, maintenance history, and inspection results. Unfortunately, in most cases the sample size of failed units is far too small to generate an accurate model, and other approaches must be pursued. This paper presents a practical method that uses equipment inspection data to assign relative condition rankings. These rankings are then mapped to a failure rate function based on worst-case units, average units, and best-case units. The paper then presents recommended failure rate models for a broad range of equipment, presents a method of calibration based on historical customer interruptions, and concludes by examining the impact of these techniques on a test system based on an actual distribution system.

II. INSPECTION-BASED CONDITION RANKING Typical power delivery companies perform periodic inspection on a majority of their electricity infrastructure. Utilities have various processes for collecting and recording inspection results. Paper forms stored in a multitude of departments make obtaining comprehensive system inspection results problematic. Many utilities, however, have migrated their inspection and maintenance programs to computerized maintenance management systems (CMMS) and data management systems that can be used as central warehouses for equipment inspection results. After a population of similar equipment has been inspected, it is desirable to rank their relative condition. Consider a piece of equipment with n inspection item results, (r 1, r 2, r n ). Further suppose that each inspection item result is normalized so that values correspond to the following: r i = 0 r i = ½ r i = 1 ; best inspection outcome ; average inspection outcome ; worst inspection outcome Each inspection item result, r i, is assigned a weight, w i, based on its relative importance to overall equipment condition. These weights are typically determined by the combined opinion of equipment designers and field service personnel, and are sometimes modified based on the particular experience of each utility. The final condition of a component is then calculated by taking the weighted average of inspection item results.by definition, a weighted average of 0 corresponds to the best possible condition, a weighted average of ½ corresponds to average condition, and a weighted average of 1 corresponds to the worst possible condition. n i= 1 Condition Score = w r w (1) i i n i= 1 After each piece of equipment is assigned a condition score between 0 and 1, equipment using the same inspection item weights can be ranked and prioritized for maintenance (typically considering cost and criticality as well as condition). This approach has been successfully applied to several utilities by the authors, and inspection forms and weights for most major pieces of power delivery equipment have been developed. In addition, inspection items have guidelines that suggest scores for various inspection outcomes. To illustrate, an inspection form for power transformers is shown in Table 1 and the scoring guideline for Age is shown in Table 2. It should also be noted that inspection items can also be related to external factors. For example, overhead lines can include inspection items related to vegetation, animals, and lightning. Scores for these items will reflect both the external condition (e.g., lightning flash density) and system mitigation efforts (e.g., arrestors, shield wire, and grounding). i Although useful for prioritizing maintenance activities, relative equipment condition ranking is less useful for rigorous reliability analysis. Since reliability assessment models require equipment failure rates, inspection results would ideally be mapped into a failure rate through a closed-form equation derived from regression models. As mentioned earlier, this is not presently feasible for most classes of equipment due to limited historical data. III. FAILURE RATE MODEL Although there is not enough historical data to map inspection results to failure rates through regression-based equations, interpolation is capable of providing approximate results. At a minimum, interpolation requires failure rates corresponding to the worst and best condition scores. Practically, it requires one or more interior points so that non-linear relationships can be determined. After exploring a variety of mapping functions, the authors have empirically found that an exponential model best describes the relationship between the normalized equipment condition of Eq. 1 and equipment failure rates. The specific formula chosen is: Table 1. Inspection Form for Power Transformers Criterion Weight Score Age (years of operation) 8 Condition of internal solid insulation 2 Oil type 1 Condition of core 2 Condition of inaccessible parts 1 Condition of tank 1 Condition of cooling system 1 Condition of tap changer 2 Condition of accessible parts 1 Condition of bushings 2 Experience with this transformer type 4 Transformer loading history 3 Number of extraordinary mechanical stresses 3 Number of extraordinary dielectric stresses 2 Noise level 1 Core and winding losses 2 Gas in oil analysis (current results) 5 Gas in oil analysis (trend in results) 4 Oil analysis 6 Sum 51 Weighted Average Table 2. Guideline for Power Transformer Age Age (years of operation) Score Less than 1 0.00 1-10 0.05 11-20 0.10 21-25 0.25

26-29 0.40 29-31 0.50 32-35 0.60 36-40 0.80 Greater than 40 1.00 λ λ ( x) = Ae Bx + C = failure rate x = condition score Three data pairs are required to solve for the parameters A, B, and C. The previous section has developed a condition ranking methodology that, by definition, results in best, average, and worst condition scores of 0, ½, and 1, respectively. Therefore, three natural data pairs correspond to λ(0), λ(½), and λ(1). λ(½) can be approximated by taking the average failure rate across many components or by using average failure rates documented in relevant literature. λ(0) and λ(1) are more difficult to determine, but can be derived through benchmarking, statistical analysis, or heuristics. Given these three values, function parameters are determined as follows: A = λ B = 2ln C = λ 2 [ λ( ½) λ( 0) ] () 1 2λ( ½) + λ( 0) λ( ½) + A λ( 0) () 0 A A A detailed benchmarking of equipment failure rates is found in [18]. These results document low, typical, and high failure rates corresponding to system averages across a variety of systems. Assuming that (1) best-condition equipment have failure rates half that of best system averages, (2) average-condition equipment have failure rates of typical system averages, and (3) worst-condition equipment have failure rates twice that of best system averages, parameters for a variety of equipment are shown in Table 3. These parameters, based on historical failure studies such as [14], are useful in the absence of system specific data, but should be viewed as initial conditions for calibration, which is discussed in the next section. (2) (3) Failure Rate (/yr)- 1.000 0.100 0.010 0.001 Primary Trunk Cable Overhead Trunk Power Transformer (<25MVA) Power Transformer (>25MVA) 0 0.2 0.4 0.6 0.8 1 Condition (p.u.) Figure 1. Selected Equipment Failure Rate Functions Failure rate graphs for some of the equipment in Table 3 are shown in Figure 1. These are simply plots of Eq. 2 using the stated A, B, and C parameters the displayed equipment. It is interesting to see that the range of failure rates of certain types of equipment is large, while other types have a more moderate range. This reflects the ranges found in a broad literature search which forms the basis of Table 3. IV. MODEL CALIBRATION After creating a system reliability model, it is desirable to adjust component reliability data so that predicted system reliability is equal to historical system reliability [11]. This process is called model calibration, and can be generalized as the identification of a set of parameters that minimize an error function. Traditionally, reliability parameters (such as equipment failure rates) either remained uncalibrated or were adjusted based on average system reliability. For example, it may be known that an analysis area has an average of 1.2 interruptions per customer per year. Based on this number, failure rates can be adjusted until the predicted average number of customer interruptions is equal to this historical value. After failure rates are calibrated, switching and repair times can be adjusted until predicted average interruption duration is also equal to historical values. Calibrating based on system averages is useful, but does not ensure that the predicted distribution of customer interruptions is equal to the historical distribution. That is, it does not ensure that either the most or least reliable customers are accurately represented only that the average across all customers reflects history. This is a subtle but important point; since customer satisfaction is largely determined by customers receiving below-average reliability, calibration of reliability distribution is arguably more important than calibration of average reliability. A system model with homogeneous failure rates will produce a distribution of expected customer reliability levels (e.g., customers close to the substation will generally

have better reliability than those at the end of the feeder). If components on this same system are assigned random failure rates such that average system reliability remains the same, the variance of expected customer reliability will tend to increase. That is, the best customers will tend to get better, the worst customers will tend to get worse, and fewer customers can expect average reliability. The distribution of expected customer reliability is critical to customer satisfaction and should, if possible, be calibrated to historical data. A practical way to accomplish this objective is to calibrate condition-mapping parameters so that a distribution-based error function is minimized. Such an error function can be based on one of three levels of granularity: (1) individual customer reliability, (2) histograms of customer reliability, or (3) statistical measures of customer reliability. An error function can be defined based on the difference between each customer s historical versus predicted reliability. This approach calibrates reliability to the customer level and utilizes historical data at the finest possible granu-

Table 3. Representative Failure Rate Model Parameters (λ values in failures per year) Description λ(0) λ(½) λ(1) A B C Overhead Equipment Overhead Lines Primary Trunk* 0.0100 0.100 0.600 0.01976 3.4295969-0.009756098 Lateral Tap* 0.0100 0.160 0.600 0.07759 2.1522789-0.067586207 Secondary & Service Drop* 0.0100 0.088 0.600 0.01402 3.7632316-0.004018433 Pole Mounted Transformer 0.0020 0.010 0.030 0.00533 1.8325815-0.003333333 Disconnect Switch 0.0020 0.014 0.280 0.00057 6.1971793 0.001433071 Fuse Cutout 0.0020 0.009 0.060 0.00111 3.9718310 0.000886364 Line Recloser 0.0025 0.015 0.060 0.00481 2.5618677-0.002307692 Shunt Capacitor 0.0055 0.020 0.170 0.00155 4.6729733 0.003948339 Voltage Regulator 0.0050 0.029 0.200 0.00392 3.9272195 0.001081633 Underground Equipment Underground Cable Primary Cable* 0.0015 0.070 1.174 0.00453 5.5597230-0.003031386 Secondary Cable* 0.0025 0.100 0.300 0.09274 1.4369300-0.090243902 Elbow Connectors 3.E-05 6.E-04 0.002 0.00039 1.7971823-0.000361446 Cable Splices and Joints 3.E-05 0.030 0.318 0.00348 4.5255272-0.003450994 Padmount Transformers 0.0005 0.010 0.100 0.00112 4.4970357-0.000621118 Padmount Switches 0.0005 0.003 0.010 0.00139 2.0592388-0.000888889 AIS Substation Equipment Power Transformers Less than 25 MVA 0.0075 0.040 0.140 0.01565 2.2478602-0.008148148 Bigger than 25 MVA 0.0050 0.030 0.120 0.00962 2.5618677-0.004615385 Circuit Breakers 0.0005 0.010 0.060 0.00223 3.3214624-0.001728395 Disconnect Switches 0.0020 0.010 0.320 0.00021 7.3142615 0.001788079 Instrument Transformers 0.0000 0.010 0.060 0.00250 3.2188758-0.002500000 Air Insulated Busbar 0.0005 0.010 0.076 0.00160 3.8767259-0.001097345 GIS Substation Equipment GIS Bay (before 1985) 0.0003 0.002 0.030 0.00011 5.6031525 0.000190114 GIS Bay (after 1985) 0.0002 0.001 0.018 0.00004 6.1127138 0.000160494 * Line and cable failure rates are per circuit mile larity. However, historical customer reliability is stochastic in nature and will vary naturally from year to year. An error function can be defined based on the difference between each customer s historical versus predicted reliability. This approach calibrates reliability to the customer level and utilizes historical data at the finest possible granularity. However, historical customer reliability is stochastic in nature and will vary naturally from year to year. This is especially problematic with frequency measures. Although customers on average may experience 1 interruption per year, a large number of customers will not experience any interruptions in a given year. Calibrating these customers to historical data is misleading, making about 10 years of historical data for each customer desirable. Unfortunately, most feeders change enough over 10 years to make this method impractical. An error function can also use a histogram of customer interruptions as its basis. The historical histogram could be compared to the predicted histogram and parameters adjusted to minimize the chi-squared error (χ 2 ): n i= 1 ( h p ) 2 i i χ = (4) h i Where n is the number of bins, h is the historical bin value, and p is the predicted bin value. Using the chisquared error is attractive since it emphasized the distribution of expected customer reliability which is strongly correlated to customer satisfaction. Histograms will vary stochastically from year to year, but the large number of customers in typical calibration areas prevent this from becoming a major concern. Last, an error function can be based on statistical measures such as mean value (µ) and standard deviation (σ). The error function will typically consist of a weighted sum similar to the following: ( µ µ ') 2 + β ( σ σ ' ) 2 Error = α (5) Unlike the χ 2 error, this function allows relative weights to be assigned to mean and variance discrepancies (α and β). For example, a relatively large a value will ensure that predicted average customer reliability reflects historical average customer reliability while allowing relatively large mismatches in standard deviation. Once an error measure is defined, failure rate model parameters can be adjusted so that error is minimized. Since this process is over determined, the authors suggest using Table 3 for initial parameter values and using gradient de-

scent or hill climbing techniques for parameter adjustment. Calibration is computationally intensive since error sensitivity to parameters must be computed by actual parameter perturbation, but calibration need only be performed once. V. APPLICATION TO TEST SYSTEM The methodologies described in the previous two sections have been applied to a test system derived from an actual overhead distribution system in the Southern U.S. This model consists of three substations, 13 feeders, 130 miles of exposure, and a peak load of 100 MVA serving 13,000 customers. The analytical model consists of 4100 components. Customer historical failures are computed from fouryear historical averages. Equipment condition for this system was not available, and was therefore assigned for randomly for individual components based on a normal distribution with a 0.5 mean and a 0.2 standard deviation. Calibration for this test system is performed based on the chi-squared error of customer interruptions. Initial failure rates for all components are assigned based on λ(½) values in Table 3, and initial failure rates are computed based on condition and the parameters in Table 3. Calibration is performed by a variable-step local search that guarantees local optimality. A summary of calibration results for overhead lines is shown in Figure 2, and a visualization of calibrated results in shown in Figure 3. The shape of the uncalibrated histogram is similar to the historical histogram, but with a mean and mode worse than historical values. After calibration, the modes align, but the predicted histogram retains a slightly smaller variance. In fact, the historical histogram is subject to stochastic variance, and the inability of the expected value calibration to match this variance is immaterial and perhaps beneficial. Uncalibrated and calibrated failure rate parameters are shown in Table 4, and corresponding failure rate functions are shown in Figure 4. In effect, the calibration for this system did not change the failure rates for lines with good condition (less than 0.2), but drastically reduced the failure rates for lines with worse-than-average condition (greater than 0.5). These results are not unexpected, since this particular service territory is relatively homogeneous in both terrain and maintenance practice, and extremely wide variations in overhead line failure rates have not been historically observed. Table 4. Calibration Results for Overhead Line Parameters Uncalibrated Calibrated A 0.01976 0.0170 B 3.429597 2.5981 C -0.00976-0.00528 χ 2 Error (% 2 ) 1148.8 155.4 % of Customers Failure Rate (/yr) 50 40 30 20 10 0 Historical Uncalibrated Calibrated 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Interruptions (per year) Figure 2. Historical Versus Predicted Customer Interruptions 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Figure 3. Visualization of Calibrated Results Uncalibrated Calibrated 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Condition (p.u.) Figure 4. Overhead Line Failure Rate as a Function of Condition

It is important to note that, in this case, equipment conditions were assigned randomly, and some were very high. Even though actual equipment for this system may never reach this poor condition state, the calibration process compensated by ratcheting down the failure rates assigned to equipment with the highest condition scores. Once a system has been modeled and calibrated, it can be used as a base case to explore the impact of issues that may impact equipment condition such as equipment maintenance. Once the expected impact that a maintenance action will have on inspection items is determined, the system impact of maintenance can be quantified based on the new failure rate. This allows the cost effectiveness of maintenance to be determined and directly compared to the cost effectiveness of system approaches such as new construction, added switching and protection, and system reconfiguration. [3] G. Kjolle and Kjell Sand, RELRAD - An Analytical Approach for Distribution System Reliability Assessment, IEEE Transactions on Power Delivery, Vol. 7, No. 2, April 1992, pp. 809-814. VI. CONCLUSIONS Equipment failure rate models are required for electric utilities to plan, engineer, and operate their system at the highest levels of reliability for the lowest possible cost. Detailed models based on historical data and statistical regression are not feasible at the present time, but this paper presents an interpolation method based on normalized condition scores and best/average/worst condition assumptions. The equipment failure rate model developed in this paper allows condition heterogeneity to be reflected in equipment failure rates. Doing so more accurately reflects component criticality in system models, and allows the distribution of customer reliability to be more accurately reflected. Further, a calibration method has been presented that allows condition-mapping parameters to be tuned so that the predicted distribution of reliability matches the historical distribution of reliability. Finally, the use of this condition-based approach allows the impact of maintenance activities on condition to be anticipated and reflected in system models, enabling the efficacy of maintenance budgets to be compared with capital and operational budgets. This model is heuristic by nature, but adds a fundamental level of richness and usefulness to reliability modeling, especially when parameters are calibrated to historical data. In the short run, gathering more detailed information on equipment failure rates and condition will strengthen this approach. In the long run, this same information can ultimately be used to develop explicit failure rate models that eliminate the normalized condition assessment requirement. VII. REFERENCES [1] EPRI Report EL-2018, Development of Distribution Reliability and Risk Analysis Models, Aug. 1981. [2] S. R. Gilligan, A Method for Estimating the Reliability of Distribution Circuits, IEEE Transactions on Power Delivery, Vol. 7, No. 2, April 1992, pp. 694-698.

[4] R.E. Brown, S. Gupta, S.S. Venkata, R.D. Christie, and R. Fletcher, Distribution System Reliability Assessment Using Hierarchical Markov Modeling, IEEE Transactions on Power Delivery, Vol. 11, No. 4, Oct., 1996, pp. 1929-1934. [5] Y-Y Hsu, L-M Chen, J-L Chen, et al., Application of a Microcomputer-Based Database Management System to Distribution System Reliability Evaluation, IEEE Transactions on Power Delivery, Vol. 5, No. 1, Jan. 1990, pp. 343-350. [6] C.M. Warren, The Effect of Reducing Momentary Outages on Distribution Reliability Indices, IEEE Transactions on Power Delivery, Vol. 7, No. 3, July, 1992, pp. 1610-1615. [7] R. Brown, S. Gupta, S.S. Venkata, R.D. Christie, and R. Fletcher, Distribution System Reliability Assessment: Momentary Interruptions and Storms, IEEE PES Summer Meeting, Denver, CO, June, 1996. [8] R. E. Brown and J. J. Burke, Managing the Risk of Performance Based Rates, IEEE Transactions on Power Systems, Vol. 15, No. 2, May 2000, pp. 893-898. [9] L. V. Trussell, Engineering Analysis in GIS, DistribuTECH Conference, Miami, FL, Feb. 2002. [10] R. E. Brown and M. M. Marshall, Budget-Constrained Planning to Optimize Power System Reliability, IEEE Transactions on Power Systems, Vol. 15, No. 2, May 2000, pp. 887-892. [11] R. E. Brown, J. R. Ochoa, Distribution System Reliability: Default Data and Model Validation, IEEE Transactions on Power Systems, Vol. 13, No. 2, May 1998, pp. 704-709. [12] M. A. Rios, D. S. Kirschen, D. Jayaweera, D. P. Nedic, and R. N. Allan, Value of security: modeling time-dependent phenomena and weather conditions, IEEE Transactions on Power Systems, Vol. 17, No. 3, Aug 2002, pp. 543 548. [13] R. N. Allen, R. Billinton, I. Sjarief, L. Goel, and K. S. So, A Reliability Test System for Educational Purposes - Basic Distribution System Data and Results, IEEE Transactions on Power Systems, Vol. 6, No. 2, May 1991. [14] R. M. Bucci, R. V. Rebbapragada, A. J. McElroy, E. A. Chebli and S. Driller, Failure Predic-tion of Underground Distribution Feeder Cables, IEEE Transactions on Power Delivery, Vol. 9, No. 4, Oct. 1994, pp. 1943-1955. [15] D. T. Radmer, P. A. Kuntz, R. D. Christie, S. S. Venkata, and R. H. Fletcher, Predicting vegetation-related failure rates for overhead distribution feeders, IEEE Transactions on Power Delivery, Vol. 17, No. 4, Oct. 2002, pp. 1170-1175. [16] S. Gupta, A. Pahwa, R. E. Brown and S. Das, A Fuzzy Model for Overhead Distribution Feeders Failure Rates, NAPS 2002: 34th Annual North American Power Symposium, Tempe, AZ, Oct. 2002. [17] J. B. Bowles, Commentary-caution: constant failure-rate models may be hazardous to your design, IEEE Transactions of Reliability, Vol. 51, No. 3, Sept. 2002, pp. 375-377. [18] R. E. Brown, Electric Power Distribution Reliability, Marcel Dekker, Inc., 2002. VIII. BIOGRAPHIES Richard E. Brown is a principal consultant with KEMA, and specializes in distribution reliability and asset management. He is the author or co-author of more than 50 technical papers and the book Electric Power Distribution Reliability. Dr. Brown received his BSEE, MSEE, and PhD from the University of Washington and his MBA from the University of North Carolina at Chapel Hill. He is a registered professional engineer, and can be reached at rebrown@kema.com.