STRATEGIC DESIGN VISION All our students enjoy thriving, productive lives in a future they create.
I want flexibility to explore career and personal interests. I need to make room in my schedule for band, athletics, or CTE courses. I m trying to graduate early and get a jumpstart on college or career. I learn best in small, personalized learning environments. I need flexible learning opportunities that will allow me to work and go to school. I need to work to help care for my family. I need to leave early to watch my younger brother. I want to take a world language not offered at school.
DIGITAL LEARNING
BLENDED LEARNING Innosight Institute 2012
1:X Classrooms Blended Classes Online Classes
CONTENT TEACHING TECHNOLOGY OPERATIONS
Online Blended Staffing High school core and elective courses LISD Virtual Learning (VLA) Texas Virtual School Network (TxVSN) Texas Tech Marcus: United States History, English 3, Algebra 2, Physics Flower Mound: United States Government, Economics, AP English 4AP Pre-Cal Lewisville High School: United States Government, Economics, English 3 AP, English 4 AP, Humanities block Creek Valley Middle School: 8 th grade social studies pilot Online: 4 full-time online teachers; 12 adjunct teachers; TxVSN providers 3 Digital Learning Specialists; Digital Learning Technologist; Digital Learning Leader Partner with: Operations, SIS team, Network and Technical Services, PEIMS, Guidance and Counseling, campus counselors, Special Education, and Learning and Teaching Blended: campusbased
Locally developed 3 rd party Deeply aligned inacol standards ISTE standards 508 Accessibility standards
Online Highly qualified Online certification Adjunct teachers Flexible work Blended Campus based
Internet connection 6Gbps, burstable to 10Gbps Private Fiber WAN Point to point 10Gbps, 69 locations Firewalls 10Gbps, fully redundant (Palo Alto) Web Content Filtering Support 10Gbps, fully redundant (Content Keeper) Bandwidth Management Supports 10Gbps (Exinda) Routing/Switching NOC Cisco Nexus Platform 7K, 5K, 2K, MDS, fully redundant Routing /Switching at Campuses Cisco Catalyst 4500, 3750, 3850
Compute Platform Cisco UCS Virtualization Platform VmWare 5.x over 90% virtualized (as of 1/2015) Network Operating System Microsoft Active Directory Storage Area Networks EMC VNX series, Isilon Backup EMC Avamar (tapeless) Wireless Cisco Wireless Control System (WCS) managed by Cisco Prime, supporting 802.11g/n; 5,813 access points Telecommunications Avaya and Cisco CUCM
Moodle (virtualized) Google Apps for Education (integration) Blackboard Collaborate (synchronous tools) Interactive tools Soft Chalk Ted Ed Thinglink 508 Accessibility Standards
631 639 17 30 90 210 Blended Enrollment 3,612% Increase *Requested Enrollments Credit Recovery 1,305 2010-11 2011-12 2012-13 2013-14 2014-15* 251 460 372 Online Enrollment Summer 2011 = 251 Enrollments Summer 2014 = 459 Enrollments 83% Increase 2010-11 2011-12 2012-13 2013-14
Creek Valley Middle School Destination Transformation 2012-2015
Vision Share mission and vision based on Lewisville ISD s Strategic Design Document Develop campus level goals based on Strategic Design and campus/student needs Leverage all available resources including professional learning and technology Develop systems that can impact the most effective change for students and staff to move toward a 21st Century Learning Environment Flexible Learning at Creek Valley Creek Valley ThingLink
Creek Valley Flexible Space Design on a Dime 2012-2015
Creek Valley Middle School Blended Learning
Time shifted, personalized learning