1 AUGUSTA TECHNICAL COLLEGE INFORMATION TECHNOLOGY PLAN
2 Table of Contents Information Technology Plan Table of Contents Mission Statement Current Capabilities Future Plans How to get there
3 AUGUSTA TECHNICAL COLLEGE MISSION STATEMENT Augusta Technical College, a unit of the Technical College System of Georgia, is a public postsecondary institution that promotes and provides the education, economic, and community development needs of its service area (Burke, Columbia, Lincoln, McDuffie, and Richmond Counties). Associate of Science Degrees, Associate of Applied Science Degrees, diplomas, and technical certificates of credit are provided through traditional and distance delivery methods. The College achieves its mission by providing academic and technical education, student support services, customized business and industry training, economic development services, continuing education, and adult education services.
4 Current Capabilities Computers Augusta Technical College currently maintains more than 1700 microcomputers in various offices, labs, classrooms, and sites. These computers consist of Windows based models with various levels of hardware, depending on their purpose. The Operating Systems are a mixture of Windows XP and Windows 7. Datacenter The datacenter located in the 100 building on the Augusta campus housed the majority of the servers in use by the school. The datacenter has a centralized APC ups system that provides battery backup for all systems in the datacenter. The building is also supported by a gas generator that provides backup power for the entire building. This combination minimizes any downtime due to power issues. There are 41 physical servers in the datacenter. They are mostly windows servers providing services files services, application servers, services, security camera recording and other vital services. 57 servers are virtualized on 6 IBM 3850 s in two VMware clusters. Storage is provided by multiple IBM N-series 3600 SANs. These systems provide primary storage for data and VMware virtual machines. Networks The network is a star topology with fiber runs to each wire closet on the Augusta Campus. All
5 connections to switches on the Augusta Campus are either 1 GB or 10GB. Each wire room is equipped with one or more uninterruptable power supplies (UPS) that provide power to critical infrastructure equipment in the event of a short power outage. Each UPS can support a limited number of devices so some wire rooms have more than others. Augusta Technical College's current network consists of multiple virtual LAN's (VLAN) combined to form one large Intranet The remote sites in Waynesboro and Grovetown are connected by T-1 circuits provided by GTA/AT&T. The Thomson site is connected with dark fiber leased from Comcast. We light the fiber with a 10GB connection. The internet connection for the school is a DS3 circuit from GTA/AT&T that connects us through the GTA network. All traffic to and from the college is run through Cisco ASA 5540 and Cisco FWSM firewalls. The network structure includes a Cisco 6513 serving as the core router. The VLAN topology is created in such a manner to limit access based on a ring structure. Access lists are designed to limit computers and users ability to physically reach servers they do not require access to. Cisco NAC is used to control unauthorized usage of the network. Only authorized devices are allowed to plug into the network. The wireless network consists of over 130 access points and core controller devices for managing the wireless infrastructure.
6 Future Computers Augusta Tech will pursue a strategy to virtualize the desktop computers over the next 3 years. The goal is to provide stable desktop computing platform that will be responsive to the computing needs of the users. Virtualizing desktops will allow us to extend the life of current PC s by repurposing them as terminal clients. Some departments will still require desktop computers such as Drafting and Computer Information Systems. Servers will likely be replaced on a 5 year cycle. Blade servers will be most of the future purchases as they can easily be switched out of the chassis platforms like UCS and IBM Blade center we have in place. Printers will be replaced on a 5-7 year cycle as well. This allows a greater return of investment on maintenance contracts rather than purchasing new hardware on a greater frequency. Datacenter The datacenter will require an upgrade to the SAN infrastructure and server infrastructure. Virtualization requirements for the desktops call for newer SAN hardware to support the greater requirements of moving desktop computing into the datacenter. Additional blade servers will be required as we scale out the PC virtualization.
7 Networks Most all Cisco switches have been replaced with Cisco Catalyst 3650X and 3750X series switches in accordance with TCSG recommendations. The 6513 core router will need to be changed out based on age and support availability from Cisco. The newer Cisco Nexus 7000 models will be evaluated for appropriate upgrades. The Cisco NAC will need to be replaced for similar reasons. The newer NAC devices also have greater capabilities to handle the requirements for BYOD computing (Tablets, phones, etc ) The limitations and expense of utilizing the GTA network require us to seek alternate methods to connect our campuses and our internet connection. These services will need to be bid out based our new requirements. Faster speeds for each of the branch campuses and a direct connection to the internet hub at 56 Marietta in Atlanta. TCSG already maintains a presence there that we can leverage for cheaper internet access and direct connections to other TCSG schools. Voice/Telephone An updated telephone system would allow increased productivity and lower costs spanning our entire enterprise. Voice over IP (VoIP) has been installed by the majority of our sister Technical Colleges across the state. This type of system allows more features, such as caller ID, calling circles, digital voice mail, and desk side video calling. TCSG and Cisco are in negotiations for a financing deal that will allow Augusta Tech to procure a VOIP solution. This deal will eliminate the significant upfront costs and spread the costs out over multiple years. The financed cost should be equivalent to the in monthly phone bill. The return of investment is 3-5 years.
8 Three Year Plan for Replacement of Computers and Infrastructure Equipment How to get there... FY14 Item Quantity Cost (each) Total Desktop Computers 400 $ $280, NAC Replacement 1 $60, $60, Cisco Core Router 1 $260, $260, Blade Servers 3 $ $33, Connectivity 12 mos. $ $78, FY15 Item Quantity Cost (each) Total Desktop Computers 400 $ $280, Cisco Switches 5 $ $37, Blade Servers 3 $ $33, Connectivity 12 mos. $ $78,
9 FY16 Item Quantity Cost (each) Total Desktop Computers 400 $ $280, Cisco Switches 5 $ $37, Blade Servers 3 $ $33, Connectivity 12 mos. $ $78, Note: These figures do not include any price increase from year to year. 11
2013-2016. Three Year District Technology Plan. Pasco School District #1 July 1, 2013 to June 30, 2016
2013-2016 Three Year District Technology Plan Pasco School District #1 July 1, 2013 to June 30, 2016 Development History August 2012 November 2012 December 2012 December 2012 February 2013 March 2013 April
More informationInformation Technology Mission Statement. Information Technology Goals
Ionia County Information Technology Strategic Plan 2008-2013 Table of Contents Information Technology Mission 3 Information Technology Goals 3 Current Network Overview 4-5 Information Technology Focus
More informationChabot-Las Positas Community College District Bond Measure Technology Improvements Supplement to Capital Improvement Program
Chabot-Las Positas Community College District Bond Measure Technology Improvements Supplement to Capital Improvement Program Guidelines for Technology Estimates: The Capital Improvement Program for both
More informationTECHNOLOGY PLAN SUMMARY
IV. TECHNOLOGY PLAN SUMMARY The Oklahoma City Metropolitan Area Public Schools (OCMAPS) Technology Plan serves as a guide for OCMAPS funding of technology into the Oklahoma City Public School District
More informationEligible Services Fall 2014 Applicant Trainings
E rate Program Eligible Services Fall 2014 Applicant Trainings Overview Draft Eligible Services List (ESL) Category One Category Two Eligible Services Broadband Voice Services Eliminated Services Eligibility
More informationCampus Network Best Practices: Core and Edge Networks
Campus Network Best Practices: Core and Edge Networks Dale Smith University of Oregon/NSRC dsmith@uoregon.edu This document is a result of work by the Network Startup Resource Center (NSRC at http://www.nsrc.org).
More informationHow To Upgrade The Council'S Network Infrastructure
Report Asset Management 21 October 2004 I1 ICT INFRASTRUCTURE UPGRADE PROGRAMME 1. Purpose of Report To propose a programme of investment necessary to update our ICT infrastructure, making it fit for purpose
More informationCity of Coral Gables
City of Coral Gables Information Technology Department IT TECHNICAL SUPPORT DIVISION Infrastructure Upgrade Plan Systems, Applications, Network, and Telecommunications Infrastructure OVERVIEW Last revision:
More informationRFP 1337 Board approved 10-08-09 Posted, 14 October, 2009
RFP 1337 Board approved 10-08-09 Posted, 14 October, 2009 Request to use the RFP 1337 bidding method for selection and use SLD- Erate 470 (Erate 2009-2010) form application for basic maintenance of internal
More informationFBLA: NETWORKING CONCEPTS. Competency: General Network Terminology and Concepts
Competency: General Network Terminology and Concepts 1. Demonstrate knowledge of the purposes, benefits, and risks for installing a network. 2. Identify types of networks (e.g., LAN, WAN, MAN) and their
More informationDiploma in Information Technology Network Intergration Specialist COURSE INFORMATION PACK
Diploma in Information Technology COURSE INFORMATION PACK REGISTRATION AND ACCREDITATION Prestige Academy (Pty) Ltd is a widely recognized and credible institution. Prestige Academy is registered with
More informationTable of Contents Table of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems...
Table of Contents Table of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems...3 Improve Processes...4 Innovation...4 IT Planning & Alignment
More informationDiploma in Information Technology Network Integration Specialist COURSE INFO PACK
Registered as a Private Higher Education Institution with the Department of Higher Education and Training in South Africa under the Higher Education Act 1997 Registration Nr. 2001/HE07/005 Diploma in Network
More informationInformation Technology 2016-2021 Strategic Plan
Information Technology 2016-2021 Strategic Plan Draft Table of Contents Table of Contents... 3 Introduction... 4 Mission of IT... 4 Primary Service Delivery Objectives... 4 Availability of Systems...
More informationLocal Area Networking technologies Unit number: 26 Level: 5 Credit value: 15 Guided learning hours: 60 Unit reference number: L/601/1547
Unit title: Local Area Networking technologies Unit number: 26 Level: 5 Credit value: 15 Guided learning hours: 60 Unit reference number: L/601/1547 UNIT AIM AND PURPOSE Learners will gain an understanding
More informationGlossary of Telco Terms
Glossary of Telco Terms Access Generally refers to the connection between your business and the public phone network, or between your business and another dedicated location. A large portion of your business
More informationTechnology Services Division Infrastructure Major Deliverables by Calendar Year
Technology Services Division Infrastructure Major Deliverables by Calendar Year Year 2002 Network INFRASTRUCTURE Green Screen Technology DELIVERABLES Migrated courthouse network devices to Multi-Protocol
More informationTable of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems... 3. Improve Processes...
Table of Contents Table of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems... 3 Improve Processes... 3 Innovation... 4 IT Planning & Alignment
More informationQuestions and Answers
1 Questions and Answers 1) EfficiencyOne currently has redundant and diverse Dark Fibre links connecting the main office and their colocation facility. Will it be a requirement to maintain this architecture,
More informationNetwork Considerations to Optimize Virtual Desktop Deployment
. White Paper Network Considerations to Optimize Virtual Desktop Deployment What You Will Learn Enterprises today strive to improve productivity, increase operating efficiency, and offer competitive advantages
More informationCisco Unified MobilityManager Version 1.2
Cisco Unified MobilityManager Version 1.2 Cisco Unified MobilityManager Version 1.1, Release 1.2 The Cisco Unified Communications system of voice and IP communications products and applications enables
More informationVoice Over IP (VOIP) Phone System Invitation to Bid
Voice Over IP (VOIP) Phone System Invitation to Bid The Board of Trustees of Neosho County Community College (NCCC) is seeking bids for a VOIP phone system for the new Ottawa campus building. This system
More informationMicro Technology Solutions, Inc. Health Care Case Study
1 P a g e Micro Technology Solutions, Inc. 21 Father DeValles Blvd. Suite 101 Fall River, MA 02723 Phone: 508.324.9475 Fax: 508.324.4477 Health Care Case Study 2 P a g e Improving Health Care Through The
More informationIn 1995, the first company in the history of voice over internet protocol put a product on the market.
VoIP HOW VOIP STARTED Voice over IP (VoIP) is a methodology and group of technologies for the delivery of voice communications and multimedia sessions over Internet Protocol networks, such as the Internet.
More informationCampus Network Best Practices: Core and Edge Networks
Campus Network Best Practices: Core and Edge Networks Dale Smith Network Startup Resource Center dsmith@nsrc.org This document is a result of work by the Network Startup Resource Center (NSRC at http://www.nsrc.org).
More informationCisco 646-276 Exam Questions & Answers
Cisco 646-276 Exam Questions & Answers Number: 646-276 Passing Score: 800 Time Limit: 120 min File Version: 25.8 http://www.gratisexam.com/ Exam Code: 646-276 Exam Name: MeetingPlace Sales Specialist (SMPS)
More informationRestricted Document. Pulsant Technical Specification
Pulsant Technical Specification Title Pulsant Government Virtual Server IL2 Department Cloud Services Contributors RR Classification Restricted Version 1.0 Overview Pulsant offer two products based on
More informationREQUEST FOR PROPOSALS FOR. IP Phone System. Issue Date: April 1, 2015. Submittal Date: May 1, 2015 at 12:00 P.M. Contact: Tricia A.
REQUEST FOR PROPOSALS FOR IP Phone System Issue Date: April 1, 2015 Submittal Date: May 1, 2015 at 12:00 P.M. Contact: Tricia A. Pawlowski Superintendent Deckerville Community Schools tpawlowski@deckerville.k12.mi.us
More informationAL RAFEE ENTERPRISES Solutions & Expertise.
AL RAFEE ENTERPRISES Solutions & Expertise. Virtualization Al Rafee has strategically made substantial investment in building up a large end to end portfolio of Virtualization across the entire IT infrastructure
More informationManaged Information Technology Services For the Town of Moraga
Request for Qualifications Managed Information Technology Services For the Town of Moraga Deadline for Submittal: Wednesday, December 5, 2012 No later than 2:00 p.m. Prepared by: Stephanie Hom Administrative
More informationChampaign Public Library Technology Plan 2008-2009
Champaign Public Library Technology Plan 2008-2009 Library Mission Statement Champaign Public Library creates a community where popular materials are abundant, reading is valued, and learning never ends.
More informationJob Description Information Services Coordinator
Job Description Position Title: Information Services Coordinator Department: Reports To: Technology & Infrastructure Manager Purpose The Information Services Coordinators role is to ensure the stability,
More informationINFORMATION TECHNOLOGY ENGINEER V
1464 INFORMATION TECHNOLOGY ENGINEER V NATURE AND VARIETY OF WORK This is senior level lead administrative, professional and technical engineering work creating, implementing, and maintaining the County
More informationCenSus ICT Strategy (2012 2015)
CenSus ICT Strategy (2012 2015) Date: September 2012 Version: 5.0 Version Control Amendment History including Author: Version Date Author / Amendment History 1.0 Draft 30 th August 2012 Graham Crossingham
More informationIs Hosted VoIP Right For You?
By Pat Moulton Is Hosted VoIP Right For You? Hosted PBX Overview: With the availability of cheap broadband services, migrating applications and storage from premise-based servers to the cloud has become
More informationRequest for Proposals Voice over Internet Protocol Unified Communications System 10-2015/2016
Request for Proposals Voice over Internet Protocol Unified Communications System 10-2015/2016 Addendum #2, September 22, 2015 Is there an electronic drawing that shows the system? Attached. What is the
More informationNetwork Technology Performance Evaluation Cisco Wireless High Availability. July 31, 2013
Network Technology Performance Evaluation Cisco Wireless High Availability July 31, 2013 Executive Summary Dramatic improvements in wireless networking combined with an increasingly important role for
More informationADSL or Asymmetric Digital Subscriber Line. Backbone. Bandwidth. Bit. Bits Per Second or bps
ADSL or Asymmetric Digital Subscriber Line Backbone Bandwidth Bit Commonly called DSL. Technology and equipment that allow high-speed communication across standard copper telephone wires. This can include
More informationNETWORK ADMINISTRATOR
JOB DESCRIPTION Title: NETWORK ADMINISTRATOR Department: Information Systems Class Code: 1821 FLSA Status: Exempt Effective Date: February 13, 1997 (Rev. 07/2012) Grade Number: 26 GENERAL PURPOSE Under
More informationIP Telephony Management
IP Telephony Management How Cisco IT Manages Global IP Telephony A Cisco on Cisco Case Study: Inside Cisco IT 1 Overview Challenge Design, implement, and maintain a highly available, reliable, and resilient
More informationPlanning Process and Methodology
Executive Summary Our mission is to provide students and staff with technology to meet their instructional and administrative needs. This incorporates all aspects of technology including networking, end
More informationSample Technology Plan
Appendix A Sample Technology Plan Rochester Hills Public Library Technology Plan 2011 2014 Prepared by: Karen Knox, Information Technology Manager January 2011 Contents Library Mission Technology Goals
More informationCase Study: Oconomowoc Area School District
Prepared for CESA #1, Sponsored by Cisco Systems, Inc. Case Study: Oconomowoc Area School District Prepared by Rich Kaestner, CoSN TCO/VOI Project Director March 16, 2008 If a broadband fiber network were
More informationPerry T. Eidson Technical Operations Communications Engineer Emory University Technical Services perry.eidson@emory.
Perry T. Eidson Technical Operations Communications Engineer Emory University Technical Services perry.eidson@emory.edu 404-727-0248 Internet2 Fall 2008 Member Meeting October 14, 2008 Founded in 1836
More informationIT Solutions Savings through Sm@rt IT
IT Solutions Savings through Sm@rt IT Business Success Your most important asset and the key to business success is your people, never more so than in tough economic times. Smart Computers and Consulting
More informationWHO ARE WE AND WHAT WE DO?
1 WHO ARE WE AND WHAT WE DO? itgroup was founded in 2010 through integration of company Net Service s 2003, modern IT management platforms and new business concept. We passed a long way and become leading
More informationChapter 9A. Network Definition. The Uses of a Network. Network Basics
Chapter 9A Network Basics 1 Network Definition Set of technologies that connects computers Allows communication and collaboration between users 2 The Uses of a Network Simultaneous access to data Data
More informationInformation Technology Standards Document
Information Technology Standards Document The Information Technology Standards Policy lists all technologies supported by the organization and serves as a guideline for all technology purchasing and use
More informationMaking the Case for Satellite: Ensuring Business Continuity and Beyond. July 2008
Making the Case for Satellite: Ensuring Business Continuity and Beyond July 2008 Ensuring Business Continuity and Beyond Ensuring business continuity is a major concern of any company in today s technology
More informationStrategic Plan. for the. Department of Information Technology 2008-2012
Strategic Plan for the Department of Information Technology 2008-2012 Submitted by Frank Williams Director, Information Technology October 20, 2008 Strategic Plan Information Technology 2008-2012 Information
More informationUnified Communications. Comprehensive upgrade to the voice services for PBC
Unified Communications Comprehensive upgrade to the voice services for PBC 1 Project Initiation Request for funding/bcc approval 1 Evaluation Methodology ISS developed lab criteria and testing methodology
More informationDiploma in Network (LAN/WAN) Administration
Diploma in Network (LAN/WAN) Administration The Diploma in Network (LAN/WAN) Administration program prepares students to setup Local & Wide Area Networks using Cisco routers and Catalyst switches in a
More informationLibrary as a service in Digital Era Preparing academic campuses in Indian scenario
Library as a service in Digital Era Preparing academic campuses in Indian scenario Department of Electronics and Communication Engineering National institute of Technology, Rourkela, India-769008 -Where
More informationSchools and Libraries Universal Service Support Mechanism Eligible Services List
Schools and Libraries Universal Service Support Mechanism Eligible Services List (WC Docket No. 13-184; CC Docket No. 02-6; GN Docket No. 09-51) The Federal Communications Commission s (FCC s) rules provide
More informationInsurance Company Deploys UCS and Gains Speed, Flexibility, and Savings
Customer Case Study Insurance Company Deploys UCS and Gains Speed, Flexibility, and Savings Hannover Transforms Data Center Management Challenge EXECUTIVE SUMMARY HANNOVER LIFE RE AMERICA Financial Services
More informationNetwork Essentials for Superintendents
Network Essentials for Superintendents Upgrade your network for digital learning UNDERSTAND. How can I improve my network? As a district leader, you can help most in the planning and implementation of
More informationVOIP IMPLEMENTATION MINNESOTA HOUSE OF REPRESENTATIVES. National Conference of State Legislatures. Paul Schweizer September 4, 2008
VOIP IMPLEMENTATION MINNESOTA HOUSE OF REPRESENTATIVES National Conference of State Legislatures Paul Schweizer September 4, 2008 Minnesota House of Representatives 1 What is IP Telephony? The technology
More informationEssentials NEWS. Networking in SC
Essentials Computer Systems Support College of Engineering University of Iowa Volume 13, No. 1, April 2012 NEWS 1... Networking in SC 3... VDI 3... ETCetra 4... IT Survey CSS Mission To provide a secure,
More informationThank you for your time and consideration
Generation 7 Built To Serve Businesses Thank you for your time and consideration POPP.com, Inc. All rights reserved. 1 - AP 4/28/15 POPP.com, Inc. All rights reserved. 2 - AP 4/28/15 Past And Present POPP
More informationTechnology Department Infrastructure & Support
Technology Department Infrastructure & Support The Technology Department Team Executive Director of Technology Technology Coordinator Network Engineer Application Administrator Application Specialist Infrastructure
More informationHosted IP Telephony. An easy to understand guide. A white paper from Mason Infotech September 2013. Helping business communicate
Hosted IP Telephony An easy to understand guide A white paper from Mason Infotech September 2013 Contents Introduction What is hosted telephony? Who is hosted good for? Why consider hosted telephony? The
More informationTechnology Services Allocation Model
Allocation Model Version 2 for FY13-14 Model Review & Changes This is a brief overview of the to help explain the following: - The various models / funding sources - The methodology in calculating allocation
More informationOffice of Information Technology Service Catalog FY2015
Office of Information Technology Service Catalog FY2015 Office of Information Technology Service Catalog FY2015 Table of Contents Accounts & Passwords... 3 Administrative... 4 Business Tools and Services...
More informationIT Assessment Report. Prepared by: Date: BRI Works www.bri.works 321 East Main Street, Suite 200 Charlottesville VA 22902 434.951.
IT Assessment Report Prepared by: Date: BRI Works www.bri.works 321 East Main Street, Suite 200 Charlottesville VA 22902 434.951.7979 Table of Contents Executive Summary 3 IT Summary 3 Assessment Goal
More informationIT Plan Agency Submitted
Page 134 of Agency IT Plan Contact Data Larry Zubke Director of Technology ND Judicial Branch 600 East Boulevard Avenue Bismarck, ND 58505 701 328-4218 LZubke@ndcourts.gov Review of Agency's IT Architecture
More informationEnterprise VoIP and Lessons Learned. A Case Study and Impact on Curriculum
Enterprise VoIP and Lessons Learned A Case Study and Impact on Curriculum 4/13/2012 1 About Me - Doug Huber Faculty Member at Lorain County Community College. Adjunct Faculty Member at University of Akron
More informationProject to set up Wireless Network for Midwest Home Health Agency
Project to set up Wireless Network for Midwest Home Health Agency Site Survey Report and Recommendations Submitted by: Asha B. Maghirang 12/8/2011 Midwest Home Health Agency is a home care provider, servicing
More informationOffice of Information Technology Service Catalog FY2015
Office of Information Technology Service Catalog FY2015 Office of Information Technology Service Catalog FY2015 Table of Contents Accounts & Passwords... 3 Administrative... 4 Business Tools and Services...
More informationInformation Technology Strategic Plan 2013 9/23/2013
Information Technology Strategic Plan 2013 9/23/2013 Unit Mission Statement: Information Technology Shared Services is dedicated to providing unparalleled service and support to the UC Davis College of
More informationNetwork Technology Refresh Briefing
Network Technology Refresh Briefing Presented to the Dallas City Council August 26, 2008 Communication & Information Services Outline Network Technology Refresh Background Why should we refresh the Network?
More informationChampaign Public Library Technology Plan 2010-2011
Champaign Public Library Technology Plan 2010-2011 Library Mission Statement The Champaign Public Library connects our community with the power of knowledge, the world of culture and ideas, and the joy
More informationUW Oshkosh IT Plan Submission January, 2014
UW Oshkosh IT Plan Submission January, 2014 Information Technology & University Strategic Objectives 1. How the plan was developed. The University s administrative team drafted seven Key Operational Plans.
More informationUnified Communications as a Service (UCaaS)
Unified Communications as a Service (UCaaS) RE-THINK: what s possible A FlexTEL White Paper April 2012 Table of Contents Introduction... Unified Communication Trends... The Challenges of Building a VoIP
More information1 Year Advance Diploma Course in Hardware Networking & Security (ADHNS) १ वर ष य एडव स डडप ऱ म इन ह डडव यर न ट वर क ग ए ड ससक य ररट
1 Year Advance Diploma Course in Hardware Networking & Security (ADHNS) १ वर ष य एडव स डडप ऱ म इन ह डडव यर न ट वर क ग ए ड ससक य ररट र ष ट र य इऱ क ट र न क एव स च प र द य गगक स स थ, ग रखप र National Institute
More informationThis chapter covers four comprehensive scenarios that draw on several design topics covered in this book:
This chapter covers four comprehensive scenarios that draw on several design topics covered in this book: Scenario One: Pearland Hospital Scenario Two: Big Oil and Gas Scenario Three: Beauty Things Store
More informationCOMPUTERS ARE YOUR FUTURE CHAPTER 7 NETWORKS: COMMUNICATING AND SHARING RESOURCES
COMPUTERS ARE YOUR FUTURE CHAPTER 7 NETWORKS: COMMUNICATING AND SHARING RESOURCES Answers to End-of-Chapter Questions Matching g 1. router o 2. node i 3. ring l 4. hub c 5. star n 6. backbone b 7. latency
More informationLab 4.5.2 Diagramming Intranet Traffic Flows
Lab 4.5.2 Diagramming Intranet Traffic Flows Objective Device Designation Device Name Address Subnet Mask Discovery Server Business Services 172.17.1.1 255.255.0.0 R1 FC-CPE-1 Fa0/1 172.17.0.1 Fa0/0 10.0.0.1
More informationYear 2 Objectives 1. Perform complete upgrade to Onondaga Hall.
Three-Year Goals and Objectives Infrastructure Projects Revised - Spring 2012 Goal: Residence Hall Communications Infrastructure Upgrade Upgrade the wired and wireless communications infrastructure of
More informationExam Name: Cisco Sales Associate Exam Exam Type: Cisco Exam Code: 646-151 Doc Type: Q & A with Explanations Total Questions: 50
Question: 1 Which network security strategy element refers to the deployment of products that identify a potential intruder who makes several failed logon attempts? A. test the system B. secure the network
More informationCisco Nexus 1000V and Cisco Nexus 1110 Virtual Services Appliance (VSA) across data centers
Cisco Nexus 1000V and Cisco Nexus 1110 Virtual Services Appliance (VSA) across data centers With the improvement in storage, virtualization and L2 extension technologies, customers can now choose to have
More informationPHILADELPHIA GAS WORKS Voice Over IP Management Solution RFP # 28120 Addendum #1 Questions & Answers Questions and Answers Part 2 November 7, 2013
Q1 Q2 Q3 Q4 QUESTIONS Can you find out what the reasoning is behind making each of the remote sites standalone sites? The majority of our customers are moving away from this method. It is more expensive
More informationFDIC Division of Supervision and Consumer Protection
FDIC Division of Supervision and Consumer Protection Voice over Internet Protocol (VoIP) Informational Supplement June 2005 1 Summary In an attempt to control expenses, consumers and businesses are considering
More informationLHRIC Network Support - Additional Service Features
LHRIC Network Support - Additional Service Features It is important to note that costs associated with LHRIC Network Support service not only cover an on-site support engineer but also include a number
More informationTECHNOLOGY SERVICES. Mission The mission of the Technology Services (TS) Department is to make your day easier with technology.
TECHNOLOGY SERVICES Mission The mission of the Technology Services (TS) Department is to make your day easier with technology. Description TS supports the County s business applications, imaging and records
More informationDistrict Information Technology Service Catalog
Coast Community College District - District Information Technology - IT Portfolio and 9-6-2013 to use the same contact information as follows: District Office helpdesk@mail.cccd.edu or extension 84618;
More informationSubtitle. VoIP Migration Strategy. Keys to a Successful Planning and Transition. VoIP Migration Strategy Compare Business Products 2014 1
Subtitle VoIP Migration Strategy Keys to a Successful Planning and Transition VoIP Migration Strategy Compare Business Products 2014 1 Contents Introduction... 3 VoIP Defined... 3 Why Are Businesses Opting
More informationCIS GOALS. CIS Mission Provide high quality, responsive computing and information services to the Texas A&M University Galveston community.
4/21/10 CIS GOALS CIS Mission Provide high quality, responsive computing and information services to the Texas A&M University Galveston community. CIS Vision To provide a computing environment that exceeds
More informationCENIC s Network. The CSU s Private Cloud Fabric for Disaster Recovery and Shared Services
The CSU s Private Cloud Fabric for Disaster Recovery and Shared Services Presented by Steven Mann, Associate Director, Network Services CSU Monterey Bay CENIC 2014 Sonoma State University, March 11, 2014
More informationAt the PAC, how many ports are in each of the 3 Catalyst 3560G switches. Do you know how many IP phones will be assigned to each of the switches?
Page 4: Current WAN and Network Infrastructure At the PAC, how many ports are in each of the 3 Catalyst 3560G switches. Do you know how many IP phones will be assigned to each of the switches? These are
More informationACADEMIC PROGRAM REVIEW PC AGE 145 TALMADGE ROAD EDISON, NJ 08817 REVIEW DATE. Report Amended October 2011
ACADEMIC PROGRAM REVIEW of PC AGE 145 TALMADGE ROAD EDISON, NJ 08817 REVIEW DATE May 12-13, 2011 Report Amended October 2011 Table of Contents PC AGE Organizational Profile... 3 Academic Program Review
More informationRequest for Proposal Phone System Clark County Department of Job and Family Services
Request for Proposal Phone System Clark County Department of Job and Family Services 1. Description of Department Clark County Department of Job and Family Services (DJFS) is an agency that has responsibility
More informationNETWORKING ENTERPRISE SPECIALIST VoIP Project (New position)
Edmonton Catholic Schools is now accepting applications for the position of NETWORKING ENTERPRISE SPECIALIST VoIP Project (New position) Edmonton Catholic Schools is a large urban school district whose
More informationService Description. Remote Consulting Service. Introduction to your service agreement. The scope of your service agreement
Service Description Remote Consulting Service Introduction to your service agreement Remote Consulting Services ( RCS ) provide for remote assistance with certain IT infrastructure tasks ( Service or Services
More informationProject Scope Statement
Project Scope Statement Project Name: Going Digital Department: Information Technology Department/Operations Department Project Manager: Colby Clark, Director of Information Technology Date: January 17,
More informationUpper Perkiomen School District
Upper Perkiomen School District Network Infrastructure Review Executive Summary Prepared by 1001 James Drive, Suite A15 Leesport, PA 19533 610 916 9400 www.jlrconsulting.com Date: March 10, 2015 Report
More informationApplication Support (Appdev) Team had a very busy year for 2011-2012.
Information Technology Services Department End of Year Report 2011-2012 This report will detail the achievements of the Information Technology Services department at the Oregon Institute of Technology
More information2. No staff, student or community users shall connect any device into the Division wired network without authorization.
55 ADMINISTRATIVE PROCEDURE NO.160 COMPUTER SYSTEMS NETWORK Background The Division provides networked computer systems, including access to the Internet, to promote educational excellence, to increase
More informationAssembling the system will require informed decisions about the following:
Introduction Chapter 5 Planning the Technology System: OVERVIEW This chapter presents the advantages of networks in educational settings and introduces the basic elements of a technology system and network
More informationUC FOR THE CLOUD ERA HOSTED, VIRTUAL & MANAGED
UC FOR THE CLOUD ERA HOSTED, VIRTUAL & MANAGED WHITE PAPER WHITE PAPER UC FOR THE CLOUD ERA 2 COMMUNICATION: THE FOUNDATION OF BUSINESS In the past, the private branch exchange (PBX) likely saved your
More informationQuestion and Answers RFP #16-2015 IP Phone System
Page 1 of 6 Question and Answers RFP #16-2015 IP Phone System 6-9-15 6-18-15 Q: Are there any specifications or plans on the installation of the phone systems? A: Vendor installed turnkey. Q: Is there
More information