APPENDIX 9 INFRASTRUCTURE SERVICING REPORT



Similar documents
Vital Earth Composting Facility Flood Risk and Drainage Statement

Taylor Wimpey UK Ltd. December 2007

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

Designed and produced by geo-graphicsdesign.com DP 300 3/02

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

Stormwater Management Functional Servicing Report

Development at 2 St Albans Road, Kingston, London, KT25HQ

Recommendations for future developments

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Action plans for hotspot locations - Ash Study

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Type of Sewer Systems. Solomon Seyoum

Low Impact Development Checklist

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace

PART 5 : WASTEWATER DRAINAGE

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE

Lansdowne Stormwater UPDATE

Newbiggin House Farm,

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

Weeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario

629, 633 and 675 Eastern Avenue City of Toronto Toronto & East York District. Functional Servicing and Stormwater Management Report June

Maymorn Structure Plan: Infrastructure Costs Estimate

5. Environmental Analysis

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

APPENDIX I DEVELOPMENT PROCESS CHECKLIST

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Breslau Settlement Plan. Preliminary Servicing and Stormwater Management Report. December Prepared by:

Building over or close to a public sewer

How To Improve The Infrastructure Of The City Of Germany

Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission

East Riding of Yorkshire Council

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Engineering Major Service Actual Budget Projected Request Executive Adopted

Climate Change and Infrastructure Planning Ahead

APPROVAL AMENDMENT HISTORY

Byford Traditional Infrastructure Development Contribution Plan Report No.1

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding

guide for obtaining new water and waste water services

Drainage Analysis for the McKownville Area

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Planning and Zoning Commission Johnston, Iowa June 29, 2015

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Council Strategy DOC/15/86752

3. QUALITY ASSURANCE REQUIREMENTS

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Guide to Subdivision and Land Development

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

Granville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August New Granville LLP

St. Clair College Planning Area Introduction

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL

Planning, Health and Environment Division

SOAK UP YOUR STORMWATER

Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

Additional Services Agreement. Part 3: Schedule of our requirements

Planning for Casey s Community

Environmental Guidelines for Preparation of an Environmental Management Plan

How To Amend A Stormwater Ordinance

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual

Chapter 2 Spatial Portrait

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Standard terms and conditions

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

INTEGRATED WATER FOR CASEY CLYDE

CHAPTER 11 STORM DRAINAGE

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

COMMUNICATIONS ALLIANCE LTD NATIONAL BROADBAND NETWORK FIBRE READY DISTRIBUTION NETWORKS

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services

6 FLOOD DAMAGES ASSESSMENT

Transcription:

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012

LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project Brief Job Number 2681 Project Client Client Contact Client Address Infrastructure Servicing Report for the proposed subdivision at Lot 50 Cockram Street in Mundijong Peet Ltd Clay Thomas Level 7, 200 St Georges Terrace PERTH, WA 6000 Document Status Rev Date Description By Signed A Aug 2012 Infrastructure Servicing Report OC ii

DISCLAIMER This document has been produced on behalf of, and for the exclusive use of the nominated recipient, and is issued for the purposes of the proposed works only. Wave International accepts no responsibility or liability whatsoever in respect to use of this document by any third party. The information contained within the document is confidential and subject to copyright. This document shall not be copied, transmitted or divulged to other parties without the prior written consent of Wave International s duly authorised representative. iii

TABLE OF CONTENTS 1 Introduction... 5 1.1 Background... 5 1.2 Proposed Land Use... 5 2 Sewer... 6 2.1 Existing Infrastructure... 6 2.2 Water Corporation Planning... 6 3 Water... 7 3.1 Existing Infrastructure... 7 3.2 Water Corporation Planning... 7 4 Roads and Traffic... 8 4.1 Existing Road Infrastructure... 8 4.2 Proposed New Road and Upgrade... 8 5 Surface Water Management... 10 5.1 District Water Management... 10 5.2 Flood Management Strategy... 10 5.2.1 Flood Conveyance... 10 5.3 Local Stormwater Management... 10 5.3.1 Lot Runoff... 10 5.3.2 Road Runoff... 10 5.3.3 Post Development Flows and Storage... 11 6 Power... 12 7 Gas... 13 8 Communications... 14 Appendix A Preliminary Infrastructure Services Layout... 15 iv

1 INTRODUCTION 1.1 Background Wave International was commissioned by Peet Ltd to prepare an infrastructure servicing report on Lot 50 Cockram Street in Mundijong. The subject land is bounded by Sparkman Road to the north, proposed Tonkin Highway to the west, Mundijong Road to the south and Adams Street to the east. The subject land is approximately 54 hectares and is shown on drawing 2681-01- SK-02 in Appendix A. This infrastructure servicing report is prepared in support of the Local Structure Plan (LSP) submission. 1.2 Proposed Land Use The Lot 50 Cockram Street Mundijong Development will be developed for residential purposes of standard traditional 500 to 550 sq m lots with pockets of medium density of 350 to 380 sq m lots and low density of 1500 sq m lots. Based on the preliminary concept plan by TBB, the lot yield will comprise between 472 and 507 lots depending on the options adopted. 5

2 SEWER 2.1 Existing Infrastructure Currently there is no sewer reticulation network in Mundijong. 2.2 Water Corporation Planning The Water Corporation has a long term plan to construct a permanent Type 1000 sewer pump station ( Mundijong A) at Scott Road to service the whole of Mundijong. The discharge from Mundijong A will be at East Rockingham Waste Water Treatment Plant via a pressure main along the service corridor and Mundijong Road. Initially a temporary pump station will be built in Scott Road and pump northwards to an existing pump station in Byford with an approximately 20 l/s capacity available. The availability of this 20 l/s capacity for Mundijong will be subject to ongoing monitoring and will only be available on a staged basis and will be dependent on the progressive upgrades of Byford pump station. Water Corporation is currently undertaking a review of the sewer planning in Mundijong and it is expected that the review will be completed by November 2012. To service Lot 50 Cockram Street, a temporary Type 40 sewer pump station can be constructed near Sparkman Road and discharge via a pressure main to the proposed temporary pump station at Scott Road. The proposed sewer infrastructure requirements for Lot 50 Cockram Street are shown on drawing 2681-01-SK-01 in Appendix A. 6

3 WATER 3.1 Existing Infrastructure The main water supply to Mundijong is currently supplied off the Serpentine Trunk Main on Summerfield Road 5.5km to the south of Mundijong Road. This water main consists of pipes of 150mm and 300mm diameters and Water Corporation is in the process of upgrading the 150mm dia. pipes to 400mm dia. pipes. 3.2 Water Corporation Planning The long term water supply proposed for Mundijong would be a supply from the north along Soldier Road from Byford gravity tank. This proposed water distribution pipeline would vary in size from 500 to 900mm dia. Sections of the mains will be installed to allow for staging as development occurs to the north of Mundijong, but this would need to be supplied off the current network and works will be developer funded. Water Corporation is currently undertaking a review of the water planning in Mundijong and it is expected that the review will be completed by November 2012. However in the interim, the water supply for Lot 50 Cockram Street can be obtained from the water main at the corner of Paterson Street and Mundijong Road. It is expected that a 250mm dia. main will be laid from Paterson Road to the site. The proposed water infrastructure requirements for Lot 50 Cockram Street are shown on drawing 2681-01-SK-01 in Appendix A. 7

4 ROADS AND TRAFFIC 4.1 Existing Road Infrastructure Lot 50 Cockram Street is bounded by Sparkman Road to the north, proposed Tonkin Highway to the west, Mundijong Road to the south and Adams Street to the east. The existing road infrastructure is described in more detail below. Sparkman Road Sparkman Road is located to the north of the site and provides a link between Adams Street and the north of the site. Sparkman Road is not constructed. Proposed Tonkin Highway Proposed Tonkin Highway is proposed to be located to the west of the site and there is no link between the site the Highway. The proposed Highway is separated from the site by a 60m Water Corporation service corridor. Mundijong Road Mundijong Road is located to the south of the site and provides an east- west connection of the development area. Mundijong Road is a sealed rural road and unkerbed. Adams Street Adams Street is located to the east of the site and provides a major link between site and the north. Adams Street is only constructed between Sparkman Road and Richardson Street. 4.2 Proposed New Road and Upgrade Several new roads and existing road upgrading will be required to provide an acceptable level of service for the fully developed Lot 50 area and varies from existing external roads to new roads within the site. The internal roads will be constructed as and when development occurs and will also be funded by the developer. External roads will be constructed or upgraded when the level of service drops below the acceptable service level. The cost of upgrading / construction of the external road infrastructure will be shared between the adjoining owners. The following road infrastructure items will be required for Lot 50 area: Sparkman Road Sparkman Road is not constructed and will be required to be constructed from the intersection with Adams Street to the Water Corporation Service Corridor. Sparkman Road may be required to be constructed to a Neighbourhood Connector B standard which is a 7.5m two lane road within a 20m road reserve. The construction of Sparkman Road will be a developer cost but cost share with adjoining owners and will be done as part of the subdivisional works or it may be done as Developer Contribution Plan. Mundijong Road The road is currently a 7.5 m two lane rural road with a 1m shoulder and may be required to be upgraded to a four-lane divided road in a 40m road reserve. The upgrading of Mundijong Road will be a developer cost but cost share with adjoining owners and will be done as part of the subdivisional works or it may be done as Developer Contribution Plan. 8

Adams Street Adams Street is currently not constructed south of Richardson Street and will be required to be constructed to a Neighbourhood Connector B standard which is a 7.5m two lane road within a 22.5m road reserve. The construction of Adams Street will be a developer cost but cost share with adjoining owners and will be done as part of the subdivisional works or it may be done as Developer Contribution Plan outside the site. North South Road through the site the North-South Road may be required to be constructed to Integrator B standard with a 7.5m two lane road with a 2-6 m central median within a road reserve of 25-30 m. The construction of North-South Road through the site will be a developer cost and will be done as part of the subdivisional works. All the above upgrading and construction of the road infrastructure have to be confirmed by a Traffic report. The proposed road infrastructure requirements for Lot 50 Cockram Street are shown on drawing 2681-01-SK-02 in Appendix A. 9

5 SURFACE WATER MANAGEMENT 5.1 District and Local Water Management Lot 50 Cockram Street falls within the area covered by the Mundijong Whitby District Structure Plan District Water Management Strategy, which was prepared by GHD (2010).The DWMS addresses broad-scale stormwater management measures over an 1800ha area which extends from the future Tonkin Highway reserve to South Western Highway. A Local Water Management Strategy has been prepared by Wave International to further define surface water and groundwater management design concepts at Lot 50 Cockram St. The following paragraphs summarise the main outcomes of the DWMS and LWMS. 5.2 Flood Management Strategy 5.2.1 Flood Conveyance Stormwater runoff from upstream landholdings flows via overland flow across the site from east to west. This flow, along with runoff from the Lot 50 development will be managed within the two multiple-use corridors on the site. Stormwater will be managed to ensure that post-development flow rates are within pre-development levels and that dwellings are protected from flooding in major storm events. 5.3 Local Stormwater Management 5.3.1 Lot Runoff Lot runoff will be managed through the use of soakwell systems to retain and infiltrate roof runoff within individual lots. Subsoil drainage will be installed within road reserves to promote infiltration and improve the efficiency of soakwells. Future lot owners may also opt to install rainwater tanks, which will also act to retain lot runoff on-site. 5.3.2 Road Runoff A conventional piped network will be designed to manage road runoff, with leaky side entry/gully pits located to suit appropriate spread rates and pit spacings. The level of service for the side entry/gully pits and the pipe network will be dependent on the road hierarchy. Road runoff from minor storm events (up to 1 year ARI) will be retained and treated within bioretention systems in public open space areas to ensure water quality objectives are met. 10

5.3.3 Post Development Flows and Storage To ensure that downstream landholdings are not adversely impacted by development in upstream catchments, each development must ensure that peak post-development flow rates generated by runoff from the development area do not exceed pre-development levels. This is achieved through the use of detention storage areas spread throughout the development. Off-line storage areas will be provided within public open space to attenuate peak flows, and will discharge to open swale drains through the multiple use corridors. 11

6 POWER The existing Western Power distribution infrastructure in the vicinity of the Lot 50 Cockram Street comprises of several three phase 22kV high voltage (HV) aerial feeder lines (BYF 524) from Byford Zone Substation along Taylor Road and Adams Street. There is currently some spare capacity on the BYF 524 feeder but the actual spare capacity is not known and confirmation from Wester Power will be required. This capacity is available on a first-come first-served basis. Western Power has plans to construct a major Zone Substation along Gossage Road in Oldbury in 2025. If the supply capacity is required before 2025 Western Power will charge the developer for the full capital costs. Western Power s Feasibility Study for Mundijong estimates that the Headworks charges will amount to approximately $2,500 to $3,000 per lot for the initial phase of the development. Headworks refer to distribution network reinforcements outside the subdivision that are necessary in order to provide power capacity to the subdivision. All headworks extensions, removal, moving or upgrades to the network will be fully funded by the developer. The WAPC and Western Power will most likely stipulate that the existing HV and LV aerials adjacent to the subdivision are to be undergrounded and any existing consumers affected must have their consumer mains reconnected to the underground network. 12

7 GAS There are no existing ATCO Gas (formally WA Gas Networks) gas headworks infrastructure in the vicinity of Lot 50 Cockram Street area and they have no current infrastructure planning in this area. Provision of natural gas to the site will require the construction of a headworks high pressure gas main from Nettleton Road from Byford. 13

8 COMMUNICATIONS It is envisaged that Lot 50 Cockram Street development would fall under the ambit of the National Broadband Network (NBN) which requires developers to install an approved pipe and pit system as part of the development. Network infrastructure will be installed subsequently by NBN appointed contractors at no cost to the developers. 14

APPENDIX A PRELIMINARY INFRASTRUCTURE SERVICES LAYOUT 1

PRIMARY SCHOOL 3.5022ha