Breslau Settlement Plan. Preliminary Servicing and Stormwater Management Report. December Prepared by:
|
|
|
- Randall Francis
- 10 years ago
- Views:
Transcription
1 Breslau Settlement Plan Preliminary Servicing and Stormwater Management Report December 2015 Prepared by: SCS Consulting Group Ltd 30 Centurian Drive, Suite 100 Markham, ON, L3R 8B8 Phone Fax Project No: 1463
2 TABLE OF CONTENTS Page 1.0 INTRODUCTION Study Area Background Information STORMWATER MANAGEMENT Existing Drainage Stormwater Runoff Control Criteria Proposed Storm Drainage SANITARY SERVICING Recent/Current Sanitary Sewer Studies Cross Border Sanitary Flow Allocation Review Capital Upgrades Required to Achieve Full Capacity of Pumping Stations Victoria Street Pumping Station Breslau Pumping Station Summary of Pumping Station Capital Upgrades Required Sanitary Piping Constraints Residential Flow Generation Rate Settlement Plan Servicing Capacity Analysis Approach 1: Service Full Buildout of Settlement Plan with Provincial Density Targets Approach 2: Eliminate Servicing Allocation to Industrial and Infill Land Uses Approach 3: Determine a Maximum Residential Population to be Serviced Conclusions - Sanitary Servicing WATER SUPPLY AND DISTRIBUTION Existing Water Distribution Water System Optimization for the Breslau Secondary Plan Area Hopewell Creek Extension of Services Class Environmental Assessment UTILITY CONSIDERATIONS Project No Page i
3 LIST OF TABLES Table 2.1 Stormwater Runoff Control Criteria LIST OF FIGURES Figure 1.1 Figure 2.1 Figure 2.2 Figure 3.1 Site Location Plan Existing Storm Drainage Plan Proposed Storm Drainage Plan Preliminary Sanitary Servicing Plan LIST OF APPENDICES Appendix A Appendix B Sanitary Servicing Alternatives Recommended Water Servicing Alternative Maps Project No Page ii
4 1.0 INTRODUCTION SCS Consulting Group Ltd. has been retained by the Township of Woolwich to prepare a Preliminary Servicing and Stormwater Management Report for the Breslau Settlement Plan. 1.1 Study Area The study area is approximately 560 ha in size and is located south of Highway 7 and east of the Grand River, (see Figure 1.1). Figure 1.1 Site Location Plan The existing subject lands are comprised of existing residential and commercial developments, and agricultural land and open space areas. The site is located within the Grand River watershed in the Township of Woolwich. Project No Page 1
5 The proposed development consists of the following land uses: low density residential, medium density residential, high density residential, commercial, employment, parks, open space, sanitary pumping station, SWM pond blocks, and proposed roads. 1.2 Background Information In preparation of the site servicing and SWM strategies, the following design guidelines were referenced: Region of Waterloo and Area Municipalities Design Guidelines and Supplemental Specifications for Municipal Services (January 2015); Grand River Conservation Authority Technical and Engineering Guidelines for Stormwater Management Submissions (December 2014); and Ministry of Environment (MOE) Stormwater Management Planning and Design Manual (March 2003). Project No Page 2
6 2.0 STORMWATER MANAGEMENT 2.1 Existing Drainage The Breslau Settlement Plan study area is located within the catchment areas of the Grand River, and Hopewell Creek, Breslau Drain #1, Randall Drain, and Chilligo Creek which are all subwatersheds of the Grand River, as illustrated on Figure 2.1. The majority of the northern portion of the study area drains to Hopewell Creek, with a small pocket in the northeast corner that drains to Chilligo Creek. The middle and westerly portions of the study area generally drain to the Grand River. The southerly portion of the study area drains to the Breslau Drain #1, and a small portion of the eastern portion of the study area drains to the Randall Drain. The roads in many parts of the existing community of Breslau are rural and stormwater is conveyed via ditches and culverts. In the more recently developed areas (i.e. the Hopewell Heights and Riverland communities), the roads are urban and drainage is conveyed by curbs, gutters, catchbasins and storm sewer systems to various outlets. There are several existing stormwater management (SWM) ponds servicing portions of the existing developed areas (refer to Figure 2.1). Specifically, there are two (2) wet stormwater ponds that service the Hopewell Heights residential subdivision (one east of Fountain Street and one to the west). These ponds outlet to Hopewell Creek. There is a wet stormwater pond located immediately east of the Grand River in the Riverland residential subdivision that currently services the Phase 1 Riverland development and outlets to the Grand River. There is also an existing on-line pond (referred to as the Mill Pond) on Hopewell Creek between the Breslau Dam and Woolwich Street South. Several of the existing industrial properties within the study area have private stormwater controls on-site. 2.2 Stormwater Runoff Control Criteria The SWM criteria for the study area are required to be consistent with the Ontario Ministry of the Environment s Stormwater Management Planning and Design Manual (2003, the requirements of the Grand River Conservation Authority (GRCA) and the requirements of the Township of Woolwich. The GRCA is currently undertaking the East Side Subwatershed Study for Hopewell Creek, Chilligo Creek, Freeport Creek, Randall Drain and Breslau Drain #1. The Phase 1 component of the subwatershed study (Characterization of the Subwatersheds Report) is complete and Phase 2 is underway. Part of the Phase 2 work involves providing targets and recommendations for future development within each of the subwatersheds. A Master Drainage Plan will be completed as part of the East Side Lands (Stage 2) Master Environmental Servicing Plan and Community Plan, however, it focuses on Stage 2 lands, which are outside of (do not include) the Breslau Settlement Plan area, with consideration for broader subwatershed objectives. Project No Page 3
7 Therefore, the SWM criteria recommended for the study area is summarized below in Table 2.1: Table 2.1: Stormwater Runoff Control Criteria Criteria Quantity Control Control Measure Control proposed peak flows to existing peak flows for the 2 through 100 year storm events. Note for drainage with a direct outlet to the Grand River, quantity control is not required. Quality Control Direct Outlet to Grand River: Provide MOE Normal (Level 2) Protection for 70% TSS Removal Erosion Control Water Budget All Other Watercourses: Provide MOE Enhanced (Level 1) Protection for 80% TSS Removal. Detention of the 25 mm rainfall runoff over a minimum 24 hour period, or as determined through an erosion analysis of the receiving downstream watercourse. An overall water balance to be provided in accordance with the objectives of the GRCA, Region of Waterloo and the Township of Woolwich Minor System Storm sewers are to be designed using the Rational Method for the 5 year design storm using the City of Kitchener Intensity-Duration-Frequency curves and a minimum time of concentration of 10 minutes. Other storm sewer design criteria include: a) Minimum Pipe Diameter 300 mm b) Manning's n: o smooth wall pipes o concrete box culverts o corrugated metal with paved invert o corrugated metal c) Minimum full flow velocity 0.75 m/s d) Maximum full flow velocity 6.0 m/s e) Minimum cover 1.5 m Project No Page 4
8 Major System Major system flows (up to the 100 year storm event) shall be safely conveyed within the municipal right-of-way or designated overland flow route(s). Erosion and Sediment Control Erosion and sediment control (ESC) plans that will comply with the best management practices outlined in the Erosion and Sediment Control Guidelines for Urban Construction by Greater Golden Horseshoe Area Conservation Authorities, December 2006 shall be provided. 2.3 Proposed Storm Drainage Stormwater management is to be provided for all new development areas, either by on-site controls/treatment measures, or by communal end-of-pipe facilities, or a combination of both including: the employment/industrial lands in southern portion of study area on either side of Fountain Street North the area bound by Maders Lane to the south, the existing development on the east side of Woolwich Street South to the west, the railway to the north and Fountain Street to the east the area bound by the railway to the south, Woolwich Street South to the west, Hopewell Creek to the north and Fountain Street to the east, and for the lands north and south of Victoria Street between the Grand River and Spitzig Road The proposed drainage concept is illustrated on Figure 2.2. The SWM concepts for these areas will be further refined at the Draft Plan or Site Plan stage. Riverland Development (Empire Homes) A portion of the undeveloped Riverland Area 2 lands are within the catchment boundaries of drainage and stormwater management infrastructure that were previously constructed to support the Riverland Area 1 Subdivision (Stages 1 and 2) development. The remaining portion of the Riverland Area 2 lands will be serviced by a proposed SWM facility at the west limit of the site south of an existing wetland. Thomasfield Homes Development There are several SWM facilities proposed to service the Thomasfield Homes Development lands, while several areas are proposed to be treated with other alternative on-site SWM control measures. Project No Page 5
9 3.0 SANITARY SERVICING The municipal sanitary sewage collection and treatment system is a two-tiered responsibility. The Region owns and operates (under contract) the municipal wastewater treatment plants. The local municipalities own and maintain the collection system including pumping stations. There is an existing 450 mm diameter sanitary sewer located on the east side of the Grand River at the Victoria Street bridge with a 600 mm diameter sanitary sewer crossing the river to a 675 mm diameter sanitary sewer on the west side of the river to the Breslau Sanitary Pumping Station (BSPS). This sewer was constructed in 2003/2004 to service the Hopewell Heights (Thomasfield) subdivision, the rural settlement of Breslau, and the Riverland (Empire) subdivision. The sewer drains west/southwest across the Grand River along the south side of Victoria Street North, under the Grand River and outlets into the Victoria Street Sanitary Sewage Pumping Station (VSPS), located west of the Grand River at Shirley Drive and Victoria Street North, in the City of Kitchener. Within the VSPS site, sanitary flows are pumped from the Grand River sanitary sewer crossing to the VSPS pumping station via the Breslau Sanitary Pumping Station (BSPS), a 3.0 m diameter wet well with two submersible pumps. The VSPS conveys the flow through the Manchester- Montgomery Trunk Sanitary Sewer System in Kitchener to the wastewater treatment plant (WWTP). Local sanitary sewers service the residences internal to the Hopewell Heights and Riverland subdivisions. The local Breslau sanitary sewer system is under the jurisdiction of the Township of Woolwich. The BSPS, VSPS and downstream trunk sanitary sewer system are under the jurisdiction of the City of Kitchener. The WWTP is under the jurisdiction of the Region of Waterloo. 3.1 Recent/Current Sanitary Sewer Studies Wastewater Treatment Master Plan The Region of Waterloo completed a Wastewater Treatment Master Plan (WWTMP) in 2007 which identified the most appropriate outlet for the East Side Community wastewater to be the Kitchener wastewater treatment plant (WWTP). The East Side Community are the lands east of the Grand River to Beaverdale Road in the South and Shantz Station Road in the North, and North to South from approximately Victoria Street North to Highway 401. In the Region s WWTMP, upgrades are proposed to include 18,200 m 3 /d from the East Side Community. However, due to adjustments to the East Side boundary by the Region and projected population revisions, the Kitchener WWTP may need to allow for East Side wastewater flows of approximately 31,000 m 3 /d. East Side Servicing Review The Region of Waterloo retained AECOM Canada Ltd. to evaluate wastewater servicing opportunities and constraints for the East Side Community. The East Side Servicing Review Technical Memorandum was completed by AECOM in December Project No Page 6
10 The Technical Memorandum concluded that the total mature state flow from the East Side Community would be 31,000 m 3 /s. It also concluded that, in the long-term, it is possible to service a large portion of the East Side Community by gravity to one large pumping station that could be owned and operated by the Region. The pumping station will outlet to the Kitchener WWTP. Small local pumping stations may be required in low lying areas. The two alternative locations identified for the large pumping station outline maximum trunk sewer depths of approximately 12 metres and 19 metres respectively. A preferred trunk sewer alignment should be identified in a Master Servicing Plan for the East Side Community undertaken by the local municipalities. The first phases of development within the East Side Community will be from Cambridge and progress to the north to Breslau. Breslau is located at the upstream end of this system, and schedule. The current schedule under the Region Official Plan estimates that East Side services will not reach Breslau until after However, the existing Village of Breslau is currently serviced by the VSPS, BSPS and sanitary sewer collection system. This report will review the opportunities and constraints to service the Breslau Settlement Plan with increased capacity available to the Township from the City of Kitchener at the Victoria Street SPS. The Victoria Street SPS has limited capacity that cannot service the full proposed buildout of the settlement plan as will be seen below. Development in Breslau beyond the capacity of the Victoria Street SPS limitations will ultimately be serviced by the East Side Lands sanitary servicing system. 3.2 Cross Border Sanitary Flow Allocation Review A Cross Border Servicing Agreement (CBSA) for Sewage Collection was established in 2003 between the City of Kitchener and the Township of Woolwich. The agreement provided the Township of Woolwich with the right to access 25% of the flow capacity to the Victoria Street SPS in Kitchener, quantified in the CBSA as a peak flow of 94 L/s, and an average daily flow of 45 L/s. This flow was allocated to Woolwich from Kitchener as 1250 residential units and 3 hectares of commercial development that could be serviced by the Victoria Street SPS. In order to assess the efficiency of the 1250 unit / 3 hectare limit of the CBSA, The Township of Woolwich retained Stantec to perform a study to compare actual flows from the developments in Breslau to the theoretical design flow generation rates to determine if additional units could be serviced by the existing system. Sanitary flow monitoring and water usage rates were reviewed and found that actual flows were lower than the design flows. Stantec described the results of the study in their report, Breslau Cross Border Sanitary Flow Allocation Review - Stantec, September Based on their findings, Stantec recommended that the Township consider the following in order to revise the 1250 unit / 3 ha limits of the CBSA: Consider a revised residential sanitary flow generation rate of 250 L/capita/day Correct known Inflow and Infiltration problems in the Breslau sanitary system Project No Page 7
11 Continue to monitor sanitary flows in Breslau to verify longer term actual flows versus negotiated flows and revisit the values presented in this report once there is a need for additional capacity These recommendations were endorsed by the Township of Woolwich Council in March Stantec s calculations based on their recommendations found that 240 additional residential units could be serviced using their revised design criteria. As there are current development applications for Breslau far exceeding 240 units, the Township continued to negotiate with Kitchener to access additional capacity from the Victoria Street SPS to service future growth in Breslau. Amended Cross Border Servicing Agreement for Sewage Collection Based on the results of the Breslau Cross Border Sanitary Flow Allocation Review (Stantec, September 2012), the CBSA was amended in March 2013 and now allows the Township of Woolwich a maximum daily flow of 45 L/s and a peak flow of 96.7 L/s. The Town has continued negotiations with the City of Kitchener and is nearing an agreement to further amend the CBSA to increase their allocation from the Victoria Street SPS, increasing the allocation to a maximum peak flow of 189 L/s (50% of the VSPS capacity of 378 L/s) and average daily flow of 90 L/s. This increase will allow for a much greater proportion of the settlement plan to be serviced via the Victoria Street SPS. For the purposes of the sanitary servicing capacity analysis of the Settlement Plan, it is assumed that Breslau will have an allocation for sanitary flows from Kitchener at the VSPS as follows: 189 L/s peak sanitary flow 90 L/s average daily sanitary flow 3.3 Capital Upgrades Required to Achieve Full Capacity of Pumping Stations Victoria Street Pumping Station The ultimate capacity of the VSPS has not been realized and capital upgrades to the pumping station are required. These upgrades were planned for in the design and construction of the station. The Township of Woolwich will need to participate with Kitchener in the following requirements: Woolwich will need to pay for an additional 25% of the initial capital cost of the VSPS, an amount of approximately $1,505,400 in 2015 dollars. The payment to Kitchener will be funded by the Township s DC reserve. Project No Page 8
12 As per the Stantec 2012 servicing report, there are 3 pumps in the VPS, 2 duty and one standby. This pump configuration can achieve a max of 328 L/s peak pumping capacity. A 3 rd duty pump needs to be installed to achieve the full pumping station capacity of 378 L/s. This upgrade will be funded through the Township s collection of the sanitary portion of Kitchener s Development Charge (D/C) at the time of building permits for new residential and non-residential development. Kitchener anticipates that the storage facility will be integral to the ultimate capacity of the VSPS. Future storage improvement costs will be funded through the Township s collection of the sanitary portion of Kitchener s Development Charge (D/C) at the time of building permits for new residential and non-residential development. Woolwich will need to amend the CBSA with Kitchener in order to receive the increased allocation of capacity and resolve the upgrade costs. Kitchener has indicated that they are willing to proceed with these upgrades, and to provide the additional capacity to Breslau Breslau Pumping Station The Breslau pumping station (BPS) is located on the West Side of the Grand River adjacent to the VPS. Sanitary flow from Breslau drains to the wet well, where it is pumped to the inlet channel of the Victoria Street Pumping Station. Stantec 2012 reports that the Conestoga Rovers and Associates (CRA) Victoria Street North Sanitary Sewage Pumping Station Preliminary Design Report provides the capacities for the pumps in this station. The firm capacity of the station in the preliminary design report is 96 L/s. MMM Group Limited was retained by Empire Communities (Riverland) Limited to undertake an assessment of available sanitary servicing capacity for the Riverland Area 2 lands, and produced a report titled Riverland Area 2 Breslau Sanitary Capacity, dated August 13, As part of that assessment as-built drawings were reviewed and a site visit to the Breslau Wet Well was conducted. Their report provides a cursory review of the hydraulic capacity of the Breslau Wet Well. There are two critical constraints identified with respect to upgrading the Breslau Wet Well servicing capacity to achieve a pumping capacity equal to the available VPS capacity of 189 L/s. Pump discharge lines are not sized for an ultimate flow of 189 L/s. Upsizing of existing discharge lines or installation of additional discharge lines connecting the Breslau Wet Well to the VPS will be required. Existing pump capacity is limited. Larger pumps and/or additional pumps will be required. Electrical power requirements will need to be reviewed. Project No Page 9
13 Extensive upgrades to the BSPS will be required to approximately double the pumping station capacity to capture the benefit of the increased pumping capacity available from Kitchener in the VSPS. A detailed study will be required to determine the optimal upgrades required to increase the Breslau Wet Well Pumping Station capacity to match or exceed 189 L/s. The approximate high level estimated costs to upgrade the BSPS peak flow pumping capacity from 96 L/s to 189 L/s fall within the following range. $150,000 - upgrade Pumps, with associated upgrades to power and piping equipment (assumes no upgrade to existing wet well required, existing volume sufficient, includes design costs) $600,000 - Install second Breslau Wet Well facility with new pumps, power and piping requirements (assumes new wet well structure required, includes design costs) Summary of Pumping Station Capital Upgrades Required Breslau Wet Well: Larger Pumps and/or additional pumps Increased Wet Well Volume Piping modifications, including discharge lines connecting to Victoria Street Pumping Station Electrical power upgrades Victoria Street Pumping Station: Compensation to Kitchener for original capital costs for additional 25% of pumping station capacity Pump upgrades Storage capacity upgrades 3.4 Sanitary Piping Constraints Buildout of the Breslau sanitary collection system has been driven by the servicing requirements of the Riverland and Hopewell Heights subdivisions. The main trunk begins at the BSPS Wet Well within the VSPS site and extends across the Grand River at Victoria Street, following Victoria Street eastwards to Woolwich Street South, as shown on Figure 3.1. The sanitary system has been divided into sub-trunks for the purposes of this analysis Project No Page 10
14 to identify any capacity constraints related to the servicing of the growth areas of the settlement plan. The sub-trunks, as shown on Figure 3.1 are as follows: Victoria Street Sub Trunk This is the main pipe crossing the Grand River that all other sub-trunks connect to. It also services a small area of commercial land along the south side of Victoria Street. This sub trunk conveys all Breslau sanitary flows to the BPS. Riverland Sub Trunk The Riverland sub trunk connects to the Victoria Street Sub Trunk east of the Grand River crossing. This sub trunk was constructed to service the Riverland residential subdivision, and was designed to ultimately service the existing residential area of Breslau south of Dolman Street and Maders Lane, currently on private sanitary services. The pipe network currently extends to Woolwich Street South and will be serviced as a future project by the Township, through local improvements primarily dependent on the timing of financing. It is unknown when municipal services will be extended, but allocation from the VPS in the existing CBSA is dedicated for these units. The south Breslau industrial lands are tributary to this sub-trunk. Extension of sanitary services to the Industrial Lands would be required from this sub trunk due to proximity and topography. Future industrial flows are tributary to the Riverland sub trunk. A 375 mm diameter sewer at 0.50% grade was installed through the second phase of the Riverland subdivision to Woolwich Street South. It does not appear that industrial flows were considered in the design of this pipe. The existing capacity of this pipe is a constraint to servicing the south industrial lands via the VSPS. Providing service for industrial flows would potentially require capital upgrades to increase the size of this pipe. A detailed downstream analysis will be required to determine the servicing potential to develop the industrial lands via the Riverland Sub trunk. Hopewell Heights Sub Trunk The Hopewell Heights sub trunk connects to the Victoria Street sub trunk at Woolwich Street South. This sub trunk currently services the existing Hopewell Heights subdivision. This sub trunk would service Neighbourhood 2 and the employment lands of the settlement plan due to proximity and topography. An Environmental Assessment for the service crossings of Hopewell Creek (Stantec 2013) found that the preferred servicing option for these lands was a crossing of the creek and connection to the existing sanitary sewer in the Hopewell Heights subdivision. A sanitary pumping station will be required to convey flows across Hopewell Creek from Neighbourhood 2 to the existing Hopewell Heights subdivision. Project No Page 11
15 Servicing of these lands by this route was considered in the original design of the sub trunk. A 450 mm diameter sewer was constructed through the subdivision to the future crossing point. Woolwich Street North Sub Trunk This pipe is existing and was built to service existing residential and commercial properties along Woolwich Street North west of Fountain Street. Some of the residences and commercial sites have been connected to the sewer, but not all. This sewer would service infill development along Woolwich Street North. As this pipe is existing, all future infill development serviced by the Woolwich Street North sub trunk will be tributary to the VSPS (and BSPS). Allocation of VSPS capacity for development in Breslau should consider that future infill along this sub trunk will require allocation from the VSPS. It would not be connected to the future East Side servicing system. Infill development along this sub trunk is a constraint to VPS allocation. Woolwich Street South Sub Trunk The tendering process for the construction of this pipe is underway. It will be built to service existing residential and commercial properties along Woolwich Street South, north of Dolman Street and Dolman Street East of Joseph Street. This sewer would service future infill development along Dolman Street and Woolwich Street South, including a proposed low density residential land use north of Maders Lane. As this pipe is scheduled for construction in 2016, all future infill development serviced by the Woolwich Street south sub trunk will be tributary to the VSPS. Allocation of VSPS capacity for development in Breslau should consider that future infill along this sub trunk will require allocation from the VPS. It would not be connected to the future East Side servicing system. Infill development along this sub trunk is a constraint to VPS allocation. Ebycrest Road Sub Trunk The Ebycrest Road sub trunk is a future service to the only area north of Victoria Street in the Breslau Settlement Plan. It would connect in the future to the Victoria Street sub trunk at or near the intersection of Victoria Street and Ebycrest Road. This sub trunk would service existing residences, and proposed commercial and medium density residential land uses. This pipe is a proposed concept to service the Settlement Plan lands north of Victoria Street that will eventually be required for the development of these lands. This area will connect to the Victoria Street sub trunk due to proximity and topography. Flows will be directed to the VSPS. It would not be part of the future East Side servicing plan. Allocation from the VSPS should consider the future infill along this sub trunk will Project No Page 12
16 be required from the VSPS. Infill development along this sub trunk is a constraint to VPS allocation. 3.5 Residential Flow Generation Rate The Township of Woolwich has endorsed the recommendations of the Breslau Cross Border Sanitary Flow Allocation Review (Stantec 2012) to consider using 250 L/capita/day as the residential sanitary flow generation rate. The Township s engineering design standards at that time required use of 350 L/capita/day. This recommendation was based on review of flow monitoring data collected by Stantec for the existing Breslau developments showing that actual sanitary flows were below 250 L/capita/day. The purpose of this change would be that additional units could be developed in Breslau using the existing capacity of the VPS. In May of 2015, the City of Kitchener revised their domestic sewage flow rate form 350 L/capita/day to 305 L/capita/day to better reflect current water and wastewater trends. The City also noted that the Region of Waterloo is undertaking a Wastewater Treatment Master Plan Update and another revision to the domestic sewage flow rate could be considered at that time. Stantec s 2012 report recommended that reducing the flow generation rate to 250 L/capita/day for existing Breslau should accompany ongoing monitoring to review the impacts of this recommendation. The flow monitoring program is ongoing. The Settlement planning process is a long term plan for Breslau, representing growth through The servicing analysis will use 305 L/capita/day as the flow generation rate, matching the current standards of the City of Kitchener. This will provide an increase to the servicing capacity over the current design criteria. The ongoing flow monitoring program may determine that this rate could be further reduced to the Stantec recommendation of 250 L/capita/day. If the results of monitoring show that actual flows remain below 250 L/capita/day over time, the allocation totals can be revisited. This may allow for further development allocation to infill and greenfield development at that time. The next step is to determine if a 305 L/capita/day generation rate can provide an adequate amount of servicing allocation to meet the growth goals of the Settlement Plan. Project No Page 13
17 3.6 Settlement Plan Servicing Capacity Analysis The Settlement Plan was prepared by The Planning Partnership and presented at a public meeting as part of the overall Settlement Planning process in July The Settlement Plan identifies land uses proposed for Breslau including proposed greenfield and infill development. These land uses are the basis of the population estimates used for the sanitary servicing analysis. An iterative process was used to determine how the growth goals of the Settlement Plan can be serviced by the current sanitary allocation available to the Township of Woolwich. Approach 1: Service Full Buildout of Settlement Plan with Provincial Density Targets The initial approach is to assess the entire Settlement Plan based on the existing serviced lands, the proposed land use designations and the provincial density targets under the provincial Growth Plan. The initial population assumptions for the settlement plan are as follows: 1. Existing serviced areas unit counts of existing units, includes: a. Riverland Area 1 Subdivision (475 units) b. Hopewell Heights Area 1 Subdivision (475 units) c. Elroy Acres residential development (210 units) d. Village Main Street (90 units) 2. Non-residential facilities to be serviced: a. Breslau Public School (4.028 ha) b. Breslau Mennonite Church (2.637 ha) 3. Greenfield Developments a. Greenfield developments must achieve provincial growth target densities of 55 persons per hectare. This will apply to: i. Neighbourhood 1 ii. Neighbourhood 2 iii. Employment Land 1 and 2 4. Commercial and Industrial Land Uses a. Flows for commercial and industrial land use designations are estimated using Region sanitary design criteria from the Area Municipal Design Project No Page 14
18 Guidelines and Supplemental Specifications for Municipal Services (DGSSMS). These land use designations from the Settlement Plan include: 5. Infill development i. South Breslau Industrial Lands ii. Commercial/Retail a. Medium Density, High Density, Mixed Use and Commercial Land uses are proposed in the area of the Victoria Street North and Woolwich Street South intersection. These land uses would be considered intensification as they fall within the built boundary of the Settlement Plan. The intensification of these areas is not assured and any intensification would occur incrementally over the long term, behind the rate of Greenfield growth anticipated in Breslau. There are no provincially required intensification targets for these land use designations. As there are no growth targets for infill areas, and the anticipated intensification rate is very slow, no population growth is provided for infill lands. Additional capacity within the system after the other areas are serviced can be allocated to infill development. Results: Full buildout of the Settlement Plan under the Approach 1 framework results in a peak flow of 287 L/s (refer to Appendix A), exceeding the Victoria Street SPS capacity of 189 L/s. Approach 2: Eliminate Servicing Allocation to Industrial and Infill Land Uses A large source of sanitary flows in Approach 1 are generated by infill development and the South Breslau Industrial Area. The existing industrial area uses private services. Using the methodology of the DGSSMS the future industrial peak flows are estimated at 68 L/s, or 35% of the ultimate capacity of the Victoria Street SPS, and 70% of the newly available capacity. Servicing this area would come at the expense of limiting greenfield and infill development of the Settlement Plan. 1. Infill and Industrial Land Use - no allocation Results: Removing servicing allocation to the South Breslau Industrial Lands and the infill land use designations in existing Breslau results in a peak flow of 194 L/s, exceeding the VSPS capacity of 189 L/s (refer to Appendix A). Under this scenario Greenfield Neighbourhoods 1 and 2 can achieve the density target of 55 persons and jobs per hectare. However, there is no remaining allocation capacity for infill, commercial or industrial development. Project No Page 15
19 This approach demonstrates that there is no single challenge to servicing the targets of the growth plan. Allocation can be distributed throughout the Settlement Plan, with consideration that the total allocation must fall within the limits of the VSPS capacity. Approach 3: Determine a Maximum Residential Population to be Serviced Based on the above results, an approach is required that determines a serviceable population for the Settlement Plan based on the available capacity of the VSPS. The following methodology was used to determine a Settlement Plan Allocation Population: 1. The design peak flow from the existing Breslau settlement was calculated using the original CBSA allocation, including areas not currently connected to municipal services, and the updated sanitary design criteria of 305 L/c/d. The result is an existing design peak flow of 80.0 L/s from the Breslau Settlement area to the VSPS. The existing areas and populations are shown on the Servicing Alternative 3 design sheet in Appendix 3 for each sub-trunk. 2. The peak capacity of the VSPS (after required capital upgrades) available to Woolwich for the Breslau Settlement Plan is 189 L/s. This results in 109 L/s of available peak flow to be allocated to development for the Village of Breslau Settlement Plan. 3. An entry for the Settlement Plan Allocation Population has been added to the Servicing Alternative 3 design sheet to determine a residential population, that when added to the existing Breslau population, will produce a design peak flow of 189 L/s. 4. An inflow and infiltration (I&I) component for this development is factored into the flow calculation. Assuming the provincial density target of 55 p/ha will be achieved for new development, the area required is calculated from the allocation population. The I&I flow component is calculated from this area. 5. The result is a Settlement Plan allocation population of 9130 people. 109 L/s of peak flow capacity represents an allocation for residential population growth of 9130 people (refer to Appendix A). This number represents the maximum allocation expressed in the form of residential development, with no other institutional, commercial or industrial (ICI) allocation provided. 6. This population can be distributed throughout the settlement plan and represents the maximum available capacity of the VSPS for residential development in the Breslau Settlement Plan. Project No Page 16
20 3.7 Conclusions - Sanitary Servicing Approach 3, providing the sanitary allocation capacity for the Breslau Settlement Area as a residential population is the preferred option due to the previous and pending CBSA methodology. The established population growth for the Settlement Plan is as follows: For residential growth within Breslau, all new development shall conform with the General Staging Objectives of Chapter of this Plan. In addition, the following population growth is established for any new greenfield development within the Breslau Settlement Area: i. Between 2017 and new residents/300 new dwelling units; ii. Between 2020 and new residents/300 new dwelling units; iii. Between 2023 and new residents/300 new dwelling units; iv. Between 2026 and new residents/300 new dwelling units; v. Between 2029 and new residents/85 new dwelling units. The growth results in an increase in population of 3,550 people, in 1285 new dwelling units. The increased allocation available from Kitchener of the VSPS will allow for residential population growth within Breslau of 9,130 people, exceeding the growth totals. The proposed settlement plan can be serviced by the additional sanitary servicing capacity available from the City of Kitchener through the VSPS. Capital upgrades to the VSPS and BSPS will be required to achieve the required sanitary servicing capacity for the Settlement Plan. The existing Breslau sanitary sub-trunk servicing network will need to be reviewed by each development application in order to determine if there is enough capacity in the downstream system to service the proposed development, or if capital upgrades are required. Project No Page 17
21 4.0 WATER SUPPLY AND DISTRIBUTION 4.1 Existing Water Distribution The Region of Waterloo has jurisdiction over the potable drinking water supply for homes and businesses throughout the Region. Water servicing in the Region is based on a twotier approach. The Region is responsible for water treatment, storage, pumping and the larger water distribution mains. The Township of Woolwich is responsible for the smaller distribution mains and for the service connections. The settlement of Breslau is supplied with municipal water through a distribution system which sources water west of the Grand River. The existing water infrastructure within the Secondary Plan area includes: a 300 mm diameter PVC watermain along Victoria Street (connects to the City of Kitchener water main at Shirley Drive a 300 mm diameter PVC watermain on Woolwich Street North a 300 mm diameter PVC watermain on Woolwich Street South (from Elroy Road to unopened Ottawa Street road allowance) a 400 mm diameter PVC watermain on Woolwich Street South (from unopened Ottawa Street road allowance to Region of Waterloo International Airport) a 450 mm diameter watermain along the unopened Ottawa Street road allowance a 300 mm diameter PVC watermain from the unopened Ottawa Street road allowance, through the Riverland subdivision local watermains within the Hopewell Heights and Riverland subdivisions The 300 mm diameter trunk watermain crosses Grand River at Victoria Street and traverses easterly through the Hopewell Heights Subdivision and terminates on Townsend Road west of Hopewell Creek. This watermain feed is an extension of the Kitchener Zone 4 pressure system. The Village of Breslau is also serviced from Kitchener by a second watermain feed from a crossing of the Grand River at the unopened Ottawa Street road allowance. The 450 mm diameter Ottawa Street trunk watermain extends across the Grand River to Woolwich Street South and currently provides the primary water feed for the Riverland Subdivision and for residences and businesses along Woolwich Street South and southerly to the Region of Waterloo International Airport. This trunk watermain is an extension of the Kitchener Zone 4 pressure zone area with an existing pressure reducing valve (PRV) on the west side of Grand River. This PRV is set to lower the top water level (TWL) to provide a maximum hydraulic grade line of 365 m. The Region of Waterloo s Tri-City Water Distribution Master Plan noted the following about water demands in the Kitchener Zone 4 area: Kit 4 Breslau North, The area is an extension of Kitchener Zone 4 and is currently serviced through a single main extending from Victoria Street. Once the village is fully developed, fire demand conditions will increase In the interim, moderate fire flow conditions in the order of L/s should Project No Page 18
22 be considered In order to deal with larger fire forces in the future, considerations should be given to the relocation of the existing Breslau S PRV to the eastside of the Grand River 4.2 Water System Optimization for the Breslau Secondary Plan Area The Region of Waterloo retained WSP Canada Inc. to complete a series of four Technical Memoranda (TM) regarding Water System Optimization for the Breslau Secondary Plan Area (SPA). The four TM s represent a process to arrive at a preferred water supply recommendation for the Breslau (SPA). The technical memoranda were prepared as follows: TM1: Review of Background Materials TM2: Domestic Water Quality and Fire Flow Demands Review minimum acceptable standards for fire protection for calculating fire flows to determine water main sizes versus the associated impacts on water quality in the delivery of potable water for domestic use. TM3: Water Supply Alternatives Develop a comprehensive set of alternatives and an evaluation framework to ensure the future works are as economical and efficient as possible. TM4: Preferred Water Supply Alternative Summary of model results and ranking of two scenarios and seven alternatives to provide a recommendation for the preferred water supply alternative. Technical Memos 1 and 2 established the existing conditions of the Breslau water distribution and set the design criteria for modelling an optimized water distribution system. Technical Memo 3 developed and refined a set of alternatives to be reviewed in consultation with the Township of Woolwich and the Region of Waterloo. First, two fundamental alternatives were considered to determine the feasibility of a single East Side pressure zone to deliver the required level of service during normal and emergency water demand conditions. Scenario A: Single East Side Lands pressure zone at HGL 365 m Scenario B: Breslau north pressure zone (HGL 380 m) separate from and East Side pressure zone (HGL 365 m) to the south Project No Page 19
23 For each scenario seven alternatives were considered in the modelling: 1. Valve between Breslau South to North. Located in Woolwich Street South, this normally closed valve in a small chamber will provide an additional supply point during a fire, if the Breslau North HGL drops below Breslau South. 2. Fountain Street Supply Main and Valve from Breslau South to North. Similar to 1 above. 3. Distribution Looping in Central Breslau. The additional mains will improve supply redundancy, looping and decrease water age at existing dead-ends. 4. Third Supply Main and Valve to lands east of Hopewell Creek. 5. Distribution Looping in West Breslau. The additional main will improve supply redundancy, looping and decrease water age at an existing dead-end. 6. Dolman Street extension (from Woolwich to Fountain) to improve looping. 7. Combination of Alternatives 1, 2, 4 and 6 Technical Memo 4 summarized and ranked the results of the modelling for each scenario and alternative. The results tables and maps show that the single-zone Scenario A and Alternative 7 deliver the best service levels as well as supply reliability for the entire Breslau SPA, without adverse effects to existing areas in the broader Eastside pressure zone. Alternative 7 closes the largest number of large-scale loops and eliminates the most small-diameter dead-ends, improving water circulation and quality as well as fire flows throughout. A copy of the preferred water servicing Alternative 7 Scenario A maps are included in Appendix B. Refer to WSP Technical Memos 1 to 4 for a full description of the process, and maps of the various water servicing scenarios and alternatives (WSP, 2015). 4.3 Hopewell Creek Extension of Services Class Environmental Assessment The Township of Woolwich has undertaken a Class B Environmental Assessment (EA) Study for selecting the preferred corridors for the future extension of water and sewage services across Hopewell Creek to service lands on the east side of the creek within the Breslau Settlement Area. The preferred water servicing concept includes a double crossing of Hopewell Creek at one location and tying into the existing 300 mm diameter watermain at Townsend Drive and/or Maplecrest Drive. Project No Page 20
24 5.0 UTILITY CONSIDERATIONS Waterloo North Hydro, Bell Canada, Rogers Cable and Union Gas have existing plant in the surrounding area. Confirmation of adequate capacity for the proposed development will be sought from each of the Utilities. The extent of system improvements, if any, will be determined upon completion of feasibility studies by each of the Utilities once detailed loading information is available. Utility servicing of the study area will be designed and constructed in accordance with the Region of Waterloo and Area Municipalities Design Guidelines and Supplemental Specifications for Municipal Services (January 2015) or the most current version. Project No Page 21
25 DRAINAGE TO CHILLIGO CREEK DRAINAGE TO HOPEWELL CREEK GREENHOUSE RD. DRAINAGE TO HOPEWELL CREEK DRAINAGE TO THE GRAND RIVER SPITZIG RD. KRAMP RD. EBYCREST RD. VICTORIA ST. N. WOOLWICH ST. N. FOUNTAIN ST. N. DRAINAGE TO RANDALL DRAIN DRAINAGE TO HOPEWELL CREEK RANDALL DRAIN DRAINAGE TO CHILLIGO CREEK DRAINAGE TO RANDALL DRAIN HOPEWELL CREEK METROLINX RAIL LINE DRAINAGE TO HOPEWELL CREEK DRAINAGE TO BRESLAU DRAIN WOOLWICH ST. S. GRAND RIVER MENNO ST. BRESLAU DRAIN FOUNTAIN ST. N. LEGEND: SETTLEMENT PLAN BOUNDARY CENTRELINE OF WATERCOURSE EXISTING SWM FACILITY NATURAL HERITAGE SYSTEM EXISTING SUBCATCHMENT BOUNDARY TOWNSHIP OF WOOLWICH 30 CENTURIAN DRIVE, SUITE 100 MARKHAM, ONTARIO L3R 8B8 TEL: (905) FAX: (905) BRESLAU SETTLEMENT PLAN DESIGNED BY: CAD SCALE: 1:15000 DATE: CHECKED BY: S.E.K. NOVEMBER 2015 EXISTING STORM DRAINAGE PLAN PROJECT No: 1463 FIGURE No: 2.1
26
27
28 APPENDIX A SANITARY SERVICING ALTERNATIVES
29 Breslau Settlement Plan - Sanitary Servicing Servicing Alternative 1 55 persons per hectare density target for greenfield development Region sanitary design criterial applied to Commercial and Industrial Land Uses Residual Capacity to be allocated to Infill Development 1463 Contributor Area (ha) Secondary Plan Areas Population by Land Use Residential School Commercial Industrial Inflow and Infiltration Total Road Area Sanitary Area Density Area # Units PPU Population Cumulative Population Peaking Factor Peak Flow Unit persons/ha (ha) Harmon (ha) (ha) 0.15 Rate L/c/d L/c/d (ha) L/s/ha L/s/ha (ha) L/s/ha L/s/ha L/s/ha L/s/ha L/s/ha Average Daily Flow Area Peak Flow Average Daily Flow Area Peak Flow Average Daily Flow Area Peak Flow Average Daily Flow Area I&I Peak Flow Average Daily Flow Riverland External Sub-Trunk Village Residential - Elroy Acres Low/Med Density Residential Med/High Density Residential Commercial/Mixed Use Institutional - Breslau Mennonite Church South Breslau Industrial Land South Breslau Industrial Land (Restricted) Riverland Sub-Trunk Low/Med Density Residential Institutional - Breslau Public School Hopewell Heights External Sub-Trunk Low/Med Density Residential Med/High Density Residential Commercial/Mixed Use Employment Lands I Employment Lands II GO Station Hopewell Heights Sub-Trunk Low/Med Density Residential Commercial/Business Park Ebycrest Road Sub-trunk Village Residential Med/High Density Residential Commercial/Retail Woolwich St. North Sub-trunk Village Residential Commercial/Mixed Use Woolwich St. South Sub-trunk Village Residential Low/Med Density Residential Commercial/Mixed Use Victoria St. Sub-Trunk Commercial/Mixed Use Totals Natural Heritage System - Environmental Protection Parks + Open Space ROWs + Miscellaneous Inefficiencies Total Land Area Totals SCS Consulting Group Ltd 09/12/2015 P:\1463 Breslau Secondary Plan\Design\Pipe Design\Sanitary\ (Dec) 07- Settlement Plan Sanitary Servicing Alternatives.xlsx Servicing Alternative 1
30 Breslau Settlement Plan - Sanitary Servicing Servicing Alternative 2 55 persons per hectare density target for greenfield development Residual Capacity to be allocated to Commercial and Industrial Land Uses Residual Capacity to be allocated to Infill Development 1463 Contributor Area (ha) Secondary Plan Areas Population by Land Use Residential School Commercial Industrial Inflow and Infiltration Total Road Area Sanitary Area Density Area # Units PPU Population Cumulative Population Peaking Factor Peak Flow Unit persons/ha (ha) Harmon (ha) (ha) 0.15 Rate L/c/d L/c/d (ha) L/s/ha L/s/ha (ha) L/s/ha L/s/ha L/s/ha L/s/ha L/s/ha Average Daily Flow Area Peak Flow Average Daily Flow Area Peak Flow Average Daily Flow Area Peak Flow Average Daily Flow Area I&I Peak Flow Average Daily Flow Riverland External Sub-Trunk Village Residential - Elroy Acres Low/Med Density Residential Med/High Density Residential Commercial/Mixed Use Institutional - Breslau Mennonite Church South Breslau Industrial Land South Breslau Industrial Land (Restricted) Riverland Sub-Trunk Low/Med Density Residential Institutional - Breslau Public School Hopewell Heights External Sub-Trunk Low/Med Density Residential Med/High Density Residential Commercial/Mixed Use Employment Lands I Employment Lands II GO Station Hopewell Heights Sub-Trunk Low/Med Density Residential Commercial/Business Park Ebycrest Road Sub-trunk Village Residential Med/High Density Residential Commercial/Retail Woolwich St. North Sub-trunk Village Residential Commercial/Mixed Use Woolwich St. South Sub-trunk Village Residential Low/Med Density Residential Commercial/Mixed Use Victoria St. Sub-Trunk Commercial/Mixed Use Totals Natural Heritage System - Environmental Protection Parks + Open Space ROWs + Miscellaneous Inefficiencies Total Land Area Totals SCS Consulting Group Ltd 09/12/2015 P:\1463 Breslau Secondary Plan\Design\Pipe Design\Sanitary\ (Dec) 07- Settlement Plan Sanitary Servicing Alternatives.xlsx Servicing Alternative 2
31 Breslau Settlement Plan - Sanitary Servicing Servicing Alternative 3 Existing Servicing Allocation per Cross Border Servicing Agreement Residual Capacity to be allocated to Greenfield, Infill, Commercial and Industrial Development Residual Servicing Capacity as Residential Population 1463 Contributor Area (ha) Secondary Plan Areas Population by Land Use Residential School Commercial Industrial Inflow and Infiltration Total Road Area Sanitary Area Density Area # Units PPU Population Cumulative Population Peaking Factor Peak Flow Unit persons/ha (ha) Harmon (ha) (ha) 0.15 Rate L/c/d L/c/d (ha) L/s/ha L/s/ha (ha) L/s/ha L/s/ha L/s/ha L/s/ha L/s/ha Average Daily Flow Area Peak Flow Average Daily Flow Area Peak Flow Average Daily Flow Area Peak Flow Average Daily Flow Area I&I Peak Flow Average Daily Flow Riverland External Sub-Trunk Village Residential - Elroy Acres Low/Med Density Residential Med/High Density Residential Commercial/Mixed Use Institutional - Breslau Mennonite Church South Breslau Industrial Land South Breslau Industrial Land (Restricted) Riverland Sub-Trunk Low/Med Density Residential Institutional - Breslau Public School Hopewell Heights External Sub-Trunk Low/Med Density Residential Med/High Density Residential Commercial/Mixed Use Employment Lands I Employment Lands II GO Station Hopewell Heights Sub-Trunk Low/Med Density Residential Commercial/Business Park Ebycrest Road Sub-trunk Village Residential Med/High Density Residential Commercial/Retail Woolwich St. North Sub-trunk Village Residential Commercial/Mixed Use Woolwich St. South Sub-trunk Village Residential Low/Med Density Residential Commercial/Mixed Use Victoria St. Sub-Trunk Commercial/Mixed Use Settlement Plan Allocation Population Low/Med Density Residential Natural Heritage System - Environmental Protection Parks + Open Space ROWs + Miscellaneous Inefficiencies Total Land Area Totals SCS Consulting Group Ltd 21/12/2015 P:\1463 Breslau Secondary Plan\Design\Pipe Design\Sanitary\ (Dec) 07- Settlement Plan Sanitary Servicing Alternatives.xlsx Servicing Alternative 3
32 APPENDIX B RECOMMENDED WATER SERVICING ALTERNATIVE MAPS
33 Ottawa St Victoria St N / HWY 7 Otterbein Rd A > M > M East Side Lands A HWY 17 Victoria St N / HWY 7 Woolwich St S Dolman St Maders Ln 2 6 Fountain St N 2 4 Kramp Collector Menno St Victoria St N / HWY 7 Kramp Rd ¹ Legend Pressure Zone Breslau North Breslau South Bridgeport Cam 1 Cam 2e Cam 2w East Side Kit 2e Kit 2ea Kit 4 Kit 4a Wat 4 Landuse (Breslau Secondary Plan) 1-Village Residential 2-Low/Medium Density Residential 3-Medium/High Density Residential 4-Commercial/Mixed Use 5-Commercial/Business Park 6-Commercial/Retail 7-Institutional (Incl. ES-Elementary School Site) 8-Employment Lands I 9-Employment Lands II 10-South Breslau Industrial Land 11-South Breslau Industrial Land (Restricted Area) 12-Go Station 13-Environmental Protection 14-Park/Open Space Alternatives 1 Woolwich Supply & Valve (Length = 352 m) 2 Fountain Supply & Valve (Length = 1183 m) 3 Central Breslau Loop (Length = 1256 m) 4 Kramp Collector Supply & Valve (Length = 690 m) 5 Andover Loop (Length = 694 m) 6 Dolman St Loop (Length = 737 m) Existing Main (2031) Planned Future Main Future Main (Potential) Railroads Waterbody M ^ > M > M > M > M Project No June 2015 Breslau Secondary Plan Woolwich St S ,000 m 1:20,000 Map 2 Breslau Alternatives S:\MA\14\ Breslau WMA Waterloo\3_TECH\3-8_Reports\TM3=Alternatives\Figures\Map2-Breslau_Alt.mxd Area 1
34 Menno St Victoria St N / HWY 7 East Side Lands A 3 1 HWY 17 Victoria St N / HWY 7 Dolman St Maders Ln 2 6 Fountain St N 2 4 Kramp Collector Victoria St N / HWY 7 Kramp Rd ¹ Legend Maximum Pressure (psi) < 40 < 80 < 100 >= 100 Pipe Diameter (mm) less than ,050 Landuse (Breslau Secondary Plan) 1-Village Residential 2-Low/Medium Density Residential 3-Medium/High Density Residential 4-Commercial/Mixed Use 5-Commercial/Business Park 6-Commercial/Retail 7-Institutional (Incl. ES-Elementary School Site) 8-Employment Lands I 9-Employment Lands II 10-South Breslau Industrial Land 11-South Breslau Industrial Land (Restricted Area) 12-Go Station 13-Environmental Protection 14-Park/Open Space Otterbein Rd Woolwich St S A Ottawa St > M > M M ^ > M > M > M > M Project No October 2015 Breslau Secondary Plan - Maximum Pressure Woolwich St S ,000 m 1:20,000 Map 3 Scenario: A7, 2031 MDD S:\MA\14\ Breslau WMA Waterloo\3_TECH\3-8_Reports\TM4=Solution\Maps\Map3-Breslau_MaxPres_Dia_A7.mxd Area 1
35 Menno St Victoria St N / HWY 7 East Side Lands A 3 1 HWY 17 Victoria St N / HWY 7 Dolman St Maders Ln 2 6 Fountain St N 2 4 Kramp Collector Victoria St N / HWY 7 Kramp Rd ¹ Legend Minimum Pressure (psi) < 40 < 80 < 100 >= 100 Pipe Diameter (mm) less than ,050 Landuse (Breslau Secondary Plan) 1-Village Residential 2-Low/Medium Density Residential 3-Medium/High Density Residential 4-Commercial/Mixed Use 5-Commercial/Business Park 6-Commercial/Retail 7-Institutional (Incl. ES-Elementary School Site) 8-Employment Lands I 9-Employment Lands II 10-South Breslau Industrial Land 11-South Breslau Industrial Land (Restricted Area) 12-Go Station 13-Environmental Protection 14-Park/Open Space Otterbein Rd Woolwich St S A Ottawa St > M > M M ^ > M > M > M > M Project No October 2015 Breslau Secondary Plan - Minimum Pressure Woolwich St S ,000 m 1:20,000 Map 4 Scenario: A7, 2031 MDD S:\MA\14\ Breslau WMA Waterloo\3_TECH\3-8_Reports\TM4=Solution\Maps\Map4-Breslau_MinPres_Dia_A7.mxd Area 1
36 Menno St Victoria St N / HWY 7 East Side Lands A 3 1 HWY 17 Victoria St N / HWY 7 Dolman St Maders Ln 2 6 Fountain St N 2 4 Kramp Collector Victoria St N / HWY 7 Kramp Rd ¹ Legend Available Fire Flow < 100 < 133 < 150 < 250 >= 250 Pipe Diameter (mm) less than ,050 Landuse (Breslau Secondary Plan) 1-Village Residential 2-Low/Medium Density Residential 3-Medium/High Density Residential 4-Commercial/Mixed Use 5-Commercial/Business Park 6-Commercial/Retail 7-Institutional (Incl. ES-Elementary School Site) 8-Employment Lands I 9-Employment Lands II 10-South Breslau Industrial Land 11-South Breslau Industrial Land (Restricted Area) 12-Go Station 13-Environmental Protection 14-Park/Open Space Otterbein Rd Woolwich St S A Ottawa St > M > M M ^ > M > M > M > M Project No October 2015 Breslau Secondary Plan - Fire Flow Availability Woolwich St S ,000 m 1:20,000 Map 4 Scenario: A7, 2031 MDD S:\MA\14\ Breslau WMA Waterloo\3_TECH\3-8_Reports\TM4=Solution\Maps\Map4-Breslau_FF_Dia_A7.mxd Area 1
37 SCS Consulting Group Ltd 30 Centurian Drive, Suite 100 Markham, ON, L3R 8B8 Phone Fax
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.
UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT
TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN
SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO
BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO MARCH 2014 BLOCK 53 Ferris Drive Plan 58M-379 & Part of Lot 4, Registered Plan 622 WELLESLEY, ONTARIO DOCUMENT
Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission
Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission GolfNorth Properties 400 Golf Course Road Conestoga, ON N0B1N0 R.J. Burnside & Associates Limited 6990 Creditview
89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto
89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit
LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT
Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
Stormwater Management Functional Servicing Report
Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015
Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161
Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
Class Environmental Assessment Schedule B Project File Report
R.J. Burnside & Associates Limited 16775 Yonge Street Suite 200 Newmarket ON L3Y 8J4 Canada telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnside.com Class Environmental Assessment Schedule B
Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18
Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall
Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and
Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background
TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT
TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT April 1, 2015 B. M. ROSS AND ASSOCIATES
BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT
Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...
APPENDIX 9 INFRASTRUCTURE SERVICING REPORT
APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project
4. Environmental Impacts Assessment and Remediation Targets
4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are
Action plans for hotspot locations - Ash Study
Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side
STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace
STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace City of Toronto Toronto & North York District Prepared For: Oxford Properties Group 130 Adelaide Street
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
CHAPTER 2 HYDRAULICS OF SEWERS
CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination
STAFF REPORT TO COMMITTEE OF THE WHOLE
STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None
Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans
APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may
City of Valdosta Land Development Regulations. Table of Contents
TITLE 1 ADMINISTRATION Chapter 102 General Provisions 102-1 Title 102-2 Purpose 102-3 Authority 102-4 Jurisdiction 102-5 Application of Ordinance 102-6 Relationship to Existing Ordinances 102-7 Powers
Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division
PW8.5 STAFF REPORT ACTION REQUIRED Contract Award Request for Proposal No. 9117-15-7122 Engineering Services for the Detailed Design, Services During Construction, and Post-Construction Services for an
SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM
SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental
Drainage Analysis for the McKownville Area
Drainage Analysis for the McKownville Area Town of Guilderland Albany County, New York Prepared by: DELAWARE ENGINEERING, P.C. 28 Madison Avenue Extension Albany, New York 12203 June 2010 Town of Guilderland
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
Parkhill Road Sewage Pumping Station Class EA Study
Parkhill Road Sewage Pumping Station Class EA Study Public Information Centre October 4, 2011 6:30 pm 8:30 pm Westmount Public School DRAWING ON EXPERIENCE BUILDING ON STRENGTH Sewage Pumping Station (SPS)
Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.
Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that
Functional Servicing and Storm Water Management Report. Project Location: 258 Sunview Street Waterloo, Ontario
258 SUNVIEW STREET Functional Servicing and Storm Water Management Report Project Location: 258 Sunview Street Waterloo, Ontario Prepared for: 258 Sunview Inc. 815 Bridge Street West Waterloo, ON N2V 2M7
Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems
STAFF REPORT ACTION REQUIRED Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems Date: September 6, 2013 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness
3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component
PART 5 : WASTEWATER DRAINAGE
Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction
BALLANTRAE-MUSSELMAN LAKE SERVICING REPORT. Submitted to: The Town of Whitchurch-Stouffville. Submitted by:
BALLANTRAE-MUSSELMAN LAKE SERVICING REPORT Submitted to: The Town of Whitchurch-Stouffville Submitted by: AMEC Environment & Infrastructure 3215 North Service Road Burlington, ON L7N 3G2 Tel: 905-335-2353
APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR
APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM Stadium Reconstruction EIR Appendices \ AECOM Technical Services, Inc 401 West A Street Suite 1200 San Diego, CA 92101 www.aecom.com 619-610-7600 tel 619-610-7601
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
629, 633 and 675 Eastern Avenue City of Toronto Toronto & East York District. Functional Servicing and Stormwater Management Report June 2013 13029
629, 633 and 675 Eastern Avenue City of Toronto Toronto & East York District Functional Servicing and Stormwater Management Report June 2013 13029 Executive Summary This Functional Servicing and Stormwater
5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-
Vital Earth Composting Facility Flood Risk and Drainage Statement
Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by
CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,
URBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
Melbourne Water. Principles for Provision of Waterway and Drainage Services for Urban Growth
Melbourne Water Principles for Provision of Waterway and Drainage Services for Urban Growth Contents About Melbourne Water 3 Principles for Creating Development Services Schemes 4 Preface 4 (Original)
8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:
. Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared
SECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
CHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Sanitary Sewer Design Criteria REVISED July 2009 PUBLIC WORKS SANITARY SEWER DESIGN CRITERIA TABLE OF CONTENTS
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate
2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate Toronto City Council February 1 5, 2007 Multi-Year Toronto Water Business Plan was approved by Council February
WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT CONSOLIDATED REPORT AND ACTION PLAN
Background WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT MARCH 2011 TABLE OF CONTENT Summary Report 1. Background 2. Flood Investigation Process 3. Public Input 4. Level of Service Objective
CHAN & PARTNERS ENGINEERING, LLC
July 2012 CHAN & PARTNERS ENGINEERING, LLC Consulting Civil Engineers Imagine Austin Comprehensive Plan Infrastructure, Operations, Maintenance & Service Cost Comparison Preferred Growth Scenario and Trend
Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.
Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
Growth Management in the City of Brampton
Growth Management in the City of Brampton Brampton introduced its Growth Management Program in 2003 to respond to the opportunities and challenges arising from rapid population and employment growth in
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS
ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE
THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330
THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 REVIEW NOTES by CHUCK DUNN CHAPTER 10 Copyright 2010 by the Real Estate Division and Chuck Dunn. All rights reserved ARE 3 rd EDITION REVIEW
USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON
22nd Canadian Hydrotechnical Conference 22e Conférence canadienne d hydrotechnique Water for Sustainable Development : Coping with Climate and Environmental Changes L eau pour le développement durable:
Maymorn Structure Plan: Infrastructure Costs Estimate
Report Maymorn Structure Plan: Infrastructure Costs Estimate Prepared for Upper Hutt City Council (Client) By Beca Carter Hollings & Ferner Ltd (Beca) 22 June 2010 Beca 2012 (unless Beca has expressly
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended
Sewage Service in Watershed
Sewage Service in Watershed Sewage service in Taylor Creek watershed is complex and changing. Many sewage treatment options are available. Depending on location and owner preference, a site may send its
CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS
CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS 62-624.100 Policy and Purpose. 62-624.200 Definitions. 62-624.300 General Provisions. 62-624.310 General Conditions, Individual Permits. 62-624.400
CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS
June 27, 2011 Chapter 9 Storm Drainage Design and Stormwater Quality Regulations Table of Contents CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS Table of Contents Chapter 9 Storm Drainage
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
Technical and Engineering Guidelines for Stormwater Management Submissions
Technical and Engineering Guidelines for Stormwater Management Submissions Prepared By: Ganaraska Region Conservation Authority This page is intentionally left blank CONTENTS PAGE 1 Introduction 1 1.1
REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM
J Wokking foh y or REPORT Meeting Date: November 28,2013 Regional Council DATE: October 22,201 3 REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING
CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM
CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM SECTION 3.1 INTRODUCTION... 1 (a) Objectives...1 (b) Applicability...1 (c) Drafting
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
STORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
CHAPTER 6. RURAL LAND USE POLICY Modification No. 8
CHAPTER 6 RURAL LAND USE POLICY Modification No. 8 This Plan recognizes that policies, which assure proper land utilization, are the keystone of this or any Official Plan. To reflect the responsibilities
Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow
AutoCAD Civil 3D 2008 Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow The ability to perform storm water hydrology and hydraulic (H&H) tasks is crucial to civil
MUNICIPAL ENGINEERING RESIDENTIAL SUBDIVISON STANDARDS
Infrastructure and Public Works Department Engineering Services City of Mount Pearl Telephone: (709) 748-1018 3 Centennial Street Fax: (709) 748-1150 Mount Pearl, NL E-mail: [email protected]
Designed and produced by geo-graphicsdesign.com DP 300 3/02
Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended
Summary: Introduction
Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with
City of West Linn Public Works Design Standards 2010. Table of Contents
City of West Linn Public Works Design Standards Table of Contents SECTION TWO STORM DRAIN REQUIREMENTS... 1 2.0000 STORM DRAINS... 1 2.0010 General Design Requirements...1 2.0011 Site Drainage Plans...2
In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section:
Click here to access definitions SECTION 12 FLOODPLAIN LANDS 12.1 INTERPRETATION In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes
CHAPTER 8 CIVIL DESIGN
CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical
THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:
THE CORPORATION OF THE CITY OF GUELPH By-law (1993)-14515 A by-law respecting storm water disposal from private property in the City of Guelph, to amend By-law (1987)-12602 and to adopt Municipal Code
Floodplain Development Land Use Review
COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review
URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT
URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT Contacts: Barry Chilibeck (666-3765) or Megan Sterling (666-2322) Revision 4